HomeMy WebLinkAbout25-176.00CameronReillyLLCBalfourParkSculptureInstallationContract No. 25-176 CONSTRUCTION AGREEMENT Cameron Reilly, LLC THIS CONSTRUCTION AGREEMENT (the "Agreement") is made by and between the City of Spokane Valley, a code City of the State of Washington ("City") and Cameron Reilly, LLC ("Contractor") jointly referred to as the "Parties". IN CONSIDERATION of the terms and conditions contained herein the Parties agree as follows: 1. Work to Be Performed. Contractor shall do all work and furnish all labor, supervision, tools, materials, supplies, and equipment and other items necessary for the construction and completion of the Balfour Park Sculpture Installation project (the "Work") in accordance with the Scope of Work outlined in Exhibit A and in accordance with this Agreement (which are by this reference incorporated herein and made part hereof and referred to as the "Contract Documents"), and shall perform any changes in the work in accordance with the Contract Documents. The terms and provisions in this Agreement shall control over any inconsistent or incompatible terms in any other Contract Document. Contractor shall, for the amount set forth in paragraph 4, below, assume and be responsible for the cost and expense of all work required for constructing and completing the Work and related activities to the City's satisfaction, provided for in the Contract Documents, within the time limits prescribed in the Contract Documents. The City Manager or designee shall administer and be the primary contact for Contractor. Upon notice from City, Contractor shall promptly commence work, complete the same in a timely manner, and cure any failure in performance under this Agreement. Unless otherwise directed by City, all work shall be performed in conformance with the Contract Documents, and all City, state, and federal standards, codes, ordinances, regulations, and laws as now existing or as may be adopted or amended. 2. Time for Performance. Contractor shall commence the Work within 10 days of receipt of a notice to proceed and shall complete the Work within the times specified in the Contract Documents, as may be extended in accordance with this Agreement and the Contract Documents. 3. Liquidated Damages. Time is of the essence for this Agreement. Delays cause inconvenience to the residents of City and cost taxpayers undue sums of money, adding time needed for administration, engineering, inspection, and supervision. It is impractical for City to calculate the actual cost of delays. Accordingly, Contractor agrees to pay liquidated damages for failure to achieve Substantial Completion (as defined in the Contract Documents) which shall be in the amount of $500.00 per day. These liquidated damages are not a penalty, but are fixed and agreed upon by and between Contractor and City because of the impracticability and difficulty of fixing and ascertaining the actual damages that City would sustain in the event that the Work is not completed in accordance with the Contract Documents. Liquidated damages may be retained by City and deducted from payments otherwise due to the Contractor. 4. Compensation. In consideration of Contractor performing the Work, City agrees to pay Contractor in accordance with the Contract Documents the sum of $77,655.00, plus Washington State Sales Tax of $6,911.30, for a total of $84,566.30, based on the bid submitted by Contractor (Exhibit B), and as may be adjusted in accordance with the Contract Documents. Balfour Park Sculpture Installation-CR Agreement Page 1 of 9 5.Payment. Contractor may elect to be paid in monthly installments,upon presentation of an application for payment in a form satisfactory to City. Applications for payment shall be sent to the City Finance Department at the address stated in paragraph 6. Pursuant to chapter 60.28 RCW,five percent of the compensation due Contractor shall be retained by City. City reserves the right to withhold payment under this Agreement for that portion of the work(if any)which is determined in the reasonable judgment of the City Manager or designee to be noncompliant with the Contract Documents,City standards,City Code,state standards,or federal standards. 6.Notice. Notice other than applications for payment shall be given in writing as follows: TO THE CITY: TO THE CONTRACTOR: Name:Marci Patterson,City Clerk Name:Lisa Kinder,Operations Manager Phone:(509)720-5000 Phone:(509)466-5555 x109 Address: 10210 East Sprague Avenue Address: 309 N Park Road Spokane Valley,WA 99206 Spokane Valley,WA 99212 7. Applicable Laws and Standards. The Parties, in the performance of this Agreement,agree to comply with all applicable federal,state, and local laws,codes,and regulations. 8. Certification ReQardinQ Debarment, Suspension,and Other Responsibility Matters — Primary Covered Transactions. A. By executing this Agreement, the Contractor certifies to the best of its knowledge and belief, that it and its principals: 1. Are not presently debarred, suspended,proposed for debarment,declared ineligible,or voluntarily excluded from covered transactions by any federal department or agency; 2. Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (federal,state, or local) transaction or contract under a public transaction; violation of federal or state antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records,making false statements,or receiving stolen property; 3. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (federal, state, or local) with commission of any of the offenses enumerated in paragraph(A)(2)of this certification;and 4. Have not within a three-year period preceding this application/proposal had one or more public transactions(federal,state,or local)terminated for cause or default. B. Where the prospective primary participant is unable to certify to any of the statements in this certification,such prospective participant shall attach an explanation to this Agreement. 9. Prevailina Wates on Public Works. Contractor,any subcontractor,or other person doing work under this Agreement,shall comply with the requirements of chapter 39.12 RCW,and shall pay each employee an amount not less than the Prevailing Rate of Wage, as specified by the Industrial Statistician of the Balfour Park Sculpture Installation-CR Agreement Page 2 of 9 Washington State Department of Labor and Industries("L&I"). If employing labor in a class not shown, Contractor shall request a determination of the correct wage rate for the class and locality from the Industrial Statistician. Contractor shall provide a copy of any such determinations to City. Before commencing, during, and upon completion of the work, Contractor shall file all forms and pay all fees required by L&I and shall indemnify and hold City harmless from any claims related to its failure to comply with chapter 39.12 RCW. The following information is provided pursuant to RCW 39.12.030: A. State of Washington prevailing wage rates applicable to this public works project,published by L&I, are located at the L&I website address: https://lni.wa.gov/licensimt-permits/public-works-projects/prevail ing-wane-rates/ B. This Project is located in Spokane County. C. The effective prevailing wage date is the same date as the bid due date as referenced in the original request for bids and as may be revised by addenda. A copy of the applicable prevailing wage rates is also available for viewing at the City Community&Public Works Department located at 10210 East Sprague Avenue, Spokane Valley, WA 99206. Upon request, City will mail a hard copy of the applicable prevailing wages for this project. 10. Relationship of the Parties. It is understood and agreed that Contractor shall be an independent contractor and not the agent or employee of City,that City is interested only in the results to be achieved, and that the right to control the particular manner,method,and means in which the services are performed is solely within the discretion of Contractor. Any and all employees who provide services to City under this Agreement shall be deemed employees solely of Contractor. Contractor shall be solely responsible for the conduct and actions of all its employees under this Agreement and any liability that may attach thereto. 11. Ownership of Documents. All drawings,plans, specifications,and other related documents prepared by Contractor under this Agreement are and shall be the property of City,and may be subject to disclosure pursuant to chapter 42.56 RCW,or other applicable public record laws. 12.Records. The City or State Auditor or any of their representatives shall have full access to and the right to examine during normal business hours all of Contractor's records with respect to all matters covered in this Agreement. Such representatives shall be permitted to audit, examine, make excerpts or transcripts from such records, and to make audits of all contracts, invoices,materials, payrolls, and record of matters covered by this Agreement for a period of three years from the date final payment is made hereunder. 13. Warranty. Unless provided otherwise in the Contract Documents, Contractor warrants that all Work and materials performed or installed under this Agreement are free from defect or failure for a period of one year following final acceptance by City,unless a supplier or manufacturer has a warranty for a greater period, which warranty shall be assigned or transferred to City. In the event a defect or failure occurs in work or materials, Contractor shall, within the warranty period,remedy the same at no cost or expense to City. This warranty provision shall not be construed to establish a period of limitation with respect to Contractor's other obligations under this Agreement. 14.Contractor to Be Licensed and Bonded. Contractor shall be duly licensed,registered,and bonded by the State of Washington at all times this Agreement is in effect. Balfour Park Sculpture Installation-CR Agreement Page 3 of 9 15. Contractor to Provide Performance and Payment Bonds. Contractor shall provide a payment bond and a performance bond in the full amount of the Agreement on the City's bond forms. Alternatively, Contractor may elect to have the City retain 10% of the Agreement amount in lieu of providing the City with a payment bond and a performance bond,pursuant to RCW 39.08.010(3). 16. Insurance. Contractor shall procure and maintain insurance, as required in this Section, without interruption from commencement of the Contractor's work through the term of the Contract and for 30 days after the physical completion date,unless otherwise indicated herein. A. Minimum Scope of Insurance. Contractor shall obtain insurance of the types described below: 1. Automobile liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be at least as broad as Insurance Services Office(ISO) form CA 00 01. 2.Commercial general liability insurance shall be at least as broad as ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, stop gap liability, independent contractors, products-completed operations for a period of three years following substantial completion of the work for the benefit of the City, personal injury and advertising injury,and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide a per project general aggregate limit, using ISO form CG 25 03 05 09 or an endorsement providing at least as broad coverage. There shall be no exclusion for liability arising from explosion, collapse or underground property damage. The City shall be named as an additional insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO Additional Insured endorsement CG 20 10 10 01 and Additional Insured-Completed Operations endorsement CG 20 37 10 01 or substitute endorsements providing at least as broad coverage. 3. Workers' compensation coverage as required by the industrial insurance laws of the State of Washington. B. Minimum Amounts of Insurance. Contractor shall maintain the following insurance limits: 1. Automobile liability insurance with a minimum combined single limit for bodily injury and property damage of no less than$1,000,000 per accident. 2. Commercial general liability insurance shall be written with limits no less than $2,000,000 each occurrence, $2,000,000 general aggregate,and no less than a$2,000,000 products-completed operations aggregate limit. C. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions for automobile liability and commercial general liability insurance: 1. Contractor's insurance coverage shall be primary insurance with respect to City. Any insurance, self-insurance, or insurance pool coverage maintained by City shall be excess of Contractor's insurance and shall not contribute with it. 2.Contractor shall fax or send electronically in.pdf format a copy of insurer's cancellation notice within two business days of receipt by Contractor. Balfour Park Sculpture Installation-CR Agreement Page 4 of 9 3. If Contractor maintains higher insurance limits than the minimums shown above, City shall be insured for the full available limits of commercial general and excess or umbrella liability maintained by Contractor, irrespective of whether such limits maintained by Contractor are greater than those required by this Agreement or whether any certificate of insurance furnished to the City evidences limits of liability lower than those maintained by Contractor. 4. Failure on the part of Contractor to maintain the insurance as required shall constitute a material breach of this Agreement, upon which the City may, after giving at least five business days' notice to Contractor to correct the breach, immediately terminate the Agreement, or at its sole discretion, procure or renew insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to City on demand, or at the sole discretion of the City,offset against funds due Contractor from the City. D.No Limitation. The Contractor's maintenance of insurance,its scope of coverage,and limits as required herein shall not be construed to limit the liability of the Contractor to the coverage provided by such insurance,or otherwise limit the City's recourse to any remedy available at law or in equity. E.Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M.Best rating of not less than A:VII. F. Evidence of Coverage. As evidence of the insurance coverages required by this Agreement, Contractor shall furnish acceptable insurance certificates to City at the time Contractor returns the signed Agreement,which shall be Exhibit C. The certificate shall specify all of the parties who are additional insureds, and shall include applicable policy endorsements, and the deduction or retention level. Insuring companies or entities are subject to City acceptance. If requested, complete copies of insurance policies shall be provided to City. Contractor shall be financially responsible for all pertinent deductibles,self-insured retentions,and/or self-insurance. G. Failure to Maintain Insurance. Failure on the part of the Contractor to maintain the insurance as required shall constitute a material breach of contract,upon which the City may,after giving at least five business days' notice to Contractor to correct the breach, immediately terminate the Agreement or,at its discretion,procure or renew such insurance and pay any and all premiums in connection therewith,with any sums so expended to be repaid to the City on demand,or at the sole discretion of the City,offset against funds due Contractor from the City. H. Subcontractor Insurance. Contractor shall cause each and every subcontractor to provide insurance coverage that complies with all applicable requirements of Contractor-provided insurance as set forth herein, except Contractor shall have sole responsibility for determining the limits of coverage required to be obtained by subcontractors. Contractor shall ensure that the City is an additional insured on each subcontractor's Commercial General liability insurance policy using an endorsement as least as broad as ISO CG 20 10 10 01 for ongoing operations and CG 20 37 10 01 for completed operations. 17. Indemnification and Hold Harmless. Contractor shall defend, indemnify and hold the City, its officers,officials,employees and volunteers harmless from any and all claims,injuries,damages,losses or suits including attorney fees,arising out of or in connection with the performance of this Agreement,except for injuries and damages caused by the sole negligence of the City. Balfour Park Sculpture Installation-CR Agreement Page 5 of 9 However, should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City,its officers, officials, employees, and volunteers,the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance,Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 18.Waiver.No officer,employee,agent,or other individual acting on behalf of either party has the power, right,or authority to waive any of the conditions or provisions of this Agreement. No waiver in one instance shall be held to be waiver of any other subsequent breach or nonperformance. All remedies afforded in this Agreement or by law shall be taken and construed as cumulative and in addition to every other remedy provided herein or by law. Failure of either party to enforce at any time any of the provisions of this Agreement or to require at any time performance by the other party of any provision hereof shall in no way be construed to be a waiver of such provisions nor shall it affect the validity of this Agreement or any part thereof. 19. Assignment and Delegation. Neither party shall assign, transfer, or delegate any or all of the responsibilities of this Agreement or the benefits received hereunder without first obtaining the written consent of the other party. 20. Confidentiality. Contractor may, from time-to-time,receive information which is deemed by City to be confidential. Contractor shall not disclose such information without the prior express written consent of City or upon order of a Court of competent jurisdiction. 21. Disputes. All disputes arising under or related to this Agreement that cannot be resolved through informal discussion and negotiations shall be resolved by litigation filed in the Superior Court of the State of Washington for Spokane County,unless otherwise required by applicable federal or state law. 22. Costs and Attorney's Fees. The prevailing party in any litigation or arbitration arising out of this Agreement shall be entitled to its attorney's fees and costs of such litigation or arbitration(including expert witness fees). 23.Subcontractor Responsibility.As required by RCW 39.06.020,Contractor shall verify responsibility criteria for each first tier subcontractor and its subcontractors of any tier that hires other subcontractors shall verify responsibility criteria for each of its subcontractors. Verification shall include that each subcontractor, at the time of subcontract execution, meets the responsibility criteria listed in RCW 39.04.350(1) and possesses an electrical contractor license, if required by chapter 19.28 RCW, or an elevator contractor license if required by chapter 70.87 RCW. This verification requirement shall be included in every subcontract of every tier. 24.Jurisdiction and Venue.This Agreement is entered into in Spokane County,Washington. Venue shall be in Spokane County, State of Washington. 25.Entire Agreement. This Agreement constitutes the entire and complete agreement between the parties and supersedes any prior oral or written agreements. This Agreement may not be changed,modified, or altered except in writing signed by the Parties. 26.Anti-kickback. No officer or employee of City,having the power or duty to perform an official act or Balfour Park Sculpture installation-CR Agreement Page 6 of 9 action related to this Agreement, shall have or acquire any interest in this Agreement, or have solicited, accepted,or granted a present or future gift,favor,service,or other thing of value from any person with an interest in this Agreement. 27. Business Registration. Prior to commencement of Work under this Agreement, Contractor shall register with the City as a business if it has not already done so. 28. Assurance of Compliance with Applicable Federal Law. During the performance of this Agreement, the Contractor,for itself,its assignees,and successors in interest agrees as follows: A. Compliance with Regulations. Contractor shall comply with the federal laws set forth in subsection G, below ("Pertinent Non-Discrimination Authorities") relative to non-discrimination in federally-assisted programs as adopted or amended from time-to-time, which are herein incorporated by reference and made a part of this Agreement. B. Non-discrimination. Contractor,with regard to the work performed by it during this Agreement, shall not discriminate on the grounds of race,color,or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. Contractor shall not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR Part 21. C. Solicitations for Subcontracts, Including Procurements of Materials and Equipment. In all solicitations, either by competitive bidding, or negotiation made by Contractor for work to be performed under a subcontract, including procurements of materials,or leases of equipment,each potential subcontractor or supplier shall be notified by Contractor of Contractor's obligations under this Agreement and the Acts and the Regulations relative to non-discrimination on the grounds of race,color,or national origin. D. Information and Reports. Contractor shall provide all information and reports required by the Acts, the regulations, and directives issued pursuant thereto, and shall permit access to its books, records,accounts,other sources of information,and its facilities as may be determined by the City or the WSDOT to be pertinent to ascertain compliance with such Acts,regulations,and instructions. Where any information required of Contractor is in the exclusive possession of another who fails or refuses to furnish the information, Contractor shall so certify to the City or the WSDOT, as appropriate,and shall set forth what efforts it has made to obtain the information. E. Sanctions for Noncompliance. In the event of a Contractor's noncompliance with the non- discrimination provisions of this Agreement,the City will impose such contract sanctions as it or the WSDOT may determine to be appropriate,including,but not limited to: 1. Withholding payments to Contractor under the Agreement until Contractor complies; and/or 2. Cancelling,terminating,or suspending the Agreement,in whole or in part. F. Incorporation of Provisions. Contractor shall include the provisions of Section 28 of this Agreement in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts,regulations and directives issued pursuant thereto. Contractor shall take action with respect to any subcontract or procurement as the City or the WSDOT may direct as a means of enforcing such provisions, including sanctions for noncompliance. Provided, that if Balfour Park Sculpture Installation-CR Agreement Page 7 of 9 Contractor becomes involved in, or is threatened with litigation by a subcontractor or supplier because of such direction,Contractor may request that the City enter into any litigation to protect the interests of the City. In addition, Contractor may request the United States to enter into the litigation to protect the interests of the United States. G. Pertinent Non-Discrimination Authorities: During the performance of this Agreement, the Contractor agrees to comply with the following non-discrimination statutes and authorities; including but not limited to: Title VI of the Civil Rights Act of 1964(42 U.S.C. §2000d et seq.,78 stat.252),(prohibits discrimination on the basis of race,color,national origin);and 49 CFR Part 21;and 49 Part 26; The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. §4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); Federal-Aid Highway Act of 1973,(23 U.S.C. §324 et seq.),(prohibits discrimination on the basis of sex); Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. §794 et seg.), as amended, (prohibits discrimination on the basis of disability);and 49 CFR Part 27; The Age Discrimination Act of 1975, as amended, (42 U.S.C. §6101 et seq.), (prohibits discrimination on the basis of age); Airport and Airway Improvement Act of 1982, (49 U.S.C. §471, Section 47123), as amended,(prohibits discrimination based on race,creed,color,national origin,or sex); The Civil Rights Restoration Act of 1987,(PL 100-209), (Broadened the scope,coverage and applicability of Title VI of the Civil Rights Act of 1964,The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973,by expanding the definition of the terms"programs or activities"to include all of the programs or activities of the Federal- aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not); Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities,public and private transportation systems,places of public accommodation,and certain testing entities(42 U.S.C. §§12131- 12189)as implemented by Department of Transportation regulations at 49 C.F.R.parts 37 and 38; The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. §47123) (prohibits discrimination on the basis of race,color,national origin,and sex); Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures Non-discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; Balfour Park Sculpture Installation-CR Agreement Page 8 of 9 Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of Limited English proficiency(LEP). To ensure compliance with Title VI,you must take reasonable steps to ensure that LEP persons have meaningful access to your programs(70 Fed. Reg.at 74087 to 74100);and Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities(20 U.S.C.§1681 et seq.). 29. Severability. If any section,sentence,clause,or phrase of this Agreement should be held to be invalid for any reason by a court of competent jurisdiction,such invalidity shall not affect the validity of any other section,sentence,clause,or phrase of this Agreement. 30. Exhibits. Exhibits attached and incorporated into this Agreement are: A. Scope of Work B. Cost Statement C. Insurance Endorsements 4-4 The Parties have executed this Agreement this 7 day of October 2025. CITY OF SPOKANE VALLEY: Contractor: Cameron Reilly,LLC AJ Hohman,City Manager ABy: Mike R�y,President Its: Authorized Representative APPROVED AS TO FORM: Office o the City Attorney Balfour Park Sculpture Installation-CR Agreement Page 9 of 9 EXHIBIT A City of Spokane Valley Balfour Park Sculpture Installation SCOPE OF WORK This contract shall provide for all labor and equipment necessary for site preparation, including, but not limited to; clear and grub, removal of sod, relocation of existing irrigation as needed, excavation and subgrade preparation for footings and hardscape, and extension of electrical substructure for lighting. Additionally,the work will include pouring the concrete footings, installing the lighting rough-in, loading and hauling the sculpture pieces from the artist's shop located at 12202 S Hangman Valley Road,Valley Ford,WA, pouring the concrete mow curb, installing metal edging, installing and anchoring sculpture pieces, installing landscape shrubs and irrigation, installing up-lights, installing basalt column &dedication plaque(latter provided by the City), restoring sod, adjusting irrigation, and placement&compaction of subbase material, CSTC, rock mulch and stabilized gravel and all other work as shown on attached plans.All costs,fees, and permits associated with this contract shall be borne by the Contractor.This shall include a no- fee Building Permit for the sculpture installation and an electrical permit for the lighting from the WA State Department of Labor&Industries. Ir t2• .d!f ` • -ri n ' S't., i-;. ' -- \` •x 4 a "' ,..-1-.-4:0 4t. q • I _ fi 1 -� r FJ c A.1 ,I II/ �t .,' Ni' (s_ . _ — FIGURE 1:ARTIIST'S RENDERING Balfour Park Sculpture Installation Page 114 ' ". „ . '+'' , ''Y , ,- 4601 ,,_ , ;% i t s , =, pp,- //ff�}��11QQ'' .A IM. A tp y, ' 46 \ 141.7 ; ' tt �a f 3 -* i i s. ,may A' tl'7,ifl..., -'.' , lit Zits-„-7 ,:„.;I0,,.—.4. i - _ * , �4 "R.# 0 �a € _,nip-.... !�_:. € _ .�+..... p..sue 4 V¢¢¢,,,,, , - .4 f tl f x Q,. u . , 4 r `ffi '. e 'k �c. d f' A - b .y ' ,,ma 01,y ( * 73/4 ' �1 J v - Sty 1 4 If it �"Bf , f`l v, + \ sit Y7 tg�. �'K i + ) S =X , ds FIGURE 2:TALL SCULPTURE PIECE FIGURE 3:MORE SCULPTURE PIECES Parcel ID-45174.9064,Site Address: 105 N Balfour Road WORK DETAILS Plans and Details prepared by AHBL and DCI Engineers are included. All work shall be done in accordance with City of Spokane Valley Street Standards and Standard Plans. Coordination with utilities, if any,will also be included in this work. Contractor to coordinate with Spokane Valley Parks Department to remove the two easterly bollards at Sprague Avenue crosswalk for access along vehicular concrete (arc pathway and Events Plaza). Contractor to protect existing flatwork. Any damage caused by the contractor will be their responsibility repair/replace at their cost. If needed, concrete may be pumped by taking the northerly lane of Sprague,the adjacent bike lane and meandering sidewalk either east or west of STA's bus stop with appropriate traffic control plans/detour plans prepared by the contract and approved by City of Spokane Valley. The Contractor shall remove any debris,tracking,and mud from parking lot,flatwork, city streets and sidewalks at the end of each workday to ensure public safety. PERMITS Contractor to obtain a Building Permit from City of Spokane Valley utilizing the attached approved plans.There will be no fee charged for this permit. (509)921-1000. Balfour Park Sculpture Installation Page 2 I 4 Contractor to obtain an electrical permit from WA State Department of Labor&Industries for the sculpture lighting installation. Their permit fee will be paid by the contractor, and the cost shall be included in the bid proposal price. All debris shall be disposed of in a legal manner.The Contractor shall arrange to dispose of waste at no additional expense to the City of Spokane Valley. WORKING DAYS The project shall be physically completed within ***21***calendar days.Work shall commence on, or around, October 8,2025. The Contractor shall secure the site at the end of each work shift to ensure public safety. UTILITIES Existing irrigation mainline and valve will need to be relocated. Coordinate with City Parks and Recreation Department to isolate zones There is an existing j-box nearby that was installed as part of the original Balfour Park construction specifically for sculpture lighting. It contains conduit with a pull string to the electrical and lighting control panels within the park building. Coordinate with City Parks and Recreation Department for access to the electrical room in the park restroom building. The Contractor shall call the One-Call Locator Service for field locations of existing utilities prior to starting work. All exiting utilities to remain shall be protected in place as best as possible. PAYMENT "Balfour Park Sculpture Installation Project"shall be a lump sum full payment for each of the four items shown on Bid Schedule A for furnishing all tools, labor, equipment, and materials required to haul and install the public artwork and perform the associated site work as listed in the above Scope of Work and as shown on the attached plans. The fifth item on Bid Schedule A will be paid only as/if needed and only upon the written approval of the City's Project Manager. Please fill out and submit the attached Bid Proposal packet by the due date. Contractual requirements are listed below: • City Contract with the associated insurance requirements (See attached sample) • Pay Prevailing Wages • File Intents and Affidavits • Provide Payment and Performance Bonds (See attached samples) • Provide Retainage Bond, if desired (see attached sample) • Provide Certificate(s)of Insurance w/endorsement(s) Balfour Park Sculpture Installation Page 314 ATTACHMENTS • Bid Proposal packet • Sample Contract and Bond forms • Balfour Park"Love Me"Artwork plans (9 sheets) prepared by AHBL and dated 9/25/25 • Balfour Park Art Foundation plans (4 Sheets) prepared by DCI Engineers and dated 9/16/25 Balfour Park Sculpture Installation Page 414 =t' Y - 3 rL p 3 N J o m3 o °>��n so i I N3 7��-k W N cc 0 O 4 m� J J21)\ , 1 • 0 el _ ,I .(: h s` y ' ti 7 .\ • uF''.. h ti _ d1w h 1 /tt1 » t e { XA i O i. 'U—, »i ' s 3U J - s1 b� W Mg w Mt g¢N rY� I gl c4wN `'w kIPe a c O> m o>�i/ y 4 o g4k� a CD 2 • e LA a. J IN o e 1��A m Rglilw! Z J m 10 A t R _ J Fre W IL!) ww 00 ui w 0a0 z J p W 2 p z F 0 J O Z W ❑ W u) Z U w < F ❑ O o = ~ 0 wo o W W O ❑ W y Z Q W x O 0 2 O Q m a Z H 2 Z ❑ m p w - } z O z _ill, _ w F a z ~ w a w Z a O a g F- ¢ W m 0 ❑ z a z Q m a F Q O z m a u O z a a cc - w m w ¢ z w U F- a m Z m a W m F ¢ ❑ ¢ 0 w 0 U 0 O z > Q U y mOFzO m ¢ JF- ❑ mF Qawz Zwm wmwF- Umm ww � F wz 0 - z a F w ❑ J Z 0 w_ z W 0 w 0 1 QQ m m F 0 U z 000 0 2 » a • 0 W W 0 F_- J = m p U W J m S w 2 W — co z w Qa' Z Z Z m W ° p Z 0 W J Q U ❑ a Z o ¢>Q O0 m U a F Q o g x ZOFmQ JD CCO m2Fm a. 00 W FS } W ¢ UZ < mW ' W gaYW UFQ3 W OH C� O 0 U ❑ m Z a ZOO ❑ z U w m 0 - m 0 w J Z ❑ a J w ° U W Q 0 ❑ J x w W a X W Q F O Q U W a U1 O Y C7 z Q❑ z ...10. Z M < P >° < Qw QQOM mFOF- 0 w H U w2a m Z ') 05 0 aFm z ~ w a o Z ¢ Z w H w o W OF im a F Q W W I-rD m p z_ a J u z ¢ OJ Z J o co ce W m Q Z O J 0 z W H Z Z 0 w Y Y Fx- O z 2 3 w Z W F W m o ❑ Z Z 2 m = mOg F0 U W W apUFa' p3 � ZOO m ❑ wali � Qg wz � > U � 0 z < w WZW u U 0 w O m z a a O w Q Q 00 } J z p um H O m Z W W w w 3 0 F m F U w Q j S of N w O W l- w W 0 0 Q a 0 a >> m Q w O z F 2 w J w U m Z m O O a a 0 LL Q w w Z Z 0 O a g a u = U z li J Z > �Fj a z W Q F Fw_- OF O W m W a 0 Y O w m W N W Z V 0 w z p El m w a z m U > a a I- J w m Fo - a r ¢ o o z ui a > O0 w > m o 0 0 0 o z 0 ¢ r m ¢ F i ¢ a w m o l F � m Z z F w � Z z Z � J Z Z z .coF "� Z Oa U m w P O LL a ¢W w OPwwomao m z y F- QF � m x (1 O m U r O m ❑ -J w w pwxmr w � wz Uw � � OZFQUf W Uw � � m E ¢ ooE iii mo < O zya0m ❑ F- 0 awFxo0OCF- wLI pP w -1 a pw wwp JzF gz ¢ ❑ Owg ❑Q F- OOm _1 r7JaOW < Zo ¢ mp u. 0Zwrw rod 2m O E ❑ zaUQ Q F 0xz OFa' F- W O FUUm zZOZo m ❑ Z m0000Q UDw re wzaa' a QJ a W xgm z0mw FZOQZT z 0ww V) w �Zpw 5 > I > , W o w W l_ y m J a a Q LL Li C3 x x Q mQ 2 le OV m J a F l } O w . F w x 0 Ei Z w z w a w 2 m a z z O m m 0 < F W m F U w F- w a m Z w w k zoo — J > 0 > ¢ J a � O � ww - 000 ¢ wow 0xwwxa >- 0 mono wozxw O OZmm Jaxax Jam mU ❑ om � 00g maaJ zFoo ¢ ¢ m3 F- Daw 3UOF- J g U < Q0 aamx0 Qa0 w i- cri d Z W J a' 0 0 Q ❑ ❑ J <z Z 0 W 2 w a Z W Q } a' 0 0 0 O 0 I F F= m C7• J m O p F = (7 2 O W W ❑ W z O Z Q Q m o W F 3 J Z Q Z ❑ 5 y ( 0 ( “ m z0 ¢ m p F z w ai z . a z Z ¢ w z . F F- ¢ J• a m p lm - 0 0 ❑ ❑ O Z F- 0 0 w a w F f X O F O m E x w o F I- O m w owuzig imww ¢ _, O am 'w ao ❑ x z _, Luxw0 wool- w -J' w ❑ zzg F WOF JU S F- Q p < O F a x Q O Z mmF , z a U v 0 m a z J ¢ ¢ a m O 5a z ¢ UJ a a w re Z m F CC W W maFilli o xmFU rzo V az0p2 < UOwa 0 Ow J0w00 m0 � W � mw Ozm � OaLL 0007QON p � WU a Ua z ❑ uj amOa J Oa apmz RFp > ui z P w _ O U Q w } U Q Z > F m a O Y O o O U z W g 2 w gw ¢m W H Z m a' a: W 8 O m U J a Z 7 0 0 O J Q am ° wz � m x ❑ Fww ❑ Ia ❑ Oc� ww0y w � yu� F } wOJY m z ❑ HZ W 0UQ 0w0 < =a' HC ow °xce Ja < ma 0 ❑ XZw Jz FFZ < wQaw' ai 5 z ❑ mw Q � y W Flj ¢ QFaU QmJQ < OZw < FU W - QO — u) Sze ~ zOOLL ¢ F EC7m >- 0 O QOmx YO � x ¢ mZ � FaYa ZO � � Z Zpa O O ¢ J U x U U z m ❑ ❑ O U a 0 F x J J w O z w J F w M z m z w a J a m a a O z w O O Z z r Fe m O F = Z o ¢ z U ¢ m cl a J¢ I- Z a O } ¢ Z xp Jmzw mawuF-iz3z wUa Wp 3aF m mg Jv~ia z xOz � w 0az O▪ FwFQzO �zw < mw z � mmp = 0 a ❑ wa � Om � mo maU � wZa � aoo O ao0 0• aQzmmx mQmOw Fm ow5mR Upww � HE -1pFy- a' p rwo _- m zQ W ce• 3aauizzJO zwOFZzw vi❑ aza FzZ0E- PJHaF32 g = ww > zrF Z O Q x Q 0 y Q p w l- w - a Q m W- C Z Q 0 O W (7 z V Ce Z Z 3 i— coZ n = 0 m m .. Y O awZ ❑¢❑ UQ ❑ 7FF7 ❑ y w VS W = 00z JOZ ? 1 ;5. 00JaY OF- aw am mmz u < mxaw IE- a0000 ¢ wp3m JOi5F X000h2H0 = u� wU z2 woo mmwF- m ❑ F- mQ > 00 2ow0Q Q0mmm w30vmm3 F- JZm aH au < w Z 'Lii O i �� y m � a.2 CO/ To sU Y IRO rn : ;g g. j'. c,'''''' - f ,, MO pr, 08 9 III:( o 1IiIIi P A <- IN O s' ; o rblS No I ill . I;o W i O O Z O H O° ix ¢ 0 F,0mo mUJ= D w D Z m w ap an I- p W InO~ w OZ cez a O a U LL m it H-1 1_, W J W W a 2 a O m a m pcel-aDI m fx I- }cexga °p1-m2 0 2 zCD°om~ W Q� i_‹ a aw°ceW w a _ D Ea Q D w-.D O a Ow O Ow o Z z „ d I O 3 w p�O,_a,r Q a 4,_`v 6O Q °J w~W a Z O W p W F V a W W O w O a O a W O a O O W Z W W 2 w W a W O ai m m O 2 U a U J(n m(n U w w w w m w w w 1- (:), N C] V U (O N-OD z I.O m Z z � o 0y Q V alt ^► O P I • ai Ci) • V ' ail Oil iilliYYikI k -� Al a ® C211141 0 4_. _ attktx..40 #40. 61 1 1 vi 1 1 • < ,E4pit• if •4; ,-,:i. • , I I a ' 0 __ ''N q 0 -' \\4\ I<I ' CO) IPP , 00 0 , -;.• (11 it /Ark 1: „ a i ., 4163, ♦ �0 HY -i LLJ W 4 ♦ ll1 ZaLL g o(3 k 0 I/ ' ,-htir),v000 � ��Q0a01 1 U W W D J Q �idiace t I , ZWW QW (n p 1 O a` 1► . , >- , x ° z >( z o 1 a 1 L w cc _1 cn x k 0 ,C ♦t ( ccO m Q W m I. al I 4d 1 CO v fir. Ca, arm r rc0 ° fl g1°J �'■ b t ,° � �4!'5 '� :rho Ia. W CO w Oy. ' o z Q N 0MNI E= � y 1 0 0 4' IS\ f.., . i b N0) ;PP J ® ® ® d I I- L. A, U , U 1 == U I , a I o D z O 0 ~ H W z m 9 , \ �,°:,U , w > � zpq Q � Y _ � w 0 2 < < 0 � p 0 0I - Q - w = 0 OQU H Y Jo ce Z m o a x o o Q a o 2 a cc J20 J � ce LLaa � zww 0 }- 0 - w0 � � � O �� � cc0F, Q WH w H W - 0 H 0 > z 11.1 • -I p Q 0 0 > W H p p > O W can0� cna -H - pL¢i Uz W O QQ � v j mgaa vN � � 0 � � O � U a — w < < cn1 ce < > < < W0 i i7 1I I I .7MD 1 NN,I-U- 124 , , 6,,.. , . 444,4: . :,....„4, , \ , w .0.-„,:-.,- ,,, 4 ...- I 1 1 o l KYAi1 51 :. '`NAy� Y W , Q W ? I ,\ L a b 0 OH 0 ' ZcC � W HH o m U) f 2 WI� � Oo � • -1zz z ce o } U � � w ***N. 0 U_ Z CCCW.)w �O U H � Qhz V Wp X H U 'W W O H , O CO Haxi WpQ J 0 0 QY o0CC w0mo 0Qa < LL aUO.-- 0Hw W (j 2' (n w > 2 z U dw0 �� P O D 0- pa W p \ inno p o �� a T.f O wa 2 CCY/ e m ;U =,p J W Y `pN �� fir A co ~ i 3 <W 0)I -. ,7;E „ ,..,. g?y�� s it y y fir t Y ■P w mw 3< xw' e a nj N 4 0 �'�� re Co W h o o 9 o y� �p J ,,, 10 P 5- .. . 1 5 A LL p ¢w o uj a o - aI- C0 Z CI 0 z(n d W 0 Z 0>w �() D U ❑ CCCaQ 0 w ° J M D wad oO Ooaa Y = N Q 0)) J 0> U U O m Q Z h- I- 'E W m D a F K Q m z�Q a)0 w ww a g y a W zQw 0w ❑ ❑� w a ..z w a_ ,ym w J F m wo u) ga W W ❑ 0 ui0O Um < (j rn (n Q F - z (n0(o0 dJ ,x z co`' w m a = O �w0 �� m F-O 2 ce z0 Cl) O 0000 F OOD W v 0 000 O FC DO J 0 �W(ou) 2I- ¢ v) X OO Q J Q r O 0 i))0?? `v(4 z w w 0w D e O w J �` � w CC W 5Z d OwUw JQ o Z a 0• 0 Q > w ti\ / Q (1) 0Z < w wZ _ �� 441 J u)c) 121 [0 co � z (n (�—.) U J W v \\\ / Q lLapalV a3 _F_t.. _ = O� 'NIA,• �— Q CO (WA ? En z 0 D - o (nQ �I _�r = I Wa � o �a aw O00o I— w 8,l Z w J Q O D IY Q Q W u_ Q W ZQ > zzF- w Q0 - 1- cr w < oW1.: Z a 02i— CI- ZQ J I- ly CC O p 2 ° Q Q O W LLI 0 a_a H O dN W I— Z2 z Ci) LY 2d0 02 wzF ¢z zz ?8oui Z za Z w 0 Q W QY� J 0oY cna 00� p�(N 0 Kw Y 0 (~ m LL 0 ` Ce<0 Eyw QY OZw OW �`� OU ZOQW �W OL co 2 cn0 _I W -Q < 0 <CD 0 C.u0cn0 DZ mY Zjw0~ Zw OO 0 rno J L F I— nQO 0 a d±0z¢z c,. Q 0 , w pw za Z zg ci z Jwo0uZ Li- >D 0 D w NQWLLZM Z wUo f O J Y z co �W �� Q > w J (nOO s 0� �02 mW Q � momJa O ¢-2~ m ow. LYW W 7 � � OQ � 0LIZ wWu)< JM �, NI � UOa w W CCdc40(nDO CO CI- > CI- 1— a_ wDn1— QaQ a w0 r m v CD H csi M 4 . )>• IMM� a` g o CO/ 3 10 ;U l | ! O p J ( L , 11 k ° ) ) � �e ' | ce�! \ ■ \ & 1 !� _ i„. .1 Xu : 1L- \ " |& , zii ! \ J> ; x ° ). :Sl'1' a,.. N ,;‘'r°:-4- ' , ;1 R ( Z J 2 \ \ , u R 7 �� '' | . f_. \ i � i | � �� � ° , |• ! ' 4 4 ■ ■ 2 _ I-/ \ 0 <0 � z /0 \ \ % � 0\ ( \ \ \ § /\ } \ \ ± 5w LT 0 \ \ _ < m o z _ § w « Z ° H I- ©R C � w R- 0 § � / 0 /z > / •- )\ w 0 < 0 � / U- co0 - § w -J \ j -I { � < L § §j 0 § o XjW Lk § § % o01 z Ww H Z0- § wwz / W z o ) m co o < e W ) ) / e S § i $ 0< 00 0 § § ) w 2 00 2 02 < 4Z0W < 0_ Lw g / ( 0 / / § - < I— % $ / § k 0 Celli 0 W 0u = wWCX ± < OD o m < I � 2 HO Cl) IC < e = ez 0 { , --� . w53A o 13A oo'NMI$ 5 0 -J w ¢ 7 Nr"----1 0 { .� 0 & Z 0 1 « w z -J j CL 0 CC L o < � \ CC 2 « J N O # ■! Mm 3 ƒ! CC)} !3 _ _I 2 § ■. & | ) '® `�� re 0,1 I f. \44 :, �)a Ea § |u 2 I �' I :j1i' «o / at ; � ° ^ R 014! - �® 1 \ ! | | | |k ; i � j 41 41 41 41 o o } oo i_ ii z < ® n cc2 co $ J \ § j / o0 uuoo w � � c = m 61gg 11Q W az - < 02 < > 2z , ° o E � o m \ \ j0 / § m III - - ., # \ / 0 2 \§ / zz � ( ƒ ) g < 22 § w = oz § � � o ° � $ 0 eI eke F- iu) o ° \ z zZD z / z a < < o = - z E Y § ? W < 0 ) $ 5 0CC m IWz < 0a / ( / � \ § \ § w < 2 0 0 ! _ ƒ § ƒ e « 4 ^ 0 Cr) O /k gm3 ){ COV |L) =1/ , a. Y lax wp a g o1 Q WJ'. ?�e�N (� s°rQ� '��� C7 F �' �. O-'W N <zP��l\vL o fL c ' � � � ?W yq� M w o a N i �/a S S y ..,. . o 0 3 a 7:i—W;m 0hai �F 9A N k y% u-_� o 41,E 1 0 4 0 � � W a J R� Or n WWW a bfS `R N Yi6�0R q e El m� � U a , , .=". ccc g N i_t , E M. ) OT '` a" / r Vz 5 e • ct.o rc P11 o • o. � e e -- w N 6B 1'91 f 9 {Ei = 8 .28 P. . 5 " of 61E igi1 • • 1. z (0 —' 11 iu Li, cc 4, p. . > sE F?E bI V; . Et i Po ;e R. F 1N o o m . ie I w u c. €e gg x¢ e # s' Fill I — • as • WS z o Na N=p 'A( yg _ _ E E— E R»c $8 I i 11 8 S6 B� Sw. AA a W Z O p E y y F23‹ K SE 11 11 m V ai 3 oU J ❑ ❑ ❑ ❑ ❑ X �yj U Z C F �rc —� - P i V IS � i m R W gg 2 '2o2 3 .too oR O ¢ _ < aM 3 �� Z V A ` V> F W hbPWIIAii iU < 8, < t W $ E a sll C r V U N O c ¢s d_ O Izs 375 aU III3t Y go _ 0, w��to � gi FMM ~ 3 Q lL 0-' m M s� �n�'�� O .yCV \�X W FPi •1®1e a Cn • 0 p ^M N ;.7 4)� a 4 $ ISC 9 oFe NO O m13, gp IL, `O O '`�,Ii1`�V Oil:. te-a2 Q `/,�4 ; 1 1 U) m a a a' W N }U(V 0 } ceiH K W.- W r Wm m0�� ebx00 az Z� aw co < r)z1-< >� �a o � Z6ae z O m wD xW UWaW 0C4DW II IWw m¢ / 0 W J O y Wu?aW wr �w oui bra¢ ¢w lb (�9�07 C�7JaD W�O W U)�Y a0 s �o�ZW vo�ZW 0<H QJao xQ 5 a°wore- a^WOzi- WOO >zO CO w �x ® I NmYaJ NJ -aJ O 0QZ U R'_� (auQm�Z yinQO Z Ul� Z(A(�W O a. j m c o 7 m Q 88 N j m m w0 O U O O M Z m N I m�Q��� a�2ga�� d��� (Q o¢ov C a�a N�aa�� wx- • aYNOa Is- [ ¢yZcnax Q� Zrnax F,0�3o ozc)W�� Q�w� © II d ( J a'F=a'OJ ixgxa'UJ UmQJ~ �OZx>O mmJ- I > OOuixz¢ cOvixz< a. -t-� o v Fm ' .A III ! u mmwoWW mmwo¢W w WOO ��OZa o=zz 9 01 I N _ zZOcaJF- Za'Q ji- zNrn W z Zma'ce V m HUJZ i1 0-• ❑I L <IW-QQ <xW-¢a 2�W_ZO --OOCO ¢>Oa k; ' mo3>z rno3>z x•-w?U <;Toon aam. r� I N O • I` Ia 40; w gt \um. I I• J_ /, 1 \ D t I CC / I III i w � LL w \IIw LL ,_ o -I a M Q I 0- \t v \\ / , / t 0 : COU \ C _ ri & ,L±2 A » k !o § S0/. , 7��• \ � [/\,§ f 9 >§ ! /[}/§ » § (w Rog,. _ }! \§)ƒ \ (���` \) \/£k ` kk NEE, Ecc |,lA2 `a �S<_ § \ G m gPPE>i J ) |; / (f': . '''''\N.\\\.,,,,,,,. .......: \ fli_| . `` �!7 • °«, / ,._.--_„7_1 c f;u !, e.,lm c§/ 1- \ 'M}|0 z \ ƒl 'Ill / \ =, _ \ pi, „.....- ,._,,.) _ » ¥_ .43 140 ''''''''' r ' H \ j ) \ ��. § I @ !! [§7/( _ \ g (\ \ \w ( � \ 2r§<: ) ( ja \ \§| §§ �) \n }(/ g) / §/ (}( \/ \ \\ )§L \ §} 1 O in N OCV N O a (D co'/' O W cr zo-ter AA. _ ( a Na 2 iLU go .> 5 Lew zm a Li mu' w w N v o f' °m w o O j LT_ OO 3 -0 W a~f Oa O! N m J_ m 14 \\y K W 2 a a low U3 _ O O vs CZ / C co O LL C 1 CZ 1 Q d ' 11 Ii 0 1 11 a ? 2'- 1 U (d 1 i 3i O O 2 j a W c ' 1 ' fo c¢i o ' 1 'pY -m o(n L.L S �M , E.jl UEW a7 O �x NQH g C m 0 9 1 5 �6e lw;c:o2 Q 2-0 < IIII D' FM 3y id CZ ®.6 N 1 1 < N / z r 1 1 1 CC 1 8 < 1 O WQ w W Co M d 0 w j w I 5 1 0 oa inw 4 1 0 ¢a < <m 0 Z F CC O 2 N (\i"..... , O Z 5 a O • • Z • lcc �� 0 U Z < W F Na L' in• w • m gw F m ink 0w m F am CM Csi = k .' % /§ ( r- o 0 A / / : : / °� t«� \ 2© �2 , o y �ti a \w , o o 0 L. • ) I / } D,cn• � ® \cwo /§ k G Z (\\j � w \ cog \ m ) zj\ w ) 3 ■ r 2 : _ ( ) i®Q \% j !)I)= um LL -!, -2 . wl �� / \}} \!§ /\121";.tli iIIII. Ii / § ir _ en to \^ { / \ . 0 | o Z | ® \ � cn ) § # 2 Z 2 In¢ o in r ¢m Z0E-I-p < F- 9O O N °]W ¢F-wW WY� J N o !�• v ca w = Jo pW=op OZ•Li a¢J. Fw Q V�� . .>;./�/ Olin 6 m L7 N W~O H Q =~CL zwz 0w 1- Q 0m 1��� •J! ZN O f- z Ow O z O ¢> W 0 pyyOJ z 12> W w ¢~c7 O .••it` N % w m 6~.m �¢ ~m¢�Z QYm H a Y Q� ti "`,� _ -- a o W W J~ WZ O¢QZ=p1-J OWO C7 cr., ,e., n ^ m j V J }<Q d W W�2 2- d W O 0 c - a. F CC) >cw O<�w0LL ¢n� H1d3G1SOad ¢ z P� ��6 \-\' n w¢ WOO OMcnO-¢M¢ pm¢ fro, O� • ¢m = o 4 I I wnwiNiw..o-.z - .� "�ij 0 a _ 4 NVld aid 21111 bi13 F En3 y ¢ .11 III <CI =III III o III- —III o _ as _ III- 13Sdd0 —III P XVw 8W3 III— OW 4, 8.0� — Z j c _ O T M III—_ Q • II b � ..' -N ELU NNJ J J w O a J J ~z Sc Si!W a p Z Z cc o c ID C w LL w w Ww� w w a)¢w ZWZ ZzF- w00 -°a Uw w w W p¢0 w WF (nJ>wzwZ z¢0 FcnO `ig N rn] co co mz¢i_1-� cn ccn= w�w�¢<. ." BOLL <u c lie C "."-F Cl) we =WcEZw� we wZ a°"<cl 02 wa oa0 zwH s € 09 MDM mWH JW J- F-CC Z. /-p 25- Oac `=o 0g z z= ¢NGO��O Z2 zW cno� 92 00 O 0 Own o;� C' H ¢F ¢� 3 m ¢ ° ¢> Or 1-LOwwc? wZr wow ae >N Hn H¢ In n H'p H¢ F-W UH COw wm H. z¢ o Qo Se �<,., <nz cn3 w�z0-z 03 up_I �z<o c,uw wJ0 O�0 axg m W���¢ yn¢¢a ncn W CC) QaCC) zpw `.:t -.a-4, CO nHa¢EO 1�e �'1I o,�� W cn¢ap H- �cn&O o _ EXHIBIT B PROPOSAL FORM PROJECT NUMBER: n/a PROJECT TITLE: Balfour Sculpture Installation NAME OF FIRM SUBMITTING BID: Cameron Reilly, LLC Each bid shall constitute an offer to the City of Spokane Valley as outlined herein and no bidder may withdraw his bid after the hour set for the closing. RECEIPT OF ADDENDA:Bidder acknowledges receipt of the following addenda by checking the box(es): ® 1 ® 2 03 ❑4 ❑ S REJECTION: The City reserves the right to reject any or all proposals, portions or parts thereof and to waive all minor irregularities in bidding. Special attention will be directed to the qualifications of the bidders when considering awarding a contract. TIME TO COMPLETE: The contract shall be substantially completed in twenty-one(21) calendar days from the date of commencement. FREIGHT:Bid price(s)to include all freight costs to and from the job site. SCHEDULES: A Bidder must complete all the schedules or his bid will be rejected as non-responsive. The undersigned hereby certifies that (he/they) (has/have) personally examined the location and construction details of work as outlined on the plans and specifications for the above project and(has/have) read thoroughly and understands the plans, specifications, and contract governing the work embraced in this improvement and the method by which payment will be made for said work and hereby proposes to undertake and complete the work embraced in this improvement in accordance with said plans, specifications, and contract in accordance with the prices provided below. The Bidder,to be considered responsible, shall provide in legible figures(not words) handwritten in ink or typed,a unit price(except Lump Sum items)and total for each of the items shown on the following schedule: City of Spokane Valley 2 Bid Proposal Documents Balfour Sculpture Installation Bid Schedule A ITEM# ITEM DESCRIPTION UNITS QUANTITY PRICE/UNIT TOTAL Site Preparation(incls. clear&grub, 101 excavation&ofthaul,grading& LUMP SUM 1 L.S. $ 9 f 2�.O(7 subgrade compaction, etc.) F Install Sculpture(incls.hauling,concrete 102 footings,mow curb,hardscape,basalt LUMP SUM 1 L.S. ((o,MC-D O column,etc.) 103 Landscaping and Irrigation LUMP SUM 1 L.S. 4 2 3, ' 7S:O v 104 Sculpture Lighting LUMP SUM 1 L.S. 4 /8, 3$ S 105 Minor Change CALC 1 CALC $10,000.00 BID SCHEDULE A SUB-TOTAL 4 -j 7, (o SS 8.9%Tax (e, q 11. SO BID SCHEDULE A TOTAL c g y, 5-4(o. 3a Person/Entity Name: Jared Wise Signature of Bidder: Company: Cameron Reilly, LLC Date: 10/2/25 City of Spokane Valley 3 Bid Proposal Documents Balfour Sculpture Installation DATE(MM/DD/YYYY) ACCORD CERTIFICATE OF LIABILITY INSURANCE 10/3/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Parker Smith&Feek Insurance LLC PHONE FAX 2233 112th Ave NE (A/C,No.Ext):425-709-3600 (A/C,No): Bellevue WA 98004 ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC# License#:PC-1719201 INSURER A:Zurich American Insurance Company 16535 INSURED CAMELLC-03 INSURER B:American Guarantee and Liability Insurance 26247 Cameron-Reilly, LLC 309 N Park Rd INSURER C: Spokane,WA99212 INSURERD: _ _ INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:830317308 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTRINSD WVD POLICY NUMBER (MM/DD/YYVV) (MM/DD/YYYY) A X COMMERCIAL GENERAL LIABILITY Y Y GL0394676301 3/1/2025 3/1/2026 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTED CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) $300,000 MED EXP(Any one person) $5,000 PERSONAL&ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY X JECT X LOC PRODUCTS-COMP/OP AGG $2,000,000 OTHER: $ B AUTOMOBILE LIABILITY BAP394676401 3/1/2025 3/1/2026 COMBINED SINGLE LIMIT $1,000,000 __(Ea accident) X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) B UMBRELLA LIAB X OCCUR SXS394676601 3/1/2025 3/1/2026 EACH OCCURRENCE $5,000,000 X EXCESS LIAB CLAIMS-MADE AGGREGATE $5,000,000 DED RETENTION$ $ — „ A WORKERS COMPENSATION GL0394676301 3/1/2025 3/1/2026 PER X OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER WA Stop Gap ANYPROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? N/A - - (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Project:Balfour Park Sculpture Installation; Location:Spokane Valley. City of Spokane Valley and all other parties required by the contract are included as Additional Insured on the General Liability Policy,if required by written contract or agreement,subject to the policy terms and conditions.This Insurance is Primary&Non-Contributory on the General Liability Policy,if required by written contract or agreement,subject to the policy terms and conditions.A Waiver of Subrogation is provided in favor of Certificate Holder and all other parties required by the contract on the General Liability Policy, if required by written contract or agreement,subject to the policy terms and conditions.General Liability Coverage includes 30 day notice of cancellation,subject to the terms and conditions of the policy. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Spokane Valley 10210 E Sprague Avenue AUTHORIZED REPRESENTATIVE Spokane Valley WA 99206 Itkft ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD