HomeMy WebLinkAbout25-065.01 AHBL Inc. - Balfour Park Playground & Splashpad CIP #0374, Amendment #1CONTRACT AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF SPOKANE VALLEY AND AHBL, INC. Spokane Valley Contract #25-065.01 For good and valuable consideration, the legal sufficiency of which is hereby acknowledged, City and the Consultant mutually agree as follows: 1. ose: This Amendment is for the Contract for design services on the Balfour Park Playground and Splashpad project by and between the Parties, executed by the Parties on March 25, 2025, and which terminates on December 31, 2027. Said contract is referred to as the "Original Contract" and its terms are hereby incorporated by reference. 2. Original Contract Provisions: The Parties agree to continue to abide by those terms and conditions of the Original Contract and any amendments thereto which are not specifically modified by this Amendment. 3. Amendment Provisions: The Original Contract is subject to the following amended provisions, which are attached hereto as Appendix "A". All such amended provisions are hereby incorporated by reference herein and shall control over any conflicting provisions of the Original Contract, including any previous amendments thereto. 4. Compensation Amendment History: This is Amendment #1 of the Original Contract. The history of amendments to the compensation on the Original Contract and all amendments is as follows: Date Compensation Original Contract Amount March 25, 2025 $22,800.00 Amendment #1 to be executed $130,725.00 Total Amended Compensation $153,525.00 The parties have executed this Amendment to the Original Contract this ?Q W day of May, 2026. CITY OF SPOKANE VALLEY: JdCn Hohman City Manager APPROVED AS TO FORM: �_ M_, • •e City Attorney CON LTA By: Erick Fit24patnck Its: Principal APPENDIX "A" 1. Paragraph 3 (Compensation) of the Original Contract is hereby amended to change the total compensation paid from $22,800.00 to $153,525.00. Paragraph 3 of the Original Contract is amended to read as follows: City agrees es to pay Consultant an agreed upon hourly rate up to a maximum amount of $153,525.00 as full compensation for everything done under this Agreement, as set forth in Exhibit A. Consultant shall not perform any_extra further, or additional services for which it will request additional compensation from City without a prior written agreement for such services and payment therefore. 2. The Scope of Services, (Exhibit A) of the Original Contract, is hereby amended to include the following additional tasks and/or services: Consultant shall provide additional services to include completing the design to 100%, bidding support and construction support for Balfour Park Playground and Splashpad project as shown on attached Exhibit A- 1 to this Appendix "A". 0) EXHIBIT A-1 fit'■ May 5, 2026 REVISED Glenn Ritter City of Spokane Valley 10210 East Sprague Avenue Spokane Valley, WA 99206 Project: Balfour Park - Playground and Splashpad Phase III, AHBL No. 2260263.10/.20/.40 Subject: Revised Proposal for Professional Design Services Dear Glenn: Thank you for the opportunity to submit this revised proposal of professional design services for the Balfour Park - Playground and Splashpad Phase III project in Spokane Valley, Washington. Based on our previous work and experience on the project, AHBL is pleased to offer this proposal. Phase III of this project will take the previous (Phase II) 60% project drawings and documents through to 100% Construction Documents (CDs) and will include Bidding Assistance, Construction Administration, and Project Closeout. The project will include two primary scopes of work: the playground with all associated incidentals and the splashpad, including all associated incidentals. The playground and splashpad will be treated as an Owner Furnished, Owner Installed (OFOI) project delivery method, allowing the owner to purchase the equipment directly through a purchasing cooperative agreement. This allows the vendors to install their equipment alongside preferred local subcontractors and provide City of Spokane Valley (COSY) and its constituents with the best quality products and installations. City of Spokane Valley has chosen Great Western Recreation (GWR) for the playground, and GWR, along with Land Expressions (LE) and Water Odyssey (WO), for the splashpad. AHBL will manage the remaining design coordination efforts for both Permit and Conformed Construction Sets as the project Landscape Architects of Record. We will provide intermediate project milestone deliverables, as well at both 80% and 95% CDs for comment, review, and coordination between all trades. We will manage our team of design subconsultants, including civil, structural, and electrical, and will provide consistent point -of -contact to City of Spokane Valley. While GWR and LE will be contracted directly with COSV, we will also work and coordinate closely with GWR and LE to ensure all documents are cohesive and complete and that all permitting requirements are met. In creating and compiling the final project drawings and documents, AHBL will also identify all OFOI items on the project, as well as all Contractor Furnished, Contractor Installed (CFCI) items, which will be published for public bid. AHBL will assist COSY with the Bidding Phase and will assemble a Conformed Construction Set after a general contractor (GC) is awarded. We will continue to support through Construction Administration and the Project Closeout phases of the project. Lastly, we understand the design schedule for this project will kick off upon approval of this contract, with the design team working toward the milestones shown in the tentative project design schedule below. Civil Engineers Structural Engineers Landscape Architects Community Planners Land Surveyors Neighbors SPOKANE 601 West" Avow Suite 305 Spo mm,WA 9MI-M13 509M5019 TEL www.ahbl.com Glenn Ritter May 5, 2026 2260263.10/.20/.40 Page 2 of 8 Tentative Project Design Schedule Notice to Proceed (NTP): May 2027. • Construction Documents: May 2026 — November 2026 0 80% Construction Documents: July 2026 0 99% Construction Documents: September 2026 0 Permitting: October 2026 — November 2026 (Assumes six to eight weeks). • Bidding: December 2026 o Advertise for Bids: TBD (December 1, 2026) 0 Pre -Bid Meeting: TBD (December 15, 2026) o Bids Due: TBD o Anticipated Construction Notice to Proceed: TBD (early 2027) • Construction Administration o Pre -Construction Meeting: TBD o Construction Duration: TBD (Assumes six months) ➢ Begin: TBD (April 2027) ➢ End: TBD (September 2027) • Project Closeout: TBD (October 2027) Our assumptions for this project are listed below: • AHBL will be responsible for managing the site plan and providing timely updated CAD and PDF drawings to the design team and subconsultants. • Project design schedule is from May 2026 — December 2026. • Project construction schedule is from April 2027 — October 2027. • Documents will be prepared, indicating and differentiating OFOI and CFCI items for clarity and bidding purposes. • No roadway frontage improvements or offsite utility improvements will be required. • Playground vendors (and team) will provide plans and CAD drawings for incorporation into the Permit and Construction plan sets. They may also provide 3D renderings of final equipment selection. • Splashpad vendors (and team) will provide plans and CAD drawings for incorporation into the Permit and Construction plan sets. They may also provide 3D renderings of final equipment selection. • Additional full project 3D renderings, (if desired) can be provided for an additional fee as an additional service. R H B L Glenn Ritter May 5, 2026 2260263.10/.20/.40WN �� Page 3 of 8 Milo • COSV will provide any/all completed boilerplate specifications for incorporation into the Project Specifications Manual. • All applicable Division 00 and Division 01 Specifications will be prepared using COSV standard templates and information provided by COSV. • All applicable Technical Specifications will be prepared in CSI format. • Permitting and design will not be phased or broken into multiple permits and/or bid packages (unless noted otherwise). Our scope of work is divided by discipline and design phase and is provided below. Civil Engineering — 2260263.10 100% Construction Documents — Task 11 Prepare base sheets for design drawings using the topographic survey and the site plan provided by AHBL Landscape. 2. Perform site visit and confirm existing conditions that might differ from the previous phase design drawings. Confirm stormwater facility and sizing. 3. Prepare plans and supporting details for a Temporary Erosion and Sedimentation Control (TESC) plan. Coverage under the Department of Ecology Construction Stormwater General Permit is not anticipated because all stormwater runoff will be infiltrated onsite. 4. Prepare site grading plan. Provide finish grade elevations for the site improvements and coordinate design elevations with the landscape architect. Site wall tops and bottoms will be specified, as needed, but this scope does not include the structural design of retaining walls, which should be designed by a structural engineer. This scope of work will include earthwork calculations for permitting purposes only. 5. Prepare plans and calculations for a storm drainage plan. We anticipate the playground will need an underdrain system. This work includes coordination with landscape and the playground supplier to adequately drain the playground subbase. 6. Prepare plans and calculations for a storm drainage letter addressing the proposed improvements. We anticipate that COSV will accept a drainage letter in lieu of a full drainage report to show compliance with the Phase 1 park improvements. 7. Prepare a horizontal control plan for the site improvements. This work includes appropriate dimensioning to locate site features, hardscape, and civil utilities. 8. Coordinate with the splashpad supplier on water service and sewer discharge. Water will come from the existing pump room inside the park building and a sewer connection will be made to the existing service line that serves the park building. Offsite water and sewer improvements are not expected at this time and therefore are not included in this scope. o© O Glenn Ritter May 5, 2026 2260263.10/.20/.40 Page 4 of 8 9. Coordinate with the design team and COSY for project development and coordination. We assume four meetings. 10. Prepare technical specifications for civil site work based on COSV General Special Provisions. These specifications will be provided for inclusion into the bidding documents. 11. Prepare cost estimates for civil related items. 12. The following products will be prepared for 80%, 95% and 100% CD phases: • TESC Plan, Notes, and Details • Site Paving Plan • Drainage and Grading Plan • Water Plan • Updated Cost Estimates and Specifications • Drainage Letter (at 95%) Bidding Services — Task 12 13. Attend pre -bid meeting (in person). 14. Support COSV with bidding questions and addenda preparation, as required. 15. Upon bidding completion, compile Conformed Construction Set design package including all drawings and project specifications. Construction Administration Assistance — Task 13 16. Attend onsite pre -construction meeting (in person). 17. Support COSV with reviews of construction Submittals, ASIs, RFIs, COs, etc., throughout the construction phase (April — September 2027). 18. Attend construction check -in meetings (virtual) on an as -needed basis. This proposal assumes five meetings throughout the construction phase (April — September 2027). 19. Attend onsite construction meetings on an as -needed basis. This proposal assumes attending three meetings throughout the construction phase (April — September 2027). 20. Attend onsite punchlist walkthrough. Generate summary report/timeline for contractor corrections. 21. Compile civil related as -built drawings and final CAD files based on contractor redlines. 'R I H B L Glenn Ritter May 5, 2026ON 2260263.10/.20/.40 _, Page 5 of 8 Structural Engineering — 2260263.20 100% Construction Documents — Task 21 Structural engineering of artwork foundations, seat walls, and anchorage of artwork to the proposed foundations. We assume that the artwork element will not require engineering, but we can provide this additional scope, if necessary, for an additional fee. Biddinq Services — Task 22 Permitting assistance will involve responding to any Authorities Having Jurisdiction (AHJ) comments, as required. Construction Administration Assistance — Task 23 Construction Administration services will include responding to contractor questions and review of shop drawings, as appropriate. Landscape Architecture — 2260263.40 100% Construction Documents — Task 41 Coordinate with the design team and develop 80% CD level design deliverable package, including drawings, CSI specifications, and Rough Order of Magnitude (ROM) estimate for COSV comment and review. Includes one design team "kickoff' meeting (virtual, 1 hour) and one design team "80% page -turn" meeting (virtual, 2 hours). Coordinate with the design team and develop 95% CD level design deliverable package, including drawings, CSI specifications, and ROM estimate for COSV comment and review. Includes one design team "95% page -turn" meeting (virtual, 2 hours). 3. Coordinate with the design team and develop Permit level design deliverable package, including drawings, CSI specifications, and ROM estimate for COSV building permit application. 4. Coordinate and support LE/GWR with simultaneous splashpad Spokane Regional Health Department permit review process. Bidding Services — Task 42 5. Attend pre -bid meeting (in person) and support COSY with meeting presentation. 6. Support COSV with bidding questions and addenda preparation, as required. 7. Upon bidding completion, compile Conformed Construction Set design package, including all drawings and project specifications. _R H B L Glenn Ritter May 5, 2026 2260263.10/.20/.40 Page 6 of 8 dw ®N I® Construction Administration Assistance — Task 43 8. Attend onsite pre -construction meeting (in person). 9. Support COSV with reviews of construction Submittals, ASIs, RFls, COs, etc., throughout the construction phase (April — September 2027). 10. Attend bi-weekly (virtual) construction check -in meetings. Assumes four meetings throughout construction phase (April — September 2027). 11. Attend monthly (onsite) construction meetings. Assumes four meetings throughout construction phase (April — September 2027). 12. Any additional requested meetings will be billed on a time and expense basis. Project Closeout — Task 44 13. Attend/lead onsite punchlist walkthrough. Generate summary report/timeline for contractor corrections. 14. Attend/lead onsite back -punch walkthrough. Confirm contractor corrections were made. 15. Generate/assist with project closeout documentation, assembly of all O&M documents (prepared and submitted by contractors), and as -built drawings based on contractor's redlines and final CAD files. Electrical Engineering (by Subconsultant) — Task 45 These services will be provided by MW Engineers as a subconsultant to AHBL. Refer to the proposal from MW Engineers attached for the detailed scope. This scope of work will be billed on a time and expense basis, not to exceed the amount provided below. Management Reserve — Task 46 Provide miscellaneous services as requested by the COSV Project Manager. This scope of work will be billed on a time and expense basis, not to exceed the amount provided below. Reimbursable Expenses — Task 90 Reimbursable expenses such as mileage and reprographics. This scope of work will be billed on a time and expense basis, with an estimate provided below. W© N Glenn Ritter May 5, 2026 ®� 2260263.10/.20/.40 t Page 7 of 8 Billing Summary Items Description Task No. Amount Civil Engineering — 2260263.10 Items 1-12 100% Construction Documents T-11 $12,000 Items 13-15 Bidding Services T-12 2,500 Items 16-21 Construction Administration Assistance. T-13 6,000 Subtotal $20,500 Structural Engineering — 2260263.20 Item 1 100% Construction Documents T-21 $4,500 Item 2 Bidding Services T-22 500 Item 3 Construction Administration Assistance T-23 1,000 Subtotal $6,000 Landscape Architecture (Prime) — 2260263.40 Items 1-4 100% Construction Documents T-41 $47,550 Items 5-7 Bidding Services T-42 5,000 Items 8-12 Construction Administration Assistance T-43 15,000 Items 13-15 Project Closeout T-44 6,200 Subtotal $73,750 Electrical Engineering (by Subconsultant) (T&E, NTE) T-45 $24,975 Management Reserve (T&E, NTE) T-46 $5,000 Reimbursable Expenses (T&E est.) T-90 $500 GRAND TOTAL $130,725 We believe we have determined, as best we can, the number of hours required to complete these tasks. However, some of the tasks listed are influenced by factors outside of our control. During the course of the project, if it is determined that more hours are required to complete any of these tasks due to circumstances beyond our control, we will notify you immediately. We will not perform additional work until we have your written authorization. Glenn Ritter May 5, 2026 2260263.10/.20/.40 W Page 8 of 8 MIR Exclusions This proposal does not include fees associated with agency reviews, submittals, or permits, nor does it include any work associated with the following services: a) Except as noted in the scope of work, professional services of subconsultants, e.g., geotechnical and traffic engineers, or wetlands, wildlife, site lighting (beyond that described herein), and other specialists that may be required. b) Preparation, submittal, or securing of extensions or renewals for expiring or expired applications or permits. Monitoring applications or permit expiration dates is the responsibility of others. c) Offsite improvements, other than those noted above. d) Costs associated with reconsiderations of agency decisions. e) Costs associated with preparing and filing variances, etc. f) Costs associated with substantial redesign after preparation of design development drawings. g) Preparation of maintenance manuals, reports, or certification testing of installed improvements. h) Design of structural walls or underground vaults (unless otherwise noted). i) Additional inspections that are a result of contractor non-compliance to the plans or specifications. Although we do assist the owner during the construction process, this proposal is for design services only and in no way implies we are construction managers. If you find this proposal acceptable, please prepare your standard contract. Our receipt of the signed contract or your written authorization will be our notification to proceed. If you have any questions, please call me at (509) 252-5019 Sincerely, Craig D. Andersen, PLA, LEED AP Director of Landscape Architecture CDA/lsk Enclosure Erick Fitzpatrick, Skylar Brower, James Davis, Drew McEachern — AHBL Accounting Q:\2026\2260263\Proposals_Contracts\Finals\20260505 Pro (REV) 2260263.10.20.40.docx Akk MW W Engineers April 7, 2026 James Davis AHBL, Inc. 601 W Main Ave Suite 305 Spokane, WA 99201 PROJECT: Balfour Park & Splash Pad CC: Craig Andersen —AHBL, Inc. Mark Wilke — MW Engineers RE: Electrical Engineering Fee Proposal James, 601 W First Ave, Ste 1300 Spokane, WA 99201, USA 509.838.9020 mwengineers.com Thank you for providing MW the opportunity to continue working with AHBL, Inc. on the Balfour Park & Splash Pad project. In accordance with your request, MW Consulting Engineers is pleased to submit this fee proposal to provide Electrical Engineering for the following Scope of Services for the below fees: time and expense, Lto noxceed Design: $16,400 Construction Administration: $7,575 Total Engineering Service Fee: $23,975 Scope of Services: Design: • Site visits for field investigation to verify existing conditions and proposed routing. • Production of stamped MEP drawings and specifications suitable for permitting. • Perform electrical load calculations. • Attendance in virtual consultant meetings. Construction Administration: • Allow office time for submittal review, RFI responses, and review of change proposal pricing. • Attendance in virtual construction meetings as required. Potential Supplemental Services: • Record Drawings: We propose to provide record drawings for the electrical scope of work based on the contractor -provided field markups for a lump sum fee of $1,000. Assumptions: 1. Agreement is in accordance with AIA Document C401-2017, Standard Form of Agreement Between Architect and Consultant. 2. Design is based on the scope described in your initial email dated April 1, 2026 which is understood to consist of the following: a. Connections to new splash pad equipment located in the (2-3) new splash pad vaults, and splash pad lighting fixtures. b. New artwork up -lighting fixtures, approximately (3). Page 1 of 3 /& MW NN.4r Engineers 601 W First Ave, Ste 1300 Spokane, WA 99201, USA 509.838.9020 mwengineers.com c. Connections to lighting fixtures integral to the playground equipment. d. Raceway system (base bid) and speaker wiring and installation of Owner -Furnished Contractor -Installed (OFCI) pole -mounted audio speakers. 3. Existing infrastructure is understood to be fully functional and have the sufficient capacity to support the project, with no replacement of distribution equipment being required. Electrical scope is limited to the extension of new circuits to splash pad equipment, new playground and splash pad lighting fixtures, and pole -mounted audio speakers. 4. Existing MEP drawings are available for the area being renovated. 5. Electronic backgrounds for the existing building will be made available to MW. 6. This proposal assumes MW's work will be identified in a single construction document package with a 3-part CSI-format specification. 7. Construction administration site visits beyond the quantity indicated above will be performed on an as -needed basis at MW CONSULTING ENGINEERS 2026 HOURLY RATES, JANUARY 1, 2026 on page 3 of this proposal. 8. Reimbursable expenses are not anticipated for this project. 9. Excludes: a. Construction administration site visits b. Constructability review c. Commissioning d. Demand metering, if necessary. The owner will provide 30-day demand metering of the existing electrical feeders and equipment based on the recommendations of the design team following preliminary field investigation. e. Electric Vehicle Charging Station design f. Engineering and services not specifically outlined within this proposal. g. LEED documentation and energy modeling h. Power System Study (Arc -Flash Hazard Analysis, Selective Coordination Study, and Short Circuit Analysis) performed by the switchgear vendor. i. Record drawing preparation j. Permit and review fees required by all required Authorities Having Jurisdiction k. Photovoltaic (PV) system larger than the code minimum as required under the Washington State Energy Code. I. Telecommunications, audio, and visual active equipment m. Value engineering services n. Video Surveillance system Please advise MW if this proposal is acceptable, and do not hesitate to reach our if you have any questions. Sincerely, Dylan Cunningham, PE Principal, Electrical Systems Page 2 of 3 Akk Mw W Engineers MW CONSULTING ENGINEERS 2026 HOURLY RATES, JANUARY 1, 2026 Managing Principal $280.00 Principal $245.00 Associate $225.00 Senior Project Manager $210.00 Project Manager $200.00 Senior Engineer $190.00 Project Engineer $180.00 Engineer II $160.00 Engineer 1 $150.00 Designer IV $190.00 Designer III $180.00 Designer II $160.00 Designer 1 $140.00 BIM Manager $165.00 BIM Operator III $130.00 BIM Operator II $120.00 BIM Operator 1 $110.00 Senior Technology Systems Project Manager $220.00 Senior Technology Systems Engineer $200.00 Senior Technology Systems Designer $190.00 Senior Field Representative $190.00 Field Representative $165.00 Senior Lighting Designer $190.00 Lighting Designer $165.00 Administration III $150.00 Administration II $130.00 Administration 1 $100.00 601 W First Ave, Ste 1300 Spokane, WA 99201, USA 509.838.9020 mwengineers.com Page 3 of 3 ACOR" CERTIFICATE OF LIABILITY INSURANCE `l DATE(MM/DDYYYV) 1 8/26/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER AssuredPartners Design Professionals Insurance Services, LLC 3697 Mt. Diablo Blvd., Suite 230 Lafayette CA 94549 CONTACT NAME: Maurice Thornton PHONE FAX A N E • 510-272-1476 A/C, /C No): ADDRESS: DesignProCerts@AssuredPartners.com INSURERS AFFORDING COVERAGE NAIC # INSURER A: XL Specialty Insurance Company 37885 LI nse#: 6003745 INSURED AH13LINC-01 AHBL, Inc. 2215 North 30th Street, Suite 300 INSURER B : Travelers Property Casualty Company of America 25674 INSURER C : The Charter Oak Fire Insurance Company 25615 INSURER D: The Travelers Indemnity Company 25658 Tacoma WA 98403 INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER:911303208 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL SUBR POLICYNUMBER POLICY EFF MM/DD/YYVY POLICY EXP MM/DD/YYV LIMITS D X COMMERCIAL GENERAL LIABILITY Y Y 6808J59430A 9/11/2025 9/11/2026 EACH OCCURRENCE $1,000,000 CLAIMS -MADE � OCCUR DAMAGES ( RENTED PREMISES Ea occurrence $ 1,000,000 MED EXP (Any one person) $ 10,000 PERSONAL & ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY [X]JECT LOC PRODUCTS - COMP/OP AGG $ 2,000,000 $ OTHER: C AUTOMOBILE LIABILITY Y Y BA8P56584A 9/11/2025 9/11/2026 COMBINED SINGLE LIMIT Ea accident $ 1,000,000 X BODILY INJURY (Per person) $ ANY AUTO OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ X PR0PERTYDAMAGE Per accident $ HIRED X NON -OWNED AUTOS ONLY AUTOS ONLY $ B X UMBRELLA LIAB X OCCUR Y Y CUP8J596642 9/11/2025 9/11/2026 EACH OCCURRENCE $10,000,000 AGGREGATE $ 10,000,000 EXCESS LIAB CLAIMS -MADE DED X RETENTION $ D WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y / N 6808J59430A 9/11/2025 9/11/2026 PER X OTH- STATUTE ER WA St0 Gap ANYPROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED) ❑ N/A E.L. DISEASE - EA EMPLOYEE $ 1,000,000 (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ 1,000,000 A Professional Liability` DPR5047495 9/11/2025 9/11/2026 Per Claim $5,000,000 'Includes Contractors Pollution Legal Liability Aggregate Limit $5,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) The following policies are included in the underlying schedule of insurance for Umbrella/Excess Liability: General Liability/Auto Liability/Employer's Liability. Project #2241024.11/.41 1 25-065, Balfour Park Playground and Splash Pad, Civil Engineering and Landscape Architecture Services — Spokane, WA City of Spokane Valley is named as an additional insured as respects general liability and auto liability as required per written contract. General Liability is Primary/Non-Contributory per policy form wording. Insurance coverage includes waiver of subrogation per the attached endorsement(s). (;EH I II-ICA I E HOLDEH CANCELLATION 30 Dav Notice of Cancellation City of Spokane Valley Attn: Glenn Ritter 10210 East Sprague Avenue Spokane Valley WA 99206 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE A X41 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD