HomeMy WebLinkAboutResolution 25-013 Master Fee ScheduleCITY OF SPOKANE VALLEY
SPOKANE COUNTY, WASHINGTON
RESOLUTION NO.25-013
A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY, WASHINGTON,
REPEALING AND REPLACING RESOLUTION 25-006, AND APPROVING THE 2026 MASTER
FEE SCHEDULE, AND OTHER MATTERS RELATING THERETO.
WHEREAS, it is the general policy of the City to establish fees that are reflective of the cost of services
provided by the City; and
WHEREAS, the City uses a resolution to establish the schedule of fees for City programs, permits and
services, and periodically the fee resolution and fee schedule must be amended to incorporate new or modified
services; and
WHEREAS, Council desires to approve the resolution and accompanying fee schedule.
NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane
County, Washington, as follows:
Section 1. Adoption. The Master Fee Schedule is hereby adopted as provided herein and as shown
and incorporated in the attached schedules.
Section 2. Re eal. Resolution 25-006 is hereby repealed in its entirety.
Section 3. Effective Date. This Resolution shall be in full force and effect January 1, 2026.
Approved this 23`d day of December, 2025.
ATTEST:
— A n I ,- 9&1"" "J
Marc, atterson, City Clerk
Approved as to form:
O ce of the City ttorney
CITY OF SPOKANE VALLEY
QPA— ���
Pam Haley, Mayor
Resolution 25-013 Fee Schedule for 2026 Page 1 of 21
MASTER FEE SCHEDULE
Fee Schedule Page No•
Schedule A: Planning
Schedule B: Building/Engineering
Schedule C: Parks and Recreation 12
Schedule D: Administrative 17
Schedule E: Other Fees 18
Schedule F: Police Fees 18
Schedule G: Transportation Impact Fees 19
Resolution 25-013 Fee Schedule for 2026 Page 2 of 21
MASTER FEE SCHEDULE
Schedule A — Planning
Automatic Annual Adjustment
Unless otherwise specifically amended, Schedule A of this Master Fee Schedule shall be reviewed and
automatically adjusted annually to reflect (80%) of any change from September to September of the Consumer
Price Index for All Urban Consumers (CPI-U), West Region, 1982-84=100, published by the United States
Department of Labor, Bureau of Labor Statistics, or other comparable index if not published. In no event shall
the cumulative change in rates or charges be more than four percent (4%) per year. Unit prices shall be rounded
to the nearest dollar. The automatic adjustment shall be effective January 1 of each year. No other fee
schedules shall be affected by such automatic adjustment.
Fee Payment
Plan review fees are collected at the time of application. Such fees may be adjusted during plan review.
Overages or under payments shall be appropriately adjusted at the time of permit issuance.
In addition to the fees identified below, amounts paid by the City for outside professional services and other
expenditures required during the permit process shall be paid by the applicant. Examples of outside
professional services include review by consultants such as surveying, floodplain, structural engineering or
other services required to determine compliance with applicable codes. Outside costs also include but are not
limited to costs for public hearing examiner, recording and legal publication notices.
AMENDMENTS
Comprehensive Plan Amendment
Zoning or other code text amendment
APPEALS
Appeal of Administrative Decision
Appeal of Hearing Examiner Findings
Transcript/record deposit on Appeals of Hearing Examiner Decisions
Appeal of Administrative Decision - Code Enforcement Final Decision
pursuant to chapter 17.100 SVMC
ENVIRONMENTAL REVIEW
STATE ENVIRONMENTAL POLICY ACT (SEPA)
Single Dwelling (when required)
Northeast Industrial Area
Threshold of Determination of DNS
Threshold of Determination of MDNS
Environmental Impact Statement (EIS) Review, minimum deposit
Addenda of existing EIS Review
SHORELINE
Substantial Development Permit - under $50K
Substantial Development Permit - over $50K
Shoreline Exemption
CRITICAL AREAS
Floodplain Permit w/out floodplain revision for a single family dwelling
FEE AMOUNT
$2,910.00
$2,910.00
$872.00
$1,165.00
$183.00
$582.00 unless otherwise
waived pursuant to SVMC 17.110
$400.00
$200.00
$1,050.00
$1,750.00
$3,000.00 (deposit) + Actual costs
$500.00
$1,165.00
$1,863.00
$698.00
$850.00
Resolution 25-013 Fee Schedule for 2026 Page 3 of 21
Floodplain Permit with floodplain revision for a single family dwelling $1,050.00
Floodplain Permit w/out floodplain revision for a land division
or commercial application $1,750.00
Floodplain Permit with floodplain revision for a land division or
commercial application $2,450.00
Floodplain Permit for large or complex project $3,500.00 (deposit) + Actual costs
LAND USE ACTIONS
SUBDIVISIONS
Preliminary plat $4,500.00 + $50.00 per lot
Final Plat $3,000.00 + $10.00 per lot
Time extensions — file review and letter $582.00
SHORT PLATS
Preliminary $4,000.00 + $30 per lot
Final plat $2,500.00 + $30 per lot
Time extensions — file review and letter $582.00
PLAT ALTERATION
Subdivision plat $3,000.00
Short plat $2,500.00
PLAT VACATION $1,716.00
BINDING SITE PLAN
Binding site plan alteration
$2,327.00
Change of Conditions
$2,327.00
Preliminary binding site plan
$2,327.00
Creating lots within final binding site plan via Record of Survey
$1,746.00
Final Binding Site Plan
$2,327.00
AGGREGATION/SEGREGATION
Lot line adjustment $550.00
Lot line elimination $500.00
Zero lot line $500.00 + $10.00 per lot
OTHER PLANNING
Administrative Exception
Variance
Administrative Interpretations
Home Occupation Permit
Accessory Dwelling Units (ADU)
Conditional Use Permit
Temporary Use Permit
Temporary Use Permit — for RV usage over 30 days
Community Services
Small Cell Permit Application
Hourly Rate for City Employees (Hourly Rate)
Document Recording Service by Staff
Street Vacation Application
$750.00
$1,834.00
$409.00
$116.00
$349.00
$3,000.00
$582.00
$35.00
$250.00
$582.00 for up to five sites + $116.00 per additional site
$110.00
Hourly
$1,590.00
Resolution 25-013 Fee Schedule for 2026 Page 4 of 21
Pre -application Meetings $500.00
*Fee shall be deducted from building or commercial permit fees when application is filed within one year of
pre -application meeting.
Public Notice when required by any permit Cost
Public Hearing when required by any permit Cost
ZONING map amendments (rezone)* $4,075.00
Planned residential development plan $2,327.00 + $30.00 per lot
Planned residential development modification $612.00
Zoning letter $350.00
*If rezone is combined with other action(s), cost of other action(s) is additional
Resolution 25-013 Fee Schedule for 2026 Page 5 of 21
Schedule B — Building
Automatic Annual Adjustment
Unless otherwise specifically amended, Schedule B of this Master Fee Schedule shall be reviewed and
automatically adjusted annually to reflect (80%) of any change from September to September of the Consumer
Price Index for All Urban Consumers (CPI-U), West Region, 1982-84=100, published by the United States
Department of Labor, Bureau of Labor Statistics, or other comparable index if not published. In no event shall
the cumulative change in rates or charges be more than four percent (4%) per year. Unit prices shall be rounded
to the nearest dollar. The automatic adjustment shall be effective January 1 of each year.
Stormwater Utility Charges on Developed Parcels shall be reviewed and automatically adjusted annually to
reflect any change from September to September of the Consumer Price Index for All Urban Consumers (CPI-
U), West Region, 1982-84=100, published by the United States Department of Labor, Bureau of Labor
Statistics, or other comparable index if not published. Unit prices shall be rounded to the nearest dollar. The
automatic adjustment shall be effective January 1 of each year.
Building permit fees shall not be included in the annual automatic adjustment because updates occur semi-
annually through the International Code Council (ICC) published updates. No other fee schedules shall be
affected by such automatic adjustment.
Fee Payment
Plan review fees are collected at the time of application. Such fees may be adjusted during plan review.
Overages or under payments shall be appropriately adjusted at the time of permit issuance.
Plan review fees are separate from and additional to building permit fees. Permit fees and any other unpaid
fees shall be collected prior to issuance of the permit.
Fees for outside professional services required during the permit process shall be paid by the applicant.
Examples of outside professional services include review by contract reviewers, special inspection or
construction services, consultant services for special topics, surveying or other services required to determine
compliance with applicable codes.
Fee Refund Policy. Refunds authorized under this policy apply to Schedule A and B.
PLAN REVIEW FEES
• Plan review fees are non-refundable once any plan review work has been started.
• Paid plan review fees may be refunded when an eligible request is received in writing.
• At a minimum, an administrative fee equal to the Hourly Rate for City Employees (Hourly
Rate) shall be retained.
• If the paid plan review fee is less than the Hourly Rate, no refund is authorized.
• If the paid plan review fee is more than the Hourly Rate, the amount for refund shall be
calculated at the rate of 100% of the paid plan review fee minus the Hourly Rate.
PERMIT FEES
• Permit fees are non-refundable once work authorized by the permit has begun.
• Paid permit fees may be refunded when an eligible request is received in writing.
• At a minimum, an administrative fee equal to the Hourly Rate will be retained when fees are
refunded.
• If the paid permit fee is less than the Hourly Rate, no refund is authorized.
• If the paid permit fee is more than the Hourly Rate, the refund shall be calculated at the rate
of 95% of the paid permit fee minus the Hourly Rate.
Resolution 25-013 Fee Schedule for 2026 Page 6 of 21
For any application taken or permit issued in error, a full refund of fees paid shall be made. No portion of the
paid fees shall be retained.
Hourly Rate for City Employees (Hourly Rate) $110.00
Overtime Rate for City Employees (Overtime Rate) - 1.5 times regular Hourly Rate $165.00
Investigation fee: Work commenced without required permits Equal to permit fee
Working beyond the scope of work $174.00
Replacement of lost permit documents Hourly rate — I hr minimum
Technology fee $25 per permit
Excessive Reviews (more than 3) Hourly Rate — 2 hr minimum
After hour inspections (6pm to 6am, weekends and holidays) Overtime Rate — 2 hr minimum
Reinspection fee Hourly Rate — 1 hr minimum
Revisions to plans requested by the applicant or permit holder shall be charged the hourly rate with a minimum
of one hour. Revised plans submitted in response to reviewer correction letters are not subject to the hourly
assessment.
Washington State Building Code Council Surcharge (WSBCC) — see the Washington State Building Code
Council website for fees.
Spokane Valley Fire Department - Permit Processing Fee $35.00
BUILDING PERMIT:
Building permit fees for each project are set by the following fees. The figures below shall be used to determine
the building permit fees and plans check fees based on the value of the construction work as stated by the
applicant or the value calculated by the Building Official using the latest valuation data published in the
Building Safety Journal by the International Code Council, whichever value is greater.
Valuations not listed in the Building Safety Journal:
Building Type Valuation Per Square Foot
Residential garages/storage buildings (wood frame) $22.00
Residential garages (masonry) $25.00
Miscellaneous residential pole buildings $22.00
Residential carports, decks, porches $18.00
Building Permit Fee Calculation
Total Valuation Building Permit Fee
$1.00 to $25,000.00 $69.25 for first $2,000.00 +
$14.00 for each additional $1,000.00 (or fraction thereof)
Up to and including $25,000.00
$25,001.00 to $50,000.00
$50,001.00 to $100,000.00
$391.25 for first $25,000 +
$10.10 for each additional $1,000.00 (or fraction thereof)
Up to and including $50,000.00
$643.75 for first $50,000.00 +
$7.00 for each additional $1,000.00 (or fraction thereof)
Up to and including $100,000.00
Resolution 25-013 Fee Schedule for 2026 Page 7 of 21
$100,001.00 to $500,000.00
$500,001.00 to $1,000,000.00
$1,000,001 and up
$993.75 for first $100,000 +
$5.60 for each additional $1,000.00 (or fraction thereof)
Up to and including $500,000.00
$3,233.75 for first $500,000.00 +
$4.75 for each additional $1,000.00 (or fraction thereof)
Up to and including $1,000,000.00
$5,608.75 for first $1,000,000.00 +
$3.15 for each additional $1,000.00 (or fraction thereof)
Plan Review Fee Calculation % of Building Permit Fee
Plans review fee (general) 65%
Plans review fee — Group R-3 occupancies (single family less than 7,999 sq. ft.) 40%
Plans review fee — Group R-3 occupancies (single family 8,000 sq. ft. or more) 65%
Plans review fee — Group U occupancies (sheds, barns, et.) 25%
OTHER PERMITS:
SITE PLAN REVIEW
New Residential Home Site Plan Review $349.00
Residential Accessory Structure Site Plan Review $92.00
Commercial Site Plan Review $675.00
DEMOLITION PERMIT
Single Family Residence $70.00 flat fee
Commercial Building $151.00 flat fee
Garage or accessory building associated with residence or commercial building $70.00 flat fee
Foundation Only Building Permit: 25% of building permit fee
Swimming Pools, over 2 feet in depth
Re -roof (no plan review charge unless submitted for review)
Change of Use or Occupancy Classification Permit
TEMPORARY CERTIFICATE OF OCCUPANCY
Commercial or Multifamily Building
Residential Building
Manufactured Home (FAS) Placement Permit
Permit or Application Expiration Extension
Towers, elevated tanks, antennas
Hourly Rate + plumbing fees
Based on Project Valuation
Hourly
$233.00
$174.00
$70.00 per section
Hourly Rate
Hourly
Resolution 25-013 Fee Schedule for 2026 Page 8 of 21
SIGN PERMIT:
Sign Permits are subject to the assessment of the WSBCC fee as noted in Schedule B "General" section and
the following review fees.
Sign Plan Review Fee $100.00
Wall Sign Permit $87.00 per sign (flat fee)
Freestanding or Monument Sign Permit $116.00 per sign (flat fee)
RIGHT-OF-WAY (ROW) PERMIT:
A traffic plan and traffic plan review is required if more than 50% of the width of any street is closed or if a
single arterial lane is closed. A minimum plan review fee equal to the Hourly Rate for City Employees (Hourly
Rate) applies to all right-of-way permits that require a traffic plan. If additional staff time is required, it shall
be charged at the hourly rate.
Fees for outside professional services required during the permit process shall be paid by the applicant.
Examples of outside professional services include review by contract reviewers, special inspection or
construction services, consultant services for special topics, surveying or other services required to determine
compliance with applicable codes.
Iva 9WIL630 110JETA'_ C1/_I _.
Non -cut obstruction without clean up
$144.00
Non -cut obstruction with clean up
$216.00
Pavement cut obstruction, non -winter
$411.00
Pavement cut obstruction, winter
$616.00
Working without a permit
200% Permit Fee
Commercial Approach Permit
$308.00
Residential Approach Permit
$180.00
Multiple Use Permit — overhead
$359.00 per 1/4 mile
Multiple Use Permit — underground
$1,642.00 per 1/4 mile
Multiple Use Permit — tree trimming only
$150.00 per 1/4 mile
Erosion/Sediment Control — Site Inspection
$154.00
Oversized Load Permit Fee
$87.00
Structure Transport Permit
$174.00 per section
ENGINEERING PERMITS
Pre- Construction meeting $140.00
Onsite Drainage only $210.00
Frontage improvement with or without site improvements $700.00
Full improvements (frontage improvements and internal streets) $1,400.00
Warranty inspections and surety release $140.00
Inspections outside normal hours
(6 pm — 6am weekdays, anytime during weekends and holidays) Overtime Rate min 2 hours
GRADING PLAN REVIEW FEE:
Engineering Site Plan Review $500.00
Frontage improvement with or without site improvements $700.00
Full improvements (frontage improvements and internal streets) $1,400.00
ROW dedication, border easements and/or drainage easements $140.00 plus surveyor costs
Additional or excessive reviews (more than 3) $140.00 per review
Resolution 25-013 Fee Schedule for 2026 Page 9 of 21
Grubbing & Clearing Only (without earth being moved)
Paving Permit (greater than 5,000 sq. ft. - new paving on -site only)
OTHER ENGINEERING
Design Deviation
TRAFFIC ENGINEERING REVIEW
Project located within traffic impact area
Trip Generation & Distribution letter
Traffic Impact Analysis
OTHER TRAFFIC
Memorial Sign
Memorial Sign (Plaque only on existing memorial sign)
$79.00
$307.00
$200.00
$70.00
$140.00
$280.00 plus costs
$600.00
$360.00
STORMWATER UTILITY CHARGE ON DEVELOPED PARCELS:
Each single-family unit $63.00 annual
All other properties each $63.00 per 3,160 sq. ft impervious surface
MECHANICAL PERMIT:
Plan review fees for mechanical permits shall be collected at the time of application as noted in the "Fee
Payment' section of this schedule. Permit fees shall be collected when the permit is issued.
A. BASIC FEES
1. Basic fee for issuing each Stand -Alone permit $70.00
2. Basic fee for each Supplemental permit $8.00
B. UNIT FEES (in addition to the basic fee)
1. Installation or relocation of Furnaces and suspended heaters
a. up to and including 100,000 btu
$15.00
b. over 100,000 btu
$20.00
2. Duct work system
$11.00
3. Heat pump and air conditioner
a. 0 to 3 tons
$15.00
b. over 3 tons to 15 tons
$25.00
c. over 15 tons to 30 tons
$30.00
d. over 30 tons to 50 tons
$43.00
e. over 50 tons
$74.00
4. Gas water heater
$11.00
5. Gas piping system
$1.00 per outlet
6. Gas log, fireplace, and gas insert installation
$11.00
7. Appliance vents installation; relocation; replacement
$10.00 each
8. Boilers, compressors, and absorption systems
a. 0 to 3 hp - 100,000 btu or less
$15.00
b. over 3 to 15 hp - 100,001 to 500,000 btu
$25.00
c. over 15 - 30 hp - 500,001 to 1,000,000 btu
$30.00
d. over 30 hp - 1,000,001 to 1,750,000 btu
$43.00
e. over 50 hp - over 1,750,000 btu
$74.00
9. Air Handlers
a. each unit up to 10,000 cfin, including ducts
$15.00
b. each unit over 10,000 cfm
$20.00
10. Evaporative Coolers (other than portable)
$11.00
Resolution 25-013 Fee Schedule for 2026 Page 10 of 21
11. Ventilation and Exhausts
a. each fan connected to a single duct
$11.00
b. each ventilation system
$15.00
c. each hood served by mechanical exhaust
$15.00
12. Incinerators
a. residential installation or relocation
$25.00
b. commercial installation or relocation
$27.00
13. Unlisted appliances
a. under 400,000 btu
$61.00
b. 400,000 btu or over
$122.00
14. Hood
a. Type 1
$61.00
b. Type II
$11.00
15. LP Storage Tank
$11.00
16. Wood or Pellet Stove insert
$11.00
17. Wood stove system - free standing
$30.00
PLUMBING PERMIT:
Plan review fees for plumbing permits shall be collected at the time of application as noted in the "Fee
Payment" section of this schedule. Permit fees shall be collected when the permit is issued.
A. BASIC FEES
1. Basic fee for issuing each Stand -Alone permit
2. Basic fee for each Supplemental permit
$70.00
$8.00
B. UNIT FEES (in addition to the basic fee)
1. Each plumbing fixture on a trap $6.00 each
(includes garbage disposals, dishwashers, backflow device, drainage, hot tubs, built-in water
softener, water closets, lavatories, sinks, drains, etc.)
2. Water Heater
$6.00 each
3. Industrial waste pretreatment interceptor $20.00
(includes its trap and vent, except kitchen type grease interceptors functioning as fixture traps.)
4. Repair or alteration of water piping, drainage or vent piping
5. Atmospheric type vacuum breaker
6. Backflow protective device other than atmospheric type vacuum breakers
7. Medical gas
8.Interceptors
$6.00 each fixture
$6.00 each
$6.00 each
$6.00 per outlet
$6.00 each
Resolution 25-013 Fee Schedule for 2026 Page 1 I of 21
Schedule C — Parks and Recreation
ADMINISTRATIVE FEES
Basic fees to be considered when applying rates
Administrative Fee $32.00
Refuse Fee $52.00
AQUATICS
Pool admission (age 5 and under) free
Pool admission (age older than 5) $1.00
Pool punch pass (25 swims) $20.00
Weekend family discount — 1 child under 13 free with paying adult
At the discretion of the City Manager, the Parks and Recreation Department may on occasion offer free
admission open swim days.
Swimming Lessons $48.00
Swim Team Fee $75.00
Pool Rental (fewer than 100 people) $300.00 for 2-hr rental
Pool Rental (101-200 people) $400.00 for 2-hr rental
Refundable Pool Damage Deposit $150.00
ALCOHOLIC BEVERAGE PERMIT $10.00
CENTERPLACE
Conference Center Wing
Auditorium (presentation system included)
$79.00 per hour
Auditorium (presentation system included)
$475.00 per day
Auditorium (presentation system included)
$236.00 per half day
Auditorium Refundable Damage Deposit
$75.00
Executive Conference Room
$52.00 per hour
Executive Conference Room %2 day
$156.00 per 4 hours
Executive Conference Room full day rental
$416.00 per day
Executive Conference Room Refundable Damage Deposit
$75.00
Meeting Room
$42.00 per hour
Meeting Room
$263.00 per day
Large Meeting Room
$75.00 per hour
Large Meeting Room
$225.00 per half day
Large Meeting Room
$450.00 per 9 hr day
Meeting Room
$131.00 per half day
Meeting Room Refundable Damage Deposit
$75.00
Portable Sound System
$150.00 per event
Bluetooth Speaker (includes hand-held or lapel microphone)
$75.00
Platinum Package
$500.00 per event
Great Room
Multi-use/Banquet Hall $105.00 per hour
Resolution 25-013 Fee Schedule for 2026 Page 12 of 21
Multi-use/Banquet Hall - Wedding Reception - 10 hours $1,500.00
Multi-use/Banquet Hall $840.00 per 9 hr session
Multi-use/Banquet Hall $1,575.00 all day (6 a.m.-1 a.m.)
Small Dining Area $52.00 per hour
Refundable Deposit $210.00
Refundable Deposit - Weddings $500.00
Table Settings (linens and tableware) $3.00 per place setting
Pipe & Drape rental $100.00 per day
Senior Center Win
Lounge with Dance Floor
$105.00 per hour
Lounge with Dance Floor - Wedding Reception - 8 hours
$1,000.000
Refundable Lounge deposit
$210.00
Refundable Lounge deposit - Weddings
$500.00
Meeting room (evening use)
$42.00 per hour
Meeting room (evening use)
$131.00 per 4 hr session
Meeting room (weekend use)
$262.00 per day
Meeting room (weekend use)
$131.00 per half day
Meeting room deposit
$75.00
West Lawn and CenterPlace
Rental fee $3,500.00 per day
West Lawn Wedding Ceremony - 2 hours (with CenterPlace Reception) $1,000.00
West Lawn Plaza - Wedding Reception - 10 hours $2,500.00
West Lawn Plaza Rental $2,000.00 per day
- North Meadow additional $500.00 per day
North Meadow Rental $1,000.00 per day
West Lawn Plaza Rental - 1/2 day $1,000.00
- North Meadow additional $250.00
North Meadow Rental - %2 Day $500.00
Outdoor Venue Refundable Damage Deposit $500.00
Miscellaneous
Double -Set Wedding Ceremony with Reception
$500.00
Self -Catered Event fee for groups bringing their own food in on Sundays
• Groups in meeting rooms
$75.00
• Groups in Fireside Lounge
$210.00
• Groups in Great Room
$500.00
Host/Hostess (after hours)
$30.00 per hour
Presentation System
$262.00 per day
(includes projector, podium, DVD/VCR sound system, camera system)
Room Setup
$30.00 per hour
85" TV with Crestron System
$262.00 per hour
Additional Microphones
$25.00 each
Technical Support
$42.00 per hour
LCD Projector/ Television
$25.00 per hour
LCD Projector/ Television
$100.00 per day
Linens Only
$10.00 per table
Glass only rental
$0.50 per glass
Easel Paper Pad
$20.00 per pad
Laptop Usage
$50.00 per event
Package Storage received two days before or after contracted event
$5.00 per box per day
Pallet Storage received two days before or after contracted event
$50.00 per pallet per day
Resolution 25-013 Fee Schedule for 2026 Page 13 of 21
Business Incentive Rental Policy — The Parks & Recreation Director has the authority to reduce the room
rental rate by one hr. when the rental meets the following criteria: minimum of 25 participants; utilize a
classroom at CenterPlace eight or more times per calendar year; and use in-house caterer for a meal each
reservation.
THE COURSE SPOKANE VALLEY
Event Rental Fees
Full Day
Hourly (max 6 hours)
K-12 School/Non-Profit Event Rental Rate*
$1,500.00
$175.00
Full Day $1,050.00
Hourly (max 6 hours) $122.50
*Local Rate available to pre -approved K-12 schools and non-profit organizations from
within the Spokane -Coeur d'Alene Combined Statistical Reporting Area (CSA)
Event Rental Deposit
Percentage of rental fee due upon reservation (non-refundable) 20%
Event Participant Fees
(per athlete)
1-100
$2.50
101-200
$2.25
201-300
$2.00
301-400
$1.75
401-500
$1.50
500+
$1.25
Event Ticket Sales
Percentage of event ticket/entry sales (if any) 15%
Event Vendor Fees*
Non -Food Vendor provided by event organizer (per 10'x10' space per day) $50.00
Food Vendor provided by event organizer (per food vendor per day) $50.00
*Vendors may also be provided by the Venue through separate agreements with the City
Portable Restroom Fees
If provided by event organizer, per unit
If provided by City, per unit
Team Practice Fees
Practice times subject to availability and online scheduling
PICNIC SHELTER RESERVATION
(For groups of fewer than 200 people)
Browns — large red (up to five hours)
Browns — small green (up to two hours)
Edgecliff (up to five hours)
Discovery Playground (up to two hours)
Greenacres — large (up to five hours)
Greenacres — shade umbrella (up to two hours)
Mirabeau Meadows (up to five hours)
Mirabeau Meadows — stage (up to five hours)
$15.00
Full Cost + 15% service charge
Participant Fees apply
$100.00
$40.00
$100.00
$40.00
$100.00
$40.00
$100.00
$50.00
Resolution 25-013 Fee Schedule for 2026 Page 14 of 21
Mirabeau Springs — shelter and dock (up to two hours) $250.00
Sullivan (up to five hours) $100.00
Terrace View (up to five hours) $100.00
Valley Mission (up to five hours) $100.00
GREENACRES PARK COMMUNITY GARDEN
4' x 8' garden plot (per season) $25.00
EVENT RESERVATION — include shelter
(For groups of 200 or more people)
Events include but are not limited to activities such as car shows, tournaments, or high -risk activities.
The Parks and Recreation Director shall make the final determination.
General fee (up to five hours): $175.00
Non-profit applications with proof of qualifying as a 501(c)(3) entity (up to five hours): $100.00
EVENT PHOTOS
Mirabeau Springs shelter and dock $150.00 per hour
REFUNDABLE FACILITY DAMAGE DEPOSIT
Fewer than 200 people $75.00
Weddings, Special Events and events with 200 or more people $300.00
SPECIAL EVENTS (See Spokane Valley Municipal Code 5.15)
Application Fee $50.00
RECREATION
Recreation program fees are established at amounts to recover costs, as specified in the Parks and Recreation
revenue policy.
REFUNDS/CANCELLATIONS
Recreation and Aquatics Programs:
• For all cancellations by the City of Spokane Valley ("City") of City Programs, participants who have
submitted payment will receive a 100% refund via a mailed refund check; or:
o Staff will do their best to transfer participants to another program if the option is available.
• For unanticipated closures due to contamination, inclement weather, maintenance issues, or poor air
quality, staff will coordinate a make-up class or session or issue a credit at the daily rate of the
cancelled class or session.
• If available, programs will be moved to alternate locations. Program refunds or credits will be issued
if alternate program locations are unavailable.
• For cancellations made by participants, notice of the cancellation must be received by the City at
least 7 days before the program start date. Cancellations must be received in writing to
parksa77drec(cpoka77evalleyina.gov and/or by phone at 509-720-5200.
o If notification of program cancellation is received 7 or more days prior to the program start
date and the participant has submitted payment, then a full refund of the amount paid shall
be given via a mailed refund check.
o If notification of program cancellation is received less than 7 days prior to the program start
date and the participant has submitted payment, then a 50% refund of the amount paid shall
be given via a mailed refund check.
o If the program spot can be filled by another participant before the program start
date, a full refund of the amount paid will be given via a mailed refund check.
o If notification of program cancellation is received after the program has begun, no refund
shall be given.
Resolution 25-013 Fee Schedule for 2026 Page 15 of 21
Park Reservations:
• For all cancellations of Park Reservations made by the City, customers will receive a 100% refund
via a mailed refund check.
Cancellations made by customers must be received in tivriting to parkscmdrec aspokanevalleywa.gov
and/or by phone at 509-720-5200.
o If notification of cancellation is received 2 or more weeks prior to the reservation date, a
100% refund shall be given via a mailed refund check.
o If notification of cancellation is received less than 2 weeks prior to the reservation date, no
refund shall be given.
o If the park reservation spot can be filled by another customer before the reservation
date, a 50% refund will be given via a mailed refund check
Resolution 25-013 Fee Schedule for 2026 Page 16 of 21
Schedule D — Administration
COPY FEE
Paper copies up to 11 "x17" (b/w or color) $0.15 per page*
Paper copies larger than 11 "x17" (b/w or color) $0.87 per square foot*
Scanned copies of paper records $0.10 per page
Electronics records uploaded to email, cloud -based storage,
CD/DVD, or flash drive $0.05 per every 4 electronic
files or attachments*
Records transmitted in electronic format $0.10 per GB*
Digital Storage Media Device (CD/DVD, flash drive) Actual Cost*
Envelope Actual Cost*
Postage Actual Cost*
Records sent to outside vendor for reproduction Actual Cost*
Customized Service Charge - When the request would require the use of IT expertise to prepare data
compilations or when such customized access services are not used by the agency for other business purposes,
the agency may charge the actual cost. The agency must notify the requestor that it will be doing a customized
service and can require a 10 percent deposit.*
*It is the intent of the City of Spokane Valley to recover the cost of providing public records when the total
cost, including but not limited to the per -page, device, envelope, or postage costs, amounts to $5.00 or more.
Copy charges above may be combined to the extent more than one type of charge applies to copies responsive
to a particular request. When combining fees associated with the request, the City will determine the total cost
and charge accordingly.
Copy charges are assessed for each installment of records provided to the requestor. A deposit of 10% may be
required on public record requests.
M►I.y a[�7 i C�7 �:iTI �i17►31l 0
CREDIT CARD TRANSACTION PROCESSING FEE
Applies to all City fees paid by credit card/debit card/electronic
check except for those fees under Schedule F — Police Fees
(amount of the alarm fee is intended to cover the total cost of
administering the false alarm program, including, but not limited
to, payment processing fees). Credit card transaction processing
fees are non-refundable.
$26.00
2.5% of transaction amount
Resolution 25-013 Fee Schedule for 2026 Page 17 of 21
Schedule E — Other Fees
BUSINESS REGISTRATION
Business Registration $25.00 annual
Nonprofit Registration $10.00 annual
Out -of -City Business Registration with
annual revenues equal to or less than $4,000 (SVMC 5.05.020(D)) $0.00
Adult Entertainment*
Establishment License, Live Adult Entertainment $1,575.00
Establishment License, Adult Arcade $1,575.00
Adult Arcade Device License $157.00
Manager License $157.00
Entertainer License $157.00
Late Adult Entertainment License Fee* (charged in addition to the license fee)
7 to 30 calendar days past due 25% of license fee
31 to 60 calendar days past due 50% of license fee
61 and more calendar days past due 75% of license fee
Appeal of Administrative Determination — Adult Entertainment License*
Adult Entertainment License denial, suspension or revocation pursuant
to SVMC 5.10 $1,050.00
*Delegation of Authority from City Manager to the Spokane County Sherriff's Office to act as the Licensing
Administrator for the purposes of administering and enforcing Chapter 5.20 SVMC.
Tow Operator Registration Fee $105.00 annual
Schedule F — Police Fees
FALSE ALARM RECOVERY FEE $65 per incident
Amount of the fee is intended to cover the total cost
of administering the false alarm program, including,
but not limited to, payment processing fees.
Resolution 25-013 Fee Schedule for 2026 Page 18 of 21
Schedule G — Transportation Impact Fees
SOUTH BARKER CORRIDOR TRANSPORTATION IMPACT FEE SCHEDULE
Pursuant to chapter 22.100 SVMC and the adopted South Barker Corridor Study and South Barker Corridor
Transportation Impact Fee Rate Study, the following fees are the transportation impact fees applicable within
the South Barker Corridor area identified in the South Barker Corridor Transportation Impact Fee Rate Study.
Base Rate = $1,153 per PM Peak Trip
ITE Code
ITE Land Use Category
Impact Fee Per Unit
_LandUseGroup
210
Single Family & Duplex
$1,084
per dwelling unit
Residential
220
Multi -Family (Low -Rise) - Not Close to Rail
$588
per dwelling unit
Transit
310
Hotel (3 or More Levels)
$680
per room
Services
492
Health Club
$3.98
per sq ft
912
Bank
$15.74
1 per sq ft
520
Elementary School
$2,052
per employee
Institution
522
Middle School
$2,236
per employee
525
High School
$1,856
per employee
975
Drinking Establishment
$7.46
per sq ft
Restaurant
934
Fast Food Restaurant (with drive-thru)
$17.13
per sq ft
938
Coffee Shop with Drive-Thru (no indoor seating)
$1,912
1 per drive-thru lane
820
Shopping Center
$2.78
per sq ft
Retail
841
Automobile Sales - Used/New
$4.32
per sq ft
945
Convenience Store/Gas Station-GFA(4-5.5k)
$8,921per
pump
110
Light Industry/High Technology
$0.75
per sq ft
140
Manufacturing
$0.85
per sq ft
Industrial
150
Warehousing
$0.21
per sq ft
151
Mini -Storage
$19.37 1
per storage unit
710
General Office
$1.66
per sq ft
Office
720
Medical Office / Clinic
$4.53
per sq ft
750
Office Park
$1.50
er sq ft
ITE Trip Generation manual, I Ith Edition
"sq ft" means square foot.
"pump" means vehicle servicing position / gas pump.
"room" means available hotel room.
Pursuant to chapter 22.100 SVMC, transportation impact fees for uses not listed in the rate table shall
be based on (1) the most similar land use category identified in the table, or (2) the base rate and the
most similar land use category identified in ITE Trip Generation Manual, as documented by a trip
generation and distribution letter in accordance with Section 3.2 of the Spokane Valley Street
Standards.
Resolution 25-013 Fee Schedule for 2026 Page 19 of 21
MIRABEAU SUBAREA TRANSPORTATION IMPACT FEE SCHEDULE
Pursuant to chapter 22.100 SVMC and the adopted Mirabeau and North Pines Road Subarea Transportation
Impact Fee Rate Study, the following fees are the transportation impact fees applicable within the Mirabeau
subarea identified in the Rate Study.
Base Rate = $698 per PM Peak Trip
ITE Code
ITE Land Use Category
Impact Fee Per Unit
_LandUseGroup
210
Single Family & Duplex
$657
per dwelling unit
Residential
220
Multi -Family (Low -Rise) - Not Close to Rail
$356
per dwelling unit
Transit
310
Hotel (3 or More Levels)
$412
per room
Services
492
Health Club
$2.41
per sq ft
912
Bank
$9.54
1 per sq ft
520
Elementary School
$1,243
per employee
Institution
522
Middle School
$1,355
per employee
525
High School
$1,125
per employee
975
Drinking Establishment
$4.52
per sq ft
Restaurant
934
Fast Food Restaurant (with drive-thru)
$10.38
per sq ft
938
Coffee Shop with Drive-Thru (no indoor seating)
$1,159
1 per drive-thru lane
820
Shopping Center
$1.69
per sq ft
Retail
841
Automobile Sales - Used/New
$2.62
per sq ft
1
945
Convenience Store/Gas Station -GFA 4-5.5k
$5,405
per pump
110
Light Industry/High Technology
$0.45
per sq ft
140
Manufacturing
$0.52
per sq ft
Industrial
150
Warehousing
$0.13
per sq ft
151
Mini -Storage
$11.73
per storage unit
710
General Office
$1.01
per sq ft
Office
720
Medical Office / Clinic
$2.75
per sq ft
750
Office Park 1
$0.91 1
per sq ft
ITE Trip Generation manual, I Ith Edition
"sq ft" means square foot.
"pump" means vehicle servicing position / gas pump.
"room" means available hotel room.
Pursuant to chapter 22.100 SVMC, transportation impact fees for uses not listed in the rate table shall
be based on (1) the most similar land use category identified in the table, or (2) the base rate and the
most similar land use category identified in ITE Trip Generation Manual, as documented by a trip
generation and distribution letter in accordance with Section 3.2 of the Spokane Valley Street
Standards.
Resolution 25-013 Fee Schedule for 2026 Page 20 of 21
NORTH PINES ROAD SUBAREA TRANSPORTATION IMPACT FEE SCHEDULE
Pursuant to chapter 22.100 SVMC and the adopted Mirabeau and North Pines Road Subarea Transportation
Impact Fee Rate Study, the following fees are the transportation impact fees applicable within the North Pines
Road subarea identified in the Rate Study.
Base Rate = $2,195 per PM Peak Trip
Land Use Group
ITE Code
ITE Land Use Category
IMPael Fee Per Unit
210
Single Family & Duplex
$2,063
per dwelling unit
Residential
220
Multi -Family (Low -Rise) - Not Close to Rail
$1,119
per dwelling unit
Transit
310
Hotel (3 or More Levels)
$1,295
per room
Services
492
Health Club
$7.57
per sq ft
912
Bank
$29.97
1 per sq ft
520
Elementary School
$3,906
per employee
Institution
522
Middle School
$4,258
per employee
525
High School
$3,533
per employee
975
Drinking Establishment
$14.21
per sq ft
Restaurant
934
Fast Food Restaurant (with drive-thru)
$32.62
per sq ft
938
Coffee Shop with Drive-Thru (no indoor seating)
$3,640
per drive-thru lane
820
Shopping Center
$5.30
per sq ft
Retail
841
Automobile Sales - Used/New
$8.23
per sq ft
945
Convenience Store/Gas Station -GFA(4-5.5k)
$16,983
per pump
110
Light Industry/High Technology
$1.43
per sq ft
140
Manufacturing
$1.62
per sq ft
Industrial
150
Warehousing
$0.40
per sq ft
151
Mini -Storage
$36.87 1
per storage unit
710
General Office
$3.16
per sq ft
Office
720
Medical Office / Clinic
$8.62
per sq ft
750
Office Park
$2.85
per sq ft
ITE Trip Generation manual, I lth Edition
"sq ft" means square foot.
"pump" means vehicle servicing position / gas pump.
"room" means available hotel room.
Pursuant to chapter 22.100 SVMC, transportation impact fees for uses not listed in the rate table shall
be based on (1) the most similar land use category identified in the table, or (2) the base rate and the
most similar land use category identified in ITE Trip Generation Manual, as documented by a trip
generation and distribution letter in accordance with Section 3.2 of the Spokane Valley Street
Standards.
Resolution 25-013 Fee Schedule for 2026 Page 21 of 21