HomeMy WebLinkAbout25-163.01 Kimley-Horn and Associates, Inc. - Aquatics Facilities Assessment Amendent 1CONTRACT AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF
SPOKANE VALLEY AND KIMLEY-HORN AND ASSOCIATES, INC.
Spokane Valley Contract No. 25-163.01
For good and valuable consideration, the legal sufficiency of which is hereby acknowledged, City and the
Consultant mutually agree as follows:
1. Purpose: This Amendment is for the Contract for development of the Parks and Recreation Master Plan
Update, by and between the Parties, executed by the Parties on October 20, 2025, and which terminates on
June 30, 2026. Said contract is referred to as the "Original Contract" and its terms are hereby incorporated
by reference.
2.Original Contract Provisions: The Parties agree to continue to abide by those terms and conditions of the
Original Contract and any amendments thereto which are not specifically modified by this Amendment.
3. Amendment Provisions: The Original Contract is subject to the following amended provisions, which
are attached hereto as Appendix "A". All such amended provisions are hereby incorporated by reference
herein and shall control over any conflicting provisions of the Original Contract, including any previous
amendments thereto.
4. Compensation Amendment History: This is Amendment #1 of the Original Contract. The history of
amendments to the compensation on the Original Contract and all amendments is as follows:
Date Compensation
Original Contract Amount October 20, 2025 $127,800.00
Amendment #1 to be executed $ 29,000.00
Total Amended Compensation $156,800.00
The parties have executed this Amendment to the Original Contract this 36 day of April, 2026.
CITY OF SP KANE VALLEY: CONSULTANT / CONTRACTOR:
John Ho an -TVUBy: Nick Chen, AICP
City Manager Its: Authorized Representative
APPENDIX "A"
1. Paragraph 3 (Compensation) of the Original Contract is hereby amended to change the total
compensation paid from $127,800.00, to $156,800.00 (which includes Washinton State Sales Tax if any is
applicable). Paragraph 3 of the Original Contract is amended to read as follows: City agrees to pay
Consultant a flat fee of $156,800.00, (which includes Washington State Sales Tax if any is applicable) as full
compensation for everything done under this Agreement, as set forth in Exhibit A. Consultant shall not perform any
extra, further, or additional services for which it will request additional compensation from City without a prior written
agreement for such services and payment therefor.
2. Scope of Services, (Exhibit A) of the Original Contract, is hereby amended to include the "Supplemental
Scope of Services" outlined in Exhibit A-1 which is attached hereto and incorporated herein by this
reference.
FA
EXHIBIT "A-1" — SUPPLEMENTAL SCOPE OF SERVICES
Project Understanding
The City intends to enter an Agreement Amendment with Kimley-Horn to conduct a
supplemental aquatic facility audit as part of the Parks & Recreation Master Plan Update. Spokane
Valley has three public outdoor aquatic facilities: Park Road Pool, Terrace View Pool and Valley Mission
Pool.
Additional Scope of Services
Kimley-Horn will provide the services specifically set forth below.
Task 1 Facility Assessments
Prior to beginning this task, the City will furnish the Professional any existing information on the site
including topographic surveys, geotechnical reports, as -built plans, data and maps from prior master plans,
and plats with utility easements and locations shown. This task includes a one -day in -person visit from the
Professional and team members.
1.1 Initial Communication and Coordination
Prior to and during this task the Professional will finalize timelines with the City, set up communication
protocol, hold a project kick-off meeting, and establish procedures for providing project status reports.
1.2 Facility Visit
The Professional will need to become familiar with the location, condition, and programming offered at all
existing aquatic facilities.
The basic approach to this task will consist of the following:
A. Prior to visiting the pools — the City will provide the Professional any existing information on the
pools including age, known condition issues, chemical usage, recent renovations, current
operating costs, attendance, and revenue.
B. The Professional will visit the three outdoor aquatic facilities and perform a general evaluation
of the condition of the facility. The facilities will be photographed and information about
condition and operational issues will be documented in the form of descriptive meeting notes.
C. Overview comments will be developed and submitted that may include information regarding
support spaces, parking, ADA compliance, and other site issues.
1.3 Conditions Report
A. The deliverable will consist of a one -to -two -page report for each location noting the following:
a. The type of pool, program elements and systems
b. Substandard conditions and/or shortcomings of the swimming pools will be documented
with analysis for possible action for correction, including identification of any equipment
and/or systems requiring more intensive evaluation and analysis.
c. Recommended priority of renovation or replacement of pool systems, and site renovation
B. The conditions report will include a discussion of estimated life -cycle in current or repaired
conditions.
C. An Opinion of Probable Cost for any repairs noted in the report will be provided. Because the
Professional does not control the cost of labor, materials, equipment, or services furnished by
others, methods of determining prices, or competitive bidding or market conditions, any
opinions rendered as to costs, including but not limited to opinions as to the costs of
construction and materials, shall be made on the basis of its experience and represent its
judgment as an experienced and qualified professional, familiar with the industry. The
Professional cannot and does not guarantee that proposals, bids, or actual costs will not vary
from its opinions of cost.
Services Not Included
Any other services, including but not limited to the following, are not included in this Agreement:
Structural Analysis of pool shell
Determining causes of identified water loss
Geotechnical testing and analysis
Locating electrical currents and their sources at and around the pools
Equipotential bonding and grouping of the pool(s)
Franchise Utility Coordination
Traffic Impact Studies or Signal Design
Preparation of Traffic control plans
Revisions due to changes in regulations
Construction Documents of any kind
Archaeological Survey
Detailed Labor/Materials Cost Estimates (As Prepared by an Estimating Service)
Record Drawing Survey
Wetlands Permitting / Delineation
Environmental Impact Statement
3D Architectural Renderings and Computer Animations
Specialty AudioNisual or Food Service Consultant Services
Operations and Training Consultation
Information Provided By City
We shall be entitled to rely on the completeness and accuracy of all information as requested in the scope
of services above provided by the City or the City's consultants or representatives.
Schedule
We will provide our services as expeditiously as practicable with the goal of meeting the following schedule:
Task 1 Facility Assessments
Fee and Expenses
1 Month
Kimley-Horn will perform the services in Tasks 1 for the total lump sum fee below (inclusive of expenses).
Task 1 Facility Assessments $29,000
Total Lump Sum Fee (Tasks 1)
$29,000
Lump sum fees will be invoiced monthly based upon the overall percentage of services performed.
Payment will be due within 25 days of your receipt of the invoice and should include the invoice number
and Kimley-Horn project number.
CERTIFICATE OF LIABILITY INSURANCE
DATE IMMMD""
31l6/2026
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT_ if the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
Edgewood Partners Ins Center
3780 Mansell Rd. Suite 370
Alpharetta GA 30022
INSURED
Kimley-Horn and Associates, Inc.
421 Fayetteville Street, Suite 600
Raleigh, NC 27601
COVERAGES
CERTIFICATE NUMBER:1072092161
INSURERS) AFFORDING COVERAGE
National Union Fire ins Co of Pittsburg
_New_Hampshire Insurance Company
Lloyd's of London
Columbia Casualty Company_,___ ._._,_..._,.__..
REVISION NUMBER:
19445
85202
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
TR
TYPE OF INSURANCE
;ADDLISUHR
POLICY NUMBER
POLICY EFF-POLICY
MIDD
EXP n
M D
LIMITS
A
X
COMMERCIAL GENERAL LIABILITY
GL5268168
4/1/2026
4/112027
EACH OCCURRENCE
s2,000,000
-- j CLAIM&MADE i- OCCUR
.._
AMAGETORENTED
PREMISES Ea occuzrence) ---•
_
; S I.000,000
..............._.___...._.____..._.....__._._.—
MED EXP IAny acre person
1 $ 25,000
X
Contraatua# Liab
PERSONAL 8 ADJ INJURY
IS 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER,
GENERAL AGGREGATE
S 4,000,000
POLICY '.. JECOT- L , LOC
I
PRODUCTS - COMP/OP AGG
! S 4,000,000
I $
I OTHER.
IIII..__._.._._..........___._._._........
,
A
A
AUTOMOBILE
X ANY .AUTO
CA4489663 (AOS)
CA2970071(MA)
4/1/2026
41M026
4/1/2027
; 411/2027
COMBINED SINGLE LIMIT
Eaaccdem .�,
BODILY INJURY (Per pe sun)
' $ 2 000,000
$
�f)WNED SCHEOULED
AUTOS ONLY AUTOS
BODILY INJURY (Per accidam)
$
Pt20PEf2iY DAMAGE...., ..
tPer ecc+der0
S
',. X HIRED X NON-OV'NEO
AUTOS ONLY AUTOS ONLY ;
..._._._._,_..._.� .. _............__.
S
D
X
UMSRELLALIAe HX OCCUR
8038116944
411/2026
41112027 !
EACH OCCURRENCE
$5,000,000
< AGGREGATE
S 6,000,000
X
EXCESS L1AS CLAIMS -MADE
i
DED i X RETENTION$
S
g
B
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY Y / N
ANYPROPRIETORIPARTNERIEXECUTIVE N
WC067961230(AOS)
WCO13711885 (CA)
1
4/1/2026
4/1/2026
411!2027
4/112027
X STATUTE ERH
E.L. EACH ACCIDENT
$ 2,000,000
OFFICERA,fEMBEREXCLUDE4?
NIA
I
EL. DISEASE • EA EMPLOYEE,
$ 2,000,000
(Manummy In NNj
]
It yas, describe under
DESCRIPTION OF OPERATIONS below
i
r
_
E.L. DISEASE - POLICY LIMIT
S 2,000.000
C
Professional Liability
RLUSP26000552026
4/1/2026
4/112027
Per Claim $2,000,000
Aygragate $2,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS! VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached It more space Is required)
Re: Contract #25-163, Spokane Valley Parks Master Plan.
City of Spokane Valley, WA is named as an Additional Insured with respects to General Liability where required by written contract. The above referenced
liability policies with the exception of workers compensation and professional liability are primary & non-contributory where required by written contract. Should
any of the above described policies be Cancelled by the issuing insurer before the expiration date thereof, we will endeavor to provide 30 days' written notice
(except 10 days for nonpayment of premium) to the Certificate Holder.
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WELL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
City of Spokane Valley, WA
10210 East Sprague Avenue
Spokane Valley, WA 99206
AUTHORIZED REPRESENTATIVE
�r �
O 1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD