Loading...
ZE-88-81 F • / Std. /4, - AGENDA, SEPTEMBER 10, 1981 TELEPHONE NO. : '456.- 2205'. 4 SPOKANE COUNTY ZONING HEARING EXAMINER COMMITTEE . • Place: Broadway Centre Building, Second Floor North 721 Jefferson Street, Spokane • - ZONING APPLICATIONS WILL BE HEARD IN THE FOLLOWING ORDER. THE HEARING EXAMINER COMMITTTEE WILL RECESS FROM 12:00 NOON TO 1 :30 P.M. FOR LUNCH AT A PLACE TO BE ANNOUNCED. ITEMS NOT HEARD PRIOR TO THE 5:00 P.M. ADJOURNMENT WILL BE CONTINUED . TOTHE NEXT AVAILABLE DATE AS ANNOUNCED BY THE CHAIRMAN OF THE HEARING EXAMINER • COMMITTEE. LEGAL DESCRIPTIONS AND PROJECT DETAILS FOR THESE PROJECTS ARE ON FILE AND AVAILABLE IN THE PLANNING DEPARTMENT'S OFFICE. • • 8:30 A.M. . • A. ZONE RECLASSIFICATIONS • 1 . ZW-68-81 AGRICULTURAL TO RESTRICTED INDUSTRIAL • (Generally located on the west side of Spotted . Road, south of Westbow Boulevard. Section 5-24-42) Proposed Use: No proposed development at this time. Site Size: Approximately 10 Acres Applicant: JEFF JOHNSON East 911 - 17th Avenue 2. T-88-81 ,GRICULTURAL SUBURBAN TO LOCAL BUSINESS . (Generally located on the north side of Sprague Avenue, east of Bannen Road. Section 14-25-44) Proposed Use: Retail Bakery Site Size: Approximately .25 Acre Applicant: JIM DORSEY • East 14903 - 15th Avenue 3. ZE-91-81 RESIDENTIAL OFFICE TO LOCAL BUSINESS (Generally located on' the east side of Pines Road, south of Fourth Avenue. Section 22-25-44) Proposed Use: No proposed development at this time. Site Size: Approximately 1 .19 Acres . Applicant: OPPORTUNITY INVESTMENTS South 523 Pines Road 4. ZE-79-81 AGRICULTURAL SUBURBAN TO COMMERCIAL (Generally located on the northwest corner of Pines Road and Maxwell Avenue. Section 16-25-44) Proposed Use: . Auto Service and Repair Site Size: Approximately 1 .83 Acres • Applicant: DARROLL WALLER East 9611 Sprague Avenue • - 1 _ .. t• i --------■.- - I a 3 CA t MISSION AVE ; I 10 ,._.... -------.7"----.-- ,.. .... _ ,.. •• 2 1.110.• 0. WI gag St 0 'HARI— 0 a u/ X Cr. .S.44•Pi r 4 L... „ . NMI "2 . 5:tiani : i I I Ihrlialti 0 ,.., WalialittIlre __t•• ! a I!ES 0 rteJ ATAL •0 CATALOO a W:„;.•,,,r,,,,,, lar • .—....__,-. / 0 •,, cr 0 t = i 1 it • CATA • . ^..e.g..1-00 V cr r.a, ........-.........4,9....-- .1 4. . •i IC; - w 1 "1".•nni% ES I a k e :Mt L.,...i t• . V, JP /lb -1,* B -Gip • A Y UJ .1 0 al, ..„.... . - ="66TTZT47=0".. v•-1.-•;••••:•••••••••••••••11•111••4.•••••••.0.7111.0110•11a•l‘IISAM.0•• , .14•••••••■•• • a . .... u•. !MIIIMIS 11.. 0 9r e :1 0 • cf CC) W SC hoc)i ' o _Pc i A v E 1 s. ALXI I C nanswesidk,..n......,..-1Palbe 1 ! - c $2 .._., • a OJtc ' D .,3,I • +4 t 71 .. k.., g ...........,.. no VA L LEYNA1 4 a a . § Mir V A L.t- E. v WAY ' I •••••••••........• -3.4"TaTT or. at. ....J... 7., i -.. - I •bt . 4 N OWPAL014.0 471 ' & r.I e kz,, 7; a– :I : ...:1 2 .• La . El to .; fr / _is, Lu I MON . , t • D VI_ • I u • I W _____. a 2 I "...."""•"; R I ;a ICE: 1 a...1 r.Z . 7.a • (•1: • I r I I V ERS 10.10. gal x —J I s V ! 2 I a: e'4‘.1 I ° " 301, z SPRAGUE ,...- 0/9411 AVE • - 4rwai - - . . - . : ,• . • . : . ItellailtrWOCKIWItirriti,Cenhel/41.-i‘k Ca t er:Ct.°.:Amor 7 I, • ---•N 2 2 3 13 il z E_8 8_81 L._ .....a...,_ xi ,• I - 1„.,„,, . a • V E r ai p;“, sckoul • 4Th AvE laid ...._ .., ren4•041" ••••••••0141171••••••••••ne.10•7a 11.,,sanumanwas‘es••••■ .2 0 i 2 Ir a CC -'Closoat 1 11 1 a r. ., ..............1...CC ..a......a. 3 i 7 raa a• J 7.- C 4 73.&1" n Ll t & 'H A al:HAVE:111! 1111111.1•1iFz our?IN rm. as II lal I_ n re Re 00 s 7: r—.2 f -6. as 2: r• ';':' ia L.0 Thq ";9.0 17 Trij 7Tli 'i?‘ AM . ?, 7 rm AvE 7 TS A !it ........vrea....t.. • 9 3 It/. – SCH00 0: • 7 8TH AVE Gni 8 1-4 u 'g - 1 Gm-n-i . vioiverne h , .„ --.........4„......„- , :: • PaTdanCritrinsipaglia I i • .12 NIVE 111111 i 10 6 IMIll• .. . ,....ni r • • 4 la • W . II 5 LI)14 /,. r 4_ 0 -,0 , ' Tle 1 _i 0 Cp r ic2 , . Er o 4 4 % Li 77-• a . .. .. . .. • 7 1 A v E 6 I 2 9 I 2TH < TwE Ft ' • F - .1 t -.o _ _ye -,st I F a3 MISSION AVE21 110 1. _ ���- Ga. - �`_� _ ' 1F$/ - M/ - - ON ` e Y 4 • I .•1AR� O '-� 9 ~ �• ., • ENUE ``\ Y �. s.an: • ♦ 4 ' DESMET• L-. a b Sr.n r 10 O WNW -AI i ¢ <tII �` � 4J.. ATAL•p 0 W.• - ylp • i, �" i_ i• uTA • • O• _ ,4 51akC W ;iC � � 'i �i D is a al B -hill t A Y r J1 3 i ' ,e-Rnameaanrb•t•MzafA.. 1.4 •04,satMM•41M.!'C4fla..inns...a ra*AII.b V. +0a� +.1- 4 l.. - , 44 ! rummitm,"Ell Q a „ f h IS 'ogre's: -K' AVE ! F ALK/ 1 L• fn..n. 2 LL $�h00[: 71 o• t+ a a'c � VALLEYW� Q X VALLEY WAY CL 5,ni i i •ee� ge^i[ W M, M W j j • r .( •.e.3 3 r� •IVERSIDE - 1 _ w- • RI :w I• ,, - 'AVE ; , SPRAGUE4 s�. of r�4AV .ermeer:; - -- - :ioeblrz/JVA+. +1.y 'r" s.'r:.. . 9 - 3 r: :,.y'�nww..: :cacaw, , J\f zL—VV—V1No 23•' � •i ,� . � . a ;- a.— 1 at I- ,�—, /tin $?.Mo r f o• r x� 111TP •...I Mrrw Y .1•I-s .�. AT .f r. �ry5 a''G/OJ . Q L „j .- 1l- fra• £ l / M • ? i /Ha.ao �AVE•z� a F 0 0 b C7� fiTf• PJ 3 u .. € Aal/oleo,• Jam' w f o F,f ,�my rAhAMS ai " 7Tn AVE 7Tw An j '�iiT•/ 7TM V r? UI . y ' , e SCHOi QE r. "awr...116 _�E opmne+rawir asrmw 8 H = .:`. ..... I twf0� l a GM rl ° b 4 "• r .` 10- I ..s-- r . �' J' m i .• UI = r 1„_1000 /0 r o Oy o T s y �1 0 IIf---'`'�1 4. A 4v e y 12 T �� 12 T I $- fi r. i STAFF REPORT DATE: SEPTEMBER 10, 1981 TO: HEARING EXAMINER COMMITTEE FROM: PLANNING DEPARTMENT STAFF SUBJECT: ZONE RECLASSIFICATION NUMBER: ZE-88-81 I . GENERAL INFORMATION APPLICANT: JIM DORSEY STATUS OF APPLICANT: Owner REQUESTED ZONING: Local Business EXISTING ZONING: Agricultural Suburban (established in 1958) PROPOSED USE: Retail Bakery PROJECT LOCATION: This site is generally located on the north side of Sprague Avenue, approximately 150 feet east of Bannen Road. II . SITE PLAN INFORMATION SITE SIZE: Approximately .25 acres SITE CHARACTERISTICS: The site is level and has a house and a garage. NEIGHBORHOOD CHARACTER: The neighborhood character of the property fronting on Sprague Avenue is Commercial or in transition to commercial uses. To the north the neighborhood character is residential. AGRICULTURAL SUMMARY: URBAN ZONING: North Agricultural Suburban, established, 1958 East Agricultural Suburban, established, 1958 West Agricultural Suburban, established, 1958 South Commercial, established, 1974 LAND USE: Site Single Family Residential and garage North Single Family Residential and vacant East Vacant lot and Single Family Residential West Single Family Residential South Commercial and Office 7 • ZONE RECLASSIFICATION NUMBER: ZE-88-81 II . SITE PLAN INFORMATION (continued) 1981 COMPREHENSIVE PLAN DESIGNATION: MAJOR COMMERCIAL NUMBER OF EXISTING BUILDINGS: 2 NUMBER OF BUILDINGS PROPOSED: 2 Existing Buildings would remain Total Square Feet Approximately 783 sq. ft. Total Percent of Site Covered 7 is MAXIMUM HEIGHT OF STRUCTURES: 18 feet PARKING REQUIRED: 4 spaces PROVIDED: 5 spaces III . BACKGROUND/ANALYSIS This request for a rezone is consistent with the Comprehensive Plan and existing land use. Staff recommends approval, subject to conditions as noted below. IV. AGENCIES RECOMMENDED CONDITIONS a) COUNTY PLANNING DEPARTMENT 1 . A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. 2. The applicant shall develop subject property generally in accord- ance within the concept presented to the Hearing Examiner Committee. Variations when approved by the Zoning Administrator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. 3. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff. 4. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners Resolution #77-1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on-site improvements. 5. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAC 197-10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non-significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and/or public testimony contain information regarding assessment of the proposal's adverse impacts to the physical environment; a finding is hereby made that no potentially significant adverse impacts upon the physical environment are anticipated as a result of the project; and a final declaration of non-significance is hereby to be issued. I r ZONE RECLASSIFICATION NUMBER: ZE-88-81 a) COUNTY PLANNING DEPARTMENT (continued) 6. All current standards of the Local Business Zone, as amended, • shall be complied with in the development of this site. b) COUNTY ENGINEERING DEPARTMENT 1 . Applicant shall construct cement concrete sidewalks adjacent to the property on Sprague Avenue. 2. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on-site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. 3. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accord- ance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 4. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 5. The construction of the road improvements stated herein shall be accomplished as approved by the Spokane County Engineer. 6. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construc- tion, and other applicable county standards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless other- wise approved by the County Engineer. c) COUNTY UTILITIES DEPARTMENT 1 . Pursuant to Board of County Commissioners Resolution No. 80-0418, the use of on-site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of permits by the Health District. 2. The owner, his heirs or successors shall join and participate in any petition or resolution which purpose is the formation of a utility local improvement district (ULID) pursuant to RCW, Chapter 36.94, as amended. The owner, his heirs and successors shall further agree not to oppose or protest any legal assessments for any utility local improvement district (ULID) established pursuant to RCW Chapter 36.94, as amended. 9 ZONE RECLASSIFICATION NUMBER: ZE-88-81 c) COUNTY UTILITIES DEPARTMENT (continued) 3. Any water service for this project shall be provided in accord- ance with the Coordinated Water System Plan for Spokane County. d) COUNTY HEALTH DISTRICT a) Recommendations: 1 . A combined surface water and sewage disposal detailed plan- shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an individual on-site sewage system may be authorized. No record of the existing on-site sewage disposal system is on file with the Health Officer. 4. Water service must be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social & Health Services. 6. Use of private wells and water systems is prohibited. e) COUNTY BUILDING AND SAFETY DEPARTMENT 1. The site is located in Fire District #1 . 2. Mains and hydrants to be installed, in accordance with the Spokane County Department of Building and Safety. 3. Reclassification of an existing building shall require an appli- cation for change of occupancy permit, and subsequent inspection for approval. f) WATER PURVEYOR 1 . Purveyor is Vera Water and Power, and they will supply the site with adequate water for domestic, fire and irrigation uses. 2. They indicate that they are able to service this site with adequate water. Po • a ZONE RECLASSIFICATION NUMBER: ZE-88-81 g) SPOKANE COUNTY FIRE PROTECTION DISTRICT NO. 1 1 . Mains and hydrants need to be installed, and access plans for fire fighting equipment around the building shall be approved prior to issuance of a building permit. 1/ File No. ZE-88-81 — SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER A. INTRODUCTION This matter having come before the Examiner Committee on September 10, 1981 , and the members of the Committee present being Kathleen Carstens, Chair- person, Eldon Thomas, and Jerry Williams. B. PROPOSAL The sponsor, Jim Dorsey, is requesting approval of a zone reclassification, File No. ZE-88-81 , Agricultural Suburban to Local Business, for the purpose of developing a retail bakery. C. FINDINGS OF FACT 1 . That the existing land use in the area is residential, commercial, and vacant. 2. That the Comprehensive Plan designates this area as appropriate for Major Commercial development. • 3. That the existing zoning of the property described in the application is Agricultural Suburban. 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with, and the Committee concurs with the Declaration of Non-Significance. 5. That the proper legal requirements for advertisement of the Agenda Item have been fulfilled. 6. That the land in this area is suitable for the proposed use, or uses within the proposed Zone Classification. 7. That the applicant has demonstrated that conditions have substantially changed since the original zoning of this area and accordingly, the pro- posed rezone. is justified. 8. That the proposed use is compatible with existing uses in the area. 9. That the owners of adjacent lands expressed neither approval or dis- approval of the proposed use. 10. The Hearing Examiner Committee finds the proposed use to be in harmony with the general purpose and will not be otherwise detrimental to the public health, safety, and welfare. 1 File No. ZE-88-81 D. CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL a) COUNTY PLANNING DEPARTMENT 1 . A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. 2. The applicant shall develop subject •property generally in accordance within the concept presented to the Hearing Examiner Committee. Minor variations when approved by the Zoning Administrator will be per- mitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the develop- ment plans shall be maintained. 3. Applicant shall comply with '208' recommendations concerning storm- water runoff and provide necessary landscaping for runoff. 4. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commis- sioners Resolution #77-1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on-site improvements. 5. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAC 197-10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non-significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and/or public testimony contain information regarding assessment of the proposal's adverse impacts to the physical environ- ment; a finding is hereby made that no potentially significant adverse impacts upon the physical environment are anticipated as a result of the project; and a final declaration of non-significance is hereby to be issued. 6. All current standards of the Local Business Zone, as amended, shall be complied with in the development of this site. b) COUNTY ENGINEERING DEPARTMENT 1 . Applicant shall construct cement concrete sidewalks adjacent to the property on Sprague Avenue. 2. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on-site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. . • 2 File No.; ZE-88-81 b) _ COUNTY ENGINEERING DEPARTMENT (continued) 3. . A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrange- ment of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 4. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 5. The construction of the road improvements stated herein shall be accomplished as approved by the Spokane County Engineer. 6. All required improvements shall conform to the current State of Wash- ington Standard Specifications for Road and Bridge Construction, and other applicable county standards and/or adopted resolutions pertain- . • ing to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. c) COUNTY UTILITIES DEPARTMENT 1 . Pursuant to Board of County Commissioners Resolution No. 80-0418, the use of on-site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of permits by the Health District. 2. The owner, his heirs or successors shall join and participate in any petition or resolution which purpose is the formation of a utility local improvement district (ULID) pursuant to RCW, Chapter 36.94, as amended. The owner, his heirs and successors shall further agree not to oppose or protest any legal assessments for any utility local im- provement district (ULID) established pursuant to RCW Chapter 36.94, as amended. 3. • Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County. d) COUNTY ,HEALTH DISTRICT 1 . A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3 File No. ZE-88-81 • d) COUNTY HEALTH DISTRICT (continued) 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an individual on-site sewage system may be authorized. No record of the existing on-site sewage disposal system is on file with the Health Officer. 4. Water service must be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social & Health Services. 6. Use of private wells and water systems is prohibited. e) COUNTY BUILDING AND SAFETY DEPARTMENT • 1 . The site is located in Fire District #1 . 2. Mains and hydrants to be installed, in accordance with the Spokane County Department of Building and Safety. 3. Reclassification of an existing building shall require an application for change of occupancy permit, and subsequent inspection for approval . f) WATER PURVEYOR 1 . Purveyor is Vera Water and Power, and they will supply the site with adequate water for domestic, fire and irrigation uses. 2. They indicate that they are able to service this site with adequate water. g) SPOKANE COUNTY FIRE PROTECTION DISTRICT NO. 1 1 .. Mains and hydrants need to be installed, and access plans for fire fighting equipment around the building shall be approved prior to issuance of a building permit. • .4, il 4 File No. ZE-88-81 • E. ORDER The Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Jim Dorsey, for a zone reclassification as described in the applica- tion should be approved. Motion by: Williams Seconded by: Thomas Vote: Unanimous to Approve ( 3 -0 ) HEARING EEjjJJXAMINERR COMMITTEE irperson • ATTEST: WALLIS D. HUBBARD Planning Director By: Date: • S . ZE SS— 8/ . '\ gaajt. I. ee7O ' T i 0 /00 / 4C a\dc ni A K v - 'a M te' Z c■ d a x v C N VIJ71?► V ki4 Y v- I(.1 .--.:i4a.Rif n 5 P/VA U-F AYE . ZoNED. - i4gr It. I-/-14 Re Pro po 5ED -Loch/' 3u ssI Nes • lleish of ,lame I Id _ fig/ pe1,04. o Q shot/ 61 : ��/,/ ere.e.v„I- oil3ldq CoVERAIE ITN0tel •117 8 Swya aIP See. /93:25 Al eggE\ ,/ M 7 ,. (P5acEn, 4 o{• Op&ry SPPE-. / ss a,/ q-`3 7% VU /ss/ 9 n /add. Q /.5-5--2•C /Ss a o '73 -Yea .` n� /.�5a c0 / SSa o fee - /55.2 7.4 /..C5 3 O /55 .376 41 0 0 2 O \ a5/.Ds i)n E./47/) •r4\K OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Date September 10 1981 Inter-office Communication To Zoning Administrator • From County Engineer • Subject ZE-88-81 -'i #15 Sprague Avenue #19 #20 #21 024 #25 Form 327—C.R. . %' ' - • File Number S P O K A N E C O U N T Y E N G I N E E R ---PRE - ZONING CONSUL TAT I ON--- A. PROPOSAL Zoning Reclassification Number: Z- - ?,?-? Project Name: —Address: ------ — - - T. 2. _ N. , •_ E.W.M. ; Section DEVELOPER Name: J--)/or Address: _ — -- AGENT Phone: Business --- Home PRELIMINARY Date: / / By: CONSULTATION — — PRELIMINARY a) Right-of-Way: CONDITIONS b) Curb c) Sidewalk . d) Paving e) Approaches . — — f) Drainage g) State/City Review: Yes No h) Misc. -- — Remarks: C. INSPECTION Date: / / By: Remarks: D. SPECIFIC CONDITIONS: / N )-1rONS r/��'r e_ GAL 5 �° et/ 18a 4s /Pr • pG Fee Paid: Yes No T' Amount $ Cash Check Planr. ing Application Signed: Date / / By: -'- F l• • le Number S P O K A N E C O U N T Y E N G I N E E R ---P R E - Z O N I N G C ON S U L T A T I 0 N--- A. PROPOSAL Zoning Reclassification Number: Z- Project Name: Address: — — ---- — — — — — DEVELOPER Name: - T;•� ,[7or,£� --- -------- or Address: AZ /r/Aa` - /s-- `--ire _ --- - AGENT Phone: Business — --" ' ` Home 7.,..74/-24,_s-7 B. PRELIMINARY Date: 6 / /5-151/ By: Se CONSULTATION �r PRELIMINARY a) Right-of-Way: Ave, CONDITIONS b) Curb - y, c) Sidewalk / eg d) Paving /y, e) Approaches : f) Drainage : //4. g) State/City Review: Yes No h) Misc. -- Remarks; _ C. INSPECTION Date: / / By: Remarks: D. SPECIFIC CONDITIONS: eLn e- i1/c cmled Fee Paid: Yes No ' Amount $ Cash Check Planning Application Signed: Date 4' /e-i py If SPOKANE COUNTY PLANNING DEPARTMENT APPLICATION FOR ZONE RECLASSIFICATION Date: r) Application No: ZE, - ^e • Name of Applicant: ,.) 1Y1,1 �A r s c'\/ - Street AddressI of Applicant: r , Rick!. 3 /5- b' City: vE / ra_ da I e State: Wen. Zip Code: (NO3 2 Tele. No. - 6j' 1 II ff yr2�, 2C�. Name of Property Owner(s): .j \ \n'\ �'nl Y0. .i h y j56 r J CI Authorized Agent representing Owner (if other than owner): 1\14 I-1 e. Existing Zoning Classification: !y:9, k- j e. u. I-2114 b F; Date Existing Zone Classification Established: / Q e Existing Use of Property: Li e a -,, -1-- /ins < C c= Proposed Zone Classification: L GEC Ri I 3 Li l41 E' 5 . Proposed Use of Property: Cq k /.la ke S h o prCaw S ar pn J l 'e S ke ?Jai o Legal Description of Property:9 P / p Y: -r/e �rt< !-l. I , e5 .1 7/, J,) L�i-h i. e b' / Co c r-Le v . � P N. e, I i 7 .5- /' c' 1 L C 5 >1- find. Sb lee. /- A.%r1h nP -LA E. S, c� f� toFSA- 0cY ) p - i' � aQ ccf- h /0 !' 1-.- c t- a ,-ta Ka- c I- (/U F,= e7 � n y� Section: / Township: Q .J A Range: G/L,l \h/ 47 Source of Legal: .S � 4 /� !- �l" " t ^I�a hP. � IDU 71� �� JSP SSn r � tP Assessor's Parcel No: (See ' tax statement) /,ifs, /Q S — Property Size: //n ll /0 0 Frontage: /). o r Feet on: c rat_ p p jut. Total amount of adjoining land controlled by this owner or sponsor: Nd NE Street Address of the Property: F Q 5 1- / I I II S, 1.•a k. e. If you do not hold title to the property affected by this application, what is your . interest in it? w e „'" hr) i • Please list previous Planning Department actions involving this property: Nin Ne. ALL OF THE FOLLOWING QUESTIONS MUST BE ANSWERED: 1 . ' What are the changed conditions of the site area, which you feel make this proposal warranted? 7941 /d fir` - E 2. What effect will'?the proposed zone reclassification have on the adjacent properties? j ,' S,,rii/ rfwse uaIke a P p - aeer -J- ,/ Rev. 2/3/81