HomeMy WebLinkAbout2026, 06-16 Formal B Meeting PacketAGENDA
SPOKANE VALLEY CITY COUNCIL
REGULAR MEETING
FORMAL B FORMAT
Tuesday, June 16, 2026
6:00 p.m.
Remotely via ZOOMMeeting and
In Person at Spokane Valley City Hall, Council Chambers
10210 E. Sprague Ave.
Spokane Valley, WA 99206
Please Silence Your Cell Phones During Council Meeting
NOTE: Members of the public may attend Spokane Valley Council meetings in -person at the address provided
above, or via Zoom at the link below. Members of the public will be allowed to comment in -person or via Zoom
as described below. Public comments will only be accepted for those items noted on the agenda as "public
comment opportunity Citizens must register by 4 p.m. the day of the meeting to provide comment by Zoom.
Please use the links below to register to provide verbal or written comment.
• Sign W to Provide Verbal Public Comment at the Meeting via Calling -In
• Submit Written Public Comment Prior to the Meeting
• Join the Zoom WEB Meeting
CALL TO ORDER
INVOCATION: Pastor Steve Allen, Valley Real Life Church
PLEDGE OF ALLEGIANCE Lead by Girl Scout Troop 2141
ROLL CALL
APPROVAL OF AGENDA
SPECIAL GUESTS/PRESENTATIONS:
Dr. Harken, You Rock Recognition Award
PROCLAMATIONS:
GENERAL PUBLIC COMMENT OPPORTUNITY: This is an opportunity for the public to speak on any subject
except agenda action items, as public comments will be taken on those items where indicated. Please keep comments
to matters within the jurisdiction of the City Government. This is not an opportunity for questions or discussion.
Diverse points of view are welcome but please keep remarks civil. Remarks will be limited to three minutes per
person. If a person engages in disruptive behavior or makes individual personal attacks regarding matters
unrelated to City business, then the Council and/or Mayor may end that person's public comment time before the
three -minute mark. To comment via zoom: use the link above for oral or written comments as per those
directions. To comment at the meeting in person: speakers may sign in to speak but it is not required. A sign -
in sheet will be provided at the meeting.
ACTION ITEMS:
1. Public Hearing: 2026 Transportation Improvement Program Amendment- Adam Jackson, Kristen Armstrong
[public comment opportunity]
2. Resolution 26-008: Adopt 2026 TIP Amendment— Adam Jackson, Kristen Armstrong
Council Agenda June 16, 2026 Page 1 of 2
3. Public Hearing: Six Year Transportation Improvement Program (TIP) — Adam Jackson
[public comment opportunity]
4. Resolution 26-009: Adopt Six Year Transportation Improvement Program — Adam Jackson
5. Motion Consideration: Bridge Investment Program Application — Adam Jackson, Kristen Armstrong
[public comment opportunity]
NON -ACTION ITEMS:
6. Admin Report: Fireworks Code Text Amendment — Tony Beattie
7. Admin Report: Budget Workshop Follow -Up - John Hohman, Erik Lamb
INFORMATION ONLY (will not be reported or discussed):
GENERAL PUBLIC COMMENT OPPORTUNITY: General public comment rules apply.
COUNCIL COMMENTS
MAYOR'S COMMENTS
CITY MANAGER COMMENTS
EXECUTIVE SESSION
ADJOURNMENT
O�0
M�
�.L•
OPLO Li
Scan to access the meeting materials
Council Agenda June 16, 2026 Page 2 of 2
CITY OF SPOKANE VALLEY
Request for Council Action
Meeting Date: June 16, 2026 Department Director Approval:
Check all that apply: ❑ consent ❑ old business ❑ new business ® public hearing
❑ information ❑ admin. report ❑ pending legislation ❑ executive session
AGENDA ITEM TITLE: Public Hearing: 2026 Transportation Improvement Program (TIP)
Amendment #1
GOVERNING LEGISLATION: RCW 35.77.010
PREVIOUS COUNCIL ACTION TAKEN:
• May 26, 2026, Administrative Report discussing the 2026 TIP amendment #1.
• June 17, 2025, City Council adopted 2026-2031 TIP by Resolution 25-012.
• Annual adoption of the six -year transportation improvement plan by June 30.
BACKGROUND:
The projects and costs listed in the adopted TIP are based upon available information at the
time of adoption. This amendment includes cost estimate updates for anticipated 2026
expenses for several previously adopted projects and also adds projects that were not initially
scheduled in 2026 (i.e. planned for latter years but grant funds were awarded and the project
was able to start earlier).
The TIP is required to be financially constrained. The TIP reflects the City's short-term
transportation needs and provides a prioritized path forward. Since the City uses Real Estate
Excise Tax (REET) monies as matching funds for state and federal grants, this amendment to
the TIP is necessary to meet the state law that requires REET funds to only be used on projects
that have been identified in an adopted plan. Based on this information, it is recommended that
the 2026 TIP be amended to include these updates. Attached is a summary of the proposed
updates and a draft resolution.
OPTIONS: Conduct Public Hearing
RECOMMENDED ACTION OR MOTION: Conduct Public Hearing
BUDGET/FINANCIAL IMPACTS: Staff has confirmed that across the various funds applicable
to the proposed projects, sufficient funds are available to meet the local match requirements for
these projects (I.E. Funds 303, 311, 312, 315, 402, 403, 404). Further, the City will not initiate a
new project or award a construction contract without the necessary secured City funds.
STAFF CONTACT: Adam Jackson, Engineering Manager
Kristen Armstrong, Senior Engineer — Programming & Special Projects
ATTACHMENTS: 2026 TIP Amendment #1
City of Spokane Valley
Public Works Department
Adopted 2026 Transportation Improvement Program
(Adopted by Resolution 25-012 on 06-17-25)
Primary
city 2026
1 o a
Proj. # Project
From To
Source
Amount
Project Costs
d co E
1 Sprague Pedestrian Crossings (Chronicle & McKinnon) At Chronicle Rd. At McKinnon Rd. TIB $ 2,000 $ 8,000
2
Sprague Preservation (Bowdish to McDonald)
Bowdish Rd. McDonald Rd.
STBG
$ 3,000 $
29,000
O
3
Barker Road Reconstruction (Sprague to Appleway)
Sprague Ave. Appleway Ave.
FMSIB
$ - $
45,000
mom O-
4
Pines Rd. (SR27) / BNSF Grade Separation Project
Pines Rd. (SR 27) at BNSF Railway & Trent (SR 290)
RAISE
$ 795,000 $
14,031,000
N m N
5
Indiana Preservation (Sullivan to Desmet)
Sullivan Rd Desment Rd.
City
$ 1,436,000 $
1,436,000
(D 0 O
74 N N
6
S. Sullivan Rd. Preservation (8th to 24th)
8th Ave. 24th Ave.
Fed/Other
$ 1,846,000 $
5,276,000
0
C,j0
7
N. Sullivan Rd. Preservation (Spokane River to Kiernan)
Spokane River Bridge (north end) Kiernan Ave.
Fed/Other
$ 2,987,000 $
4,356,000
y
8
32nd &Pines Preservation
32: Pines Rd. to SR 27 Pines Rd: 32nd to 40th City
$ 1,779,000 $
2,375,000
E
9
Argonne Rd. Concrete Pavement - Indiana to Knox
Indiana Ave. Knox Ave.
Unfunded
$ 44,000 $
238,000
DO - 0) O
10
Wellesley Preservation (Sullivan to Flora)
Sullivan Rd. Flora Rd.
City
$ 75,000 $
75,000
M ,
m D-
11
Barker & 8th Roundabout
Barker Rd. at 8th Ave.
HSIP
$ - $
70,000
- rn >
12
Sullivan Rd. / SR 290 Interchange Reconstruction
Sullivan Rd. at SR 290
NHFP
$ 641,000 $
2,731,000
N -E 0
E
13
Argonne Rd. & 1-90 Interchange Bridge
Argonne Rd. Bridge at 1-90
FMSIB
$ 81,000 $
1,680,000
14
Barker Road Corridor (Mission Ave. to South City Limit)
South City Limit Mission Ave.
Unfunded
$ 36,000 $
120,000
cD.�
15
Fancher Rd. Preservation (Sprague to Trent)
Sprague Ave. Trent Ave.
City/Unfunded
$ 1,900,000 $
1,900,000
r r O
16
Barker Road & 1-90 Interchange Project
Barker Rd. Bridge at 1-90
Unfunded
$ 1,200,000 $
1,200,000
E D
17
Sands Road Bridge
Sands Road Bridge at Chester Creek
City
$ 25,000 $
25,000
O
22
Northeast Industrial Sewer Extension
Flora Rd. (Euclid -Garland), Tschirley Rd, Dalton Rd.
Unfunded
$ 25,000 $
25,000
p Q
(D
Projects below this line did not have any planned expenditures in year 2026 of the 2026-2031 TIP.
18 Pines Rd. (SR-27) / 16th Ave. Intersection Improvement Pines Rd. (SR 27) at 16th Ave.
19
Citywide Safety Projects
TBD TBD
O ?
20
Street Preservation Projects
TBD TBD
21
Citywide Trail Improvements
TBD TBD
-
-
-
(1) E
23
Mirabeau Parkway / Mansfield Ave. Intersection Improv.
Mirabeau Parkway at Mansield Ave.
-
W m
24
Sullivan Rd. / Kiernan Ave. Intersection Improvement
Sullivan Rd. at Kiernan Ave.
-
-
-
co
L �-
25
Sullivan Rd. / Marietta Ave. Intersection Improvement
Sullivan Rd. at Marietta Ave.
26
Ridgemont Estates Street & Stormwater Improvements
22nd Ave. Vera Crest Dr.
-
-
-
N O -O
m
27
South Bowdish Rd. - Phased Corridor Improvements
Sprague Ave. Dishman Mica
-
-
-
co a
28
8th Ave. / Carnahan Rd. Intersection Improvement
8th Ave. at Carnahan Rd.
U 0)
29
Flora Rd. Reconstruction -Appleway Trail to Flora Park
Appleway Trail Flora Park
-
-
-
0) Q _
30
Sprague & Pines Intersection Improvement
Sprague Ave. at Pines Rd. (SR 27)
-
-
-
E (1) m
>
31
8th Ave. / Park Rd. Intersection Improvement
8th Ave. at Park Rd.
-
-
-
O-
32
Broadway Ave. Improvements- Flora to Barker
Flora Rd. Barker Rd.
U
33
Park Rd. /Mission Ave. Intersection Improvement
Park Rd. at Mission Ave.
-
-
-
L N (1)
34
Flora Rd. / SR 290 Intersection Improvement
Flora Rd. at Trent Ave. SR 290
O-
ADOPTED TOTAL $ 12,875,000 $ 35,620,000
City of Spokane Valley
Department of Community & Public Works
Amended 2026 Transportation Improvement Program
(Adopted by Resolution 26-008 on 06-16-26)
Primary
City 2026
Total 2026
Proj. # Unchanged Projects
From To
Source
Amount
Project Costs
11 Barker & 8th Roundabout
Barker Rd. at 8th Ave.
HSIP $
- $
70,00E
14 Barker Road Corridor (Mission Ave. to South City Limit)
South City Limit Mission Ave.
Unfunded $
36,000 $
120,00E
17 Sands Road Bridge
Sands Road Bridge at Chester Creek
City $
25,000 $
25,00E
Subtotal $
61,000 $
215,00E
Proj. # Updated Projects
From
To
Primary
Source
City 2026
Amount
Total 2026
Project Costs
2
Sprague Preservation (Bowdish to McDonald)
Bowdish Rd.
McDonald Rd.
STBG
$
234,000 $
2,321,000
3
Barker Road Reconstruction (Sprague to Appleway)
Sprague Ave.
Appleway Ave.
FMSIB
$
- $
1,860,000
4
Pines Rd. (SR27) / BNSF Grade Separation Project
Pines Rd. (SR 27) at BNSF Railway
& Trent (SR 290)
RAISE
$
250,000 $
18,100,000
6
S. Sullivan Rd. Preservation (8th to 24th)
8th Ave.
24th Ave.
NHS
$
450,000 $
4,720,000
7
N. Sullivan Rd. Preservation (UPRR to Kiernan)
UPRR Bridge
Kiernan Ave.
City
$
1,500,000 $
2,900,000
9
Argonne Rd. Concrete Pavement - Indiana to Knox
Indiana Ave.
Knox Ave.
City
$
50,000 $
50,000
10
Wellesley Preservation (Sullivan to Flora)
Sullivan Rd.
Flora Rd.
City
$
200 $
200
12
Sullivan Rd. / SR 290 Interchange Reconstruction
Sullivan Rd. at SR 290
NHFP
$
243,000 $
1,800,000
13
Argonne Rd. & 1-90 Interchange Bridge
Argonne Rd. Bridge at 1-90
FMSIB
$
240,000 $
1,800,000
16
Barker Road & 1-90 Interchange Project
Barker Rd. Bridge at 1-90
City
$
50,000 $
50,000
Subtotal $
3,017,200 $
33,601,200
Primary
City 2026 Total 2026
Proj. # Removed Projects
rr mi
To
Source
Amount Project Costs
1
Sprague Pedestrian Crossings (Chronicle & McKinnon)
At Chronicle Rd.
At McKinnon Rd.
TIB
$ - $ -
5
Indiana Preservation (Sullivan to Desmet)
Sullivan Rd
Desment Rd.
City
$ - $ -
8
32nd & Pines Preservation
32: Pines Rd. to SR 27
Pines Rd: 32nd to 40th City
$ - $ -
15
Fancher Rd. Preservation (Sprague to Trent)
Sprague Ave.
Trent Ave.
City/Unfunded
$ - $ -
22
Northeast Industrial Sewer Extension
Flora Rd. (Euclid -Garland), Tschirley Rd, Dalton Rd.
Unfunded
$ - $ -
Subtotal $ $
Proj. # Added Projects
From.
To
Primary
Source
City 2026
Amount
Total 2026
Project Costs
2026 Local Access Streets (Neighborhood TBD)
TBD
TBD
City
$
1,400,000 $
1,400,000
Barker Road Reconstruction
Appleway
1-90
DEMO
$
250,000 $
1,750,000
Streets Maintenance & Operations Costs
Citywide
Citywide
City
$
510,000 $
510,000
Appleway Trail & Stormwater
Farr
Dishman Mica
STBG-SA
$
11,000 $
81,000
Carnahan Stormwater Improvements
South City Limit
9th
City Storm
$
- $
125,000
Arterial School Crossings
Broadway, 32nd, Pines
Varies
SRTS
$
- $
1,192,000
Broadway Preservation
Fancher
Havana
City
$
100,000 $
100,000
Fancher Rd. Preservation (Broadway to Trent)
Broadway Ave.
Trent Ave.
City
$
65,000 $
65,000
Fancher Rd. Preservation (Sprague to Broadway)
Sprague Ave.
Broadway Ave
City
$
10,000 $
10,000
Pines Preservation
32nd
40th
City
$
40,000 $
40,000
32nd Preservation
Pines Rd.
State Route 27
NHS
$
800,000 $
3,400,000
Barker Roundabout at 4th
Barker at 4th
Barker at 4th
TIB
$
10,000 $
50,000
Barker Reconstruction
Sprague Ave.
8th Ave
DEMO
$
7,500 $
50,000
Sprague Preservation
University
Bowdish
STBG
$
7,500 $
50,000
N. Sullivan Rd Preservation
Spokane River
UPRR Crossing
City
$
2,380,000 $
2,380,000
Pines Rd. (SR-27) / 16th Ave. Intersection Improvement
Pines(SR 27) at 16th
Pines(SR 27) at 16th
DEV
$
- $
100,000
Thierman Preservation
Sprague Ave.
Broadway Ave
City
$
25,000 $
25,000
Mansfield Pedestrian Crossings
Mansfield at Perrine
Mansfield at Trillium Apt PBP
$
- $
26,000
Subtotal $
5,616,000 $
11,354,000
2026 AMENDED TOTAL $8,694,200 $45,170,200
P,P,,,, andtlmeCrames idevtiCred iv the TIP aretobe--deved estimates..1y tlil m change dve to a varlet➢of orwmsnoces.
June 2026 Amendment.xlsx
P:\Public Works\TIP\2026-2031 TIP\2. Amedments\June 2026 Amendment\June 2026 Amendment.xlsx
CITY OF SPOKANE VALLEY
Request for Council Action
Meeting Date: June 16, 2026 Department Director Approval:
Check all that apply: ❑ consent ❑ old business ® new business ❑ public hearing
❑ information ❑ admin. report ❑ pending legislation ❑ executive session
AGENDA ITEM TITLE: Motion Consideration: Resolution 26-008 Amending 2026
Transportation Improvement Program (TIP)
GOVERNING LEGISLATION: RCW 35.77.010
PREVIOUS COUNCIL ACTION TAKEN:
• June16, 2026, Public Hearing on the proposed 2026 TIP Amendment #1.
• May 26, 2026, Administrative Report discussing the 2026 TIP amendment #1.
• June 17, 2025, City Council adopted 2026-2031 TIP by Resolution 25-012.
• Annual adoption of the six -year transportation improvement plan by June 30.
BACKGROUND:
The projects and costs listed in the adopted TIP are based upon available information at the
time of adoption. This amendment includes cost estimate updates for anticipated 2026
expenses for several previously adopted projects and also adds projects that were not initially
scheduled in 2026 (i.e. planned for latter years but grant funds were awarded and the project
was able to start earlier).
The TIP is required to be financially constrained. The TIP reflects the City's short-term
transportation needs and provides a prioritized path forward. Since the City uses Real Estate
Excise Tax (REET) monies as matching funds for state and federal grants, this amendment to
the TIP is necessary to meet the state law that requires REET funds to only be used on projects
that have been identified in an adopted plan. Based on this information, it is recommended that
the 2026 TIP be amended to include these updates. Attached is a summary of the proposed
updates and a draft resolution.
OPTIONS: 1) Adopt the proposed Amended 2026 TIP with or without additional changes; or
2) take further action as appropriate.
RECOMMENDED ACTION OR MOTION: Move to adopt Resolution 26-008, amending the
2026 TIP.
BUDGET/FINANCIAL IMPACTS: Staff has confirmed that across the various funds applicable
to the proposed projects, sufficient funds are available to meet the local match requirements for
these projects (I.E. Funds 303, 311, 312, 315, 402, 403, 404). Further, the City will not initiate a
new project or award a construction contract without the necessary secured City funds.
STAFF CONTACT: Adam Jackson, Engineering Manager
Kristen Armstrong, Senior Engineer — Programming & Special Projects
ATTACHMENTS: Resolution 26-008
2026 TIP Amendment #1
W ITEMM
CITY OF SPOKANE VALLEY
SPOKANE COUNTY, WASHINGTON
RESOLUTION NO.26-008
A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY,
WASHINGTON, AMENDING THE 2026 TRANSPORTATION IMPROVEMENT
PROGRAM FOR THE CITY OF SPOKANE VALLEY, AND OTHER MATTERS
RELATING THERETO.
WHEREAS, the Spokane Valley City Council Adopted the 2026-2031 Six Year Transportation
Improvement Program (TIP) on June 17, 2025, Resolution 925-012, with such program acting as a guide
for the coordinated development of the City's transportation system; and
WHEREAS, changes in certain funding sources and project schedules have occurred; and
WHEREAS, the attached Amended 2026 TIP incorporates said changes for year 2026; and
WHEREAS, the amendments to the 2026 TIP are consistent with Spokane Valley's adopted
Comprehensive Plan.
NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane
County, Washington, as follows:
Section 1. The City Council hereby adopts the attached Amended 2026 TIP for the City of Spokane
Valley for the purpose of guiding the design, development and construction of local and regional
transportation improvements for the year 2026.
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a
variety of circumstances, and are not intended by the City to be relied upon by property owners or
developers in making development decisions.
Section 2. Effective Date. This Resolution shall be in full force and effect upon adoption.
Adopted this 16t1i day of June, 2026.
City of Spokane Valley
Laura Padden, Mayor
ATTEST:
Marci Patterson, City Clerk
Approved as to Form:
Office of the City Attorney
Resolution 26-008 Amending 2026 TIP
City of Spokane Valley
Public Works Department
Adopted 2026 Transportation Improvement Program
(Adopted by Resolution 25-012 on 06-17-25)
Primary
city 2026
1 o a
Proj. # Project
From To
Source
Amount
Project Costs
d co E
1 Sprague Pedestrian Crossings (Chronicle & McKinnon) At Chronicle Rd. At McKinnon Rd. TIB $ 2,000 $ 8,000
2
Sprague Preservation (Bowdish to McDonald)
Bowdish Rd. McDonald Rd.
STBG
$ 3,000 $
29,000
O
3
Barker Road Reconstruction (Sprague to Appleway)
Sprague Ave. Appleway Ave.
FMSIB
$ - $
45,000
mom O-
4
Pines Rd. (SR27) / BNSF Grade Separation Project
Pines Rd. (SR 27) at BNSF Railway & Trent (SR 290)
RAISE
$ 795,000 $
14,031,000
N m N
5
Indiana Preservation (Sullivan to Desmet)
Sullivan Rd Desment Rd.
City
$ 1,436,000 $
1,436,000
(D 0 O
74 N N
6
S. Sullivan Rd. Preservation (8th to 24th)
8th Ave. 24th Ave.
Fed/Other
$ 1,846,000 $
5,276,000
0
C,j0
7
N. Sullivan Rd. Preservation (Spokane River to Kiernan)
Spokane River Bridge (north end) Kiernan Ave.
Fed/Other
$ 2,987,000 $
4,356,000
y
8
32nd &Pines Preservation
32: Pines Rd. to SR 27 Pines Rd: 32nd to 40th City
$ 1,779,000 $
2,375,000
E
9
Argonne Rd. Concrete Pavement - Indiana to Knox
Indiana Ave. Knox Ave.
Unfunded
$ 44,000 $
238,000
DO - 0) O
10
Wellesley Preservation (Sullivan to Flora)
Sullivan Rd. Flora Rd.
City
$ 75,000 $
75,000
M ,
m D-
11
Barker & 8th Roundabout
Barker Rd. at 8th Ave.
HSIP
$ - $
70,000
- rn >
12
Sullivan Rd. / SR 290 Interchange Reconstruction
Sullivan Rd. at SR 290
NHFP
$ 641,000 $
2,731,000
N -E 0
E
13
Argonne Rd. & 1-90 Interchange Bridge
Argonne Rd. Bridge at 1-90
FMSIB
$ 81,000 $
1,680,000
14
Barker Road Corridor (Mission Ave. to South City Limit)
South City Limit Mission Ave.
Unfunded
$ 36,000 $
120,000
cD.�
15
Fancher Rd. Preservation (Sprague to Trent)
Sprague Ave. Trent Ave.
City/Unfunded
$ 1,900,000 $
1,900,000
r r O
16
Barker Road & 1-90 Interchange Project
Barker Rd. Bridge at 1-90
Unfunded
$ 1,200,000 $
1,200,000
E D
17
Sands Road Bridge
Sands Road Bridge at Chester Creek
City
$ 25,000 $
25,000
O
22
Northeast Industrial Sewer Extension
Flora Rd. (Euclid -Garland), Tschirley Rd, Dalton Rd.
Unfunded
$ 25,000 $
25,000
p Q
(D
Projects below this line did not have any planned expenditures in year 2026 of the 2026-2031 TIP.
18 Pines Rd. (SR-27) / 16th Ave. Intersection Improvement Pines Rd. (SR 27) at 16th Ave.
19
Citywide Safety Projects
TBD TBD
O ?
20
Street Preservation Projects
TBD TBD
21
Citywide Trail Improvements
TBD TBD
-
-
-
(1) E
23
Mirabeau Parkway / Mansfield Ave. Intersection Improv.
Mirabeau Parkway at Mansield Ave.
-
W m
24
Sullivan Rd. / Kiernan Ave. Intersection Improvement
Sullivan Rd. at Kiernan Ave.
-
-
-
co
L �-
25
Sullivan Rd. / Marietta Ave. Intersection Improvement
Sullivan Rd. at Marietta Ave.
26
Ridgemont Estates Street & Stormwater Improvements
22nd Ave. Vera Crest Dr.
-
-
-
N O -O
m
27
South Bowdish Rd. - Phased Corridor Improvements
Sprague Ave. Dishman Mica
-
-
-
co a
28
8th Ave. / Carnahan Rd. Intersection Improvement
8th Ave. at Carnahan Rd.
U 0)
29
Flora Rd. Reconstruction -Appleway Trail to Flora Park
Appleway Trail Flora Park
-
-
-
0) Q _
30
Sprague & Pines Intersection Improvement
Sprague Ave. at Pines Rd. (SR 27)
-
-
-
E (1) m
>
31
8th Ave. / Park Rd. Intersection Improvement
8th Ave. at Park Rd.
-
-
-
O-
32
Broadway Ave. Improvements- Flora to Barker
Flora Rd. Barker Rd.
U
33
Park Rd. /Mission Ave. Intersection Improvement
Park Rd. at Mission Ave.
-
-
-
L N (1)
34
Flora Rd. / SR 290 Intersection Improvement
Flora Rd. at Trent Ave. SR 290
O-
ADOPTED TOTAL $ 12,875,000 $ 35,620,000
City of Spokane Valley
Department of Community & Public Works
Amended 2026 Transportation Improvement Program
(Adopted by Resolution 26-008 on 06-16-26)
Primary
City 2026
Total 2026
Proj. # Unchanged Projects
From To
Source
Amount
Project Costs
11 Barker & 8th Roundabout
Barker Rd. at 8th Ave.
HSIP $
- $
70,00E
14 Barker Road Corridor (Mission Ave. to South City Limit)
South City Limit Mission Ave.
Unfunded $
36,000 $
120,00E
17 Sands Road Bridge
Sands Road Bridge at Chester Creek
City $
25,000 $
25,00E
Subtotal $
61,000 $
215,00E
Proj. # Updated Projects
From
To
Primary
Source
City 2026
Amount
Total 2026
Project Costs
2
Sprague Preservation (Bowdish to McDonald)
Bowdish Rd.
McDonald Rd.
STBG
$
234,000 $
2,321,000
3
Barker Road Reconstruction (Sprague to Appleway)
Sprague Ave.
Appleway Ave.
FMSIB
$
- $
1,860,000
4
Pines Rd. (SR27) / BNSF Grade Separation Project
Pines Rd. (SR 27) at BNSF Railway
& Trent (SR 290)
RAISE
$
250,000 $
18,100,000
6
S. Sullivan Rd. Preservation (8th to 24th)
8th Ave.
24th Ave.
NHS
$
450,000 $
4,720,000
7
N. Sullivan Rd. Preservation (UPRR to Kiernan)
UPRR Bridge
Kiernan Ave.
City
$
1,500,000 $
2,900,000
9
Argonne Rd. Concrete Pavement - Indiana to Knox
Indiana Ave.
Knox Ave.
City
$
50,000 $
50,000
10
Wellesley Preservation (Sullivan to Flora)
Sullivan Rd.
Flora Rd.
City
$
200 $
200
12
Sullivan Rd. / SR 290 Interchange Reconstruction
Sullivan Rd. at SR 290
NHFP
$
243,000 $
1,800,000
13
Argonne Rd. & 1-90 Interchange Bridge
Argonne Rd. Bridge at 1-90
FMSIB
$
240,000 $
1,800,000
16
Barker Road & 1-90 Interchange Project
Barker Rd. Bridge at 1-90
City
$
50,000 $
50,000
Subtotal $
3,017,200 $
33,601,200
Primary
City 2026 Total 2026
Proj. # Removed Projects
rr mi
To
Source
Amount Project Costs
1
Sprague Pedestrian Crossings (Chronicle & McKinnon)
At Chronicle Rd.
At McKinnon Rd.
TIB
$ - $ -
5
Indiana Preservation (Sullivan to Desmet)
Sullivan Rd
Desment Rd.
City
$ - $ -
8
32nd & Pines Preservation
32: Pines Rd. to SR 27
Pines Rd: 32nd to 40th City
$ - $ -
15
Fancher Rd. Preservation (Sprague to Trent)
Sprague Ave.
Trent Ave.
City/Unfunded
$ - $ -
22
Northeast Industrial Sewer Extension
Flora Rd. (Euclid -Garland), Tschirley Rd, Dalton Rd.
Unfunded
$ - $ -
Subtotal $ $
Proj. # Added Projects
From.
To
Primary
Source
City 2026
Amount
Total 2026
Project Costs
2026 Local Access Streets (Neighborhood TBD)
TBD
TBD
City
$
1,400,000 $
1,400,000
Barker Road Reconstruction
Appleway
1-90
DEMO
$
250,000 $
1,750,000
Streets Maintenance & Operations Costs
Citywide
Citywide
City
$
510,000 $
510,000
Appleway Trail & Stormwater
Farr
Dishman Mica
STBG-SA
$
11,000 $
81,000
Carnahan Stormwater Improvements
South City Limit
9th
City Storm
$
- $
125,000
Arterial School Crossings
Broadway, 32nd, Pines
Varies
SRTS
$
- $
1,192,000
Broadway Preservation
Fancher
Havana
City
$
100,000 $
100,000
Fancher Rd. Preservation (Broadway to Trent)
Broadway Ave.
Trent Ave.
City
$
65,000 $
65,000
Fancher Rd. Preservation (Sprague to Broadway)
Sprague Ave.
Broadway Ave
City
$
10,000 $
10,000
Pines Preservation
32nd
40th
City
$
40,000 $
40,000
32nd Preservation
Pines Rd.
State Route 27
NHS
$
800,000 $
3,400,000
Barker Roundabout at 4th
Barker at 4th
Barker at 4th
TIB
$
10,000 $
50,000
Barker Reconstruction
Sprague Ave.
8th Ave
DEMO
$
7,500 $
50,000
Sprague Preservation
University
Bowdish
STBG
$
7,500 $
50,000
N. Sullivan Rd Preservation
Spokane River
UPRR Crossing
City
$
2,380,000 $
2,380,000
Pines Rd. (SR-27) / 16th Ave. Intersection Improvement
Pines(SR 27) at 16th
Pines(SR 27) at 16th
DEV
$
- $
100,000
Thierman Preservation
Sprague Ave.
Broadway Ave
City
$
25,000 $
25,000
Mansfield Pedestrian Crossings
Mansfield at Perrine
Mansfield at Trillium Apt PBP
$
- $
26,000
Subtotal $
5,616,000 $
11,354,000
2026 AMENDED TOTAL $8,694,200 $45,170,200
P,P,,,, andtlmeCrames idevtiCred iv the TIP aretobe--deved estimates..1y tlil m change dve to a varlet➢of orwmsnoces.
June 2026 Amendment.xlsx
P:\Public Works\TIP\2026-2031 TIP\2. Amedments\June 2026 Amendment\June 2026 Amendment.xlsx
CITY OF SPOKANE VALLEY
Request for Council Action
Meeting Date: June 16, 2026
Department Director Approval:
Check all that apply: ❑ consent ❑ old business ❑ new business ® public hearing
❑ information ❑ admin. report ❑ pending legislation ❑ executive session
AGENDA ITEM TITLE: Public Hearing: Draft 2027-2032 Six -Year Transportation Improvement
Program (TIP)
GOVERNING LEGISLATION: RCW 35.77.010, Perpetual advanced six -year plans for
coordinated transportation program expenditures.
PREVIOUS COUNCIL ACTION TAKEN: Annual adoption of the TIP and its amendments. On
May 26, 2026, staff delivered an administrative report for the Draft 2027-2032 TIP.
BACKGROUND: The TIP is composed of transportation projects intended to be implemented
in the next six years that address the transportation needs within the City of Spokane Valley.
The City is required by RCW 35.77.010 to prepare and, after holding a public hearing, adopt a
comprehensive transportation program for the ensuing six calendar years. This plan must be
submitted to the Washington State Department of Transportation by June 301h of each year.
OPTIONS: Conduct public hearing.
RECOMMENDED ACTION OR MOTION: Conduct public hearing.
BUDGET/FINANCIAL IMPACTS: None for this specific topic. The required City match on
federal and state funded projects is typically between 10% and 20%. The delivery of the
proposed projects generally relies on outside funding support. Staff regularly review the
projected Real Estate Excise Tax (REET) fund balances through the planned years to
determine if there are sufficient funds to satisfy the City's fiscal responsibility for projects.
STAFF CONTACT: Adam Jackson, P.E. — Engineering Manager
Kristen Armstrong, P.E. — Senior Engineer
ATTACHMENTS: PowerPoint Presentation (See next agenda item for resolution and TIP)
E
L
0
CL
as
E
as
0
LM
om
E
N
M
O
N
Ps
N
O
N
co
N
0
co
Ccc
tow
�L-
N N
U)
�w
w.
I L
wto
O cn
U Q
Ecc cn
Q �
O
i
O
o
L
�
U
(n
Q
O
4--j
>
L6
O
U
+�
0
�
M
O
_
U
O
O
�j
•�
704)
)
O
_
O
DC
�
�
�
w
�
•�
.�
LU
U)
O
O
O-0-0
U
U
70
70
�OtA
O
O
-0
U)
W
• (n
O
=3
7C3
co
O
a--+
0
MEMO
C:
O
O
/)
c ♦
• (_n
c6
V
�
�
7C3
O
c6
L
cn
O
.�
�
Q
�
U
^
cn
.�
cu
O
a--+
O
=
a
co
o
co
O
23
Fmi
O
O
O
•
7C3 Co
O
}' >
>
cn
•�
(� },
�
cn
O
O
U
Cll
•�
cn
Q
cn
• O
C6
b�0 U
^
>
06
'u
O
to70
U
O
(n
:
=3
U
Q
cn
w 0-
00
31
1
B
CO
cn
Co
LL
c 0 CO
co oa
Al
m
i
.O
cc
0)
13
0)
MEMO
cc
cc
MEMO
El
C�
O
LM
a
.m cc �+ i
��.+ �
' { r
Polioo � y c x
0-
cu
L E
0
co
r.'l
CL
H
N
N
ti
N
O
N
C�6
0
0
_(1)
U
U
0
:
�
O
M
.�
c
U
�
i
M
�
OU
cn
O
�
�
'j
O
70
O
m
U)
U+-)j
0
(1)
v
fB
U
U)
.�
O
V
�:-Q)
L
Rd
U
m
-i-j
ro
nahar
E
L
L
a-+
O
a--+
U')
m
�
N c
Q
Q
v a V) Ln
W
kft
U
�
�
J
E
t
0
LA
o �
° ;
*�'
t
�
dip CJ
LL
p�'p E
v o
_
LL
i
4
� 66
>
o
V,
U)
3
�E
a
E
v
t
o
$
cn N
°
Ln
a
o
B
0
En
ul
+�
fL cn
a
c!
c
to
T N
a
c
f6 o
N
N
3 U
N
E
-o
(U 2
N
ch
a o
m
F
Q
u 0�
u
u
M
Ln
I- Ln
O)
r+
N N
N
M
co
b�A
O
L
O
co
O
n
cn
co
N
cm
O
N
N
O
N
'1611,
LIM
CITY OF SPOKANE VALLEY
Request for Council Action
Meeting Date: June 16, 2026
Department Director Approval:
Check all that apply: ❑ consent ❑ old business ® new business ❑ public hearing
❑ information ❑ admin. report ❑ pending legislation ❑ executive session
AGENDA ITEM TITLE: Motion Consideration: Resolution 26-009: Approval of Draft 2027-2032
Six -Year Transportation Improvement Program (TIP)
GOVERNING LEGISLATION: RCW 35.77.010, Perpetual advanced six -year plans for
coordinated transportation program expenditures.
PREVIOUS COUNCIL ACTION TAKEN: Annual adoption of the TIP and its amendments. On
May 26, 2026, staff delivered an administrative report for the Draft 2027-2032 TIP.
A public hearing was scheduled for June 16, 2026, preceding this resolution's consideration.
BACKGROUND: The TIP is composed of transportation projects intended to be implemented
in the next six years that address the transportation needs within the City of Spokane Valley.
The City is required by RCW 35.77.010 to prepare and, after holding a public hearing, adopt a
comprehensive transportation program for the ensuing six calendar years. This plan must be
submitted to the Washington State Department of Transportation by June 30t" of each year.
At the May 26, 2026 council meeting, City Council provided consensus for staff to pursue
funding for projects included in the City's adopted Legislative Agenda, so long as Council is
provided notice of the funding pursuits as they arise. This consensus is reflected in "Section 2"
of the attached resolution.
OPTIONS: Adopt the 2027-2032 Six -Year TIP as presented or take other action.
RECOMMENDED ACTION OR MOTION: Move to approve Resolution 26-009, adopting the
2027-2032 Six -Year TIP as presented.
BUDGET/FINANCIAL IMPACTS: None for this specific topic. The required City match on
federal and state funded projects is typically between 10% and 20%. The delivery of the
proposed projects generally relies on outside funding support. Staff regularly review the
projected Real Estate Excise Tax (REET) fund balances through the planned years to
determine if there are sufficient funds to satisfy the City's fiscal responsibility for projects.
STAFF CONTACT: Adam Jackson, P.E. — Engineering Manager
Kristen Armstrong, P.E. — Senior Engineer
ATTACHMENTS: Resolution 26-009
2027-2032 Six -Year TIP
W ITEMM
CITY OF SPOKANE VALLEY
SPOKANE COUNTY, WASHINGTON
RESOLUTION 26-009
A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY,
WASHINGTON, ADOPTING THE 2027-2032 TRANSPORTATION IMPROVEMENT
PROGRAM FOR THE CITY OF SPOKANE VALLEY, AND OTHER MATTERS RELATING
THERETO.
WHEREAS, to provide for the proper and necessary development of the street system within the
City of Spokane Valley, the City shall, pursuant to RCW 35.77.010, develop and adopt annually a Six -Year
Transportation Improvement Program (Six -Year TIP) with such program acting as a guide for the
coordinated development of the City's transportation system; and
WHEREAS, the Six -Year TIP of the City shall specifically set forth those projects and programs
of both City and regional significance that benefit the transportation system and promote public safety and
efficient vehicle movements; and
WHEREAS, the Six -Year TIP shall be consistent with the City's Comprehensive Plan and be
adopted following one or more public hearings before the City Council; and
WHEREAS, a draft copy of the Six -Year TIP was submitted to the Washington State Department
of Commerce and has been reviewed and approved prior to the scheduled adoption of the TIP in accordance
with RCW 36.70A.106; and
WHEREAS, following adoption of the Six -Year TIP, the City will forward a copy to the
Washington State Secretary of Transportation; and
WHEREAS, the City Council conducted a public hearing on June 16, 2026, for the purpose of
inviting and receiving public comment on the proposed Six -Year TIP.
NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane
County, Washington, as follows:
Section 1. The City Council hereby adopts the attached Six -Year TIP for the City of Spokane
Valley for the purpose of guiding the design, development and construction of local and regional
transportation improvements for the years 2027 through 2032. The City Clerk is directed to file the 2027-
2032 Six -Year TIP with the Washington State Secretary of Transportation before June 30, 2026. The Six -
Year TIP shall be reviewed at least annually for the purpose of determining the work to be accomplished
under the program and the City's transportation requirements.
Projects and timeframes identified in the Six -Year TIP are to be considered estimates only, may change due
to a variety of circumstances, and are not intended by the City to be relied upon by property owners or
developers in making development decisions.
In the event a railroad ceases to use rail right-of-way within the City, the City will utilize all reasonable
options available under state or federal law to preserve the right-of-way for future rail purposes pursuant to
RCW 35.77.010(3),
Section 2. City Council acknowledges that the Six -Year TIP projects identified therein as being
part of the City's Legislative Agenda have been extensively reviewed and determined by City Council to
greatly benefit the community. By including a project in both the City's Legislative Agenda and Six -Year
Resolution 26-009, Adopting Six -Year TIP
W ITEMM
TIP, City Council authorizes City staff to pursue any and all eligible funding avenues necessary to deliver
the project without further action required by City Council so long as staff provide notification to City
Council of the funding opportunities as they become available and are pursued by staff.
Section 3. Effective Date. This Resolution shall be in full force and effect upon adoption.
Adopted this day of June, 2026.
ATTEST:
Marci Patterson, Clerk
Approved as to Form:
Office of the City Attorney
City of Spokane Valley
Laura Padden, Mayor
Resolution 26-009, Adopting Six -Year TIP
f»rwirre
nvPmPnt Prc
1 YAWd11
4
�r
a
✓f
- r
/
City of Spokane Valley
Public Works Department Spokane
2027-2032 Transportation Improvement Program (TIP) , oo0;Va11ey"
Glossary & Abbreviations
Fund Source
Type
Name
• BIP
Federal
Bridge Investment Program
• BUILD
Federal
Better Utilizing Investments to Leverage Develop.
• City
Non -Federal
City Funds
• CDBG
Federal
Community Development Block Grant
• DEMO
Federal
Federal Appropriation Funds (Earmarks)
• CMAQ
Federal
Congestion Mitigation & Air Quality Improvement
• COM
Non -Federal
Washington State Department of Commerce
• DEV
Non -Federal
Private Developer Funds
• FMSIB
Non -Federal
Freight Mobility Strategic Investment Board
• HSIP
Federal
Highway Safety Improvement Program
• NHFP
Federal
National Highway Freight Program
• NHS
Federal
National Highway System Asset Management
• Other
Varies
Misc. Funding Source(s)
• PBP
Non -Federal
Pedestrian/Bicycle Program
• RCO
Non -Federal
Washington State Recreation Conservation Office
• RR
Non -Federal
Railroad
• SRTS
Non -Federal
Safe Routes to School
• STORM
Non -Federal
City Stormwater Funds
• STA
Varies
Spokane Transit Authority
• STBG
Federal
Surface Transportation Block Grant (formerly STP)
• STBG-SA
Federal
Surface Transportation Block Grant — Set Aside
• TIB
Non -Federal
Transportation Improvement Board
• Utility
Varies
Utility Purveyor Funds
Project Phases
• PE Preliminary Engineering
• RW Right -of -Way
• CN Construction
2027-2032 Transportation Spokane
Improvement Program (TIP) ;oOValley
1: Sprague Preservation (Bowdish to McDonald)
Project Years: 2024-2026 Project Type: Closeout
Description: Pavement preservation.
6-Year TIP Cost: $29,580
2: Barker Road Reconstruction (Sprague to Appleway)
Project Years: 2024-2026 Project Type: Closeout
6-Year TIP Cost: $17,400
Description: Reconstruction to urban 3-lane section. This is a City Council identified legislative agenda project.
3: S. Sullivan Rd. Preservation (8th to 24th)
Project Years: 2024-2026 Project Type: Closeout
6-Year TIP Cost: $50,020
Description: Preservation project with sidewalk infill, midblock pedestrian crossing, stormwater upgrades, and ITS expansion.
4: Sullivan Preservation (UPRR to Kiernan)
Project Years: 2025-2026 Project Type: Closeout
6-Year TIP Cost: $28,690
Description: Preservation and stormwater project excluding intersection of Euclid.
5: 32nd Ave Preservation (Pines to SR27)
Project Years: 2025-2026 Project Type: Closeout
6-Year TIP Cost: $29,250
Description: Pavement preservation with Water District coordination.
6: Arterial School Crossings
Project Years: 2025-2026 Project Type: Closeout
6-Year TIP Cost: $11,190
Description: New enchanced crossings on 32nd, Pines, and Broadway.
7: Pines (SR27) & BNSF Grade Separation Project
Project Years: 2019-2027 Project Type: Bridge
6-Year TIP Cost: $2,004,400
Description: Construct Grade Separation at Pines(SR27)/BNSF RR/Trent (SR290).
8: Pines Preservation (32nd to 40th)
Project Years: 2025-2027 Project Type: Preservation
6-Year TIP Cost: $1,500,000
Description: Pavement preservation with bike and pedestrian facilities.
9: Sullivan Preservation (Spokane River to UPRR)
Project Years: 2025-2027 Project Type: Preservation
6-Year TIP Cost: $3,350,000
Description: Preservation project with new signal, park access roads, sidewalks and stormwater facilities.
10: S. Barker Corridor (Sprague to 8th)
Project Years: 2025-2027 Project Type: Reconstruction
6-Year TIP Cost: $8,950,000
Description: Reconstruct street with three lanes, bikes lanes, sidewalks, and stormwater as needed. Roundabouts at 4th and 8th Ave. This is a City
Council identified legislative agenda project.
11: Broadway Preservation (Havana to Fancher)
Project Years: 2026-2027 Project Type: Preservation
6-Year TIP Cost: $4,325,000
Description: Pavement preservation with stormwater upgrades and consideration for mid -block crossing near fairgrounds access.
12: Thierman Preservation (Sprague to Broadway)
Project Years: 2025-2027 Project Type: Preservation
6-Year TIP Cost: $735,000
Description: Pavement preservation in parternship with Spokane County Water District #3.
13: Appleway Trail & Stormwater (Farr to Dishman Mica)
Project Years: 2025-2027 Project Type: Pedestrian/Bicycle
6-Year TIP Cost: $1,324,150
Description: Extension of the Appleway Trail and reconstruction of stormwater facilities.
14: Flora Cross Course Pedestrian Facilities
Project Years: 2026-2028 Project Type: Pedestrian/Bicycle
6-Year TIP Cost: $600,000
Description: Improve Flora to make pedestrian connection between Flora Cross Course and Euclid Ave.
Page 1 of 3
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
15: Mansfield Pedestrian Crossings
Project Years: 2026-2027 Project Type: Pedestrian/Bicycle
Description: Installation of enhanced pedestrian crossings.
16: Indiana Preservation (190 ramp to Desmet)
Project Years: 2027-2028 Project Type: Preservation
Description: Pavement preservation.
17: Wellesley Preservation (Isenhart to Trent)
Project Years: 2028-2029 Project Type: Preservation
Description: Pavement preservation with Stormwater and multimodal.
18: Sprague Preservation Phase 2 (University to Bowdish)
Project Years: 2026-2028 Project Type: Preservation
Description: Pavement preservation with locations of full depth patching.
6-Year TIP Cost: $259,000
6-Year TIP Cost: $1,500,000
6-Year TIP Cost: $2,650,000
6-Year TIP Cost: $2,189,000
19: Sullivan & Trent Interchange
Project Years: 2024-2030 Project Type: Bridge 6-Year TIP Cost: $48,702,000
Description: Phased reconstruction of interchange, including widening of Sullivan between Kiernan and Wellesley adding ITS, center turn lane,
lighting, and shared use path. This is a City Council identified legislative agenda project.
20: Fancher Preservation (Sprague to Trent)
Project Years: 2025-2029 Project Type: Preservation 6-Year TIP Cost: $6,110,000
Description: Phased preservation project with asphalt grind and inlay with stormwater retrofits. Broadway -Trent planned for 2027 and Sprague -
Broadway planned for 2028.
21: SR-27 & 16th Intersection
Project Years: 2026-2029 Project Type: Intersection 6-Year TIP Cost: $6,900,000
Description: Add traffic control at five -leg intersecton (potential roundabout) with multimodal.
22: Northeast Sewer Extension
Project Years: 2026-2029 Project Type: Reconstruction 6-Year TIP Cost: $6,320,000
Description: Phased street reconstruction and sewer extension with Spokane Co.: 2027 Donwood community at Barker/Euciid, 2029 Flora and
Tschirley (Euclid -Garland), Dalton (Flora-Tschirley) consider multimodal along Flora.
23: Argonne & 1-90 Bridge
Project Years: 2025-2030 Project Type: Bridge 6-Year TIP Cost: $25,080,000
Description: Bridge reconstruction, rechannelization, signal rework and multimodal. Concrete reconstruction of Argonne from 190 to Montgomery and
a southerly connection at Mission. This is a City Council identified legislative agenda project.
24: Carnahan Street & Stormwater (8th to South Limit)
Project Years: 2026-2030 Project Type: Stormwater 6-Year TIP Cost: $3,540,000
Description: 2027 stormwater conveyance upgrades with potential for pavement preservation and addition of bike/ped facilities.
25: Ridgemont Estates Street & Stormwater
Project Years: 2026-2030 Project Type: Stormwater 6-Year TIP Cost: $8,995,000
Description: Stormwater improvements and road reconstruction in City's southeast neighborhood.
26: Street Maintenance and Operations Costs (Annual)
Project Years: Annual Project Type: Preservation 6-Year TIP Cost: $3,060,000
Description: Ongoing street maintenance and operations activities in Street Fund 101, including bridge and traffic infrastructure.
27: Barker & 1-90 Interchange (Mission to Appleway)
Project Years: 2026-2032 Project Type: Bridge 6-Year TIP Cost: $47,845,000
Description: Phased interchange reconstruction, reconfiguration of adjacent intersections, and widening Barker to a 4/5-lane urban section with
multimodal facilities. This is a City Council identified legislative agenda project.
28: Local Access Street Improvements
Project Years: Annual Project Type: Preservation 6-Year TIP Cost: $9,000,000
Description: Surface treatments (not shown on map), grind/inlays, and reconstruction projects as annual funding allocations allow. Potential project
neighbhorhoods: Midilome, Carnahan, Ponderosa, Hillcrest, Sprague, Vera Crest.
Page 2 of 3
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
29: Citywide Safety Projects
Project Years: Annual Project Type: Safety 6-Year TIP Cost: $7,000,000
Description: Consistent with Local/Regional Safety Plans; including arterial pedestrian facilities/crossings citywide (i.e. Sprague or Valleyway),
particularly near schools. Funded projects identified separately in TIP.
30: Street Preservation Projects
Project Years: Annual Project Type: Preservation 6-Year TIP Cost: $15,000,000
Description: 4th, 8th, 16th, 24th (Dishman-Sullivan), Dishman Mica, Appleway (E of Corbin), Vista(Appleway-Mission), Marietta (Sullivan -Euclid), 3rd
and 4th (Havana-Fancher), Thierman (8th-Broadway), Ponderosa Area (Schafer, 44th, Sands), Sprague (Fancher-Herald, McDonald -Sullivan),
Evergreen (Sprague-32nd), Bowdish and University (Sprague -Mission), Pines (16th-32nd)
31: Citywide Multimodal Improvements
Project Years: Annual Project Type: Pedestrian/Bicycle 6-Year TIP Cost: $5,418,000
Description: Consistent with Active Transportation Plan such as: Appleway Trail (Farr to Havana), Flora (Centennial Trail -Flora Cross Course), River
Loop (Sullivan -Flora Parks), and Millwood Trail (Fancher to Vista) and other prioritized projects.
32: Sullivan & Kiernan Intersection
Project Years: 2029-2031 Project Type: Intersection 6-Year TIP Cost: $3,000,000
Description: Improve channelization and signal operations at intersection and reconstruct intersection with concrete and improved multimodal.
Coordinate with County sewer extension project.
33: Sullivan & Marietta Intersection
Project Years: 2029-2031 Project Type: Intersection 6-Year TIP Cost: $3,000,000
Description: Improve channelization and signal operations at intersection and reconstruct intersection with concrete.
34: Mirabeau & Mansfield Intersection
Project Years: 2030-2032 Project Type: Intersection 6-Year TIP Cost: $3,500,000
Description: New intersection control (signal or roundabout) with multimodal.
35: Bowdish Reconstruction (Sprague to Dishman Mica)
Project Years: 2030-2040 Project Type: Reconstruction 6-Year TIP Cost: $2,800,000
Description: Phased projects to reconstruct Sprague to Dishman Mica as urban section with bicycle and pedestrian facilities. May also include
intersection improvements at 32nd Ave. and ITS.
36: 8th & Carnahan Intersection
Project Years: 2030-2033 Project Type: Intersection 6-Year TIP Cost: $425,000
Description: Add intersection control (turn lanes, potential signal) and improve multimodal.
37: Sprague & Pines Intersection
Project Years: 2031-2034 Project Type: Intersection 6-Year TIP Cost: $450,000
Description: Install SB right turn lane, EB left turn lane, and intersection control (signal and channelization) and improve multimodal.
38: 8th & Park Intersection
Project Years: 2031-2034 Project Type: Intersection 6-Year TIP Cost: $340,000
Description: Provide new traffic signal or roundabout and improve multimodal.
39: Broadway (Flora to Barker)
Project Years: 2032-2035 Project Type: Reconstruction
Description: Expand 3-lane urban section with and improve multimodal.
6-Year TIP Cost: $50,000
40: Park & Mission Intersection
Project Years: 2032-2035 Project Type: Intersection 6-Year TIP Cost: $50,000
Description: Improve channelization and evaluate for signal operations.
41: Flora & SR 290 Intersection
Project Years: 2032-2034 Project Type: Intersection 6-Year TIP Cost: $100,000
Description: Improved traffic control with added turn lanes or roundabout, per adopted Planned Action Ordinance, including multimodal.
6-Year Total TIP Cost: $236,237,681
6-Year Total TIP Cost - By Year
2027
2028
2029
2030
2031
2032
$41,571,680
$28,072,000
$42,993,000
$45,811,000
$41,320,500
$36,469,500
Page 3 of 3
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
1: Sprague Preservation (Bowdish to McDonald) Sp6&en 11 j ey
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
Secured
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$29,580
$0
$0
$0
$0
$0
$29,580
TOTAL
1
$29,580
$0
$0
$0
$0
$0
$29,580
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Closeout
Total Project Years: 2024-2026
Total Project Cost: $3,208,000
Project Description: Pavement preservation.
Funding Sources
SourceName
Funding
City
$361,000
STBG
$2,847,000
Funding Sources
Legend
■ STBG 88.7%
City 11.3%
Pagel of 41
2: Barker Road Reconstruction (Sprague to Appleway) Spokan��
jValleyi
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
Secured
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$17,400
$0
$0
$0
$0
$0
$17,400
TOTAL
1
$17,400
$0
$0
$0
$0
$0
$17,400
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Closeout
Total Project Years: 2024-2026
Total Project Cost: $2,200,000
Project Description: Reconstruction to urban 3-lane section. This is a City Council identified legislative
agenda project.
Funding Sources
SourceName
Funding
City
$62,100
FMSIB
$1,740,000
STBG
$397,900
Funding Sources
Legend
A4 FMSIB 79.1%
■ STBG 18.1 %
City 2.8%
Page 2 of 41
3: S. Sullivan Rd. Preservation (8th to 24th) Spokan��
jUalleyi
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
Secured
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$50,020
$0
$0
$0
$0
$0
$50,020
TOTAL
j
$50,020
1 $0
I $0
I $0
I $0
1 $0
j $50,020
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Closeout
Total Project Years: 2024-2026
Total Project Cost: $5,643,000
Project Description: Preservation project with sidewalk infill, midblock pedestrian crossing, stormwater
upgrades, and ITS expansion.
Funding Sources
SourceName
Funding
City
$308,000
NHS
$5,335,000
Funding Sources
Legend
E NHS 94.5%
City 5.5%
Page 3 of 41
4: Sullivan Preservation (UPRR to Kiernan) spo�i1
� ey
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
Secured
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$28,700
$0
$0
$0
$0
$0
$28,700
TOTAL
1
$28,690
$0
$0
$0
$0
$0
$28,690
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Closeout
Total Project Years: 2025-2026
Total Project Cost: $3,070,000
Project Description: Preservation and stormwater project excluding intersection of Euclid.
Funding Sources
SourceName
Funding
City
$1,570,000
STBG
$1,500,000
Funding Sources
Legend
City 51.1%
0 STBG 48.9%
5: 32nd Ave Preservation (Pines to SR27)
II� �
y �
it +"
,•
E 29th Ave
_
v
E Lenora pr
a �ve
a�� r* W
-
G1
Q
E 30th Ave
L
Ai"
,
E 32nd Ave
E 33rd Ct
'
■ ..•'
L �� � *
: ,� +�.�_
� ,� . � " .
� 34th Ave
U
�
�'�'• �� E 34th� ' �;
U)
,•
L
�
3;5
r n-
Current 6-Year TIP Phased Funding Status - By Year
Sp615nie
jUalley®
«rr
ti
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
Secured
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$29,250
$0
$0
$0
$0
$0
$29,250
TOTAL
$29,250
$0
$0
$0
$0
1 $0
1 $29,250
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Closeout
Total Project Years: 2025-2026
Total Project Cost: $3,175,000
Project Description: Pavement preservation with Water District coordination.
Funding Sources
SourceName
Funding
City
$875,000
NHS
$2,300,000
Funding Sources
Legend
NHS 72.4%
i City 27.6%
Page 5 of 41
6: Arterial School Crossings Spokan��
jValleyi
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
W2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$11,917
$0
$0
$0
$0
$0
$11,917
TOTAL
I
1 $11,190
$0
$0
$0
$0
$0
$11,190
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Closeout
Total Project Years: 2025-2026
Total Project Cost: $1,191, 700
Project Description: New enchanced crossings on 32nd, Pines, and Broadway.
Funding Sources
SourceName Funding
SRTS 1 $1,263,700
Funding Sources
Legend
SRTS 100.0%
Page 6 of 41
7: Pines (SR27) & BNSF Grade Separation Project
N
a"
1
- W111,
rrl
Current 6-Year TIP Phased Funding Status - By Year
Spokane
jUalley®
.:A
J
A
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
Secured
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$2,004,400
$0
$0
$0
$0
$0
$2,004,400
TOTAL
1
$2,004,400
$0
$0
$0
$0
$0
$2,004,400
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Bridge
Total Project Years: 2019-2027
Total Project Cost: $47,839,000
Project Description: Construct Grade Separation at Pines(SR27)/BNSF RR/Trent (SR290).
Funding Sources Funding Sources
SourceName
Funding
BUILD
$21,689,000
City
$4,703,000
CMAQ
$6,405,000
DEMO
$6,247,000
Other State
$5,000,000
STBG
$3,795,000
Legend
BUILD 45.3%
■ CMAQ 13.4%
DEMO 13.1%
■ Other State 10.5%
City 9.8%
Page 7 of 41
8: Pines Preservation (32nd to 4Oth) Spokan��
j Valley®
Y"r%
r
It
•, 411- r
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$1,500,000
$0
$0
$0
$0
$0
$1,500,000
TOTAL
1
1 $1,500,000
$0
$0
$0
$0
$0
$1,500,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Preservation
Total Project Years: 2025-2027
Total Project Cost: $1,585,000
Project Description: Pavement preservation with bike and pedestrian facilities.
Funding Sources
SourceName Funding
City 1 $1,585,000
Funding Sources
Legend
City 100.0%
Page 8 of 41
9: Sullivan Preservation (Spokane River to UPRR)
NO"
Mi
•� .Sk
q, i • �9r�4� mow, - °yi,
IF
l i x
��4a00-0.r"
Current 6-Year TIP Phased Funding Status - By Year
Spokane
,,,;ooOUalley®
U) y
Z
+.r
". Spokane Valley
AM
,I r
N
A
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$50,000
$0
$0
$0
$0
$0
$50,000
RW
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$3,300,000
$0
$0
$0
$0
$0
$3,300,000
TOTAL
1
1 $3,350,000
$0
$0
$0
$0
$0
$3,350,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Preservation
Total Project Years: 2025-2027
Total Project Cost: $5,730,000
Project Description: Preservation project with new signal, park access roads, sidewalks and
stormwater facilities.
Funding Sources
SourceName Funding
City 1 $5,730,000
Funding Sources
Legend
416F City 1 oo.o°ro
Page 9 of 41
10: S. Barker Corridor (Sprague to 8th) 9061nie
1
� ey
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
Secured
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$8,950,000
$0
$0
$0
$0
$0
$8,950,000
TOTAL
1
1 $8,950,000
$0
$0
$0
$0
$0
$8,950,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Reconstruction
Total Project Years: 2025-2027
Total Project Cost: $10,150,000
Project Description: Reconstruct street with three lanes, bikes lanes, sidewalks, and stormwater as
needed. Roundabouts at 4th and 8th Ave. This is a City Council identified legislative agenda project.
Funding Sources
SourceName
Funding
City
$1,664,992
DEMO
$1,483,475
HSIP
$1,500,000
PBP
j $1,665,000
TIB
1 $3,836,533
Funding Sources
Legend
TIB 37.8%
■ PBP 16.4%
■ City 16.4%
■ HSIP 14.8%
■ DEMO 14.6%
Page 10 of 41
11: Broadway Preservation (Havana to Fancher) Sp6&en l j ey
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
Secured
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$4,325,000
$0
$0
$0
$0
$0
$4,325,000
TOTAL
1
1 $4,325,000
$0
$0
$0
$0
$0
$4,325,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Preservation
Total Project Years: 2026-2027
Total Project Cost: $4,500,000
Project Description: Pavement preservation with stormwater upgrades and consideration for mid -block
crossing near fairgrounds access.
Funding Sources
SourceName
Funding
City
$1,000,000
NHS
$3,500,000
Funding Sources
Legend
NHS 77.8%
■ city 22.2%
Page 11 of 41
12: Thierman Preservation (Sprague to Broadway)
Spokan
.,;oO%Iley®
Y - E_-Broadway Ave c -
J E Spn4gfleld Ave ; �`, �e"
z is j' _.
r
'' I € '• k
ki Ave 0�.
OEM
E Valleyway Ave-
L_
IJ1 �
E Nixon Ave , z
A CO
Main Ave d .
�- - Snnkane\/allev
.F s i. __.
a Union.Racific- l ' lr aad
." g •� a �-
- r .
/ �71 L[ .tea• vi
Pwi!
E ,Sprague Ave_ J
Current 6-Year TIP Phased Funding Status - By Year
N
A
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$15,000
$0
$0
$0
$0
$0
$15,000
RW
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$720,000
$0
$0
$0
$0
$0
$720,000
TOTAL
1
1 $735,000
$0
$0
$0
$0
$0
$735,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Preservation
Total Project Years: 2025-2027
Total Project Cost: $750,000
Project Description: Pavement preservation in parternship with Spokane County Water District #3.
Funding Sources
SourceName Funding
City 1 $750,000
Funding Sources
Legend
City 100.0%
Page 12 of 41
13: Appleway Trail & Stormwater (Farr to Dishman Mica)
Spokan��
jValleyi
1 � E 1st Ave
610
CO L
016 CIO
LL
ft U)
k E Appleway Blvd
Spokane Valley
i
o
1 1 1 4"
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$24,150
$0
$0
$0
$0
$0
$24,150
RW
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$1,300,000
$0
$0
$0
$0
$0
$1,300,000
TOTAL
1
1 $1,324,150
$0
$0
$0
$0
$0
$1,324,150
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Pedestrian/Bicycle
Total Project Years: 2025-2027
Total Project Cost: $1,405,000
Project Description: Extension of the Appleway Trail and reconstruction of stormwater facilities.
Funding Sources
SourceName
Funding
City
$474,000
STBG-SA
$931,000
Funding Sources
Legend
■ STBG-SA 66.3%
■ City 33.7%
Page 13 of 41
14: Flora Cross Course Pedestrian Facilities SOU<e l
� ey
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$100,000
$0
$0
$0
$0
$0
$100,000
RW
Planned
$100,000
$0
$0
$0
$0
$0
$100,000
CN
Planned
$0
$400,000
$0
$0
$0
$0
$400,000
TOTAL
1
1 $200,000
$400,000
$0
$0
$0
$0
$600,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Pedestrian/Bicycle
Total Project Years: 2026-2028
Total Project Cost: $600,000
Project Description: Improve Flora to make pedestrian connection between Flora Cross Course and
Euclid Ave.
Funding Sources
SourceName Funding
Other 1 $600,000
Funding Sources
Legend
*k Other 100.0%
Page 14 of 41
15: Mansfield Pedestrian Crossings Spokan��
j Valley®
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$259,000
$0
$0
$0
$0
$0
$259,000
TOTAL
1
1 $259,000
$0
$0
$0
$0
$0
$259,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Pedestrian/Bicycle
Total Project Years: 2026-2027
Total Project Cost: $285,000
Project Description: Installation of enhanced pedestrian crossings.
Funding Sources
SourceName Funding
PBP 1 $285,000
Funding Sources
Legend
lk PBP 100.0%
Page 15 of 41
16: Indiana Preservation (190 ramp to Desmet) SOU<e
.,;oXey
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$50,000
$0
$0
$0
$0
$0
$50,000
RW
$0
$0
$0
$0
$0
$0
$0
CN
Planned
$0
$1,450,000
$0
$0
$0
$0
$1,450,000
TOTAL
1
$50,000
$1,450,000
$0
$0
$0
$0
$1,500,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Preservation
Total Project Years: 2027-2028
Total Project Cost: $1,500,000
Project Description: Pavement preservation.
Funding Sources
SourceName Funding
City 1 $1,500,000
Funding Sources
Legend
City 100.0%
Page 16 of 41
17: Wellesley Preservation (Isenhart to Trent) Spokane
j Va11ey3
E.welles ey Ave .�.....-
rb
IN
�i"`-'
Herby Ave
. � s
r
r ► '4� r
I
Spokane Valle
k r
!,
290
Current 6-Year TIP Phased Funding Status - by Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$150,000
$0
$0
$0
$0
$150,000
RW
$0
$0
$0
$0
$0
$0
$0
CN
Planned
$0
$0
$2,500,000
$0
$0
$0
$2,500,000
TOTAL
1
1 $0
$150,000
$2,500,000
$0
$0
$0
$2,650,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Preservation
Total Project Years: 2028-2029
Total Project Cost: $2,650,000
Project Description: Pavement preservation with Stormwater and multimodal.
Funding Sources
SourceName Funding
City 1 $2,650,000
Funding Sources
Legend
City 100.0%
Page 17 of 41
18: Sprague Preservation Phase 2 (University to Bowdish) Sp6&en 11 j ey
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$0
$0
$0
$0
$0
$0
$0
RW
Secured
$80,000
$0
$0
$0
$0
$0
$80,000
CN
Secured
$0
$2,109,000
$0
$0
$0
$0
$2,109,000
TOTAL
$80,000
$2,109,000
$0
$0
$0
$0
$2,189,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Preservation
Total Project Years: 2026-2028
Total Project Cost: $2,287,000
Project Description: Pavement preservation with locations of full depth patching.
Funding Sources
SourceName
Funding
City
$937,000
STBG
$1,350,000
Funding Sources
Legend
■ STBG 59.0%
City 41.0%
Page 18 of 41
19: Sullivan & Trent Interchange sP61��
,,;ooOUalley®
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$543,000
$0
$0
$0
$0
$0
$543,000
RW
Partial
$3,800,000
$1,000,000
$0
$0
$0
$0
$4,800,000
CN
Partial
$0
$3,000,000
$3,000,000
$17,000,000
$20,000,000
$0
$43,359,000
TOTAL
1
1 $4,343,000
$4,000,000
$3,000,000
$17,000,000
$20,000,000
$0
$48,702,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Bridge
Total Project Years: 2024-2030
Total Project Cost: $53,793,000
Project Description: Phased reconstruction of interchange, including widening of Sullivan between
Kiernan and Wellesley adding ITS, center turn lane, lighting, and shared use path. This is a City Council
identified legislative agenda project.
Funding Sources Funding Sources
SourceName
Funding
City
$3,301,000
DEMO
$9,650,000
NHFP
$3,053,000
Other
j $31,422,000
STBG
1 $6,367,000
Legend
Other 58.4 %
■ DEMO 17.9 %
■ STBG 11.8 %
■ City 6.2%
■ NHFP 5.7%
Page 19 of 41
20: Fancher Preservation (Sprague to Trent) Spokan��
jVa11eyi
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$45,000
$15,000
$0
$0
$0
$0
$60,000
RW
Secured
$25,000
$25,000
$0
$0
$0
$0
$50,000
CN
Secured
$3,600,000
$2,400,000
$0
$0
$0
$0
$6,000,000
TOTAL
1
1 $3,670,000
$2,440,000
$0
$0
$0
$0
$6,110,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Preservation
Total Project Years: 2025-2029
Total Project Cost: $6,200,000
Project Description: Phased preservation project with asphalt grind and inlay with stormwater retrofits.
Broadway -Trent planned for 2027 and Sprague -Broadway planned for 2028.
Funding Sources
SourceName Funding
City 1 $6,200,000
Funding Sources
Legend
City 100.0%
Page 20 of 41
21: SR-27 & 16th Intersection SP61��
,,;ooOUalley®
c urrent 6-Year i W e1nased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$150,000
$0
$0
$0
$0
$0
$150,000
RW
Planned
$0
$200,000
$0
$0
$0
$0
$200,000
CN
Planned
$0
$0
$6,550,000
$0
$0
$0
$6,550,000
TOTAL
1
1 $150,000
1 $200,000
1 $6,550,000
$0
$0
$0
$6,900,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Intersection
Total Project Years: 2026-2029
Total Project Cost: $7,050,000
Project Description: Add traffic control at five -leg intersecton (potential roundabout) with multimodal.
Funding Sources
SourceName
Funding
DEV
$300,000
Other
$6,750,000
Funding Sources
1
in
Legend
Other 95.7%
N DEV 4.3%
Page 21 of 41
22: Northeast Sewer Extension Spokane
jVa11eyi
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$100,000
$100,000
$0
$0
$0
$0
$200,000
RW
$0
$0
$0
$0
$0
$0
$0
CN
Partial
$1,400,000
$0
$4,720,000
$0
$0
$0
$6,120,000
TOTAL
1
1 $1,500,000
$100,000
$4,720,000
$0
$0
$0
$6,320,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Reconstruction
Total Project Years: 2026-2029
Total Project Cost: $6,450,000
Project Description: Phased street reconstruction and sewer extension with Spokane Co.: 2027
Donwood community at Barker/Euciid, 2029 Flora and Tschirley (Euclid -Garland), Dalton (Flora-
Tschirley) consider multimodal along Flora.
Funding Sources
SourceName
Funding
City
$1,000,000
Other
$5,450,000
Funding Sources
Legend
■ Other 84.5%
■ City 15.5%
Page 22 of 41
23: Argonne & 1-90 Bridge sP61��
,,;ooOUalley®
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$1,050,000
$0
$0
$0
$0
$0
$1,050,000
RW
Partial
$0
$30,000
$0
$0
$0
$0
$30,000
CN
Partial
$0
$0
$12,000,000
$12,000,000
$0
$0
$24,000,000
TOTAL
1
1 $1,050,000
$30,000
$12,000,000
$12,000,000
$0
$0
$25,080,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Bridge
Total Project Years: 2025-2030
Total Project Cost: $27,530,000
Project Description: Bridge reconstruction, rechannel ization, signal rework and multimodal. Concrete
reconstruction of Argonne from 190 to Montgomery and a southerly connection at Mission. This is a City
Council identified legislative agenda project.
Funding Sources Funding Sources
SourceName
Funding
City
$202,000
FMSIB
$2,000,000
Other
$24,030,000
STBG
$1,298,000
Legend
Other 87.3%
■ FMSIB 7.3%
■ STBG 4.7%
City 0.7%
Page 23 of 41
24: Carnahan Street & Stormwater (8th to South Limit) spo�i1
� ey
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Partial
$30,000
$210,000
$0
$0
$0
$0
$240,000
RW
Planned
$0
$0
$50,000
$0
$0
$0
$50,000
CN
Planned
$260,000
$0
$0
$2,990,000
$0
$0
$3,250,000
TOTAL
1
$290,000
$210,000
$50,000
$2,990,000
$0
$0
$3,540,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Stormwater
Total Project Years: 2026-2030
Total Project Cost: $3,600,000
Project Description: 2027 stormwater conveyance upgrades with potential for pavement preservation
and addition of bike/ped facilities.
Funding Sources
SourceName
Funding
City
$350,000
Other
$3,250,000
Funding Sources
4&-
Legend
■ Other 90.3%
■ City 9.7%
Page 24 of 41
25: Ridgemont Estates Street & Stormwater 9061n i1 j ey
Current 6-Fear i W Pt, A Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Secured
$60,000
$40,000
$60,000
$0
$0
$0
$160,000
RW
$0
$0
$0
$0
$0
$0
$0
CN
Partial
$2,325,000
$1,860,000
$0
$4,650,000
$0
$0
$8,835,000
TOTAL
1
1 $2,385,000
$1,900,000
$60,000
$4,650,000
$0
$0
$8,995,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Stormwater
Total Project Years: 2026-2030
Total Project Cost: $9,500,000
Project Description: Stormwater improvements and road reconstruction in City's southeast
neighborhood.
Funding Sources
SourceName Funding
City 1 $9,500,000
Funding Sources
Legend
4&1 City 100.0%
Page 25 of 41
26: Street Maintenance and Operations Costs (Annual) Sp6&a e�
,,;oo*Ualley®
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
$0
$0
$0
$0
$0
$0
$0
RW
$0
$0
$0
$0
$0
$0
$0
CN
Secured
$510,000
$510,000
$510,000
$510,000
$510,000
$510,000
$3,060,000
TOTAL
1
$510,000
$510,000
$510,000
$510,000
$510,000
$510,000
$3,060,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Preservation
Total Project Years: Annual
Total Project Cost: $3,060,000
Project Description: Ongoing street maintenance and operations activities in Street Fund 101,
including bridge and traffic infrastructure.
Funding Sources
SourceName Funding
City 1 $3,060,000
Funding Sources
Legend
City 100.0%
Page 26 of 41
27: Barker & 1-90 Interchange (Mission to Appleway) Spokane
jVa11ey®
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Partial
$1,230,000
$3,000,000
$1,000,000
$0
$0
$0
$5,230,000
RW
Planned
$2,000,000
$5,000,000
$500,000
$500,000
$0
$0
$8,000,000
CN
Planned
$0
$0
$6,865,000
$0
$5,750,000
$22,000,000
$34,615,000
TOTAL
1
$3,230,000
$8,000,000
$8,365,000
$500,000
$5,750,000
$22,000,000
$47,845,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Bridge
Total Project Years: 2026-2032
Total Project Cost: $71,757,000
Project Description: Phased interchange reconstruction, reconfiguration of adjacent intersections, and
widening Barker to a 4/5-lane urban section with multimodal facilities. This is a City Council identified
legislative agenda project.
Funding Sources
SourceName
Funding
City
$468,000
DEMO
$1,517,000
FMSIB
$1,260,000
Other
j $68,600,000
Funding Sources
Legend
Other 95.5%
® DEMO 2.1 %
FMSIB 1.8%
City 0.7%
Page 27 of 41
28: Local Access Street Improvements Spokan��
jVa11eyi
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$100,000
$100,000
$100,000
$100,000
$100,000
$100,000
$600,000
RW
$0
$0
$0
$0
$0
$0
CN
Planned
$1,400,000
$1,400,000
$1,400,000
$1,400,000
$1,400,000
$1,400,000
$8,400,000
TOTAL
$1,500,000
1 $1,500,000
1 $1,500,000
$1,500,000
$1,500,000
1 $1,500,000
79,000,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Preservation
Total Project Years: Annual
Total Project Cost: $9,000,000
Project Description: Surface treatments (not shown on map), grind/inlays, and reconstruction projects
as annual funding allocations allow. Potential project neighbhorhoods: Midilome, Carnahan, Ponderosa,
Hillcrest, Sprague, Vera Crest.
Funding Sources
SourceName Funding
City 1 $9,000,000
Funding Sources
Legend
City 100.0%
Page 28 of 41
29: Citywide Safety Projects Spokan��
jVa11eyi
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$18,000
$48,000
$18,000
$48,000
$18,000
$150,000
RW
$0
$0
$0
$0
$0
$0
$0
CN
Planned
$0
$2,055,000
$342,500
$2,055,000
$342,500
$2,055,000
$6,850,000
TOTAL
1
$0
$2,073,000
$390,500
$2,073,000
$390,500
$2,073,000
$7,000,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Safety
Total Project Years: Annual
Total Project Cost: $7,000,000
Project Description: Consistent with Local/Regional Safety Plans; including arterial pedestrian
facilities/crossings citywide (i.e. Sprague or Valleyway), particularly near schools. Funded projects
identified separately in TIP.
Funding Sources
SourceName
Funding
City
$700,000
HSIP
$6,300,000
Funding Sources
Legend
HSIP 90.0%
City 10.0%
Page 29 of 41
30: Street Preservation Projects Spokan��
jVa11eyi
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$100,000
$100,000
$100,000
$100,000
$100,000
$500,000
RW
$0
$0
$0
$0
$0
$0
$0
CN
Planned
$0
$2,900,000
$2,900,000
$2,900,000
$2,900,000
$2,900,000
$14,500,000
TOTAL
1
1 $0
$3,000,000
$3,000,000
$3,000,000
$3,000,000
$3,000,000
$15,000,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Preservation
Total Project Years: Annual
Total Project Cost: $15,000,000
Project Description: 4th, 8th, 16th, 24th (Dish man -Su llivan), Dishman Mica, Appleway(E of Corbin),
Vista(Appleway-Mission), Marietta(Sullivan-Euclid), 3rd and 4th (Havana-Fancher), Thierman(8th-Broadway),
Ponderosa Area (Schafer, 44th, Sands), Sprague (Fancher-Herald, McDonald -Sullivan), Evergreen (Sprague-32nd),
Bowdish and University (Sprague -Mission), Pines (16th-32nd)
Funding Sources
SourceName Funding
City 1 $15,000,000
Funding Sources
Legend
City 100.0%
Page 30 of 41
31: Citywide Multimodal Improvements Spokane
jValleyi
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$0
$187,500
$187,500
$187,500
$187,500
$750,000
RW
Planned
$0
$0
$0
$198,000
$0
$0
$198,000
CN
Planned
$0
$0
$0
$0
$4,470,000
$0
$4,470,000
TOTAL
I
I $0
$0
$187,500
$385,500
$4,657,500
$187,500
$5,418,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Pedestrian/Bicycle
Total Project Years: Annual
Total Project Cost: $24,200,000
Project Description: Consistent with Active Transportation Plan such as: Appleway Trail (Farr to
Havana), Flora (Centennial Trail -Flora Cross Course), River Loop (Sullivan -Flora Parks), and Millwood
Trail (Fancher to Vista) and other prioritized projects.
Funding Sources
SourceName Funding
Other 1 $24,200,000
Funding Sources
Legend
Other 100.0%
Page 31 of 41
32: Sullivan & Kiernan Intersection Spokan��
jVa11eyi
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$0
$80,000
$20,000
$0
$0
$100,000
RW
Planned
$0
$0
$0
$400,000
$100,000
$0
$500,000
CN
Planned
$0
$0
$0
$0
$2,400,000
$0
$2,400,000
TOTAL
I
I $0
$0
$80,000
$420,000
$2,500,000
$0
$3,000,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Intersection
Total Project Years: 2029-2031
Total Project Cost: $3,000,000
Project Description: Improve channelization and signal operations at intersection and reconstruct
intersection with concrete and improved multimodal. Coordinate with County sewer extension project.
Funding Sources
SourceName Funding
Other 1 $3,000,000
Funding Sources
lotLegend
Other 100.0%
Page 32 of 41
33: Sullivan & Marietta Intersection spo�i1
� ey
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$0
$80,000
$20,000
$0
$0
$100,000
RW
Planned
$0
$0
$0
$400,000
$100,000
$0
$500,000
CN
Planned
$0
$0
$0
$0
$2,400,000
$0
$2,400,000
TOTAL
I
I $0
$0
$80,000
$420,000
$2,500,000
$0
$3,000,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Intersection
Total Project Years: 2029-2031
Total Project Cost: $3,000,000
Project Description: Improve channelization and signal operations at intersection and reconstruct
intersection with concrete.
Funding Sources
SourceName Funding
Other 1 $3,000,000
Funding Sources
Legend
19 Other 100.0%
Page 33 of 41
34: Mirabeau & Mansfield Intersection spo�i1
� ey
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Partial
$0
$0
$0
$75,000
$75,000
$0
$150,000
RW
Planned
$0
$0
$0
$0
$50,000
$50,000
$100,000
CN
Planned
$0
$0
$0
$0
$0
$3,250,000
$3,250,000
TOTAL
I
I $0
$0
$0
$75,000
$125,000
$3,300,000
$3,500,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Intersection
Total Project Years: 2030-2032
Total Project Cost: $3,500,000
Project Description: New intersection control (signal or roundabout) with multimodal.
Funding Sources
SourceName
Funding
DEV
$75,000
Other
$3,425,000
Funding Sources
I
is
Legend
Other 97.9%
N DEV 2.1 %
Page 34 of 41
35: Bowdish Reconstruction (Sprague to Dishman Mica) Spokane
,,;oo0'Va1y®
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$0
$0
$200,000
$0
$200,000
$400,000
RW
Planned
$0
$0
$0
$0
$100,000
$0
$100,000
CN
Planned
$0
$0
$0
$0
$0
$2,300,000
$2,300,000
TOTAL
$0
$0
1 $0
1 $200,000
1 $100,000
1 $2,500,000
$2,800,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Reconstruction
Total Project Years: 2030-2040
Total Project Cost: $13,000,000
Project Description: Phased projects to reconstruct Sprague to Dishman Mica as urban section with
bicycle and pedestrian facilities. May also include intersection improvements at 32nd Ave. and ITS.
Funding Sources
SourceName Funding
Other 1 $13,000,000
Funding Sources
Legend
Other 100.0%
Page 35 of 41
36: 8th & Carnahan Intersection Spokan��
jUalley®
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$0
$0
$87,500
$87,500
$0
$175,000
RW
Planned
$0
$0
$0
$0
$0
$250,000
$250,000
CN
Planned
$0
$0
$0
$0
$0
$0
$0
TOTAL
I
I $0
$0
$0
$87,500
$87,500
$250,000
$425,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Intersection
Total Project Years: 2030-2033
Total Project Cost: $3,000,000
Project Description: Add intersection control (turn lanes, potential signal) and improve multimodal.
Funding Sources
SourceName Funding
Other 1 $3,000,000
Funding Sources
Legend
4k Other 100.0%
Page 36 of 41
37: Sprague & Pines Intersection
.�
Ilk 4L IL It 4
;• .f
Or
M. .It
1 � -
.kAN
"
41
4
Ave
E Spragueor
N
r
`yam
Current 6-Year TIP Phased Funding Status - By Year
Spokane
jUalley®
Spokane Valley
N
A
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$0
$0
$0
$150,000
$150,000
$300,000
RW
Planned
$0
$0
$0
$0
$0
$150,000
$150,000
CN
Planned
$0
$0
$0
$0
$0
$0
$0
TOTAL
I
I $0
$0
$0
$0
$150,000
$300,000
$450,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Intersection
Total Project Years: 2031-2034
Total Project Cost: $2,600,000
Project Description: Install SB right turn lane, EB left turn lane, and intersection control (signal and
channelization) and improve multimodal.
Funding Sources
SourceName Funding
Other 1 $2,600,000
Funding Sources
Legend
Other 100.0%
Page 37 of 41
38: 8th & Park Intersection SP61��
jUalley®
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$0
$0
$0
$50,000
$50,000
$100,000
RW
Planned
$0
$0
$0
$0
$0
$240,000
$240,000
CN
Planned
$0
$0
$0
$0
$0
$0
$0
TOTAL
I
I $0
$0
$0
$0
$50,000
$290,000
$340,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Intersection
Total Project Years: 2031-2034
Total Project Cost: $3,000,000
Project Description: Provide new traffic signal or roundabout and improve multimodal.
Funding Sources
SourceName Funding
Other 1 $3,000,000
Funding Sources
Legend
*k Other 100.0%
Page 38 of 41
39: Broadway (Flora to Barker) Sp6&a eU 11 j ey
�
i
g011
�
2-7
3 15
o
;L •'+'4' _ti
w.
•
��77
M . . 00M L5
Or
e 0.0
y
Sc'albi-11.8,000'
R,r.rl
�t r . %
Current 6-Year TIP Phased Funding Status - By Year
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Partial
$0
$0
$0
$0
$0
$50,000
$50,000
RW
Partial
$0
$0
$0
$0
$0
$0
$0
CN
Partial
$0
$0
$0
$0
$0
$0
$0
TOTAL
1 1
$0
$0
$0
$0
1 $0
1 $50,000
1 $50,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Reconstruction
Total Project Years: 2032-2035
Total Project Cost: $5,000,000
Project Description: Expand 3-lane urban section with and improve multimodal.
Funding Sources Funding Sources
SourceName Funding
Other 1 $5,000,000
Legend
Other 100.0%
Page 39 of 41
40: Park & Mission Intersection
4 `
j y
Mission, A
_ L
ELL
Current 6-Year TIP Phased Funding Status - By Year
Spokane
jUalley®
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$0
$0
$0
$0
$50,000
$50,000
RW
Planned
$0
$0
$0
$0
$0
$0
$0
CN
Planned
$0
$0
$0
$0
$0
$0
$0
TOTAL
I
$0
$0
$0
$0
$0
$50,000
$50,000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Intersection
Total Project Years: 2032-2035
Total Project Cost: $2,500,000
Project Description: Improve channelization and evaluate for signal operations.
Funding Sources
SourceName Funding
Other 1 $2,500,000
Funding Sources
Legend
Other 100.0%
Page 40 of 41
41: Flora & SR 290 Intersection
r r
290
Current 6-Year TIP Phased Funding Status - By Year
ML
f
9061n
.,;o0%Iley®
Phase
Status
2027
2028
2029
2030
2031
2032
6-Year Total
PE
Planned
$0
$0
$0
$0
$0
$100,000
$100,000
RW
Planned
$0
$0
$0
$0
$0
$0
$0
CN
Planned
$0
$0
$0
$0
$0
$0
$0
TOTAL
I
$0
$0
$0
$0
$0
$100,000
$100-000
Project Summary
Summary information is for the entire project and may extend beyond the 6-Year TIP time frame.
Project Type: Intersection
Total Project Years: 2032-2034
Total Project Cost: $4,000,000
Project Description: Improved traffic control with added turn lanes or roundabout, per adopted Planned
Action Ordinance, including multimodal.
Funding Sources
SourceName Funding
Other 1 $4,000,000
Funding Sources
Legend
Other 100.0%
Page 41 of 41
CITY OF SPOKANE VALLEY
Request for Council Action
Meeting Date: June 16, 2026 Department Director Approval: 0
Check all that apply: ❑ consent ❑ old business ® new business ❑ public hearing
❑ information ❑ admin. report ❑ pending legislation ❑ executive session
AGENDA ITEM TITLE: Motion Consideration: Potential Grant Opportunity - BIP FY26
GOVERNING LEGISLATION: RCW 35.77.010: Six -Year Transportation Improvement Program
PREVIOUS COUNCIL ACTION TAKEN:
• December 16, 2024, City Council authorized the City Manager to pursue the final design for
the revised jug handle configuration.
• September 26, 2023, City Council approved staff to contract with KPFF Consulting
Engineers for the project's design phase.
• December 20, 2022, City Council passed a motion to advance Alternative 2 — Diamond
Interchange w/ peanut Roundabouts to final design.
• Since 2021, City Council has authorized the City Manager to apply for grant funding to
multiple programs for this project, including FMSIB, SRTC, BUILD, RAISE, BIP, and INFRA.
• Since 2019, the City has identified the Sullivan & Trent Interchange project as a City priority
project and included it on its federal agenda and the Six -Year Transportation Improvement
Program (TIP).
BACKGROUND: On May 14, 2026, the FHWA made available Bridge Investment Program (BIP)
discretionary grant funds. Projects are scored based on the typical merit criteria associated with
USDOT grant programs: state of good repair, safety and mobility, economic competitiveness,
resiliency and the environment, quality of life, and innovation. If these merit criteria are satisfied,
the program evaluates the project's benefit cost impacts, project readiness, and financial
completeness. Critical program details are:
Total Available Program Funds: $2.48 billion available FY26
Award Range (Min -Max):
Match Amount:
Application Due Date:
Award Notification Date:
Obligation Date (if awarded):
Expenditure Date (if awarded)
$2.5 - $100 million
80% BIP Program max funding
86.5% Federal max. participation
13.5% Non -Federal min.
June 29, 2026
September 30, 2026
No later than September 30, 2029
September 30, 2034
Staff recommend submitting the Sullivan & Trent Interchange Project to this call for projects.
Application requests can only seek funds for "future eligible expenses" and awards cannot be
used to reimburse for funds/phases already obligated. For example, in 2023 the engineering
phase of the project was initiated. Therefore, the costs for the engineering phase are not allowed
to be a "future eligible expense" for the project. Related, the City has secured funding for the right-
of-way phase of the project, some of which will be obligated by September 2026. Those ROW
funds cannot be considered when calculating the application's "future eligible expense" for the
project.
The BIP application requires a unique funding breakdown that separates previously incurred costs
and future eligible costs. It further requires a separation of future eligible costs by federal and non-
federal funding. Table 1 below illustrates the application's proposed funding scenario specific to
the BIP program, including an $23,921,892 BIP request and $7.5 million of "not secured" non-
federal funds. These non-federal funds can be local funds or from potential state programs like
FMSIB, TIB, or legislative appropriations.
Page 1 of 2
Table 1. BIP Application Funding Summary
2023-2026 Design Engineering + 2026 ROW Acquisitions
AL _
$ 7,070,267 83
Subtotal S 7,070,267 83.
2022 Alternatives Analysis
$ 368,530
4.34%
2023-2026 Design Engineering + 2026 ROW Acquisitions
$ 1,059,113
12.46%
Subtotal
S 1,427,643
IF6.80%
Total Previously Incurred Project Cosil
S 8,497,910
100.00%
' 1 1 :1 -
1 ", ,...
i•�iiiiYWii�i(o:.
Federal•
Requested BIP Program
$ 23,921,892
52.81%
Secured 2023, 2025 Federal Earmarks and 2025 STBG Funds
$ 12,000,000
26.49%
Subtotal
S 35,921,892
79.31 %
Non -Federal Funding
Committed City of Spokane Valley (13.5% Match for Secured Funds)
$ 1,872,832
4.13%
Freight Mobility & Strategic Investment Board (FMSIB) funding
Pending acknowledged. Actual dollar value to be determined by 2026 FMSIB
7,500,000
16.56%
call for projects and and state legislative approval
$
Other sources are acceptable: TIB, local, Legisl appropriation.
am Subtotal S 9,372,832
Total Future Eligible Project Cost S 45,294,725
S
20.69%
100.00%
OPTIONS: Move to authorize the City Manager or designee to apply for the BIP Fiscal Year
2026 grant for the Sullivan & Trent Interchange project or take other action.
RECOMMENDED ACTION OR MOTION: Move to authorize the City Manager or designee, to
apply for the BIP Fiscal Year 2026 grant for the Sullivan & Trent Interchange Project.
BUDGET/FINANCIAL IMPACTS: If awarded, there are multiple points of consideration:
1. An unsecured balance of $7.5 million is required. There are multiple state funding
programs that offer non-federal funds, including FMSIB and TIB.
2. The City has allocated sufficient non-federal funds for all executed federal grants. As the
project nears the obligation of construction phase, local funds will be reviewed, along
with any other secured non-federal funds, to ensure sufficient non -Federal funds are
available. These funds may include private contributions from the Planned Action
Ordinance area.
3. Staff contracts with a consultant to update the BIP application's benefit cost analysis
document. The consultant cost is estimated at $15,000 and is included in the budget.
STAFF CONTACT: Adam Jackson, Engineering Manager & Kristen Armstrong, Sr. Engineer
ATTACHMENTS: None
Page 2 of 2
CITY OF SPOKANE VALLEY
Request for Council Action
Meeting Date: June 16, 2026 Department Director Approval:
Check all that apply: ❑ consent ❑ old business ❑ new business ❑ public hearing
❑ information ® admin. report ❑ pending legislation ❑ executive session
AGENDA ITEM TITLE: Administrative Report — Proposed Fireworks Code Amendments
GOVERNING LEGISLATION: Chapter 7.15 SVMC; RCW 70.77.
PREVIOUS COUNCIL ACTION TAKEN: Approval of Ordinance 03-066 May 13, 2003.
BACKGROUND: Fireworks regulation occurs at both the state and local level. While the state
allows some possession and use of fireworks on certain dates, local governments are permitted
to pass ordinances more restrictive than state law. When the City of Spokane Valley incorporated,
it continued the Spokane County ban on the discharge of fireworks via Ordinance 03-066. This
allowed for consistent enforcement between the City and unincorporated areas. However, over
time, the Spokane Valley Police Department (SVPD) and the Spokane Valley Fire Department
(SVFD) have identified challenges with the regulatory scheme, particularly when it comes to
enforcement. For instance, while officers can respond to areas where fireworks are being
discharged, it is rare for them to locate the person or persons responsible. Officers respond, but
largely have no way of knowing who discharged the fireworks. Even if they can locate fireworks,
the possession of consumer fireworks is not currently prohibited.
The proposed amendments would repeal and replace chapter 7.15 SVMC in its entirety. The new
chapter will address law enforcement concerns by prohibiting the possession of fireworks in the
City. An officer will no longer have to witness the use of fireworks in order to enforce the code.
Instead, fireworks can be seized and the person or persons possessing those fireworks may be
cited. The new chapter also clearly identifies other unlawful acts and outlines the penalties for
such violations.
In addition, this amendment aligns the City's code with state law requirements regarding the
permitting of public displays of fireworks. Public displays of fireworks are large displays for the
public that are largely handled by pyrotechnic professionals. The most frequent public display of
fireworks occurs at Avista Stadium, the home of the Spokane Indians baseball team. These
amendments have been reviewed by a vendor who provides those services and they have no
concerns with any of the changes. In accordance with the City's interlocal agreement with SVFD
and the procedures in the proposed amendment, applications for the public display of fireworks
will be submitted to SVFD, which will conduct an investigation to ensure that the proposed public
display meets state and local laws. The fire official will forward the findings and recommendation
for or against issuance of the permit to the City Manager who will then place the item on the City
Council consent agenda for consideration. If there is no consent agenda prior to the public display
of fireworks, the item will be added as an action item. Importantly, by virtue of this amendment,
public display of fireworks will be prohibited in any residential zone.
Pursuant to state law, these amendments, if ultimately approved by City Council, will be effective
one year from the date of adoption.
OPTIONS: Consensus to place the proposed amendments on a future agenda for an ordinance
first reading; or take other action deemed appropriate.
RECOMMENDED ACTION OR MOTION: Consensus to place the proposed amendments on a
future agenda for an ordinance first reading.
BUDGET/FINANCIAL IMPACTS: none anticipated
STAFF CONTACT: Tony Beattie, Senior Deputy City Attorney
ATTACHMENTS:
- Proposed Amendments to chapter 7.15 SVMC
- Current chapter 7.15 SVMC
Chapter 7.15
FIREWORKS
Sections:
7.15.010 Purpose.
7.15.020 Definitions.
7.15.030 Acts prohibited without appropriate licenses and permits — Exceptions.
7.15.040 Public display permit.
7.15.050 Seizure of fireworks.
7.15.060 Unlawful possession of fireworks — Penalty.
7.15.070 Unlawful discharge or use of fireworks - Penalty.
7.15.080 Unlawful sales, delivery, transport — Penalty.
7.15.090 Other violations — Penalty.
7.15.100 Violation a separate, continuing offense.
7.15.110 Costs.
7.15.010 Purpose.
The purpose of chapter 7.15 SVMC is to ensure the safety, security, and general welfare of the citizens of Spokane
Valley by prohibiting the possession, manufacturing, importation, transfer, transportation, sale, storage, use, or
discharge of fireworks within the City of Spokane Valley.
7.15.020 Definitions.
The City, pursuant to RCW 35A.11.020 and 35A.12.140 by and through this reference, hereby incorporates the
definitions set forth in Chapter 70.77 RCW, State Fireworks Law, including RCW 70.77.120 through 70.77.241 as
now enacted or hereafter amended. These definitions apply to words and terms used in this chapter.
7.15.030 Acts prohibited without appropriate licenses and permits — Exceptions.
A. Except as specifically authorized pursuant to this chapter, no person may manufacture, import, transfer,
transport, sell, possess, store, use, or otherwise discharge fireworks within the City of Spokane Valley.
B. Exceptions. The prohibitions in SVMC 7.15.030(A) shall not apply to the following activities within the
City:
1. The otherwise lawful use of flares, or signals produced by flame by persons, railroads, or
transportation agencies for the purpose of signaling to the public an obstruction or hazard on the
traveled way.
2. The possession and use of agricultural and wildlife fireworks as authorized by RCW 70.77.311(1).
3. The transportation of fireworks by a licensee as defined by RCW 70.77.175 or a public or contract
carrier delivering to a licensee.
4. The assembling, compounding, use, and display of articles pyrotechnic or special effects in the
production of motion pictures, radio or television productions, or live entertainment when under the
direction and control of a pyrotechnic operator licensed by the state of Washington, and who possesses
a valid permit from the local fire official.
5. The public display of fireworks authorized by a permit issued by the local fire official and approved by
City Council in accordance with this chapter.
7.15.040 Public display permit.
A. Application for a local public display permit shall be submitted to the local fire official, as designated by
the Spokane Valley Fire Department, 30 days prior to the public display of fireworks is scheduled. The
following information shall be provided to the local fire official along with the application:
1. The name of the organization sponsoring the display, if other than the applicant.
2. The date the display is to be held.
3. The exact location for the display.
4. The name and license number of the pyrotechnic operator who is to supervise discharge of the
fireworks and the name of at least one experienced assistant.
5. The number of set pieces, shells (specify single or multiple break), and other items.
6. The manner and place of storage of such fireworks prior to the display.
7. A diagram of the grounds on which the display is to be held showing the point at which the fireworks
are to be discharged, the location of all buildings, highways, and other lines of communication, the
lines behind which the audience will be restrained, the location of all nearby trees, telegraph or
telephone lines, or other overhead obstruction.
8. The applicant shall provide an insurance declaration page demonstrating proof of general liability
insurance with a combined single limit of $2,000,000 per occurrence, and $2,000,000 in aggregate.
Evidence of insurance shall be filed with the application and shall name the City of Spokane Valley as
an additional named insured. Depending upon the nature of the special event and its risk to the public
and private individuals, the City may increase the liability limits for a given event. Instead of
insurance, the applicant may procure and provide proof of a bond issued by surety company authorized
to do business in the State of Washington in the amount of $2,000,000 conditioned upon the
applicant's payment of all damages to persons or property resulting from or caused by such public
display of fireworks, or any negligence on the part of the applicant or its agents, servants, employees,
or subcontractors in the presentation of the display.
B. A public display of fireworks shall not be allowed in any residential zone.
C. The local fire official receiving an application for a public display permit shall investigate whether the
character and location of the display as proposed would be hazardous to property or dangerous to any
person. Through its investigation, the local fire official shall determine whether or not the public display
meets the conditions of this chapter, along with state and local laws and regulations. The local fire official
shall submit a report to the City Manager at least 21 days prior to the date of the public display that
includes its findings and a recommendation for or against issuance of the permit. The report shall be
placed on the City Council's consent agenda or as an action item for consideration at a council meeting
prior to the scheduled display. The City Manager or designee shall notify the local fire official of the
approval or denial. The City Council's determination is the final determination of the City.
D. If a permit for the public display of fireworks is approved, the sale, possession, transportation, and use of
fireworks for the public display is lawful for that purpose only.
E. Any permit issued by the local fire official after approval by the City Council shall explicitly state that the
permittee shall defend, indemnify, and hold harmless the City, its officers, officials, employees and
volunteers from and against any and all claims, suits, actions, or liabilities for injury or death of any person,
or for loss or damage to property, which arises out of the applicant's event, or from any activity, work or
thing done, permitted, or suffered by applicant which arises from the applicant's event, except only such
injury or damage as shall have been occasioned by the sole negligence of the City.
7.15.050 Seizure of fireworks.
Any fireworks which are sold, offered for sale, used, discharged, possessed, manufactured, imported, or transported
in violation of this chapter shall be subject to immediate seizure by the City. Proceedings for forfeiture and disposal
shall be through RCW 70.77.440, as amended.
7.15.060 Unlawful possession of fireworks — Penalty.
A. Except as otherwise permitted by this chapter, any person who knowingly possesses:
1. less than one pound of fireworks, exclusive of external packaging, shall be guilty of a misdemeanor
punishable by up to 90 days in jail or a 1,000 dollar fine, or by both such imprisonment and fine; or
2. one pound or more of fireworks, exclusive of external packaging, shall be guilty of a gross misdemeanor
punishable by up to 364 days in jail or a 5,000 dollar fine, or by both such imprisonment and fine.
B. For the purposes of SVMC 7.15.070, "external packaging" means any materials that are not an integral part of
the operative unit of fireworks.
7.15.070 Unlawful discharge or use of fireworks — Penalty.
Except as otherwise permitted by this chapter, any person who knowingly possesses fireworks under circumstances
evincing an intent to use or discharge such fireworks, or to allow the same to be used or discharged, is guilty of a
gross misdemeanor punishable by up to 364 days in jail or a 5,000 dollar fine, or by both such imprisonment and
fine.
7.15.080 Unlawful sales, delivery, transport — Penalty.
Except as otherwise permitted by this chapter, it is unlawful for any person to knowingly sell, offer for sale,
distribute, deliver, transport, or exchange for consideration, any fireworks to any person or user.
A person who violates this section shall be guilty of a gross misdemeanor punishable by up to 364 days in jail or a
5,000 dollar fine, or by both such imprisonment and fine.
7.15.090 Other violations — Penalty.
Except as otherwise provided in this chapter, any person violating any of the provisions of this chapter is guilty of a
misdemeanor punishable by up to 90 days in jail or a 1,000 dollar fine, or by both such imprisonment and fine.
7.15.100 Violation a separate, continuing offense.
A person is guilty of a separate offense for each day during which he or she commits, continues, or permits a
violation of any provision of this chapter.
7.15.110 Costs.
The inclusion in this chapter of criminal penalties does not preclude enforcement of this chapter through civil
means. A person violating this chapter is liable for costs and expenses incurred by the City in bringing any civil
action, including court costs and reasonable investigative and attorney fees, pursuant to RCW 70.77.549.
City of Spokane Valley, WA
§ 7.15.010
CHAPTER 7.15
FIREWORKS
§ 7.15.010. Definitions.
§ 7.15.050
The City, pursuant to RCW 35A.11.020 and 35A.12.140 by and through this reference,
hereby incorporates the definitions set forth in Chapter 70.77 RCW, State Fireworks
Law, including RCW 70.77.120 through 70.77.241 as now enacted or hereafter
amended. These definitions apply to words and terms used in this chapter.
(Ord. 66 § 1, 2003)
§ 7.15.020. Intent.
It is the intent of the City of Spokane Valley to continue the prohibition on the use, sale,
discharge or explosion of consumer fireworks pursuant to the Spokane County Code
Sections 3.17.070 and 3.17.080 which are adopted by reference as if fully set forth herein
except as modified by this chapter.
(Ord. 66 § 2, 2003)
§ 7.15.030. Sale, possession and use of fireworks.
A. No fireworks shall be sold or offered for sale within the City of Spokane Valley.
B. No person shall ignite, discharge, use or explode any fireworks within the City
except as authorized in this chapter.
C. No person under the age of 16 years shall possess any fireworks within the City
unless accompanied by an adult.
(Ord. 66 § 3, 2003)
§ 7.15.040. Display fireworks and special use.
A. Public display fireworks may be authorized by permit issued by the City pursuant
to RCW 70.77.260 including standards, obligations and duties set forth in Chapter
70.77 RCW.
B. Use of fireworks by religious organizations or other specific purposes set forth in
RCW 70.77.311(2)(c) and (d) is permitted on an approved date and an approved
location pursuant to permit.
C. Use of trick and novelty devices as defined in WAC 212-17-030, as amended, is
permitted.
(Ord. 66 § 4, 2003)
§ 7.15.050. Permit application.
An application for a public display of fireworks or use identified in SVMC § 7.15.040
shall be made to the city manager or designee at least 10 days prior to the
commencement of the public display. The form of the application with conditions
of approval shall be consistent with forms and conditions used or adopted by the
Downloaded from https://ecode360.com/SP4654 on 2026-06-11
City of Spokane Valley, WA
§ 7.15.050
§ 7.15.080
Washington State Patrol through the Director of Fire Protection including administrative
regulations found at Chapter 212-17 WAC. Bonding and insurance requirements shall
be those which are set forth in Chapter 70.77 RCW, State Fireworks Law, as amended.
The city manager or designee is authorized to adopt forms, rules and procedures in order
to implement the permit process provided the same are consistent with Washington State
law.
(Ord. 66 § 5, 2003)
§ 7.15.060. Permit fees.
The City by resolution, consistent with RCW 70.77.555, shall establish permit fees for
the public display of fireworks.
(Ord. 66 § 6, 2003)
§ 7.15.070. Seizure of fireworks.
Any fireworks which are illegally sold, offered for sale, used, discharged, possessed or
transported in violation of this chapter shall be subject to immediate seizure by the City.
Proceedings for forfeiture and disposal shall be through RCW 70.77.440, as amended.
(Ord. 66 § 7, 2003)
§ 7.15.080. Violation — Penalty.
Any person violating any of the provisions of this chapter shall be guilty of a
misdemeanor. A person is deemed to have committed a separate offense for each and
every day during which the violation is committed or continues.
In addition, a person violating this chapter is liable for costs and expenses incurred by
the City in bringing any civil action, including court costs and reasonable investigative
and attorney fees, pursuant to RCW 70.77.549.
(Ord. 66 § 8, 2003)
Downloaded from https://ecode360.com/SP4654 on 2026-06-11
CITY OF SPOKANE VALLEY
Request for Council Action
Meeting Date: June 16, 2026
Department Director Approval: ❑
Check all that apply: ❑ consent ❑ old business ❑ new business ❑ public hearing
❑ information ® admin. report ❑ pending legislation ❑ executive session
AGENDA ITEM TITLE: Admin Report: Public Safety Items Prioritization
GOVERNING LEGISLATION: N/A
PREVIOUS COUNCIL ACTION TAKEN: The City has nine contracts in place for various public
safety related services with Spokane County. These items were last discussed at the 2027
Budget Workshop on June 9, 2026.
BACKGROUND:
The City held the 2027 Budget Workshop on June 9, 2026. During the discussion at the
workshop, various public safety related items were discussed. The purpose of tonight's
presentation is to have Council rank potential public safety related projects to help guide in
staff's priorities in working on these items going forward.
On the ranking worksheet, each Councilmember will rank the potential projects from 10 to 1,
with 10 being the highest priority and 1 being the lowest. If a Councilmember does not wish to
pursue one or more of the listed items, it should be ranked as 0. Any item with four or more Os
will be deemed as not a priority by the Council as a whole. Also, there is space at the bottom of
the worksheet if a Councilmember wishes to add an additional item for consideration during this
process.
OPTIONS: Discussion and ranking of Council priorities related to public safety.
RECOMMENDED ACTION OR MOTION: Discussion and ranking of Council priorities related to
public safety.
BUDGET/FINANCIAL IMPACTS: Public safety comprises about two thirds of the General Fund
recurring expenditures, and these costs have a significant impact on the City's overall budget
and have the potential to impact other City services due to revenue constraints. Also, many of
the items listed for ranking will have associated costs to complete them that are unknown at this
time.
STAFF CONTACT: John Hohman, City Manager
ATTACHMENTS: Ranking Worksheet
a)
E
m
c
E
0
E
U
C
7
O
U
fA
V
.)
O
aL
c
0
E
0
0
CO
U
C
O
U
0)
Q E
C �
CO 0
O Q
i (6
O p U
E > 0
w O,,
-O (6 O
J CO LO 1—v
N N O
0 0 o
N N of
7
O
UU)_
C O U
7 N
O �C
O O Co
N N CO C C
> > o 0 O
E E �
N N N (0 E N
c
Q Q U)m O 0
o �
0
m U a) c c
O U N N O
i U C 0
c E E T
0 w w w 0-
U)
c
O
.O
0
C
E
E
O
U
N
m
0
S
C
m
CO
L
0
i
u
T
01
d
m
N
Q
C
N
U
U
(6
IL
N
Y
U
N �
C 01
C O
O 7
U m
rn
E N
N'
O � W
O
7 W
n � J 7 > U
O U)
O N �
O O O_
G O y U N
N N �
(6 O
rn N> cn a '0 0 E
C
a) >` .> > C a)U O V
O C cu N N .O E
i6 d' Q E E
N . N: N 2 E t
_ _ Q y
Q¢ E 2 U U U N O O C r N
d ° o 0 0 d 2
N N i U C 01 01 N (`.
O O O U N C E E m y
U as CwLL, 0
m
0
H