BSP-17-87 #1B_ 4 BEFORE THE SPOKANE COUNTY SUBDIVISION ADMINISTRATOR IN THE MATTER OF BINDING ) FINDINGS OF FACT, SITE PLAN NO. BSP -87 -17 ) CONCLUSION AND DECISION THIS MATTER, an application from Spokane Industrial Park has been received and decided upon, pursuant to Spokane County Subdivision regulations, on the 5th day of May, 1988. The individual signing below has further been properly delegated the responsibility for rendering the decision by the Spokane County Director of Planning. FINDINGS OF FACT AND CONCLUSION 1 . The proposal is to divide 160 acres Into 46 lots for the development of industrial lots. 2. The proposal is located in the north half of Section 12, Township 25 North, Range 44 E.W.M., Spokane County, Washington, lying north of the railroad between Sullivan and Flora Roads. 3. The current zoning of the property Is Manufacturing, established in 1960. The proposed lot sizes, frontage and Intended uses are allowed within this zone. 4. The Spokane County Comprehensive Plan designates this area as Industrial. The lots and uses proposed are generally in accord with this planning category. 5. The required public notice was provided for this proposal and agencies having a potential interest in the project were notified and asked for recommendations. 6. There was a recommendation for a more detailed environmental review from the Spokane County Engineers. The sponsor and the Spokane County Engineers have agreed upon necessary road Improvements and, phasing of development to mitigate potential Improvements and phasing of development to mitigate potential adverse traffic Impacts. A mitigated Determination of Nonsignificance is substituted for the original D.N.S.. The mitigating measures recommended by the Spokane County Engineer's have been agreed upon by the sponsor to generally reduce anticipated traffic Impacts of the proposal. That in consideration of the recommended conditions and Spokane County development standards, the proposal Is not detrimental to the public health, safety and general welfare. That the project is proposed to have phased development in three stages with necessary Improvements constructed to meet the needs of each phase. Such phasing is consistant with subdivision practices. That the provisions of the Manufacturing Zone and other sections of the Spokane County Zoning Ordinance apply to the use of the individual lots. DECISION Based upon the above noted Findings of Fact, Binding Site Plan Application BSP- 87-17 is hereby APPROVED subject to conditions noted below which shall be complied. with by the applicant and/or sponsor prior to finalization of the binding site plan. Findings for BSP -17 -87 Page 2 CONDITIONS OF APPROVAL FOR BSP -87 -17 Th at the below listed a;nditionc of °II Departments and Agencies are binding upon the p " ^ a°' owner(s) of the 12ropertv heirs successors or assions. PLANNING DEPARTMENT CONDITIONS: 1 . The preliminary binding site plat of record approval is for the property legally described in the application for this proposal. 2. That the Final Binding Site Plan be designed substantially in conformance with the preliminary binding site plat of record as legally described and advertised. No Increase of lot number shall occur without a new application submittal and approval. 3. The Spokane County Subdivision Administrator shall review any proposed Final Binding Site Plan to Insure compliance with the Findings and Conditions of Approval. 4. That the preliminary binding site plan be given conditional approval for three (3) years to June 1, 1991. The applicant may request an Extension of Time by submitting a written request forty -five (45) days prior to the above expiration date. 5. That a Final Binding Site Plan number be indicated before the final binding site plan is filed; such number to be approved by the County Planning Director /Designee. 6. That appropriate road names be Indicated on the binding site plan. 7. That appropriate utility easements be indicated on copies of the proposed final binding site plan. Written approval of said utility easements by said utility companies must be received with the submittal of the final binding site plan. 8. That 3 current certificates of title be furnished the County Planning Department prior to filing the final binding site plan. 9. That the following statement be placed in the final binding site plan dedication: "No more than one primary use be placed on any Lot nor shall any lot be further subdivided for the purpose of creating additional lots, ownerships, or building sites without first filing a replat." 10. The final binding site plan map shall Indicate by a clear dashed line, the required setbacks from all private, tract x or public roads. The dedication shall contain a statement that: "Side yard and rear yard setbacks shall be determined at the time building permits are requested. The setbacks indicated on this binding site plan may be varied from it proper zoning approvals are obtained." 1 1 . That a plan for water facilities adequate for domestic service and fire protection be approved by the water supplier, fire protection district, Spokane County Building & Safety Department and County health authorities. The agencies will certify on the WATER PLAN, prior to the filing of the final binding site plan or any phase of the preliminary binding site plan that the plan is in conformance with their respective needs and regulations. The WATER PLAN and certification will be drafted on a transparency suitable for reproduction and be signed by the sponsor. 12. The purveyor will also certify on the Water Plan that appropriate contractual arrangements and schedule of Improvements have been made with the sponsor for construction of the water system in accordance with the approved WATER PLAN. The time schedule for improvements will provide for completion of the water system and Inspection by the appropriate health authorities prior to application for building permits within the final binding site plan. The arrangements or agreements will Include a provision holding Spokane County and the purveyor harmless from claims by any lot purchaser refused a building permit due to the failure of the sponsor to satisfactorily complete the approved water system. Findings for BSP -17 -87 Page 3 13. The final plat dedication will contain the following statement: "The public water system, pursuant the WATER PLAN approved by County and State Health authorities, the local fire district, County Building 8 Safety Department, and water purveyor, will be installed within this binding site plan, and the subdivider /sponsor will provide for individual domestic water service as well as fire protection to each lot prior to sale of each lot and prior to Issuance of a building permit for each lot.' 14. That no building permit will be issued for any lot within the Final Binding Site Plan until certified by a Washington State licensed engineer "that the water system has been installed pursuant the approved WATER PLAN for the Final Binding Site Plan", signed and stamped by said engineer. 15. That a survey is required prior to the filing of a final binding site plan. COUNTY ENGINEER'S CONDITIONS The County Engineer has examined this development proposal and has determined that the Impact of this proposal upon the existing County Road System warrants the dedication of additional Right of Way and the roadway Improvements herein specified. That conditions of approval of the Binding Site Plan by the County Engineer is given subject to dedication of Right of Way and approval of the road sytem. In conjunction with phasing of the final Binding Site Plans, specific conditions appropriate to each phase will be specified. 2. The proposed Binding Site Plan shall be Improved to the standards set forth in Spokane County Board of Commissioners Resolution No. 80 -1592, as amended, which establishes regulations for roads, approaches, drainage and fees in new construction. 3. The applicant shall deed to spokane County 14' feet of the subject property for Road Right of Way along Sullivan Road and shall construct an additional traffic lane along Sullivan Road from Marietta Avenue northward to the intersection of Euclid Avenue realigned. Construction may be phased as development occurs along the Sullivan Road frontage. 4. The applicant shall deed to Spokane County 48' feet of Right of Way for Marietta Avenue In the alignment as shown on the preliminary Binding Site Plan. 5. All required Improvements shall conform to the current State of Washington standard specifications for road and bridge construction and other applicable County standards and/or adopted resolutions pertaining to road standards and stormwater management in effect at the date of construction, unless otherwise approved by the County Engineer. 6. Prior to the filing of each phase of the final binding site plan, appropriate plans, profiles and cross sections as determined by the County Engineer for Sullivan Road, Euclid Avenue and/or Marietta Avenue showing proposed street centerline and curb grades be submitted for approval; road plans to be prepared under the direction of licensed professional Civil Engineer. Euclid Avenue road plans and improvement are to Include full depth pavement design and construction (Includes existing travelway connection to Flora Road). That appropriate road drainage plans and design calculations as determined by the County Engineer showing the alignment of drainage facilities be submitted for approval. Drainage plans to be prepared under the direction of a licensed professional Civil Engineer. The applicant shall submit for approval by the Spokane County Engineer prior to the release of a building permit a surface water disposal plan for the building site or portion thereof if the development Is phased. Prior to the release of a building permit, a parking plan and traffic circulation plan for each site shall be submitted and approved by the Spokane County Engineer. The design, location and arrangement of parking stalls shall be in accordance with standard engineering practices. Paving or surfacing as approved by the County Engineer will be required for any portion of the project which is to be occupied or traveled by vehicles. Findings for BSP -17 -87 Page 4 Construction within the existing or proposed public streets and easements shall be performed under the direct supervision of a licensed engineer /surveyor, who shall furnish the County Engineer with "As Built" plans and a certificate in writing that all Improvements were installed to the lines and grades shown on the approved construction plans and that all disturbed monuments have been replaced. 10. No construction work Is to be performed within the existing or proposed public right of way until a permit has been issued by the County Engineer. All work is subject to inspection and approval by the County Engineer. 11 . All construction within the existing or proposed public right of way is to be completed prior to filing the final binding site plan or a bond in the amount estimated by the County Engineer to cover the cost of construction of improvements, construction certification, "As Built" plans and monumenting the street centerlines shall be filed with the County Engineer. 12. The applicant shall construct Euclid Avenue and Marietta Avenue as shown on the preliminary binding site plan as public roads. These roadways shall be constructed In compliance with the typical roadway cross sections designated and approved by the County Engineer. A copy of those typical cross sections is attached for inclusion in the "Conditions of Approval '. All other roadways shown on the preliminary binding site plan shall be private roads. 13. The change in alignment and vacation of current alignment of Euclid Avenue shall be approved by the Board of County Commissioners prior to the filing of the binding site plan containing that particular phase of the development. Adde 5u 3- ? r - 8 s A?-- 1 4. In conjunction with the realignment of Euclid Avenue the applicant is responsible for the reconstruction of the existing traffic signal system at the Sullivan Road and realigned Euclid Road intersection and for the construction of the entire additional traffic lane on Sullivan Road. 15. In conjunction with the requirements of Short Plat 86 -457 the applicant is responsible for the future construction of a new traffic signal system at the Intersection of Sullivan Road and Marietta Avenue when the Intersection meets traffic engineering warrants for traffic signal construction. 16. That the minimum curb radii at all street intersections within the proposal shall be 30' feet. Minimum radii at Sullivan Road intersections shall be 40' feet. 17. To construct the road Improvements stated therein, the applicant may, with the approval of the County Engineer, join In and be a willing participant in any petition or resolution which purpose is the formation of a Road Improvement District (RID) for said Improvements pursuant to RCW 36.68, as amended. At such time as an RID is created or any road improvement project Is sanctioned by Spokane County, the improvements required (curbs, pathways, drainage control, paving, traffic signal systems, etc.) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns. 18. Should an RID be pursued, it shall be the responsibility of the applicant to provide road and drainage plans sufficient for the creation of a Road Improvement District. These plans shall be prepared by a licensed professional civil engineer and shall be prepared in compliance with Spokane County road standards and drainage guidelines. In order to construct required roadway improvements on Sullivan Road, Marietta Avenue and Euclid Avenue the applicant may petition the Board of County Commissioners to create a Road Improvement District R.I.D.'The RID must be created by the Board of County Commissioners prior to the filing of the binding site plan. 19. The following statement shall appear on the binding site plan document "Parking will be prohibited along Euclid Avenue ". 20. A statement shall be placed on the binding site plan doucment which prohibits direct access from lots to Sullivan Road or Flora Road. r_ Findings for BSP -17 -87 Page 5 21. Direct access from lots to Marietta Avenue and Euclid Avenue shall be limited to the access points approved by the County Engineer and as shown on the preliminary binding site plan. 22. A minimum 20' foot wide easement shall be provided along the east side of Sullivan Road and each side of the public road right of way on Euclid Avenue and Marietta Avenue. The purpose of the easement is to accommodate pathways, landscaping, and drainage from roadways. 23. A system of pathways, accessible to the public, be constructed along Sullivan Road, Euclid Road and Marietta Avenue. The pathway is to be located within the common pathway, drainage and landscape easement area. That a statement shall be placed on the binding site plan permitting Spokane County to enter within the easement for the purpose of drywell and sign maintenance. Snow removed from the public roadways shall be permitted with the easement. Maintenance of pathways, drainage swales and landscaping areas shall be the responsiblity of the applicant. 24. The proposed private roads as shown on the preliminary binding site plan are approved by the County Engineer. 25. The following statement must appear on the binding site plan document: "The private roads as shown hereon are easements which provide a means of Ingress and egress for those lots within the binding site plan having frontage thereon." 26. Private road plans.wilh connections to a public road are the responsibility of the developer and are required prior to the release of a building permit. A statement to this effect shall be placed in the binding site plan document. 27. Private roads be Improved to a minimum Improved surface width of 30' feet with a minimum 20' foot wide landscaping and drainage easement on either side of the roadway. Subject to approval under section 10.207 of the Spokane County Fire Cale. 28. All vested owners shall sign and record private road documents as prescribed by the Spokane County Engineer. These documents shall be reviewed and approved by the Spokane County Engineer prior to recording with the Spokane County Auditor. Recording numbers shall be referenced on the binding site plan document. 29. The following statement shall be placed on the binding site plan document: "WARNING: Spokane County has no responsibility to build, Improve, maintain or other wise service the private roads contained within or providing service to the property described in this binding site plan. By accepting this binding site plan or subsequently by allowing a building permit to be Issued on property on a private road, Spokane County assumes no obligation for said private road and the owners hereby acknowledge that the County has no obligation of any kind or nature whatsoever to establish, examine, survey, construct, alter, repair, improve, maintain, provide drainage or snow removal on a private road. This requirement is and shall run with the land and shall be binding upon the owner, their heirs, successors or assigns including the obligation to participate in the maintenance of the private road as provided herein. 30. The following statement shall be placed on each phase of the binding site plan: "The owner(s) or successor(s) In Interest agree to authorize the County to place their name(s) on a petition for the formation of a Road Improvement District (RID) by the petition method pursuant to Chapter 36.88 RCW, which petition includes the owner(s) property, and further not to object, by the signing of a ballot, the formation of a RID by the resolution method pursuant to Chapter 36.88 RCW, which resolution includes the owner(s) property. If a RID is formed by either the petition or resolution method, as provided for in Chapter 36.88 RCW, the owner(s) or successor(s) further agree: (1) that the improvements or construction contemplated within the proposed RID is feasible, (2) that the benefits to be derived from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense of formation of the RID, and (3) that the property within the proposed RID is sufficiently developed. Provided, further, the owner(s) or successor(s) shall retain the right, as authorized under RCW 36.88.090, the object to any assessment(s) on the property as a result of the improvements called for in Findings for BSP -17 -87 Page 6 conjunction with the formation of a RID by either petition or resolution method under Chapter 36.88 RCW. 1. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Spokane County Health District prior to the Issuance of any on -site sewage disposal permit or building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3. Water service shall be coordinated through the Director of Utilities, Spokane County. 4. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social & Health Services. 5. Prior to filing the final plat, the sponsor shall present evidence that the plat Iles within the recorded service area of the water system proposed to serve the plat. 6. A public sewer system will be made available for the project and individual service will be provided to each lot prior to sale. Use of individual on -site sewage disposal systems shall not be authodzed. 7. A statement shall be placed in the dedication to the effect that: "A public sewer system will be made available for the project and Individual service will be provided to each lot prior to sale. Use of individual on -site sewage system shall not be authorized." 8. The dedicatory language on the plat shall state: "Use of private wells and water systems Is prohibited." 9. The plat dedication will contain a statement to the effect that: "The public water system as approved by County and State health authorities and the local fire district and purveyor will be Installed within this plat, and the subdivider will provide for Individual domestic water service as well as fire protection to each lot prior to sale of each lot." 1 . The dedication shall state: "The owner(s) or Successor(s) in Interest agree to authorize the County to place their name(s) on a petition for the formation of ULID by petition method pursuant to RCW 36.94 which the petition Includes the Owner(s) property and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROVIDED, this condition shall not prohibit the owner(s) or successor(s) from objection to any assessment(s) on the property as a result of Improvements called for in conjunction with the formation of a ULID by either petition or resolution method under RCW Chapter 36.94 ". 2. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as amended. 3. Project will connect to existing Park Sewer System Review and inspection of the sewer plans will be the responsibility of the applicant. 1 . The required fire flow for any building or property development is determined by building size, type of construction, and proximity of exposures. Required fire flows shall be based on an evaluation of each building at the time of building permit application. 2. Project is located within Fire District No. 1. The required fire flow is determined by the district. Findings for BSP -17 -87 Page 7 3. Fire hydrants for commercial and Industrial buildings shall be located so that no portion of the building exterior Is more than 175' feet from the hydrant. 4. Fire hydrants shall be located so as to be accessible to fire apparatus and not be obstructed by any structure or vegetation or have the visibility impaired for a distance of fifty feet in the direction of vehicular approach to the hydrant. 5. Specific location of hydrants shall be determined by the Fire District. 6. The applicant shall provide verification from the Fire District to the Department of Building and Safety that provisions have been made for adequate fire protection prior to the release of building permits. 1 . A new water right application for any new wells will probably be required for this project. Please contact Mr. Rynear R. Huffman (509- 456 -6199) of Ecology's Eastern Regional Office for further information. 1 . Water main extension/water system expansions require the applicant to complete a Water System Plan and submit plans and specifications for approval before construction of the proposed water mains. Approved on �.J day of 1988. DOUGLAS SZDAMS Subdivision Administrator W. County Engineer County Utilities County Health District County Building & Safety Sponsor Surveyor File Parties of Record PUNCH M918riVi OFFICER orim 1, HrE' EsP owl NE: _/UJ 1 ,l � E' 1\70 I�N E PROJECT NAME: 1-,J Arlvl (3SP 17 INSPECTOR: SEio• 5 DATE: CONTRACTOR AND /OR SUBCONTRACTORS: Z.,IancQAs���i winkle SEWER INFORMATION: N1A AIR TESTED: DATE: NIANDRELL: DATTs: TV INSPECTION EUEREQST: INSPECTOR'S SIGNATURE: ❑ PASS ❑ F ❑ PASS ❑ FAIL DATE`. I �J J 3 �J J C' nur PROJECT NAME: JAJ. Erial Perk (Sullw�n INSPECTOR: Skrm"AS CONTRACTOR AND /OR SUBCONTRACTORS: T. Im j AtP4,, W,nklv,. SEWER INFORMATION: u/A AIR TESTED: DATE: NfAND r : DATE: TV INSPECTION REQUEST: INSPECTOR'S SIGNATURE P LL DATE: Z/23/96 ❑ PASS o FAIL o PASS a FAIL DATE: PL J V PUN G i% ZEES l C'Q UN � E'er PiIr N EIE.R?Sj PROJECT NAME: I Park (Irlarie�fa) 135P?1 INSPECTOR: SronKS DATE: 213/% CONTRACTOR AND /OR SUBCONTRACTORS: I 1,7n l Asphc? l t � Yt ;,04r, ITEMS: I,) Co. 5 ec. cl a s n f' i n Z ro ro 2 per SEWER INFORMATION: N/p AIR TESTED: DATE: ❑ PASS ❑ FAIL MANDRELL: DATE: ❑ PASS ❑ FAIL TV INSPECTION REQUEST: DATE: INSPECTOR'S SIGNATURE: REPORT Pg. I —of 3 OFFICE OF THE SPOKANE COUNTY ENGINEER update updates [35P)74? - , Date �i3,fR( * 3/8/93 b/ »/92 Project Name lm Pk (&, I r ( 5..11 "Vag Inspector Siwe k4 Project No. CRP/ RID Weather a.m. p.m. Report No. Time Charged Contractor this Day - ]/2 or 1 Contractor and lor Sub(s) T ba I a aLnlb, 14Z%a 4, Other County Personnel K Contractor Personnel Classification 2 3 4 5 6 Equipment List I Hrs. Used I Standby Number 4 5 6 r3 nt zz Diary Section 1) F' ror b t1, <' lrs &fnr f2a_" ? �S� •1��•r5 f0% Ln „o- Signing checked a.m. p.m. INSPECTOR'S SIGNATURE y rlAmr-k L t,s 1- aAt6V.AN9PEZMN REPORT Pg. Z of 3 OFFICE OF THE SPOKANE COUNTY ENGINEER update wJnet Date 101619t- 3/8/93 II /30/9Y Inspector 5L kt Weather a.m. p.m. Time Charged Contractor this Day - /s or 1 Other County Personnel Contractor Personnel Classification Project Name T.._1 ,_1 pk (E b 1 c 5.INva*, Project No. CRPIRID De....rf tie Contractor and/or Sub(s) Equipment List Hrs. Used I Standby Number 85P) 7 1 ',.r. �sr.... -- - — rz)u: af i . 1 2 3 4 5 6 1 -ii, n• ,_1 ITEM NO. C7 N DESCRIPTION W LOCATION UNITS OTY. CITY. TO DATE INT. Signing checked a.m. p.m. INSPECTOR'S SIGNATURE 1 2 3 4 5 6 Equipment List Contractor Personnel Classification Number Standby 1 2 3 4 5 6 Diary Section 118) Z la N T1 -4'c s ' . v r per ITEM NO. DESCRIPTION LOCATION UNITS QTY. OTY. TO DATE INT. I I I i DAILY INSPECTION REPORT Pg. 3 of 3 OFFICE OF THE SPOKANE COUNTY ENGINEER up�aEc Date !O /6/9L 1/30/911 Project Name f:;M!j�;k T+ J,, s - Pk (S .11 »e Inspector '54ro ks Project No. CRP /RID Ew trd)_ Weather a.m. p.m. Report No Time Charged Contractor this Day - 1 /2 or 1 Contractor and /or Sub(s) Other County Personnel Signing checked a.m. p.m. INSPECTOR'S SIGNATURE o. P L I m P' D a I Ira OFFICE or q J HrE SP OI=�� � E-21 G°O uN i y E EEH's PROJECT NAME:1,;dj, -ia I Park (MarieEfa) 85P�— I INSPECTOR: Strank5 DATE: 318193 CONTRACTOR AND /OR SUBCONTRACTORS: 10-7ncJ Aspkl)t) yc/;nkl-,r, ITEMS: SEWER INFORMATION: N�A AIR TESTED: DATE: ❑ PASS ❑ FAIL MANDRELL: DATE: ❑ PASS ❑ FAIL TV INSPECTION REQUEST: DATE: INSPECTOR'S SIGNATURE: 1 7e Taylor Engineering, Inc. Civil Design and Land Planning Principals: Pem" M. naylor, P.E. Stanley R. Stirling ,hark A. Aronson. EE. Da«d C. Larsen, P.E. RECEIVED September 12, 1994 Scott Brown Spokane Industrial Park, Inc. North 3808 Sullivan Road, Bldg. N -15 Spokane, Washington 99216 SEP 14 1994 SPOKANE COUNTY ENGINEER RE: Euclid Road - Spokane County Punchlist Items Dear Mr. Brown: Associates: Scotr al. Busch, P.E. This letter is in regard to the onsite meeting that was held for the referenced items. We went through the items and the following. is our understanding of the method in which the items will be addressed. The items are referenced,by the numbers shown on the Daily Inspection Report - Office of the Spokane County Engineer which is attached to this letter Item No. 1: There did not appear to be many areas where the pathway shoulders were not present, however, as per our discussion, your crews will fill in along the edge of the pathway where necessary. Item No. 2: The curb cut at approximately STA. 1 +00 left wilt need to be removed and replaced with new curb. This plan will need to be revised to show the remaining items mentioned. Item No. 3: Deleted Item No. 4: The road section on the plans and portions of the plans will have to be revised to reflect areas where swales are determined not necessary. Item No. 5: We will survey the swales along the Euclid Avenue to verify installation provides for the designed requirements. Item No. 6:., We will. need .to. add %detail to plans for driveway. that are not _ located in swales., _ W. 106 Mission Ave. 0 Spokane, WA 99201 • (509) 32 &3371 FAX (509) 328 -8224 r k Item No. 7: Deleted Item No. 8: As discussed in Item 5, we will survey the swales along Euclid Avenue to verify installation provides for the design requirements. Item No. 9: It appears that there is no room for a pathway along the area in question, in front of Northwest Culvert, and that you would like us to convey this to Spokane County. The deletion of the pathway may require revisions to the plans. Item No. 10: Deleted Item No. 11: We will submit a shop drawing to Spokane County to revise the existing asphalt ramps at intersections. The revision will consist mainly of installing a strip of brick pavers which are textured to provide for handicap access. This will require a revision to the plans. Item No. 12: We will coordinate the road section for Sullivan Road with Spokane County and add clarifications to the plans if necessary. Item No. 13: We will survey the swales along Sullivan Road and Euclid Avenue to verify the installation provides for the design requirements. Item No. 14: This item appears to be the same as Item 13. Item No. 15: The sewer manhole will be raised and remortared by your personnel. Item No. 16: The curb drop mentioned will be removed and replaced with new curb by your personnel. Item No. 17: The G.I. and drywells on Sullivan Road at Euclid and Fairview will be cleaned by your personnel. Item No. 18: We will review the intersections along Euclid and Sullivan and provide you with the outstanding signing requirements. Item No. 19: We will check the roads during as -built surveying of the swales to determine if monuments are installed. It appears that items numbered 2,11,15,16,17 and possibly 18 are item that related back to the road construction completed by Inland Asphalt. Taylor Engineering, Inc. Civil Design and land Planning W. 106 Mission Ave. • Spokane. WA99201 • (509)328 -3371 FAX (509) 328 -8224 Please review this information and if you have any questions or it is not per your understanding of our meeting, please contact us. Sincerely, TAYLOR ENGINEERING, INC. Scott M. Busch, P.E. Enclosure cc: Randy Waters - Inland Asphalt FPHI IU s"— Spokane ,Count Engineers S M B/try/94- 9 98/09 1 2941 tb ro wn Taylor Engineering, Inc. Civil Design and Land Planning W. 106 Mission Ave. • Spokane, WA 99201 • (509) 325 -3371 FAX (509) 3288224 A. H 12/22/93 08:57 %5509 3213378 CobNTY ENGINEERS 001 DAILY INSPECTION REPORT Pg. I Of 3 OFFICE OF THE SPOKANE COUNTY ENGINEER Update 85P17 zZ l Dale Project Name n elu i nk ( F,j1._ SwIl:,.ar, Inspector �54m — Project No. CRP1RiD Weather a.m. p.m. Report No. Time Charged Contractor this Day - 1 /2 or 1 Contractor arndlor Sub(3) other County Personnel it i 2 3 4 S 6 Equipment List. 'Firs. Used I Standby Contractor Personnel Classification Number 2 3 4 _ g •- • �a7ca�¢•.�J.�::nr�- ►T'nan • nrr��rr�arn�r ...,.,:�.�.�..r,�...�.,•�___.. • ��T /� / s �li �itiT1•�Jr� III Z� IIIS�� _. -�. U+:. .a.. Ai�.i�Ilhli lkni:4 SfeJri •,Ta n 1��, Vii.. 5 r r' L'.5 la7o ro» p ITEM DESCRIPTION I LOCATION UNITS QTY, CITY. TO DATE INT. NO- — — -- postdY" brand fax trans me 7671 Signing checked a.m. / p.m. INSPECTOR'S SIGNATURE _,425Ef_� 12/22/93 08:58 $509 3243478 C&INI7 ENGINEERS 4^r-k L.s& .jam *d N REPORT OFFICE OF THE SPOKANE COUNTY ENGINEER apdabe- Date ,_016 19L 3/8/93 — Inspector k c Weather a -m. p.m. Time Charged Contractor this Day - lh or 1 Other County Personnel Contractor Personnel Classification 16 002 pg. Z of 3 Project Name 2H 1 , 2k (F...1, 1 5.[It.gz Project No. CAP/ RID o .+Aln Contractor and/or Subs) 'Equipmerit List Hrs. Used I Standby Number IL P Z7- �.r. r(�lTq.n..- . - - - �-.� �. ...•�.. .. • • • rw • j .vi n z 831371 11 C I -L r ,, r 0-y in • • - • • -11 1 C ITEM NO. DESCRIPTION 0 s LOCATION UNITS CITY. IOTY. TO DATE INT. Signing checked a. M. p.m. 1 2 3 4 5 6 INSPECTOR'S SIGNATURE 12/22/91 08:58 $509 024347A c0UNTF ENGINEERS [a 003 DAILY INSPECTION REPORT OFFICE OF THE SPOKANE COUNTY ENGINEER Date 10/4/5I Inspector Weather a -m- p• Time Charged Contractor this Day • Yz or 1 Other County Personnel pg. 3 of 3 Project Name Project No. CRPI RID - 6 • -lyd1 Report No. Contractor and/or Sub(s) Equlpment:Llst Hrs. Used Standby 1 2 3 4 _ 5 6 Contractor Personnel Classification Number 1 2 3 _.� a 5 6 Diary Section � 14) S r Mn e Qi� ITEM DESCRIPTION LOCATION UNITS QTY. OTY. TO OATE INT. N0. Signing checked a.m. p.m. INSPECTOR'S SIGNATURE S P O r< A N E C O U N T Y PUBLIC WORKS DEPARTMENT Dennis M. Scott, P.E., Director February 26, 1996 Mr. Richard Rollnick, President Pentzer Development Corporation North 3808 Sullivan Road Spokane, WA 99216 -1670 Re: Spokane Business & Industrial Parks Dear Mr. Rollnick: Pursuant to your request for a status report from the County to Pentzer, I asked staff to advise me of any outstanding items that may still need to be addressed prior to total approval on issues affecting the park. Any issues related to our sewer agreement will be handled as a separate issue and as a matter of fact is being addressed as an amendment at the Board of County Commissioners meeting being held this evening. It is our understanding that Pentzer is in the final process of consummating an agreement with Crown West Realty, L.L.C. for their purchase of the above referenced property. We also understand that if there are any outstanding issues, your intent is to know what they might be so you can share these with Crown West Realty, L.L.C. As you know, any Binding Site Plan could be referred to as a "living Document" in that as each development occurs there may be conditions that would need to be met that are not a requirement at this time. The intent of this letter is to identify items that have been constructed but still need to have some effort to allow them to be accepted. The work items that appear to be left affect three of the Binding Site Plans. They are as follows: BSP 17 1. Construct concrete wheelchair ramps at all intersections for pathway per plans (note 6 on 15/15). W. 1026 Broadway Ave. Spokane, WA 99260-0170 (509) 156.3600 FAX: (509) 456 -4715 TDD: (509) 324.3166 2. Ponds on Euclid needs definition and finish shape of design length, width, depth and berms per plans. 3. Adjust drywell frame and grate for 6" pond depth. 4. Remove sod at curb drops to provide proper flow into swales and ponds. 5. Shoulder, pathway and slope have not been constructed per plans, at Euclid and Sullivan on the right side. BSP 21 1. Construct Spokane County Specification wheelchair ramps at the intersections for pathway per plans (note 6 on 15/15). 2. Remove sod at curb drops to provide proper flow into swales and ponds. BSP 22 1. Construct concrete wheelchair ramps at all intersections for pathway per plans (note 6 on 15/15). 2. Ponds on Sullivan needs definition and finish shape of design length, width, depth and berms per plans. 3. Clean debris form G.I. and drywells on Sullivan (2 G.I.'s and D.W. @ Fairview /Sullivan and G.I. and D.W. @ Euclid/Sullivan). 4. Adjust drywell frame and grate for 6" pond depth. 5. Remove sod at curb drops to provide proper flow into swales and ponds. Although this list appears long, some of the items are currently being worked on. There is also a bond in the amount of $177,500 that needs to be addressed with the property transfer. When the above items have been completed, by either Pentzer Development Corporation or Crown West Realty, L.L.C., the County Engineer can certify to the Board of County Commissioners that all work has been completed on the above referenced Binding Site Plans and that the roads can be accepted. Very Truly Yours, Dennis M. Scott, P.E. Director of Public Works c Bill Johns, P.E., County Engineer UL /LO /y0 VO: J4 '(jJUSJGOOLLM i� TAYLOR ENCYP EERRING, INC. rmr n�,g" and bold rw-hs west 106 Mission Ave Spokane, WA 99201 Voice Phone (509) 328 -3371 Fax: (509) 329-8224 To: Bill Hemmings, P.E. Spokane County Engineers Office Fax (509) 324 -3478 Phone: (509) 456-3600 From: Scott M Busch Re: Spokane Industrial Park - South Expansion FAX TRANSMITTAL Date: February 27, 1996 Message consists of 6 page(s) including cover sheet This fax is in regard to the Plat Punchlist received for the referenced project Following as referenced by BSP and Item number are our response to the items: BSP 17 1 Concur, it appears that there are 20 existing asphalt ramps which need to be replace with concrete ramps. 2. Ponds on Euclid will require some shaping and work based on recommendations your office should be receiving at the end of the week This item appears to be 65% complete. 3. The 208 requirements are address in the items above. If the inspector is referring to continuous swales, they are not being used. There may be some areas where drainage is to be graded from a curb cut to the swale but that would be minimal. 4. Frame and grates will be adjusted as necessary based on the record drawings submitted and approved by the county. 5. This item appears to be maintenance, however it can be done. 6. Shoulder and sideslope appear to be 2:1 in the field as called out on the plans. In regard to the pathway, there is existing asphalt surfacing all along the right side of the road, and, if necessary, a piece approximately 20' long could be installed to connect this area to the Sullivan pathway. 8.This area is across the frontage of Northwest Culvert and they strongly requested that this be deleted across their frontage and also it does not appear that there is adequate space for the pathway. BSP 22 1. See item 1 above. 2. The ponds ar e shown on the record drawings that were submitted, reviewed and approved by Spokane County. The only item requiring revisions were 2 or 3 frame and grates adjusted up. 1A1LVR Glluli' DR I-- '.UI • u1`.. 02/28/96 08:55 $5093286224 TAYLOR ENGINEER »a. COT,2 'Y ENGINEERS Z002 3. The 208 requirements are address in the items above. If the inspector is referring to continuous swales, they are not being used There may be some areas where drainage is to be graded from a curb cut to the swaie but that would be minimal. 4. This appears to be a maintenance item. 5. Current plans show constructing the swale from back of curb as was done in the field. 6. It is our understanding that this requires adjusting the drywell frame & grate at Sta. I4 +75 to 6" above adjacent grade. 7. Appears to be a maintenance item, BSP 21 1. See item I above. 2, Appears to be maintenance item. Please review this information and if you have any comments or concerns, please contact our office. 02/28/96 08:56 $5093268224 TAYLOR ENGINEER ++ COUNTY ENGINEERS lRj uu.s 02/26/96 IS:43 OSS09 32434: - COUNTY ENGINEERS 2)002 VdJO LYJ "_ �7 pROJECT NAME: I„ J"5tr'1v1 Park Et""d 6.s P 17 DATE: ZIWJa INSPECTOR: - %-v +ks CONTRACTOR ANDIOR SUBCONTRACTORS: X«1m.d.4sp�l�� � ✓inklcr SEER INFORMATION: N/A rINSPE CTOR'S TE ST: DATE: DRELL: DATE: INSPECTION REQUEST: SIGNA TURE: p4 o PASS ❑ FAIL ❑ PASS ❑ FAIL 02/28/96 08:56 '$5093288224 TAYLOR ENGINEER COUNTY ENGINEERS 02/26/96 15:44 $509 3243: COIINTY ENGINEERS '�moww'F - elv ac a, m JF.N� PROIECTNAMS: JrAWEr,al Park 5"IW2v VSPZZ DATE: Z/23/9L INSPECTOR: Sir I. 19 004 la 003 7CO ACTOR AND/OR SUBCON RACTORS: jam4 J sV a tt. W a krw 02/28/96 08:57 $5093288224 TAYLOR ENGINEER COUNTY ENGINEEKS t¢juua 02/26/96 15:44 '8'509 3233 COUNTY ENGINEERS 0004 FUNO H- MAW or plan a Coummy PROJECTNAME:.r.a,irie Park (maricaa) 05PLl INSPECTOR: Stronks DATE: CONTRACTOR AND /OR SUBCONTRACTORS: Ztil� Aspkilt M SEWER D -'ORMATION: k1A AIR ��: DATE: MANDRELL: DATE: TV INSPECTION REQU INSPECTOR'S SIGNATM 0 PASS o FAIL 0 PASS o FAIL DATE: 02/28/96 08:5 // V :LID :NUE 11 12 u 0 0 O I �I Z 5 'IC I I 5E 'IC LOOPS OTE 3. Q 0 J / "SPOKANE COUNTY TRAFFi%; DEPT. R =40' EX IST. TRAFFIC L OOPS . _ `SEA NOTE EHS tpjuu 1 STA.4 +00 TOP OF GRA EL. 2010.70 S EE N S EXISTINGXPARKING BLD V °� STALL CONC. SIDEWALK As PER � STA.Ot37 TO STA.I+ OKANE COUNTY STANDARDS SAWCUT,REMOVE 8 RE ACE ISTASPHALT IN BASE R! TO NEW SECTION. LEGEND T` 220 013.00 NEW ELEVATION MAX. 2 :1 SIDESLOPE 2012-19 EXISTING ELEVATIO FROM TOP OF CURB:' —2010 EXISTING CONTOURS TO EXIST GRADE. ® 208 SWALES DR VEWAYS TO EXIST NEW CURBS EXISTING EDGE OF ASPHAL A INSTAI (PING COUNT. W V T. C. TOP OF CURB ELEVATIONS ` r 2012.00 co ll TES; ST STORM WATER .I: ALL.. DRYWELLS :LID :NUE 11 12 u 0 0 O I �I Z 5 'IC I I 5E 'IC LOOPS OTE 3. Q 0 J / "SPOKANE COUNTY TRAFFi%; DEPT. R =40' EX IST. TRAFFIC L OOPS . _ `SEA NOTE EHS tpjuu 1 STA.4 +00 TOP OF GRA EL. 2010.70 S EE N S EXISTINGXPARKING BLD V °� STALL CONC. SIDEWALK As PER � STA.Ot37 TO STA.I+ OKANE COUNTY STANDARDS SAWCUT,REMOVE 8 RE ACE ISTASPHALT IN BASE R! TO NEW SECTION. LEGEND T` 220 013.00 NEW ELEVATION MAX. 2 :1 SIDESLOPE 2012-19 EXISTING ELEVATIO FROM TOP OF CURB:' —2010 EXISTING CONTOURS TO EXIST GRADE. ® 208 SWALES DR VEWAYS TO EXIST NEW CURBS EXISTING EDGE OF ASPHAL A INSTAI (PING COUNT. NEW DRY ELLS T. C. TOP OF CURB ELEVATIONS '. 2012.00 TES; ST STORM WATER .I: ALL.. DRYWELLS TO BE SPOKANE COUNTY STANDARD. _ F 2.ORYWELL GRATES TO BE CENTERED 0.96' OFF FACE OF CURB. :,CON,TRACTOIjl TO COORDINATE TRAFFIC. LOOP QN ' RE -CONSTR-UCTION WITH TRAFFIC SIGNAL CONTRACTOR. �.. PE NC ....:' .. 24 0 1 2 3. OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON q Date <3 Inter- office Communication From wl V-t �- -4 tti/ �z 5 rte/ / -" T/ nJ G- G a � / t s v r 3on1'�) �8 S7 /7 ZI ZZ o i 1 4)AL/ 7 27 7 /nl /oh or' i 0/ G- / n' 4 L f� o'n�' 5 i/ ti /,A 7 r'oZ t A e `rW� O T/ 6-, o �?� s T, 7_�4/A 7 7 7_ T=� �vL yaN'� / A - 7 — `�pJ t= GAL e J r47� //J rvr/r� A) i T O /Z � S 7' / � Z �� �) 000, - r aL )r j g7 � /7 4 z �.JI LL o. o � t�Jf✓_�t'_D -- o ga 0 0 0, /T� BOND ESTIMATE PROJECT BSP 21 J. Radke DATE 19- Mar -93 ----------------------------------------------------------- DRAINAGE ITEMS UNITS QUANITY PRICE COST 1) Drywell - Type A EA 0.7 1250.00 875.00 2) Drywell - Type B EA 1 1573.00 1573.00 3) Grate - Type 1 EA 0 325.00 0.00 4) Grate Type 2 EA 330.00 0.00 5) Grate - Type 3 EA 1.7 320.00 544.00 6) Backfill For DW CY 61 14.90 908.90 7) Concrete Inlet EA 675.00 0.00 8) C.M. Pipe 10" Dia. LF 0 21.30 0.00 9) C.M. Pipe 12" Dia. LF 25.90 0.00 lo) C.M. Pipe 15" Dia. LF 32.00 0.00 11) C.M. Pipe 18" Dia. LF 28.80 0.00 12) Precast Manhole EA 1435.00 0.00 13) Solid lid EA 300.00 0.00 14) Ditch Excavation CY 92 10.00 920.00 15) Sod SF 276 --- ----- 0.70 ---- ---- 193.20 ----- - - - - -- ---------------------------------------------------- NON STANDARD DRAINAGE ITEMS ------------------------------------------------------------------------------- 1) 0.00 0.00 2) 0.00 3) 0.00 4) 0.00 5) 0.00 6) ------------------------------------------------------------------------------- DRAINAGE SUBTOTAL 5014.10 ------------------------------------------------------------------------------- 16) Monuments EA 0.6 160.00 96.00 17) Barricade LF 32.00 0.00 18) Street Signs EA 0.2 75.00 15.00 ------------------------------------------------------------------------------- OTHER SUBTOTAL 111.00 ------------------------------------------------------------------------------- GRADING, SURFACING, CURB, AND SIDEWALK 19) Rough Grade CY 778 10.00 7780.00 20) Top Course CY 389 10.60 4123.40 21) Base Course CY 10.60 0.00 22) Asphalt Concrete Tons 515 44.50 22917.50 23) Curb Type A LF 6.50 0.00 24) Curb Type B LF 672 7.90 5308.80 25) Curb Type R LF 7.60 0.00 26) Sidewalk ------------------------------------------------------------------------------- SQ YD 16.20 0.00 NON- STANDARD ROAD ITEMS ------------------------------------------------------------------------------- 0.00 2) 0.00 3) 0.00 4) 0.00 ------------------------------------------------------------------------------- ------------------------------------------------------- GRADING AND SURFACING ------------------ 40129.70 - - - - -- GRAND TOTAL 45,254.80 C BOND ESTIMATE :EJECT BSP 21 -------------------------- DRAINAGE ITEMS Drywell - Type A Drywell - Type B Grate - Type 1 Grate Type 2 Grate - Type 3 Bac k f i l l For DW Concrete inlet C.M. Pipe 10" Dia. C.M. Pipe 12" Dia. l) C.M. Pipe 15" Dia. C.M. Pipe 18" Dia. :) Precast Manhole I? Solid lid Ditch Excavation - Sr_d -------------------- N STANDARD DRAINAGE ITEMS NAME JS UNITS EA EA- EA EA EA CY EA LF LF LF LF EA EA OUANITY 7 10 17 610 CY 921 3 � = 1 x 2760 DATE 17- Mar -89 PRICE COST 1�50.VO 8750.00 1450.00 14500.00 310.00 0.00 33 00 0 , 00 320.00 5440.0o 10.50 6405.0() 540. 00 0. . III ) 12.00 0. 00 16.50 0.00 18.00 O. oC) 21.00 0. 00 1435.00 0.00 300.00 0.00 7.90 7275. 0.50 ------------- 1380.00 - - - - -- O.Oci 0.00 0.00 0. 00 0.00 f). (Do ------------------------- ') Monuments Barricade ? Street Sians ------------------- - - - - -- --------------------------------------- GRADING, SURFACING, CUES, AND SIDEWALK Rrua_h Grade ? Top Course Base Course ? Asphalt Concrete Curb Type A Curb Type B Curb Type R Sidewalk DRAINAGE SUBTOTAL 43750.90 ------------------------------------- EA 6 140.00 840.0) LF 32.00 7.00 EA ------------------------------------- - 75.Oo 150.00 OTHER SUBTOTAL ------------------------------------- 990.00 CY 7787.4 7.90 61520.46 CY 3893.7 10.60 41273.22 CY 10.60 O.Oc? Tons 5155.2 37.90 195382.08 LF 5.50 0.00 LF 6717.1 7.10 47691.41 LF 6.50 0.00 SO YD 14.(D0 C). C)0 4 ROAD ITEMS 0. oo 0.00 0.00 0.00 GRADING AND SURFACING, 345867.17 --- BOND ESTIMATE ------------------------------------------------------------------- PROJECT BSP 17 J. Radke DATE NON STANDARD DRAINAGE ITEMS 1) 2) 3) 4) 5) 6) ----------------------- 16) Monuments 17) Barricade 18) Street Signs - ---- ---- -------- -- - - -- --------------- GRADING, SURFACING, 19) Rough Grade 20) Top Course 21) Base Course 22) Asphalt Concrete 23) Curb Type A 24) Curb Type B 25) Curb Type R 26) Sidewalk ----------------- - - - - -- NON- STANDARD ROAD ITEMS ----------------------- 1) RR Crossing 2) 3) 4) ----- ------- ----- -- - - -- DRAINAGE SUBTOTAL -------------------------------------------- EA 0 160.00 LF 32.00 EA 75.00 -------------------------------------------- OTHER SUBTOTAL -------------------------------------------- CURB, AND SIDEWALK 19- Mar -93 COST 750.00 1258.40 0.00 0.00 448.00 745.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 505.00 1838.90 0.00 0.00 0.00 0.00 0.00 0.00 5545.30 0.00 0.00 0.00 0.00 CY DRAINAGE ITEMS UNITS QUANITY PRICE 1) Drywell - Type A EA 0.6 1250.00 2) Drywell ­Type B EA 0.8 1573.00 3) Grate - Type 1 EA 0 325.00 4) Grate Type 2 EA 4139.60 330.00 5) Grate - Type 3 EA 1.4 320.00 6) Backfill For OW CY 50 14.90 7) Concrete Inlet EA 675.00 8) C.M. Pipe 10" Dia. LF 0 21.30 9) C.M. Pipe 12" Dia. LF 25.90 10) C.M. Pipe 15" Dia.. LF 32.00 11) C.M. Pipe 18" Dia. LF 28.80 12) Precast Manhole EA 1435.00 13) Solid lid EA 300.00 14) Ditch Excavation CY 50.5 10.00 15) Sod SF 2627 0.70 NON STANDARD DRAINAGE ITEMS 1) 2) 3) 4) 5) 6) ----------------------- 16) Monuments 17) Barricade 18) Street Signs - ---- ---- -------- -- - - -- --------------- GRADING, SURFACING, 19) Rough Grade 20) Top Course 21) Base Course 22) Asphalt Concrete 23) Curb Type A 24) Curb Type B 25) Curb Type R 26) Sidewalk ----------------- - - - - -- NON- STANDARD ROAD ITEMS ----------------------- 1) RR Crossing 2) 3) 4) ----- ------- ----- -- - - -- DRAINAGE SUBTOTAL -------------------------------------------- EA 0 160.00 LF 32.00 EA 75.00 -------------------------------------------- OTHER SUBTOTAL -------------------------------------------- CURB, AND SIDEWALK 19- Mar -93 COST 750.00 1258.40 0.00 0.00 448.00 745.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 505.00 1838.90 0.00 0.00 0.00 0.00 0.00 0.00 5545.30 0.00 0.00 0.00 0.00 CY 438 10.00 4380.00 CY 269 10.60 2851.40 CY 10.60 0.00 Tons 371 44.50 16509.50 LF 6.50 0.00 LF 524 7.90 4139.60 LF 7.60 0.00 SQ YD ----------------------- -------- ------------- 16.20 0.00 -- - - - - -- LS 1 1000.00 1000.00 0.00 0.00 0.00 28880_50 GRADING AND SURFACING GRAND TOTAL 34,425.80 BOND ESTIMATE ------------------------------------------------------------------------------ ROJECT BSP 17 NAME JS DATE 09- Dec -88 ------------------------------------------------------------------------------ DRAINAGE ITEMS UNITS GUANITY PRICE COST ) Drywell - Type A EA 6 1250.00 7500.00 ) Drywell - Type B EA 2 1450.(D0 11Ep0.pc) Grate - Type 1 EA 31il.in? 0.00 Grate Type 2 EA 330.pi1 0.01? Grate - Type 3 EA 14 320.00 4480.00 Backrill For DW CY 500 10.50 550. 00 Concrete Inlet EA 540.00 0.00 C.M. Pipe 10" Dia. LF 12.00 0.00 C.M. Pipe 12" Dia. LF 16.50 0.00 0) C.M. Pipe 15" Dia. LF 18.00 0.00 1) C.M. Pipe 18" Dia. LF - A.00 0.(10 2) Precast Manhole EA 1435.00 0.00 3) Solid lid EA 300.00 O.00 41 Ditch Excavation CY 505 7.30 3983.50 5) S� �d SF '7'6' 0.50 13131. 50 --------------------------------------------------,---------------------------- ON STANDARD DRAINAGE ITEMS ------------------------------------------------------------------------------ 0. O0 I) 0. iJ 0. (D0 0.00 ------------------------------------------------------------------------------ DRAINAGE SUBTOTAL 45'54.00 ------------------------------------------------------------------------------ E) Monuments EA 140.01? 0.(D0 7) Barricade LF o2 00 0. (D(? 2) Street Signs EA 75.00 0.(?(? ------------------------------------------------------------------------------ OTHER SUBTOTAL 0 • ( ? ( j •------------------------------------------------------------------------------ GRADING, SURFACING, CURB, AND SIDEWALK 9) Rough Grade CY 4378.4 7.9(? 34529.36 :0) Top Course CY6'?4.8 10.60 22564.88 :1) Base Col.lrse CY 10.60 0. 00 :2') Asphalt Concrete Tons 3713.6 37.90 140745.41 '3) Curb Type A LF 5.50 0.00 '4) Curb Type B LF 5241.5 7.10 37214.65 ':5) C Type R LF 6.50 0.00 'E) Sidewalk SG YD 14.00 0.00 •------------------------------------------------------------------------------ JON- STANDARD ROAD ITEMS ------------------------------------------------------------------------------- ,) RR crossing LS 1 10000.00 101j00.00 0.00 i) 0.00 }t 0.00 ------------------------ --------------- 7 --------------------------------------- ----------------------------------------------------- GRADING AND SURFACING -------------------- 251114.33 - - -- -- GRAND TOTAL 297068.33 GRAND TOTAL 97,550.30 v BOND ESTIMATE - -- ----- -- -- - - - -- - - ----------------------- ---= -- - -- -- -- ------------------- eROJECT BSP J_ ----- -- - - - - -- -- - DATE ------ 19- Mar -93 - - - - -- ---- -- - - --- ---- ----- ------ - DRAINAGE ITEMS - Radke - - ---- - - - - - -- UNITS QUANITY PRICE COST 1) Drywell - Type A EA 0.7 1250.00 875.00 2) Drywell - Type B EA 1.2 1573.00 1887.60 3) Grate - Type 1 EA. 0.4 325.00 130.00 4) Grate Type 2 EA 0.1 330.00 33.00 5) Grate - Type 3 EA 1.3 320.00 416.00 6) Backfill For DW CY 69 14.90 1028.10 7) Concrete Inlet EA 675.00 0.00 8) C.M. Pipe 10" Dia. LF 0 21.30 0.00 9) C.M. Pipe 12" Dia. LF 25.90 0.00 10) C.M. Pipe 15" Dia. LF 32.00 0.00 11) C.M. Pipe 18" Dia. LF 1.5 28.80 43.20 12) Precast Manhole EA 1435.00 0.00 13) Solid lid EA 300.00 0.00 14).Ditch Excavation CY 357 10.00 3570.00 15) ------------------------------------------------------------------------------- Sod SF 3214 0.70 .2249.80 NON STANDARD DRAINAGE ITEMS ------------------------------------------------------------------------------- 1) Removal of Existing C.B. EA 0.6 150.00 90.00 2) 0.00 3) 0.00 4) 0.00 5) 0.00 6) 0.00 ------------------------------------------------------------------------------- DRAINAGE SUBTOTAL 10322.70 ------------------------------------------------------------------------------- 16) Monuments EA 160.00 0.00 17) Barricade LF 32.00 0.00 18) Street Signs EA 75.00 0.00 ------------------------------------------------------------------------------- OTHER SUBTOTAL 0.00 ------------------------------------------------------------------------=------ GRADING, SURFACING, CURB, AND SIDEWALK 19) Rough Grade CY 3285 10.00 32850.00 20) Top Course CY 10.60 0.00 21) Base Course CY 1346 10.60 14267.60 22) Asphalt Concrete Tons 692 44.50 30794.00 23) Curb Type A LF 6.50 0.00 24) Curb Type B LF 686 7.90 5419.40 25) Curb Type R LF 7.60 0.00 26) ------------------------------------------------------------------------------- Sidewalk SQ YD 48 16.20 777.60 NON- STANDARD ROAD ITEMS ------------------------------------------------------------------------------- Curb Removal LF 185 5.00 925.00 2) Asphalt Concrete Removal SY 151 10.00 1510.00 3) Relocate Cyclone Fence LF 114 6.00 684.00 4) 0.00 ------------------------------------------------------------------------------- ----------------------------------------------------------------- GRADING AND SURFACING --- 87227.60 ---- - - - - - -- GRAND TOTAL 97,550.30 � B ESTIMATE -------------------- ________-___-_________-___ _________-___________-- .T^Biqding G�te.Plar 22 NEW EUCLID NAME RBT ".. ^� DATE 1�-"��n_� �` DRAINAGE ITEMS 1} Drywell - Type A 2) Dryvell ~ Type R 3) (Zrats - Type I �) Grate Type 2 5) (�r�te - Type 3 �) 6�ckfjll Fcr DW T) Concrsts Inlet R) C.M. Pipe l0" Dia. C.M. Pipe l2" Dia. 10) _'.M. Pipe 15" Dia. 11) C.M. Pipe 1S" Die. 12) Precast Manhole 13) Solid iid 1�) Ditc� Exc�vation 1�} So� N�N STANDARD DR;��N��GE ITE��S ------------------------------ 1) Remov�l nf Existing C.G. 2) 3) �) 5) --------------------------------------- 32�53 � � ^ UMITS QUAaITY PRICE COST EA � 125/),00 8�50,00 E� �2 ��65o0 17 '-.S C) . �� �A 4 225��� 1300.I)0 EA _ 33 00 EA is 3200� 4l60�; C' E-SC) 1470 10143,0n EA 575^0o 0.00 LF 12,00 000 LF 246(> 0^00 LF 29.00 0,;() LF 15 2�00 �'6000 EA i� 5.0c) 000 EA CY 5F _____________________________ �2 50 l6()7^�00 _ ________ � -------------------------------------- EA 6 15000 900,00 0.00 0.0o �^00 00� O00 _________________ DRAINAGE SUGTLITAL I 6.) Monumerl-1s 17) Garri���e �S) Stree� �i�ns E� LF ----------------------���� ������������ OTHER SU5TC _____________________________________________________ GPADIN6, SURFACING, CUR8 AND SIDEWALK R_ Grade 20) Top Course 21) ��se Course Asphalt Concrete 23} Curb Type A 2�) Curb Type G 2 5) Cvrb Type R 2E.) S " dewalk -------------------------------- NON-STANDARD ROAD ITEMS ________________________________ l" Curb Reme�ai 3) Re�oca�i�n o[ Cvcicne e �) [�Y 32�53 CY CY 13-l67 Tons LF LF ��66 LF so YD ____________________ 4 C9 �C) Li94.53 ------------------ 140,0� 32. Clo 0^0() �5S� 0'00 ------------------ 0.00 ------------------ S,E 28 �0.6C) 0,00 1V. E.0 142750.29 42.65 2�5 �� �DG .60 6u0 0. 00 0 241,�4 000 14.�� ----------------- ______________________________________________ LF l��B 5.0V 00 LF li40 6.0') �()C) ______________________________________________ 6RADIH8 AND SURF 'ClN6 81�,�41^ '/} ----------------------------------------------- GRAND TOTAL 905,426^20 A `^�_�/I / * SANK MEMBEP idC L/C NO: G072321 PAGE: INTERNATIONAL TRADE OPERATIONS 800 FIFTH AVENUE, FLOOR 31, SEATTLE, WASHINGTON 98104 P.O. BOX 3977, SEATTLE, WASHINGTON 98124 JULY 30, 1993 BENEFICIARY: SPOKANE COUNTY ENGINEERS N. 811 JEFFERSON SPOKANE, WA 99260 -0170 FAXED TO: MR. DAVID BERTO FAX NO: 509- 324 -3478 ACCOUNT PARTY: SPOKANE INDUSTRIAL PARK, INC. N. 3808 SULLIVAN RD, BLDG N -15 SPOKANE, WA 99216 OUR LETTER OF CREDIT NUMBER G072321 DATED JANUARY 20, 1991 IN FAVOR OF SPOKANE COUNTY ENGINEERS IS AMENDED AS FOLLOWS: 1. AMOUNT IS INCREASED BY 97,500.00 U.S. DOLLARS TO NEW LETTER OF CREDIT BALANCE 177,500.00 U.S. DOLLARS 2. CHANGE SPECIAL CONDITION NUMBER 2 TO READ: 2. EACH DRAWING UNDER THIS LETTER OF CREDIT, COVERS THE ASSURANCE OF.COMPLETION OF INSTALLATION OF ROADWAY IMPROVEMENTS, INCLUDING GRADING, GRAVEL, PAVING, CURBS, SIDEWALKS, STORM DRAINAGE, DRAINAGE SWALES, MONUMENTS, STREET SIGNS AND OTHER WORK AS IS INCIDENTAL AND RELATED THERETO IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS AS SUBMITTED TO AND APPROVED BY THE SPOKANE COUNTY ENGINEER'S OFFICE ON MARCH 14, 1989 (BSP 17 -87), MARCH 20, 1989 (BSP 21 -88) AND JANUARY 30, 1991 (BSP 22 -88). THIS LETTER OF CREDIT IS OTHERWISE UNCHANGED. THIS IS AMENDMENT NUMBER 004. THIS AMENDMENT CONSTITUTES AN INTEGRAL PART OF AND MUST BE ATTACHED TO THE ORIGINAL CREDIT. YOURS FAITHFULLY, mialvru AUG 0 51993_ CouotY EngineerieZ 1 * ** CONTf"ftmW pAtfEW*kfe.T. •SEAFUS66 5EATTLE•P 1RST NAT /ONAL BANK - r S MEMBER FDIC. . . L/C NO:-.G0.7232T PAGE:, 11. INTERNATIONAL TRADE OPERATIONS. 80.0 FIFTH AVENUE, FLOOR 31, SEATTLE,...WASHINGTON. 98104. P.O. BOX 3977, SEATTLE, WASHINGTON. 98124 DECEMBER 31, 1991 BENEFICIARY: SPOKANE COUNTY ENGINEERS N. 811 JEFFERSON. SPOKANE, WA 9 92 60 -0 170 ACCOUNT PARTY: SPOKANE INDUSTRIAL PARK, INC. P.O. BOX 3727 SPOKANE, WA 99220 OUR LETTER OF CREDIT NUMBER 72.321 -G DATED 5 APRIL 1989 IN FAVOR OF SPOKANE COUNTY ENGINEERS IS AMENDED AS FOLLOWS: 1. EXPIRATION DATE IS EXTENDED TO JUNE 30, 1992 2.. AMOUNT IS DECREASED BY 755,000.00 U.S. DOLLARS 3. WE AMEND OUR AUTO RENEWAL CLAUSE TO READ: IT IS A CONDITION OF THIS LETTER OF CREDIT THAT IT SHALL BE DEEMED AUTOMATICALLY EXTENDED FOR AN ADDITIONAI; PERIOD OF 6 MONTHS FROM THE PRESENT OR'ANY FUTURE EXPIRATION DATE HEREOF, UNLESS AT LEAST 30 DAYS PRIOR TO SUCH EXPIRATION DATE, WE NOTIFY YOU BY CERTIFIED MAIL OR OVERNIGHT COURIER THAT WE ELECT NOT TO.EXTEND THIS LETTER OF CREDIT FOR SUCH ADDITIONAL PERIOD. PLEASE NOTE THAT OUR LETTER OF CREDIT NUMBER IS NOW CHANGED TO READ: G072321., PLEASE MARK YOU RECORDS ACCORNDINGLY AND QUOTE OUR NEW REFERENCE NUMBER IN ANY FUTURE CORRESPONDENCE. THIS LETTER OF CREDIT IS OTHERWISE UNCHANGED. THIS IS AMENDMENT NUMBER 003. ** *CONTINUED ON'NEXT.PAGE * ** FORM 6075 1/90 SEAME•F/RST NANONAL BANK MEMBERFOiC - .. L/C. NO: G072321 PAGE: 2 INTERNATIONAL TRADE OPERATIONS 800 FIFTH.AVENUE, FLOOR 31, SEATTLE, WASHINGTON .98104. P.O. BOX.3977, SEATTLE, WASHINGTON 98124 THIS AMENDMENT CONSTITUTES AN INTEGRAL PART OF AND MUST BE ATTACHED TO THE ORIGINAL CREDIT: YOURS FAITHFULLY, " A RI ED SI ATURE' DORIS KEMP PLEASE ADVISE, US OF..YOUR: ACCEPTANCE_ OR REJECTION TO THIS AMENDMENT BY FAX /AIRMAIL. (A ORI 'D SI NATURE OF BENEFICIARY) FORM W75 1 W DEC 3 1 1991 S P O K A N E e DONALD C. BROCKETT PROSECUTING ATTORNEY OFFICE OF PROSECUTING ATTORNEY December 30, 1991 ansmitted Darcy Hilderbrand International Trade Operations Seattle -First National Bank P.O. Box 3977 Seattle, WA 98124 Re: Irrevocable Letter of Credit Number 72321 -G Dear Ms. Hilderbrand: U N ` C ';- I. vii �i f = _[R IAMFS P. EMACIO Chef Deputy fax CLAR D. COLw¢u. _ Oad CnmirW Pputy Senior Anomeya Noes V. Barnhill Ruben B. Binger Michael C. Dempsey Caald A. Cainger Kevin M. Konmo Patricia A. Thompson This letter is intended to confirm our telephone conversation of December 30, 1991, whereby you authorized the Spokane County Engineers to present a draw on the above - referenced letter of credit, prior to the close of business on December 31, 1991, to Frankie McCoy at the Spokane and Eastern Branch of Seattle -First National Bank, rather than at the counters of Seattle -First National Bank, Letter of Credit Department, Seattle, Washington, as specified in the letter credit. If the above is not your understanding, please let me know immediately. Thank you for your cooperation in facilitating this matter. Very truly yours, MCD.dmm cc Jerry Sims Michael C. Dempsey Deputy Prosecuting Attorney ❑ ❑ ❑ Cd n.l Div Civil Div ' F•mdy U. D,,,nmear Cuuni -City Public Safety Building V9. 1115 Bm.drq W. out Mallon Avenue W. 1100 MAN,. Avenue S,k,ne. WA -92W -0270' - Spokane. WA --100-02 Sp, WA 9-2W -0270 15091450.5764 SCAN 272 -57n4 150914! -2466 SCAN 272 -:axe 150 -t 456 -3602 SCAN 272 -3662 Fraud) Drugs Unu N. 721 lenenon SFnkane. WA u92e0 -0290 (5ou149b4 to SCAN 37 o410 County -City Public Safety Building W. 1100 Mallon Avenue Spokane, WA 99260 -0270 (509) 456 -3662 SCAN 272 -3662 Deputies Wi,uni , W. Allen Ronald P. Arkills lames 1. Barb" lerutifer A. Boltanki Mary Aral Brady lack T. B." Darlene A. Omvan-Andennn Frank Chrismff Paw G. Comeau, Dawn C. Cone: Carol O. Davis Diarux G. Dougherty IoM F. Driscoll Michelle A. Flint D. Climm. Franca I." G. Edward D. I lay Anhur K. Flavaahi David R. I lenrrean IM D. I luppin Man M. Ilunon Saru!ra L)ohnaton Carlin M. lade Ae"n 6 Kirin Neil H. Korh Andrew L. K6okamp IRhbc 1. Kurbiv. Mad A. Lumingcr Sn,annc Larnavu Mad IL 'nth'n G. luuinian Andrew 1. Meus Mich -Ile A. Miller Marylin Makemmrm Claude Momnwaco Aaron R. IWerwn Gvah A. Phillip.un Wiiliam I I. Reeves Manin D. Rollin. N.1 I -Smith 1,n, D. Swinnn•n. lame R. Sw ".t.nr Sworn I. Tnckrr Aanle' 1. Wnhe Waller V. W'aly. lueen'd, Uep.nmmr W. 12U5 MAk- Avenue S,k•e,. WA --2,0.0270 15001456.0046 SCAN 272 -role ✓VV L� ✓L LI •.JL JLI SPOKANE INDUSTRIAL PARK December 27, 1991 Mr. Jerry Sims Plat Inspector Office of the County Engineer N. 811 Jefferson Spokane, WA 99260 -0180 RE: Letter of December 23rd, 1991 Dear Mr. Sims: r. C/c PENTZER: DEVELOPMENT CORPORATION. L WASkM0N N7LRP0' RC0.NYN/1 N 3808 Sulk'van Road Phone: (509) 914 Spokane, WA 992161670 FAX: (509) 9203748 .I am in receipt of your letter dated December 23rd, 1991, wherein you have asked that Pentzer Development Corporation issue an irrevocable letter of credit in the value of $80,000.00. Please be advised that I had an opportunity to discuss this issue with Park General Manager William E. Butler on December 26th, 1991. . Please be advised that Mr. Butler does not feel that a bond is warranted in this instance. I have.been instructed to inform you that the position of Pentzer Development Corporation relative to this issue has not changed from that referenced in my previous letter of December 2nd, 1991. I attempted, unsuccessfully, to contact you by telephone regarding this issue on the morning of December 27th, 1991. Should you have any additional questions or comments regarding this issue, please donor hesitate to contact meat your convenience. Sincerely, SPOKANE R DbUSTRIAL PARK Scott R. Brown Ptnperty Manager pJm wvuctnerur�a[swmmtn 6A vNa2na�ernato�vrN S P O K A N E OFFICE OF THE COUNTY ENGINEER Ronald C. Hormann, P.E., County Engineer Mr. Scott Brown Pentzer Development Corp. N 3808 Sullivan Road Spokane, WA. 99216 -1670 RE: Letter of December 2, 1991 Dear Mr. Brown: > U N T Y A DIVISION OF THE PUBLIC WORKS DEPARTMENT Dennis M. Stott, P.E., Director December 23, 1991 We received your letter of December 2, 1991 stating the reasons why you believe Pentzer Development Corporation should not be required to extend surety for roadway and drainage improvements in BSP 17 and BSP 21. I now have had time to discuss this matter with the Spokane County Engineer. We do not agree with all items in your letter, however we have reduced the required surety for all items connected with the two traffic signal systems and the related paving work. It is the position of the Spokane County Engineers Office that the unfinished required improvements not delayed by the signal construction need to be covered by the surety until such time as those items are completed. The updated reduced amount of surety still required would be $80,000.00. This figure is based on the work remaining to be completed on the railroad crossing on Euclid Road, the remaining '208' drainage swale construction and some final adjustments to some of the drywells. Should you wish to post a "irrevocable letter of credit ", other 4tions with you. If you call me at 456 -3600. type of surety other than an I would be happy to discuss have any questions, feel free to sla Very truly yours, Ronald C. Hormann, P.E. S okane County Engineer Jerry Sims Plat Inspector N. 811 Jefferson Spokane, WA 99260 -0180 (509) 456 -3600 FAX (509) 456 -4715 BOND ESTIMATE PROJECT BSP 17 & BSP 21 NAME J Sims DATE 20- Dec -91 ------------------------------------------------------------------------------- DR.AINAGE ITEMS UNITS GUANITY PRICE COST 1) Drywell - Type A EA 1250.00 0.00 2) Drywell - Type E EA 1480.00 0.00 3) Grate - Type 1 EA 325.00 0.00 4) Grate Type 2 EA 330.00 0.00 5) Grate - Type 3 EA 320.00 0.00 6) Backrill For DW CY 14.70 0,00 7) Concrete Inlet EA 610.00 0.00 8) C.M. Pipe 10" Dia. LF 2:0.00 0.00 9) C.M. Pipe 12" Dia. LF 24.60 0.00 10) C.M. Ripe 15" Dia. LF 30.50 ZOO 11) C.M. Pipe 18" Dia. LF 24.00 0.00 12) Precast Manhole EA 1435.00 0.00 13) Solid lid EA 300.00 0.00 145 Ditch Excavation CY 2062 9.20 13970.40 --- 15) Sod SF 55647 0.70 38952.90 ------------------------------------------------------------------------------- NON STANDARD DRAINAGE ITEMS -------------------------------------------------------------------------------- 1) Repair Dr.vwells LS 1 700.00 700.00 2) 0.00 3) 0.00 4) 0.00 5) 0. 00 6) 0.00 DRAINAGE SUBTOTAL 58623.10 ------------------------------------------------------------------------------- 16) Monuments EA 160.00 0.00 17i Barricade I_:- 3 2.00 ill 0. 00 18) Street Signs &A 75.00 0.00 ------------------------------------------------------------------------------- OTHER SUBTOTAL 0.00 ------------------------------------------------------------------------------- GRADING, SURFACING, CURB, AND SIDEWALK 19) Rough Grade CY 9.20 0.00 20) Top Course CY 10.60 0.00 21) Base Course CY 10.60 0.00 22) Asphalt Concrete Tons 44.40 0.00 23) Curb Type A LF 6.20 0.00 24) Curb Type B LF 7.90 0.00 25) Curb Type R LF 7.20 0.00 26) Sidewalk SG YD 15.30 0.00 ------------------------------------------------------------------------------- NON- STANDARD ROAD ITEMS ------------------------------------------------------------------------------- 1) RR Crossing I Approaches LS 1 2:000.00 20000.0141 c) 0.00 3) 0.00 4) 0.00 --- ----------------------- e - , ---------------------------------------------------- GRADING AND SURFACING 20000.00 +fC� Q 00 v 1 GRAND TOTAL 78 V" _I ------------------- RR0161T SSP 17 8 21 DRAINAGE ITEMS 1) Drywell - Type A 2) Drywell - Type B 3) Grate - Type 1 4) Grate Type c 5) Grate - Type 3 6) Rackfill For DW 7) Concrete Inlet 8) C.M. Ripe 10" Dia. 9) C.M. Pine 12" Dia. 10) C.M. ripe 15" .Dia. 11) C.M. pipe 18" Dia. 12) Precast Manhole 13) Solid lid 14) Ditch ;Excavation 15)' Sod ----------------------------- NON STANDARD DRAINAGE 'ITEMS ----------------------------- 1) Repair drywells 2) . 4) 5) 6) 16) Monuments 17) Barricade 18) Street, Signs POND ESTIMATE NAME J Sims DATE 18- Dec -91 UNITS QUANITY PRICE COST EA 107.4 - 1250.00 0.00 EA rase Course 1480.00 0.00 EA 0.00 325.00 0.00 EA 423.1 330.00 0.00 EA Curb Type A 320.00 0.00 CY 0.0 14.70 0.0141 EA 610.00 0.00 LF Curb Type R Eo 00 0. 0141 LF 0.00 24.60 0.00 LF 30.50 0.00 LF 24.00 0.00 EA --------------------------- 1435. 0. 01/1 EA 1) 300.00 0.00 CY 2062 9. 20 15970.0.'t SF ---------------------------------------------- 55647 0.70 38952.90 ---------------------------------------------- LS i 700.00 700. 33 15.00 495.00 0.00 Wheelchair ramps for Pathways EA ! °° 0.0141 0` ` 01- 0. 00 AND SURFACING 88383.32 0.0141 0.00 ---------------------------------------------- DRAINAGE SUBTOTAL 58623.30 ---------------------------------------------- EA 160.00 0.00 LF 32.00 0.00 EA c 75.00 i 50. 00 OTHER SUBTOTAL -------------------------------------- GRADING, SURFACING. CURB, AND SIDEWALK 1 50 . 00 IS) Ro ugh grade CY 322.2 9.20 2?64. '2- 20) Top Course CY 107.4 10.60 1138.44 21) rase Course CY 10.60 0.00 22) Asphalt Concrete Tons 423.1 44.40 18785.64 23) Curb Type A LF i. 20 0.0 24) Curb Type B LF 7.90 0.00 25) Curb Type R LF 7.20 0.00 26) ------------------------------------------------------------------------------- Sidewalk So YD 15.30 0.70 NON- STANDARD ROAD ITEMS --------------------------- -------------------- ---- - - 1 L 5 � 1) RR Crossing 0--44looO 3 n2pmowwNes LS 1 fir" m 3) Remove 7 Replace Radius @ Marietta & Su LF 33 15.00 495.00 4) -------------------------------------------------------------------------4 Wheelchair ramps for Pathways EA ! °° 0` ` 01- GRADING AND SURFACING 88383.32 GRAND TOTAL 147,156.62 STREET QUANTITIES PROJECT NO.- B617 &21 DESIGNER- J SIMS DATE- 12/18/91 PROJECT DESCRIPTION- PSG 17 & BSP 21 STREET 0 NAME- PATHWAYS LENGTH- j450.00 FT. WIDTH- 6.00 FT. BEGINNING STATION = 0.00 ENGINE STATION = 1450.00 TERM # 1 : CHOPPED TERM 4 2 : CHOPPED ITEM SURFACE AREA- ROADWAY EXCAVATION! CRUSHED SURFACING TOG' COURSE CRUSHED SURFACING BASE COURSE ASPHALT CONCRETE ---------- --- ---------- - - - - -- STREET t MEASUREMENT QUANTITY ---------------------------------------- 6700. 00 S. F. 1.00 FT. 32E.2 0Y. 0.33 FT. 107.4 C.Y. 0.00 FT. 0.0 C.Y. 0.17 ------------------------------- FT. 110.1 ---- - - TONS - - -- NAME- MARIETTA AVE LENGTH- 458.00 FT. WIDTH- 54.00 FT. BEGINNING STATION = :7.00 ENDING STATION = 491.00 TERM C 1 . CHOPPED TERM 4 2 : CHOPPED I TEhi SURFACE AREA - ROADWAY EXCAVATION CRUSHED SURFACING TOP COURSE CRUSHED SURFACING BASE COURSE ASPHALT CONCRETE MEASUREMENT _4735. 00 S. F. 0.00 FT. 0.00 FT. 0.00 FT. 0.17 FT. QUANTITY 0. 0 C. Y. 0. 0 C. Y. 0. 0 C. Y. K1.0 TONS ifeN ION ROADWAY EXCAVATLON 32L.2 C. Y. CRUSHED SURFACING TOP COURSE 107.4 C.Y. CRUSHED SURFACING BASE COURSE 0.0 C.Y. ASPHALT CONCRETE 4'L3.1 TONS SPOKANE INDUSTRIAL PARK December 2, 1991 Mr. Jerry Sims Spokane County Engineers Plat Inspector N. 81.1 Jefferson Spokane, OVA 99260 -0180 RE: Letter of November 5th, 1991 Dear Mr. Sims: DEVELOPMENT CORPORATION A WASMXM WATER MWEe Co.~ N. 3808 Sullivan Road Phone. (509) 924 -112(. Spokane, WA 992161670 FAX: (509) 9243748 Spokane Industrial Park is in receipt of your letter of November 5th, 1991, addressed to Seattle First National Bank requesting issuance.of an irrevocable standby letter of credit in the value of $153,000.00, to remain in effect until such time as all road and drainage improvements at Spokane Industrial Park under two binding site plans are completed. I have now.had the opportunity to discuss.this issue with corporate management. It is the position of Pentzer Development Corporation that all road and drainage improvements required under the two referenced binding site plans would have been completed prior to November 1991, had it not been for construction - related delays caused by representatives of the Spokane County Engineers office. As you are aware, the Spokane County Engineer's office maintained exclusive control over the installation of a new traffic signal at Marietta Avenue and Sullivan Road, and the installation of an improved traffic signal at the intersection of Euclid Avenue and Sullivan Road. Your office was responsible for designing the necessary specifications, bidding the project, and supervising work performed by the contractor selected by department representatives. Pentzer Development Corporation had no control over either project, but was required to pay whatever costs department representatives verified were payabla to achieve installation of the two lights. Due to our lack of control over this part of the construction process, two civil engineers and I met with representatives of your department to discuss time frames with your office on May 17th, 1991. During this meeting your representatives verified that the contract for installation of the Marietta Avenue traffic signal had been awarded to Rod's Electric, and that the installation would be complete no later than June 20th, 1991. Your representatives further indicated that work would begin immediately on design specifications for the improved traffic signal at the intersection of Euclid Avenue and Sullivan Road, and that the project would be bid out and completed at some point in August 1991. MANACCD8Y)ULAREANAppop('p '.'i4 PRIN!(D pN R(CYG:Fp PAPJR Based upon time frames provided to me during this meeting, our contractor, Inland Paving Company, scheduled certain road improvements to coincide with installation of the traffic signals. Specifically, Inland Paving representatives verified that final paving of the truck turnout lane along Sullivan Road between Marietta and Euclid Avenues, together with paving at both intersections, could not be completed until after both signals were installed. Subsequent to the meeting, your contractor, Rod's Electric, did not complete installation of the Marietta Avenue traffic signal until sometime in September 1991. In addition, engineering department representatives delayed completion of the Euclid Avenue traffic signal specifications by at least six weeks, preventing subsequent bidding and acceptance of a contractor until mid- September 1991. Colvico was selected as the low bidder by your department, and a meeting was scheduled with representatives of Taylor Engineering, Colvico, your department, Inland Paving Company and I on September 19th; 1991. During that meeting, I was forced to agree to pay overtime wages to your contractor, Colvico, in an effort to secure completion of the Euclid Avenue traffic signal improvements by October 23rd, 1991, in the hope that Inland Paving would still be able to complete installation of road.surtace and pathways prior to batch plant closing in November. in fact, I have now received an invoice with letter from Bob Brueggeman dated November 18th, 1991, in the value of $3,255.92 for overtime services performed by Colvico, Inc. It is the position of my company that; had County Engineering representatives secured completion of traffic installation services in a timely manner, SIP contractor, Inland Paving Company, could have completed the road improvements during this construction season, thereby eliminating the necessity for any form or irrevocable letter of credit. While the commitment was made to pay for Colvico overtime costs, my company does not wish to pay the cost of securing an irrevocable letter of credit in the value of $153,000.00 for an additional one -year period. In addition to overtime charges, SIP may be forced to pay interest on the unpaid portion of the construction agreement to Inland Paving Company. While the precise value at issue has not yet been determined, I can assure you that the cost to my company would be substantial. While Pentzer Development Corporation does not intend to take out the irrevocable letter of credit, I can verify that Inland Paving Company remains under contract for remaining services which are the subject of the letter of credit, and, as a licensed and bonded contractor, should provide the county with a sufficient guarantee that services will be performed as required under the binding site plans. Mr. Sims, I would appreciate your concurrence with my company's position on this issue via written communication at your earliest convenience. Please do not hesitate to contact me with any additional questions a, eurnmenis cor_cernir,o this.issue. 1. Sincerely, SPOKANE INDUSTRIAL PARK Scott R. B Property Manager pjm November 5, 1991 Seattle First National Bank International Trade Operations P.O. Box 3977 Seattle, WA. 98124 RE: BSP 17 8 BSP 21 Dear Sir or Madam: Please be advised that Irrivocable Standby Letter of Credit Number 72321-G issued by your company as surety for installation of roads and associated drainage facilities for the above mentioned project, in the current amount of $835,000.00 may be reduced to $153,000.00. If you have any questions, feel free to call our office. Very truly yours, Ronald C. Hormann, P.E. Spokane County Engineer E�nggineer e rry Sims Plat Inspector cc: Spokane Industrial Park, Inc. N. 811 Jefferson Spokane, WA 99260 -0180 (509) 456 -3600 FAX'(509) 456 -4715 OFFICE OF THE COUNTY ENGINEER • A DIVISION OF THE PUBLIC WORKS DEPARTMENT Ronald C. Hormann, P.E., County Engineer Dennis M. Scott, P.E., Director PROJECT BSP 17 & BSP 21 DRAINAGE ITEMS 1) Drywell - Type A 2) Drywell - Type B 3) Grate - Type 1 4) Grate Type 2 5) Grate - Type 3 6) Backfill For DW 7) Concrete Inlet 8) C.M. Pipe 10" Dia. 9) C.M. Pipe 12" Dia. 10) C.M. Pipe 15" Dia. 11) C.M. Pipe 18" Dia. 12) Precast Manhole 13) Solid lid 14) Ditch Excavation 15) Sod NON STANDARD DRAINAGE ITEMS --------------------------- 1) Repair Drywells 3) 4) 5) 6) BOND ESTIMATE NAME J Sims DATE 05- Nov -91 ---------------------------------------- UNITS GUANITY PRICE COST EA 1250.00 0.00 EA Street Signs 1480.00 0.00 EA 150.00 325.00 0.00 EA SUBTOTAL 330.00 0.00 EA GRADING, SURFACING, 320.00 0.00 CY 14.70 0.00 EA 660.7 610.00 0.00 LF Top Course 20.00 0.00 LF 3502.24 24.60 0.00 LF 30.50 0.00 LF Asphalt Concrete 24.00 0.00 EA 28931.04 1435.00 0.00 EA 300.00 0.00 CY 1031 9.20 9485.20 SF ---------------------- 55647 0.70 ------------ 38952.90 - - - - -- -------------------------------------- LS 1 71410.00 700.00 0.00 0.00 0.00 0.00 0. 00 DRAINAGE SUBTOTAL 49138.10 16) Monuments EA 160.00 0.00 17) Barricade LF 32.00 0.00 18) Street Signs EA 2 75.00 150.00 ------------------------------------------------------------------------------ OTHER SUBTOTAL 150.00 ------------------------------------------------------------------------------ GRADING, SURFACING, CURB, AND SIDEWALK 19) Rough Grade CY 660.7 9.20 6078.44 20) Top Course CY 330.4 10.60 3502.24 21) Base Course CY 10.60 0.¢10 22) Asphalt Concrete Tons 651.6 44.40 28931.04 23) Curb Type A LF 6.20 0.00 24) Curb Type B LF 7.90 0.00 25) Curb Type R LF 7.20 0.00 26) --------------------------------------------------------------- Sidewalk SO YD 15.30 ---- ----- 0.00 - - - - -- NON- STANDARD ROAD ITEMS 1) RR Crossing & Signal LS 1 60000.00 60000.00 c) Stripe Road LS 1 5000.00 5000.00 3) 0.00 4 ) 0.00 GRADING AND SURFACING 103511.72 ------- ----- ------------------ - - - - -- GRAND TOTAL 152,799.82 STREET QUANTITIES PROJECT NO.- DESIGNER- J SIMS PROJECT DESCRIPTION- BSP 17 & BSP 21 STREET # 1 NAME- PATHWAYS ALONG EUCLIE LENGTH- 12.00 FT. BEGINNING STATION = 3330.00 TERM # 1 : CHOPPED TERM # 2 : CHOPPED DATE- 11/ 5/91 2230.00 FT. ENDING STATION = ITEM MEASUREMENT SURFACE AREA- 26760.00 S.F. ROADWAY EXCAVATION 0.67 FT. CRUSHED SURFACING TOP COURSE 0.33 FT. CRUSHED SURFACING BASE COURSE 0.00 FT. ASPHALT ----------------------- CONCRETE --- ------------ 0.17 ---- - FT. - - - -- STREET # NAME- ASPHALT ON MARIETTA 54.00 FT. BEGINNING STATION = TERM # 1 : CHOPPED TERM # 2 : CHOPPED ITEM SURFACE AREA - ROADWAY EXCAVATION CRUSHED SURFACING TOP COURSE CRUSHED SURFACING BASE COURSE ASPHALT CONCRETE LENGTH- 458.00 FT. 37.00 ENDING STATION = MEASUREMENT 24732.00 S.F. 0. 00 FT. 0.00 FT. 0.00 FT. 0.17 FT. TOTALS ROADWAY EXCAVATION CRUSHED SURFACING TOP COURSE CRUSHED SURFACING BASE COURSE ASPHALT CONCRETE 5560.00 WIDTH- QUANTITY 660. 7 C. Y. 330. 4 C. Y. 0. 0 C. Y. 338.6 TONS 495.00 WIDTH- QUANTITY 0. 0 C. Y. 0. 0 C. Y. 0. 0 C. Y. 313. 0 TONS 660. 7 C. Y. 330. 4 C. Y. 0. 0 C. Y. 651.6 TONS REPORT Pg, f of OFFICE OF THE SPOKANE COUNTY ENGINEER ')ate in 2- /gi nspector 5tr6,,k5 Weather a. m. p.m. Time Charged Contractor this Day - Yz or 1 Other County Personnel Contractor Personnel Classification 1 1 2 3 4 5 6 Project Name Tnol"5 tri a j Rp QnJ F. J:,J 9k) 331-30 ED Contractor �andlorSub(s) 1 s H' ah Number O 3 4 5 6 Diary Secti ... .. . • w M 1 p • il a wu - 7 hf - ITEM DESCRIPTION LOCATION UNITS CITY. OTY. TO DATE INT. NO. Signing checked a.m. p.m. INSPECTOR'S SIGNATURE �r 0 SEA TTLE -FIRS T NAT /ONAL BANK MEMBER FDIC INTERNATIONAL TRADE OPERATIONS P.O. BOX 3977 SEATTLE, WASHINGTON 98124 U.S.A. CABLE: FIRSTBANK SEATTLE TELEX: 320249 Page 1 of 2 Standby LC Number 72321 -G TRREVOCABT.F STANDRY LFTT,F,R OF CREDIT 05 APRIT. 1989 LETTER OF CRFDTT NUMBER 72321 -G as RFNEFTCTARY: ittalmemo7611 potva .. SPOKANE i C01!NTY FNGINF.F,RS Past-IC °brandlaxlransm From , C J ✓` M. 811 JEFFERSON 70 f ,t �r> co. SPOKANE. WA 99260 -0170 / VI' 7 i ACCOUNT PARTY: SPOKANE TNDUSTRTAT. PARK, TMC. P.O. P.ON 3727 SPOKANE, WA 99220 AMOIiMT: USD835,000.00 (ETGHT HUNDRF.O THTRTY -FTVE THOUSANP. AND X:0!100 U.S. OOLT.ARS; WE HEREBY TSSIIF OUR TRREVOCARLF STANDRY LFTTFR OF CREDTT TN YOUR FAVOR, WHTCH TS AVATT.ART.E AGATMST PRFSFNTATTON OF THE FOT.T.OWTNG: 1. YOUR SIGHT DRAFT DRAWN ON SFATTT.F -FIRST NATTONAL RANK, AND STAT!Yr, THE LETTER OF CREDTT NUMBER. 2. CF.P.TIFTCATTON PURPORTEM.Y STGNFF) RY AN AUTHOR?7.E11 REPRFSENTATTVE OF SPOKANE. COUNTY ENGTNF.ERS, M. 311 .TFFFERSON. SPOKANE, WA AS FOLLOWS: WE CERTTFY THAT THE AMOUNT OF THTS ORAWTMf, TS D UE. PURSUANT TO NON- COMor,ETTON OF ALT. OR ANV TMPROVF,MFNTS (TMSFRT TMPROVF.MF.NT(S) AS STATED TN 3PECTAT. CONDITION NO. 2 RELOW).' 3. THE ORIGTNAT. OF THTS STANORY LETTER OF CRFOIT, THIS LETTER OF CREDTT FXPTRFS AT THE COUNTERS OF SEATTLE- FTP.ST NATTONAT. RANK, T.F.TTFR OF CREDTT UFPARTMFMT, CURRENTLY LOCATED AT 800 PTFTH AVENTIE, Fr.00R 31, SEATTLE, WASHTNGTON 98104 ON 31 URCFMRFR 1991. REV. 3/86 a SEA! !LE•F/RST MAT /OVAL BAN "�BUI FDIC -� INTERNATIONAL TRADE OPERATIONS P.O. BOX 3977 SEATTLE, WASHINGTON 98124 U.S.A. CABLE FIRSTBANK SEATTLE TELEX: 320249 Parr. 2 of 2 Standby LC Number 72321 -G SPECIAL CONDITIONS: 1. PARTIAL DRAWINGS ARE PERMITTED 2. EACH DRAWING UNDER, THIS LFTTER OF CREDIT, COVERS THE ASSURANCE OF COMPLETION OF TNSTAT.T.ATTON OF ROADWAY IMPROVEMENTS. TNCT.IJDTNG GRADTNG, GRAVEL, PAVING, CURBS, SIDEWALKS, STORM DRAINAGE. DRATNAGF. SWALFS, MONUMENTS, STREET STGNS AND OTHER WORK AS IS TNCTDENTAT. AND RET.ATFD THERETO TN ACCORDANCE WITH THE ORAWTNGF AND SBFCTFTCATTONS AS SUBMITTED TO AND APPROVED RY THE SPOKANE COUNTY F.NGTNEFR'S OFFICE ON MARCH 14. 1989 (RSP 17 -87) AND MARCH 20. 1.989 !RSP 21 -881 WE HEREBY AGREE WITH THE DRAWER, ENDORSER AND RONA FTUF HOT.DER OF THIS DRAFT NFGOTTATFD UNDER. AND TN STRTCT COMPT.TANCF WITH THE TERMS OF THIS UTTER OF CRF.DTT THAT SATO DRAW SHAT.T. RE 91JI.Y HONORED UPON PRESF.NTATTON TO US, AT ANY TIME BEFORE COMPLETION OF THE AROVF- UFSCRTRF.I) TMPROVFMF.NTS OR PERFORMANCE, IN WHTCH RVFXT WRITTEN NOTTCF SHAT.T. RE GTVFN RY SPOKANE COUNTY T9 SEATTT.E -FTRST NATIONAL RANK, SEATTLE, WA. THIS LETTER OF CREDIT IS SUBJECT TO UP 1983 REVISION TCC PURT.TCATTON NUMBER 400. VERY TP.ULY YOURS, SEATTLE -FIRST NATIONAL RAND( RY AIJTHn... 7FTr S I T;NATIJP.F AUTHORIZED SIGNATURE ET.WT%T - v Km bUJV Mtv. S /db" ®SEATTLE•F/RST NAT /ONAL BANK MEMBER FDIC Page 1 of 1 T.0 ?.Timber 72321 -G DATE: 12 APR T T. 1989 INTERNATIONAL TRADE OPERATIONS P.O. BOX 3977 SEATTLE, WASHINGTON 98124 U.S.A. CABLE: FIRSTBANK SEATTLE TELEX: 320249 RENEFTCTARY: SPOKANE, COUNTY ENGTNF.FP.S N.I. 811 JEFFERSON- SPOKANE, WA 99260 -0170 ACCOUNiTEF SPOKANE TPIDUSTRIAr. PARK, T \'C. P.O. ROX 2727 SPOKANE. WA 99220 OUR LETTER OF CREDIT NUMBER 72221 -G TN FAVOR OF YOURSELVES TSSITFD O= APRT ?. 1969 IS HF.RFRY AMR ?TnFn AS FO ?.LO[dS: i7P.'DER SPFCTAT, CONDTTTONS ADD THE FOLT,OWTNG: 3. IT IS A CONDrTTON OF TATS r,FTTFR OF CREDTT THAT TT SHALT, RE DEEMED AUTOMATTCALLY EXTENDED FOR ST?CCESSTVF ADDITIO \TAT. PERIODS OF ONE !11 YEAR FROM THE PRESENT OR ANY FUTURE EXPTRATTnN nATFS HEREOF, UNLESS AT LEAST 60 DAYS PPTDR TO SUCH FXPTRATTON DATE. WE NOTIFY YOU THAT WE ELECT NOT TO EXTEND THiS LETTER OF CREDTT FOR SUCH ADDTTTONAT PERIOD. SHOULD WE ELECT TO EXF.R(.TSF TTTF OPTTON OF T)FCT.TNTNG TO AIiTOMAT. TCALT,Y RENEW THIS T.FTTEP. OF CREnTT, RY SO \OTTFYY ?m YOU AS gFPFTC PROVTDED, AND YOU HAVE NOT RECEIVED A SATTSF.ACTORY SITRSTTTi7TF T,FTTFR OF CREDTT OR COMPARABLE FINANCIAL TNSTP,IIMF \T, Yn!7 MAY THEN DRAW TTP TO THE FACE AMOUNT OF THIS r OF CREDTT AT1J!7STF.n FOR PRFV TOTTS P.RAIuI\18C OR Pcr)I7rTTmITN S i CATIt AMOUNT. TF" ANY, BY PRFSF.VTT \TG WTTHTV THE THEN CTTRP.FNT VALTn TTY PF.RTOn OF THTS T.F.TTFR OF CREDIT. YOUR DRAFT AND THE ORIGINAL OF THIS TFTTFR OF CREDTT T\. THE MANNER SPECIFIED HFREIN. THE LETTER OF CREDIT TS OTHF.RWTSF. IINCHANOFD. THTS TS AMFNDMEXT F.ITMRF.R DO1. THIS AMENDMENT CONSTTTrmFS AN T.NTEGRAT. PART OF AND MUST HE ATTACHED TO THE ORTril'NAL CREDTT. YOURS FATTHPIiLLY. ALIT ORT7,FD STC,NATURE MONROF m N O SEA raE•F/RST NAT /ONAL BAND INTERNATIONAL TRADE OPERATIONS MEWERfl P.O. BOX 3977 SEATTLE, WASHINGTON 98124 U.S.A. Page 1 of I CABLE: FIRSTBANKSEATTLE TELEX: 320249 T.0 Number 72321 -G DATE: 14 APP.TT. 1989 RENFFTCTARY: SPOKANR C�ITNTY ENC,TN;FFRS. N. fill .TFFPvRSONr SPOKANE, WA 99260 -0170 ACCOUN'TFF : SPOKANE rNnITSTRTAT. PARK, INC. P.O. ROY 3727 SPOKANE, IVA 99220 OUR LETTER OF CRFDTT NUMBER 72321 -G TN FAVOR OF YO!?RSFT,VFS TSSI ?FD 0 5 APRTT. 1989 IS HFRERV ANF??DFD AS FOLT.O!VS: I7NP.F.R SPECTAL CONDITION N0. 3 AT THE END OF THE FIRST PAP.AGRAP FOLT.OWTNG: OUR NOTTFTCATTON TO YO17 IVTLT• RF RY CFRTT,FTpD NA ? ?. OP, COURIER. THE LETTER OF CREDIT TS OTHFPwTSF T'A NGFn TuTc IS AMF,ynrylc)iT THIS AMENDMENT CONSTTTITTES AN TNTEGRAT. PART OF AND MUST RR ATTAT THE ORTGT ?TAT. CREDIT YOURS FAITHFULLY. AUT OR.7.ED SMNAT?RF MONROF: RM 6034 REV. 3/86 ti i `at® . I jqj PUBLIC WORKS DEPARTMENT OFFICE OF COUNTY ENGINEER RONALD C. HORMANN, P.E. COUNTY ENGINEER SPOKANE, WASHINGTON 99260 -0170 Date; /7 /9a9 Subdivision Name: 9 J P 2 I Dear Sir or Madam: One of the requirements set forth by the Spokane County 'tanning Commis- sion in connection with the above - entitled plat involves the _cling with this office of a Street Improvement Bond. A preliminary inspect_on of the plat has been made by this office and the amount of the Street Improve:oe!.t Bond is found to be: A Street Improvement Bond in the above amount must o,_ 'fled with this office prior to approval of the final plat. The bond will `e released only upon satisfactory completion of the required street imps , ement. Phase contact this office when work on the improvement is ready for inspection, or if you desire additional information or advice concerning the work. Very truly yours, Ronald C. Hermann, P.E. Spokane County Engineer By: ke-/ i ij sa Plat /Forms4 Pnhlir Wnrkc Ri,il`iinn / Nnrth R1l .lofforcnn Ctroot / gnn4ano lAlachinnton 4476!1- f117f1 L5(191 456 - 46(1(1 NON STANDARD DRAINAGE ITEMS ------------------------------------------------------------------------------- 17 O. C)0 2) (x.00 3) ) . 00 4) C). 00 5) ('),00 6) 0. ( ------------------------------------------------------------------------------- DRAINAGE SUBTOTAL 43750.90 ------------------------------------------------------------------------------- 16) Monuments EA 6 140.00 840.00 17) Barricade LF 32.0(') o.00i 18) Street Signs EA 2 75.00 150.!70 -------------------------------------------------------------------------------- OTHER SUBTOTAL 990.O0 ------------------------------------------------------------------------------- GRADING, SURFACING, CURB, AND SIDEWALK 19) Rough Grade CY 7787.4 7.90 61520.46 20) Top Course C:Y 3893.7 10.60 41'273.'22 21 ) Base Course CY 10.60 o. 0(7 22) Asphalt Concrete Tens 5155.2 37.90 195382.(78 23) Curb Type A LF 5.50 O.O( 24) Curb Type B LF 6717.1 7.10 47691.41 25) Curb Type R LF 6.50 0.00 26) Sidewalk SG YD 14.00 0.00 ------------------------------------------------------------------------------- NON- STANDARD ROAD ITEMS ------------------------------------------------------------------------------- 17 0.( ) O. 00 o) (7.00 4) 0.00 ------------------------------------------------------------------------------- GRADING AND SURFACING 345867.17 ------------------------------------------------------------------------------- GRAND TOTAL 390608.07 ------------------------------------------------------------------------------- BOND ESTIMATE PROJECT BSP 21 N NAME JS D DATE 1 17- Mar -89 DRAINAGE ITEMS U UNITS O OUANITY P PRICE C COST 11 D Drywell - Type A E EA 7 7 1 1250.O0 8 8750.00 2) D Drywell - Type B E EA 1 10 1 145(7.0(? 1 145( ?(?.0(:) 3) G Grate - Type 1 E EA 3 310.00 0 0. ( 4) G Grate Type 2 E EA 3 330.00 0 0.00 5) G Grate - Type 3 E EA 1 17 3 320.00 5 5440.00 6:) B Bac k f ill For DW C Cy 6 61(7 1 10.50 6 64(.)5. )() 7) C Concrete Inlet E EA 5 540.00 0 0.00 8) C C.M. Pipe 10" Dia. L LF 1 12.00 o o.O(:) 9) C C.M. Pipe 12" Dia. L LF 1 16.50 0 0. 00 107 C C.M. Pipe 15" Dia. L LF 1 18.00 0 0.00 117 C C.M. Pipe 18" Dia. L LF 2 21.O0 O O.C)C) 12) P Precast Manhole E EA 1 1435.00 0 0.00 13) S Solid lid E EA 3 300.00 0 0.00 14) D Ditch Excavation C CY 9 921 7 7.90 7 7275.90 15) S Sod � SF _ ° °; 276( 0 0.50 1 1380.00 ---------------------------------------"---------=------ - �. S --------------------- STREET QUANTITIES PROJECT NO.- DESIGNER- JS PROJECT DESCRIPTION- ESP 21 STREET 0 1 DATE- 03/17/8? NAME- MARIETTA AVE LENGTH- 3363 FT„ BEGINNING STATION = so.wo ENDING BEGINNING STATION 0.00 ENDING STATION INTER I I "T' INCLUDED 1SWIDTH = 50.00 SK - 0.00 INTER 0 2 'T' INCLUDED lEWIDTH - 24,00 !TEi'll --------------------- SK = 0.00 INTER 4 3 "T INCLUDED 1SWIDTH = 30.00 ------ 19404.0J S.F. Sw - 0.•0 TERM 4 1 CROSS STREET !NCLUDED E• 37.00 PW 37.00 SK TERM 0 2 CHOPPED C.Y. CRUSHED SURPACING BASE COURSE O.00 FT. 010 1 EM SURFACE ROADWAY CRUSHED CRUSHED --------------------- AREA- EXCAVATION' OURPACING TOF COURSE SURFACING BASE COURSE AERHALT CONCPE7E MEASUREMENT --------------------- l2i?89151 5.F. 1.00 FT. .50 FT� 0.00 FT. .73 FT. CURB EXISTING 0. 00 FT.. ---------------------------------------------- 2-- STREET # WIDTH- 54FT. 3363.37 RAD - 30.0j RAO - 30. 00 RAU = 30. 0.00 RAO 40.00 PROPOSED OUAN7 I W ----------- GS14.4 2.Y. 30072 C.y 0.0 C.y'. 4606.3 TONS 6717.1 F7. NAME- STUGWALKE LENGTH- 3234 FT. WIDTH- 12FT., BEGINNING STATION = so.wo ENDING STATION = 363.67 TERM 4 1 CHOPPED TERM 4 2 CHOFFED !TEi'll --------------------- - ----- MEASUREMENT MUANTITV SURFACE --- ------- ------------------ AREA- ' ------ 19404.0J S.F. ----- - -- - -- ----- --- --- ------- ROADWAY EXCAVATION FT, ?72•3 C.Y. CRUSHED SURFACING TOP COURSE .67 .37 F7, US6.5 C.Y. CRUSHED SURPACING BASE COURSE O.00 FT. 010 ASPHALT CONCRETE 17 FT, 495.6 TONS CURS EXISTING 6567.34 FT. PROPOSED 0.0 FT.. TOTALS ROADWAY EXCAVATION 7737.4 0Y., CRUSHED SURFACING TOP COURSE 3893.7 C.Y. CRUSHED SURFACING BASE COURSE 1-0 Cv. ASPHALT CGNCRETE 5135.2 TONS 6717.1 FT, ------------ Non Standard Dr 1) 2) 3) 4) Std Bd 1 DWI Gonc Dia Dia Dia OTHER Page Dal Dwl BRF Inlet Pine Pice Pi De I ) 2) 3) 4) 5) 6) 7) 96/4 BOND EST FORM PROJECT - 7 — NAME DATE 1l 1'Z. Item Drainage items Units Quantity Price Cost 1) Drywell Type A EA 2) Drywell Type B FA 3) Grate Type I EA 4) Grate Type 2 EA 5) Grate Type 3 EA -------- — — ---- ------- 6) Backfill for DW CY 7) Concrete inlet EA 8) C.M. pipe 10• dia. LF 9) C.M. pipe 12" dia. LF 10) C.M. pipe 15" dia. LF 11) C.M. Dine 18" dia. LF 12) Precast Manhole EA 13) Solid Lid EA 14) Ditch Excavation Cv 15) Sod SF Non Standard Dr 1) 2) 3) 4) Std Bd 1 DWI Gonc Dia Dia Dia OTHER Page Dal Dwl BRF Inlet Pine Pice Pi De I ) 2) 3) 4) 5) 6) 7) 96/4 PUBLIC WORKS DEPARTMENT OFFICE OF COUNTY ENGINEER RONALD C. HORMANN, P.E. COUNTY ENGINEER SPOKANE, WASHINGTON 99260 -0170 Date: 2 /2/l1 9 Subdivision Name: 13 5 P 1 / ^ U / Dear Sir or Madam: One of the requirements set forth by the Spokane County Planning Commis- sion in connection with the above - entitled plat involves the filing with t.`is office of a Street Improvement Bond. A preliminary inspection of the plat has been made by this office and the amount of the Street Improvement Bond is foua:i to be: c� o0 A Street Improvement Bond in the above amount must be filed with t'_s office prior to approval of the final plat. The bond will be released on_, upon satisfactory completion of the required. street improvement. Pleas, contact this office when work on the improvement is ready for inspection, or is you desire additional information or advice concerning the work. Very truly yours, Ronald C. Hormann, P.E. Spokane County Engineer B sa Plat /Forms4 PnhIir Wnrlec RiiiI(iinn / Nnrth R11 Jofforcnn C,"aot / rnnl,ano WA chi nntnn QQ9F0 -n17n f.5n91 4.5F, 110. c cl V ...Sr ------------------------------------------------------------------------------- �.. BOND ESTIMATE 0.0)i 2) 55856.72 PROJECT BSP 17 NAME jw DATE 02 Mar -89 ------------------------------------------------------------------------------- DRAINAGE ITEMS UNITS OUANITY PRICE COST 1) Drywell - Type A EA 6 1250. 7500.00 2) Drywell - Type B EA 8 1450.00 11600.00 3) Grate - Type 1 EA 17) Barricade 310.00 0.00 4) Grate Type 2 EA 75.00 330.00 0.00 5:) Grate - Type 3 EA 14 320.00 4480.00 6) Backfill For DW CY 500 10.50 5250.00 7) Concrete Inlet EA 540.00 0.00 8) C.M. Pipe 10" Dia. LF 12.00 0.00 9) C.M. Pipe 12" Dia. LF 16.50 0.00 10) C.M. Pipe 15" Dia. LF 18.00 0.00 11) C.M. Pipe 18" Dia. LF 21.00 0.00 12) Precast Manhole EA 1435.00 0.00 13) Solid lid EA 300.00 0.00 14) Ditch Excavation CY 1141 7.90 5013.90 15) Scud SF3oSq =5*3423 0.50 1711.50 ------------------------------------------------------------------------------ NON STANDARD DRAINAGE ITEMS ------------------------------------------------------------------------------- 1) Rough Grade CY 0.0)i 2) 55856.72 20) 0.00 3) 3419.4 10.60 0.00 4) Base Course CY 0.00 5) 0.00 22) 0. 00 6) 5042.5 57.90 0.00 ------------------------------------------------------------------------------- DRAINAGE SUBTOTAL LF 39555.40 ------------------------------------------------------------------------------- 16) Monuments EA 140.00 0.00 17) Barricade LF 32.00 0.00 18) Street Signs EA 75.00 0.00 ------------------------------------------------------------------------------- OTHER SUBTOTAL 26) 0.00 ------------------------------------------------------------------------------- GRADING, SURFACING, CURB, AND SIDEWALK 19) Rough Grade CY 7576.8 7.90 55856.72 20) Top Course CY 3419.4 10.60 36245.64 21) Base Course CY 10.60 0.00 22) Asphalt Concrete Tens 5042.5 57.90 151110.75 23) Curb Type A LF 5.50 0.00 24) Curb Type B LF 5241.5 7.10 37214.65 25) Curb Type R LF 6.50 0.00 26) Sidewal4:: SO YD 14.00 0.0i) NON - STANDARD ROAD ITEMS ------------------------------------------------------------------------------- 1) RR Crossing & Signal LS 60000 1.00 60x 00.00 2) Remove Existing Asphalt SY 972 20.00 19440.00 o) 0.00 4) 0.00 GRADING AND SURFACING 403867.76 ------------------------------ - - - - -- GRAND TOTAL 443423.16 41 4�",oeo •'0 PROJECT NO.- BSP 17 PROJECT DESCRIPTION- STREET # 1 STREET QUANTITIES DESIGNER- JERRY SINS DATE- 1/2/89 NAME- EUCLID AVE MEASUREMENT LENGTH - 2331 FT. 159411.13 WIDTH- 66FT,. ROADWAY BEGINNING STATION = 2869.00 ENDIVE STATION = 5200.00 INTER # 1 'T' INCLUDED ISWIDTH = 00.00 SK == 0.00 RAD = 70.00 INTER # 2 'T' INCLUDED ISWIDTH = 44,.00 SK = 0.00 RAD = 10.00 INTER # 3 FULL INCLUDED ISWIDTH = 30.00 SK = 0.00 RAD = 30.00 TERM # 1 : CHOPPED TERM # 2 : CHOPPED ITEM FT. MEASUREMENT SURFACE AREA- 159411.13 S.F. ROADWAY EXCAVATION 1.00 FT. CRUSHED SURFACING TOP COURSE .44 FT. CRUSHED SURFACING BASE COURSE 0.00 FT. ASPHALT CONCRETE .03 FT. CURB EXISTING 62.00 FT. STREET # 2 NAME-- EUCLID AVE LENGTH- - BEGINNING STATION = 5200,00 TERM # 1 : CHOPPED PROPOSED QUANTITY 5904.1 C.Y. 2583.1 C. V. 0.0 C.Y. 4054.5 TONS 4603.0 FT. 3&7 FT. WIDTH- 66FT.. ENDING STATION 5567.15 TEEM # 2 : CROSS STREET INCLUDED EW 12.00 PW 12.00 SK 0.00 RAD" 30.00 ITEM SURFACE AREA - ROADWAY EXCAVATION CRUSHED SURFACING TOP COURSE CRUSHED SURFACING BASE COURSE ASPHALT CONCRETE CURB EXISTING MEASUREMENT QUANTITY 238 26.15 S.F. 1.00 FT. 882.5 C.Y. .50 FT. 441.2 C.Y. 0.00 FT. 0.0 C.Y. .30 FT. 603.0 TONS 106.00 FT. PROPOSED 608.5 FT. STREET # 3 NAME- WALKWAYS LENGTH- 2667 FT. WIDTH- 12FT. BEGINNING STATION = 2900.00 ENDING STATION = 5567.15 TERM # 1 : CHOPPED TERM # 2 : CHOPPED ITEM MEASUREMENT QUANTITY SURFACE AREA- 32005.80 S.F. PROJECT C P 17 BOND EST FORM NAME BCD Al DATE rW /19 . z - 9 I Item 0 Drainage items I Units I I Quantity i Price I Cost 1) Drywell - Type A EA I I f 2) Drywell - Type B EA - 3) Grate - Type 1 EA i 4) Grate - Type 2 EA j 5) Grate - Type 3 I EA 6) Backfill for DW I CY 7) Concrete inlet I EA i 8) C.M. pipe 10" dia. I LF j - -- 9) C.M. pipe 12" dia. I 10) C.M. pipe 15" dia. LF LF -- 11) C. M.. pipe 18" dia. I LF i 12) Precast Manhole I EA _ ------------ - - - - -- - -- 13) Solid Lid EA 14) -k-:eh Excavation CY /` 4 15) Sod SF non btanoara urainaee items 1) 2) 3) 4) Std Bdl Dwl Co nc _ Ti Dia Dia Dia OTHER iv Page DWI DWI BRF Inlet Pe — De Pi De 1) 2) 3) 4) 5) 6) 7) 96/4 , BOND ESTIMATE - -- - -- - - - - - -- --------------------------------- ------------------- NAME JS DATE 09 PROJECT BSP 17 --------------------------------------------------------------- UNITS QUANITY PRICE COST DRAINAGE ITEMS EA 6 1250.00 7500.00 1) Drywell - Type A EA 8 1450.00 11600.00 2) Drywell - Type B EA 310.00 0.00 3) Grate - Type 1 EA 330. 0.00 4) Grate Type 2 EA 14 320.00 4480.00 5) Grate - Type 3 CY 500 10.50 5250.00 6) Backfill For DW EA 540.00 0.00 7) Concrete Inlet LF 12.00 0 81 C.M. Pipe SO" Dia. LF 16.50 0.00 9) C.M. Pipe 12" Dia. LF 18.00 0.00 10) C.M. Pipe 15" Dia. LF 21.00 0.00 11) C.M. Pipe 18" Dia. EA 1435.00 0. 12) Precast Manhole EA 300.00 0 13) Solid lid CY 505 7.90 3989.50 14) Ditch Excavation SF 26269 0.50 13134.50 15) Sod -------------------------------------------------- NON STANDARD DRAINAGE ITEMS ----------- ---------- - - - - -- ------------------------------------------ 0.00 1) 0.00 2) 0.00 3) 0.00 4) 0.00 5) 0.00 61 ----------------------------------------------------------- DRAINAGE SUBTOTAL 45954.00 ----------- ----- -- -------------- --------------------- - - - - 140.00 0.00 16) Monuments LF 32.110 0.00 17) Barricade EA 75.00 0.00 • 18) Street Signs - -- -- - -- - - -- ----------------------------------------- -OTHER SUBTOTAL 0.00 ----------------------------------------------------- GRADING, SURFACING, CURB, AND SIDEWALK: CY 4378.4 7.90 34589.36 19) Rough Grade CY 2694.8 10.60 28564.88 20) To Course Top CY 10.60 0.00 21) Base Course Tons 3713.6 37.90 140745.44 2'2) Asphalt Concrete LF 5.50 0.00 23) Curb Type A LF 5'241.5 7.10 37214.65 24) Curb Type B LF 6.50 0.00 25) Curb Type R SO YD 14.00 0.00 26) Sidewalk - - ---- -------------------------------------------- NON- STANDARD ROAD ITEMS - ----- - - - - -- 1 10o00.00 10000.00 1) RR crossing 0.00 2) 0.00 3) 0.00 4) ------__------- _______ ____________ _____________ ----------------------------------- ----------- GRADING - - - AND SURFACING - -- 251114.33 GRAND TOTAL 297068.33 ------------------------------------------------------------------------------- NON STANDARD DRAINAGE ITEMS ------------------------------------------------------------------------------- 1) Rough Grade BOND ESTIMATE 4378.4 7.90 0.00 2) ----------------- PROJECT BSP 17 NAME JS DATE 07- Dec -88 ------------------------------------------------------------------------------- DRAINAGE ITEMS UNITS QUANITY PRICE COST 1) Drywell - Type A EA 6 1250.00 7500.00 2) Drywell - Type B EA 8 1450.00 11600.00 3) Grate - Type 1 EA DRAINAGE SUBTOTAL 310.00 0.00 4) Grate Type 2 EA 140.00 330.00 0.00 5) Grate - Type 3 EA 14 320.00 4480.00 6) Backfill For DW CY 500 10.50 5250.00 7) Concrete Inlet EA 540.00 0.00 8) C.M. Pipe 10" Dia. LF 12.00 0.00 9) C.M. Pipe 12" Dia. LF 0.00 16.50 0.00 10) C.M. Pipe 15" Dia. LF ------------------------------------------------------------------------------- 18.00 0.00 11) C.M. Pipe 18" Dia. LF 21.00 0.00 12) Precast Manhole EA 1435.00 0.00 13) Solid lid EA 300.00 0.00 14) Ditch Excavation CY 505 7.90 3583.50 15) Sod SF 26269 0.50 13134.50 ------------------------------------------------------------------------------- NON STANDARD DRAINAGE ITEMS ------------------------------------------------------------------------------- 1) Rough Grade CY 4378.4 7.90 0.00 2) Top Course CY 2694.8 10.60 0.00 3) Base Course CY 10.60 0.00 4) Asphalt Concrete Tons 3713.6 37.90 0.00 5) Curb Type A LF 5.50 0.00 6) ------------------------------------------------------------------------------- Curb Type B LF 5241.5 7.10 0.00 ------------------------------------------------------------------------------- Curb Type R DRAINAGE SUBTOTAL 6.50 45954.00 16) Monuments EA 140.00 0.00 17) Barricade LF 32.00 0.00 18) Street Siqns EA 75.00 0.00 OTHER SUBTOTAL 0.00 --------------------------------------------------------------------------- GRADING, SURFACING, CURB, AND SIDEWALK 19) Rough Grade CY 4378.4 7.90 34589.36 20) Top Course CY 2694.8 10.60 28564.88 21) Base Course CY 10.60 0.00 22) Asphalt Concrete Tons 3713.6 37.90 140745.44 23) Curb Type A LF 5.50 0.00 24) Curb Type B LF 5241.5 7.10 37214.65 25) Curb Type R LF 6.50 0.00 26) ------------------------------------------------------------------------------- Sidewalk SO YD 14.00 0.00 NON- STANDARD ROAD ITEMS -------------------------------------------------------------------------------- 1) R,R, c `� `S ^� L� ���j9� 0.0o 2) 0.0 3) 0. 4) ------------------------------------------------------------------------------- 0.00 GRADING AND SURFACING 241114.33 ------------------------------------------------------------------------------- r_onnin rnrni �o-�nco �,o STREET QUANTITIES PROJECT NO.- BSP 17 DESIGNER- JERRY SIMS DATE- 12/07/88 PROJECT DESCRIPTION- BINDING SITE PLAN STREET # 1 NAME- EUCLID AVE LENGTH- 2300 FT. 0.0 C.Y. WIDTH- 52FT. TONS BEGINNING STATION = 2900.00 ENDING FT. STATION = 5200.00 WIDTH- INTER # 1 'T' INCLUDED ISWIDTH = 30.00 SK = 0.00 RAD = 30.00 INTER # 2 'T' INCLUDED ISWIDTH = 44.00 SK = 0.00 RAD = 30.00 INTER # 3 FULL INCLUDED ISWIDTH = 30.00 SK = 0.00 RAD = 330.00 TERM # 1 : TAPER TAPER LENGTH = 100.00 QUANTITY TERM # 2 : CHOPPED 18854.08 S.F. ITEM ------------------------------- - - -- SURFACE AREA - ROADWAY EXCAVATION CRUSHED SURFACING TOP COURSE CRUSHED SURFACING BASE COURSE ASPHALT CONCRETE CURB EXISTING MEASURE 126465.13 .67 .4= 0.00 .29 0.00 LENT S.F. FT. FTr- A �" � 4 �Y FT. _ w!i^ " t, Q FT. FT. PROPOSED QUANTITY 3122.6 C.Y. 2001. 3 C. Y. 0.0 C.Y. 28 31.4 TONS 4603.0 FT. STREET # 2 MEASUREMENT QUANTITY SURFACE AREA- 32005.80 S.F. NAME- EUCLID AVE LENGTH- 367 FT. 790.3 C.Y. WIDTH- 52FT. .33 FT. BEGINNING STATION = 5200.00 ENDING STATION = 5567.15 1, „ „ 11 TERM # 1 : CHOPPED TEEM # 2 : CROSS STREET INCLUDED EW 12.00 PW 12.00 SK: 0.00 RAD 30.00 ITEM ------------------------------------------------------------------------------ MEASUREMENT QUANTITY SURFACE AREA- 18854.08 S.F. ROADWAY EXCAVATION .67 FT. 465.5 C.Y. CRUSHED SURFACING TOP COURSE .43 FTr d �" S� 4 �+ 299.4 C.Y. CRUSHED SURFACING BASE COURSE 0.00 FT. 0.0 C.Y. ASPHALT CONCRETE .33 FT. 477.2 TONS CURB ------------------------------------------------- EXISTING 106.00 FT. ------------ PROPOSED -- --------- 638.5 - - FT. - - -- STREET # 3 NAME- WALKWAYS LENGTH- 2667 FT. WIDTH- 12FT. BEGINNING STATION = 2900.00 ENDING STATION = 5567.15 TERM # 1 : CHOPPED TERM # 2 : CHOPPED ITEM ------------------------------------------------------------------------------ MEASUREMENT QUANTITY SURFACE AREA- 32005.80 S.F. ROADWAY EXCAVATION .67 FT. 790.3 C.Y. CRUSHED SURFACING TOP COURSE .33 FT. 395.1 C.Y. rm tQwcn ci lPParTNr Fta^ZF rni iG-cc n nn =- 1, „ „ 11 *brn*Lr CONCRETE .17 FT. 405"0 TONS CURB � EV , ING 5374.30 FT. lPOSED 0.0 FT" _____________________________ _________________________ _ TOTALS ROADWAY EXCAVATION 4378.4 C.Y. CRUSHED SURFACING TOP COURSE 2694.8 C.Y. CRUSHED SURFACING BASE COURSE 0.0 C.Y. ASPHALT CONCRETE 3713.6 TONS CURB ============================================================================== 5241.5 FT. Item Il BOND EST FORM Units Quantity 01 �.j 'I j ' ���1, �;� ;- DATE PROJECT , NAME _yi 2) Item Il Drainage items Units Quantity I Price I Cost 1) Drywell — Type A EA C^ -- LF 2) Drywell — Type B EA — 3) 3) Crate — Type 1 EA Precast Manhole EA 4) Grate - Type 2 EA ' 6) 5) Grate - Type 3 EA ' G 6) Backfill for DW CY 7) Concrete inlet EA 1 8) C.H. pipe 10" dia. LF DWI Conc OTHER _ - 9) C.M. pipe 12' dia. -- - LF - — 10) C.M. pipe 15" dia. --- - - -- -- LF - - -- - - -- --� - - - -- • - 11) C.M. pipe 18 dia. - - -- LF — 3) i 12) Precast Manhole EA �- 13) Solid Lid EA, I 6) - 14) Ditch Excavation CV i 15) Sod SF Z(� Non Standard Standard Drainage Items 2) 3) 4) 96/4 Std Bdl DWI Conc OTHER _ Page Dwl Owl _Dia _Dia _Dia BAF Inlet Pice Pipe Ti De ;) \ "i ;j --\ 1) � 8 -; =:v - 2) 3) 4) 5) 6) 7) 96/4 AUG o 51993_ SE4FIRST SANK L/C NO: G072321 PAGE: 1 INTERNATIONAL TRADE OPERATIONS 800 FIFTH AVENUE, FLOOR 31, SEATTLE, WASHINGTON 98104 P.O. BOX 3977, SEATTLE, WASHINGTON 98124 JULY 30, 1993 BENEFICIARY: SPOKANE COUNTY ENGINEERS N. 811 JEFFERSON SPOKANE, WA 99260 -0170 ACCOUNT PART-Y:, ' SPOKANE INDUSTRIAL PARK, INC. N. 3808 SULLIVAN RD, BLDG N -15 SPOKANE, WA 99216 FAXED TO: MR. DAVID BERTO FAX NO: 509- 324 -3478 / 1 1 OUR LETTER OF CREDIT NUMBER G072321 DATED JANUARY 20, 1991 IN FAVOR OF SPOKANE COUNTY ENGINEERS IS AMENDED AS FOLLOWS: 1. AMOUNT IS INCREASED BY 97,500.00 U.S. DOLLARS TO NEW LETTER OF CREDIT BALANCE 177,500.00 U.S. DOLLARS . 2. CHANGE SPECIAL CONDITION NUMBER 2 TO READ: 2. EACH DRAWING UNDER THIS LETTER OF CREDIT, COVERS THE' ASSURANCE OF.COMPLETION OF INSTALLATION OF ROADWAY IMPROVEMENTS, INCLUDING GRADING, GRAVEL, PAVING, CURBS, SIDEWALKS, STORM DRAINAGE, DRAINAGE SWALES, MONUMENTS, STREET SIGNS AND OTHER WORK AS IS INCIDENTAL AND RELATED THERETO IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS AS SUBMITTED TO AND APPROVED BY THE SPOKANE COUNTY ENGINEER'S OFFICE ON MARCH 14, 1989 (BSP 17 -87), MARCH 20, 1989 (BSP 21 -88) AND JANUARY 30, 1991 (BSP 22 -88). THIS LETTER OF CREDIT IS OTHERWISE UNCHANGED. THIS IS AMENDMENT NUMBER 004. THIS AMENDMENT CONSTITUTES AN INTEGRAL PART OF AND MUST BE ATTACHED TO THE ORIGINAL CREDIT. YOURS FAITHFULLY, County Engineering * ** CONTlfttbmbN pAtfEWkitG.T. •SEAFUS66 R�iErvt� AUG 0 51993_ SEAF/RST SANK L/C NO: G072321 PAGE INTERNATIONAL TRADE OPERATIONS 800 FIFTH AVENUE, FLOOR 31, SEATTLE, WASHINGTON 98104 P.O. BOX 3977, SEATTLE, WASHINGTON 98124 JULY 30, 1993 BENEFICIARY: SPOKANE COUNTY ENGINEERS N. 811 JEFFERSON SPOKANE, WA 99260 -0170 ACCOUNT PARTY:- '- SPOKANE INDUSTRIAL PARK, INC. N. 3808 SULLIVAN RD, BLDG N -15 SPOKANE, WA 99216 FAXED TO: MR. DAVID BERTO FAX NO: 509- 324 -3478 OUR LETTER OF CREDIT NUMBER G072321 DATED IN FAVOR OF SPOKANE COUNTY ENGINEERS IS AMENDED AS FOLLOWS: JANUARY, x991 1. AMOUNT IS INCREASED BY 97,500.00 U.S. DOLLARS TO NEW LETTER OF CREDIT BALANCE 177,500.00 U.S. DOLLARS 2. CHANGE SPECIAL CONDITION NUMBER 2 TO READ: 2. EACH DRAWING UNDER THIS LETTER OF CREDIT, COVERS THE ASSURANCE OF COMPLETION OF INSTALLATION OF ROADWAY IMPROVEMENTS, INCLUDING GRADING, GRAVEL, PAVING, CURBS, SIDEWALKS, STORM DRAINAGE, DRAINAGE SWALES, MONUMENTS, STREET SIGNS AND OTHER WORK AS IS INCIDENTAL AND RELATED THERETO IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS AS SUBMITTED TO AND APPROVED BY THE SPOKANE COUNTY ENGINEER'S OFFICE ON MARCH 14, 1989 (BSP 17 -87), MARCH 20, 1989 (BSP 21 -88) AND JANUARY 30, 1991 (BSP 22 -88). THIS LETTER OF CREDIT IS OTHERWISE UNCHANGED. THIS IS AMENDMENT NUMBER 004. THIS AMENDMENT CONSTITUTES AN INTEGRAL PART OF AND MUST BE ATTACHED TO THE ORIGINAL CREDIT. YOURS FAITHFULLY, 1 CmM Engineerin; * * * CONTfft]tH5m0N3NM pAffE W* 4,G. T. '• SEAFUS66 AUG 0 51993_ SEAF/RST BANm L/C NO: G072321 PAGE: 1 INTERNATIONAL TRADE OPERATIONS 800 FIFTH AVENUE, FLOOR 31, SEATTLE, WASHINGTON 98104 P.O. BOX 3977, SEATTLE, WASHINGTON 98124 JULY 30, 1993 BENEFICIARY: SPOKANE COUNTY ENGINEERS N. 811 JEFFERSON SPOKANE, WA 99260 -0170 ACCOUNT PARTY:. - SPOKANE INDUSTRIAL PARK, INC. N. 3808 SULLIVAN RD, BLDG N -15 SPOKANE, WA 99216 FAXED TO: MR. DAVID BERTO FAX NO: 509 -324 -3478 OUR LETTER OF CREDIT NUMBER G072321 DATED JANUARY 20, 1991 IN FAVOR OF SPOKANE COUNTY ENGINEERS IS AMENDED AS FOLLOWS: 1. AMOUNT IS INCREASED BY 97,500.00 U.S. DOLLARS TO NEW LETTER OF CREDIT BALANCE 177,500.00 U.S. DOLLARS 2. CHANGE SPECIAL CONDITION NUMBER 2 TO READ: 2. EACH DRAWING UNDER THIS LETTER OF CREDIT, COVERS THE ASSURANCE OF COMPLETION OF INSTALLATION OF ROADWAY IMPROVEMENTS, INCLUDING GRADING, GRAVEL, PAVING, CURBS, SIDEWALKS, STORM DRAINAGE, DRAINAGE SWALES, MONUMENTS, STREET SIGNS AND OTHER WORK AS IS INCIDENTAL AND RELATED THERETO IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS AS SUBMITTED TO AND APPROVED BY THE SPOKANE COUNTY ENGINEER'S OFFICE ON MARCH 14, 1989 -,(BSP 17 -87), MARCH 20, 1989 (BSP 21 -88) AND JANUARY 30, 1991 (BSP 22 -88). THIS LETTER OF CREDIT IS OTHERWISE UNCHANGED. THIS IS AMENDMENT NUMBER 004. THIS AMENDMENT CONSTITUTES AN INTEGRAL PART OF AND MUST BE ATTACHED TO THE ORIGINAL CREDIT. YOURS FAITHFULLY, Cody Engineerin; * ** CONTj@OftmbN ;pM PAt�;W*lkG.T. •SEAFUS66 J PL PUN FAXaw I OPPXCIE CEO �� �NOW, y Eel` OINE�mms PROJECT NAME: r„J� {riAI Park (Marieaa) 85P2.1 11 INSPECTOR: StranKS DATE: 318193 CONTRACTOR AND /OR SUBCONTRACTORS: Inland A5pk7)t: Yt/ n kltr� ITEMS: 1, SEWER INFORMATION: NIA AIR TESTED: DATE: ❑ PASS ❑ FAIL MANDRELL: DATE: ❑ PASS ❑ FAIL TV INSPECTION REQUEST: DATE: INSPECTOR'S SIGNATURE: f � DAILY INSPECTI OFFICE OF THE SPOKAN E update Date i0Jk 4 , � 3/W93 Inspector SL4r,2,k — Weather a.m. P.m. Time Charged Contractor this Day - /s or 1 Other County Personnel Contractor Personnel Classification 3 4 5 6 ON REPORT Pg. I of 3 COUNTY ENGINEER &5P17 4 LZ Project Name l + Pk (F Ir 4 5 I L'oar) Project No. CRP/RID Report No. Contractor and /orSub(s) T / L,l6 i %nlr lrr Equipment List, Hrs. Used I Standby Number 13 17S Z Diary Section 1) F'11 fr h '5'rjes sf r Da j+ ;1 , S I'Les 102A romp o = x -- ITEM DESCRIPTION LOCATION UNITS CITY. OTY. TO DATE INT. NO. 2 3 4 5 6 Signing checked a.m. p.m. INSPECTOR'S SIGNATURE AAck L BAWYttOPEOMIN REPORT Pg. Z of 3 OFFICE OF THE SPOKANE COUNTY ENGINEER update Date 10 /09L 3/8/93 Inspector Skr ks Weather a.m. p. M. Time Charged Contractor this Day - Aor 1 Other County Personnel Project Name P/c (E - did i SIN V 9 Project No. CRP/ RID Report No. Contractor and for Sub(s) Equipment List Contractor Personnel Classification 2 3 4 5 6 2 3 4 5 6 Hrs. Used I Standby Number Diary Section Jj�.t1�.•h11.71��►IiT��Z. iii/ 7If1s 5 . i.If� r[ .�a.��f . w� re � ••s..... - � i C ani l eur i Comer- 3 t Ait i n ITEM DESCRIPTION LOCATION UNITS OTY. CITY. TO DATE INT. NO. Signing checked a.m. D.M. INSPECTOR'S SIGNATURE DAILY INSPECTION REPORT OFFICE OF THE SPO updatc Date 10/6/92. 318193 Inspector works Weather a.m. P.m. Time Charged Contractor this Day - Aor 1 Other County Personnel KANE COUNTY ENGINEER pg. 3 of 3 Project Name M=me% T'J 4,• Plc l5 •N •an4 Project No. CRP/ RID E ndZ— Report No. Contractor and/or Sub(s) Equipment List 1 2 3 4 5 6 Hrs. Used I Standby Contractor Personnel Classification Number 1 2 3 G 6 Diary Sect 95 ITEM DESCRIPTION LOCATION UNITS QTY. OTY. TO DATE INT. NO. Signing checked a.m. p.m. INSPECTOR'S SIGNATURE 5 P O IG ^ N 13 OFFICE, OF THE COUNTY ENGINEER Ronald C. Heimann, P.E., County Engineer May 25, 1993 Taylor Engineering 106 W Mission Ave. Suite 206 Spokane, WA 99201 Re: Spokane Industrial Park Dear Scott M. Busch, P.E.: O U N - h Y A DIVISION 0I 'I TIE PUBUC WORKS DEPARI'MErrr Dennis M. Scott, P.E., Director In order for the Engineering Division to complete the evaluation of the 208 swales on the above project, a comparison of as -built vs. as- planned swale volume must be conducted. Please provide calculations with respect to the as -built swale volumes. Respectfully, Randy tronks RS:ds W.1026 Broadway Ave. Spokane, VVA 99260 -0170 (509) FAX (509) 4564715 OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Date Inter- office Communication ra 'TAI y e i-? Z TIJ G t From Subject 'i % /2 /'�A G a- A L 3"A/ II v Z J ;4- 7 `T Z o `d 5 .w ,� L t, T 1 t o G/ GoM%�1ziSoA) e q CIS —��JZT i v5, 0 S� A- L r 5 — ? L A- iv Al y -b - S c i -A- L- F \1 L L) A/7, � : G o/J - P �T L �1 S �Zv ✓lDfi L- ?T .5 3T (, t L) LL � A- L7�: i✓ J W ?T .5 3T (, t L) LL � OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON � Q Date y 1 19 g s. Inter - office Communication /).Z t nl G From Subject �/ /� / - A rJ Z r ALP ,1 � ;` 7Z / .4 1 1 : . T ¢ t v,A L 7- g // ` T �f ?o'$ S r,J 0� 7"/�f ��o✓j D Ji LT i V 5 - ��A-r�A1r, -7 5wA Lc \/oL ✓A/7 `( L'7' S L.J fir- L.-7:7 -V O L v ,l q S . L) L 1' I 1 1 TAylor Engineering, Inc. Civil Design and Land Planning principals: Per? Al. Tailor, P.E. Stanley R. Srirling Afark A. Aronson. P.E. DaWd C. Larsen, P.E. Associates: May 7, 1993 Scott Aa. Busch. P.E. Scott Brown Spokane Industrial Park, Inc. N. 3808 Sullivan Road, Bldg. N -15 Spokane, WA 99216 Re: Spokane Industrial Park - 208 swales along Euclid Avenue Dear Scott: As requested, survey shots were taken for the reference project. Attached are the results of that survey. The swales, in general, appear acceptable with the exception of the Swale located in front of Yellow Freight. Please see the attached information for further information. Spokane County is the governing agency which determines final acceptance. Therefore we are forwarding a copy of this information to their office for their review. Sincerely, TAYLOR ENGINEERING, INC. Scott M. Busch, P.E. Enclosure S'vfB /try/93- 021/050793 cc: Spokane County W. 106 Mission Ave. • Spokane. WA 99201 • (509) 32 &3371 FAX(509)328 -8224 i I it �' c.�r.. � +. y o v. t ��'• o� 5 � � G J 4. Y C+� y 4.5 C�, t A. a rc QC� ``a.. i I it S w or\ a. IJ STA 2 T STA L Jtiz A<k �\ 3`13 P O$ Low {Jr wo. \ \g Avy .O`1 Low p�riw. a 0o LoJ fad W o.\ a. Swc. \a. Sty+ 1'83 To STA 6'00 La�L ZO x \\1 N� %. zoo (o 58 8 LE ?006.93 N Tk !e'00 10 Ib\ J�Y 4. C S \c L' STN 8 To STA \ \`SG La�� Zy\' G O to . (30� \0.-�, ..Acywa - \ \� Av .ol 1-ow 'I 2l9 Ate\ .y\ z8� 5w cam\ ¢ N\ STA IS ♦ ' it To STA 9tla / Ory Wes- \\ CJ �,L J A % c,\.c Lc,.) AJ� �j \4`A iLN SW� \a. G ST A, Igte.7 To SSA 2L +3`1 La�4 . L7 J AGTN4\ 2V1 n. C5, t,n CA AV , 3 . .oz )rk'\ \. PJr ws. \\ S Avg. -O`i Love °e\ wo Avc O\ 1A',�ti. S U- 4- \ c. 1-i Lc-G'r ST P, 2 *5 +23 oS Sww \� Avg 23 1- AJ4 0� 15 Iq S �u \q F 02 Low STA Lc-G'r SZA 30 +23 oS Sww \� Avg 23 1- AJ4 0� \,fit, Y, STA ?O 23 S \A 3\ 4 LA 1 38 , f� 125 0.. 6orlow of Swv \e f� �, .26 !ow Pt \\nW47 Ate'• C� 1 LOw STA 3 \`18 To ST P. 3L lZOtko� oZ' `Jws \a, A.+S .13 Lo.J (Jr.lwa. \ \p Av .05 f�� }.way AJC O1 Lo,.J 0 Swo \a. L SS A 25 + 76 To ST A 32 + 43 R'. '- S A 2`l + - 1 4p T 57 A 30 +So 1\l` 38` Acc c \ 136. Av5 .10 N:t\— A•i 03 v, ST P, 30 + P to To STA J = 3 14 153 0 5 ra b S JS. I2. D+ywc \\ .05 Hi 3Co+21 ,40 �u.� v�o. -u -. LOIN f(i- SZ A• 74, . 26, \ A �tIC,.`d, 5 w �\a t3 STA 33 +�3 •`10 T._, STA 3t�+ 21 .4c� R:S�.t STA 33 +T.Z••YD To 9TJt 35 +10 38` Acc c \ 136. rj \ 04 Sw<.. \o_ AvsJ. O(e Low fJ�ywc \\ 14 Low ST (\ 35 +Ib To STA 3Co+21 ,40 IZO \\1.`10 fJmS�S•.�.r1. rJo \ \o o� Swu \¢ r\.i ,, . 08 Low 25b A�kw -\ 248 O�s.S r� 5 WC, \ a. D STk 33 +90 Te STA 37 t l4 STA 33 +40 To 5T A, 35' 1l (Soho oC S, OAo kot. O Lew Dr wa 11 07 14;ty- P >!\ w y Art . . 2�\ FH,�\ / STA 35 `17 T ST AL 3G +Zl 1"OYiu w� OL SWS \¢. AJS oz P ct\ w R J O `f Hic, ST1A 3G• +27 T 5TA 3l +14 (3cHo.•.. o� Sw._ \e. Ar�, .Ol H bc. ` O �.C�2fA \\�CC2 • \b STOwf�. :ny Wr,.0 ti.J � fw \� � �+.�of P�\tS STA 38'00 To S7 38 +SO Lc4} loo P, a\ go' Da. 1 ST p, L kG.00 To ST `16 (Z:c STA 1 I ID *oo To STA `1- 35 P�ol�o... 04 Swo. \¢. Ass. 18 Low STA 4l 35 To STA 46 *84 I`'IS IJ OC�G OL Swu \!L I�JC J •OS LOW �r \\ z8 Low fc4 Wc,� Ao 14 Lo J 15 1 +\OC�� r �`,, T S 70 z25 SSA 50'?q To STA 50'V9 R,S� 60 AclJO\ S5 a� AJt1 .05 Lo Pa \ R W !"1J 3 LOW S \ a. K. „,7N L1l'00 T STA so tZ, 01 L SSA 1 �le w} e� Ct a.J ♦o+� 146 A�lr.o.\ I'J O \t Ci V^. by V 4 \Q• ryJ4 1 N� y Pa \l wG� A J� .07 Low .. 5 - TA Er.." of cw�..,.o.•. .Ol 14 5\. �r.JCw c')S S ? \• \V , I ! ) J v Y\.a 5V , Thy. swc� \` Ec,a\ o� Gl.a.v +o.� h�..s v���.b \a- � ;I T , � ASPHALT CONCRETE PAVEMENT C COMPACTION CONTROL REPORT Date 6 /7/91 Contract No. EZECM SR No. Gauge No. M352. Project Engineer ]'Ju�� Section /'Inrie%ta Ave- (In,4,,,,y_ . F� ) % Rice Sta. Nr7,5�' to Sta. 33t60 Control Lot No. I Tons 360 ACP X ATB Thick IYa Class B C, E, F, G Lane: L or Rt.; EB WB, NB, SB Other Owt5;de 13Aw, Depth Forr.UL Sta. U. L. Dens. ffset Read- ins Av . orr.Ga Std. % Rice Sta. Nr7,5�' to Sta. 33t60 Control Lot No. I Tons 360 ACP X ATB Thick IYa Class B C, E, F, G Lane: L or Rt.; EB WB, NB, SB Other Owt5;de 13Aw, Depth Forr.UL t b 7 1131 IH3.i3 9`1.0 9z f3 5 y 11 t Z Z5 3 /13.0 4 )NH.7 9z.J 93.H yy. t-R 201 .S I 1yH'S 1 113 1 .93 -3 9� � Leveling Wearing Std.Density Rice Density /,1111.9 Rollers Passes Temp: Mat Air 7So Remarks )9Z OK 1 J 3. 22f01 aS'F60 3, 'j 111113 111 4.8 932 S 11'l.z 114 ; 27t6Z 30t65 1 .11 t.7 I'1Z.9 91•L 91.3 i .2- 1 3. Sum Sum _ A vg. v Z -8 92. Gauge Correction Factor 0 Sta. U.L. Dens. Dffset Depth Read- I ins Av . Eorr.Ga % Std. % Rice Sta. q+75 to Sta. 33#•60 Control Lot No. Z. Tons 390 ACP )C ATB Thick /%L Class C, E F G Lane: Lt or Rt.; EB, B, NB, SB Other r : • e rorr.UL t t b 7 115.6 1112.6 9`1.0 9Z-I 5 Z.5" 11 t Z IGt 3 /13.0 ) 9z.J 9Z.0 Z- t-R 2 t3Z O 1yH'S 1 .93 -3 Leveling Wearing Std.Densit Rice Densit 151. Rollers Passes Temp: Mat Air 7-s-0 Remarks Leveling Wearing Std.Density Rice Density S Rollers Passes Temp: Mat Air 75 0 Remarks 1 J 3. 22f01 ?S F57 3, 'j 111113 I � s 932 93_(; 11'l.z 1 .3 27t6Z _ 1 .11 �tii 3 ' 91•L 9Z.Z i .2- Z. Sum Sum _ A vg. Avg. Z -8 Gauge Correction Factor 0 Sta. U. L. Dens. ffset — Read - - ins Avg. Forr.Ga Std. % Rice Sta. yr75 to Sta. 33160 Control Lot No. 3 Tons 360 ACP ATB Thick I/a Class )(_ C E, F G Lane: Lt. or EB, WB NB, SB Other Z 5 ;de /Yt /31a Wid Depth orr.UL t b 6 1112.6 9Z-I Z.5" IGt 1 , 1 Z.7 9Z.0 Z- 2 t3Z O 1 92,11 Leveling Wearing Std.Density Rice Density S Rollers Passes Temp: Mat Air 75 0 Remarks 1 J 3. ?S F57 3 . I � s 93_(; 1 .3 30t81 7 lqz.& ' 9Z.Z Z. Sum Avg. Gauge Correction Factor Q Inspector Street Inspector /Q„�, / Contractor -Z Comments: INSPECTOR'S SIGNATURE ACP -1 P ASPHALT CONCRETE PAVEMENT COMPACTION CONTROL REPORT 1 Date 617-7191 Contract No. EZE088 SR No. Gauge No. M35 Project Engineer '�a� Tr- Section Marieaal Ave CIrwG.s�_ Par/ ) Sta. U. L. Dens. ffset Read- in s Av . rorr.Ga orr.UL Std. % Rice Sta. 4 +7.5 to Sta. 33 f6p Control Lot No. I Tons 390 ACP ATB Thick JAL Class C E, F G Lane: Rt ; EB,� NB, SB Other t F Depth 10#13 2.7 02- 9L -� . t. 17 tZ N /HL 3, ly3 3 9L -'Y 3,3 Z o + 6 1 7 ly 3_G 9L _7 Leveling Wearing Std.Densit Rice Densit Y 1 Rollers Passes Temp: Mat Air 7 Remarks )� 97- , Ok i , I49 G 93 L '11 3 4 , q - .y Iva Z IH 3,y 92.6 _ Sum v • 2.6 Gauge Correction Factor p Sta. t.L. Dens. ffset Depth Read- in s Avg. orr.Ga .% Std. % Rice Sta. to Sta. Control Lot No. Tons ACP ATB Thick Class B, C, E, F, G Lane: Lt. or Rt.; EB, WB, NB, SB Other orr.UL Leveling Wearing Std.Density Rice Density Rollers Passes Temp: Mat Air Remarks _ Sum Avg. Gauge Correction Factor Sta. U. L. Dens. ffset Depth Read- in s Av Eorr. Ga Std. % Rice Sta. to Sta. Control Lot No. Tons ACP ATB Thick Class B, C, E, F, G Lane: Lt. or Rt.; EB, WB, NB, SB Other orr.UL Leveling Wearing Std.Dens Rice Densit Rollers Passes Temp: Mat Air Remarks Sum Avg. Gauge Correction Factor Inspector $fr was Street Inspecto Contractor � Comments: INSPECTOR'S SIGNATURE ACP -1 \ § ± & , , ( ) d ] \ / f z \ � ®f- �� / / / q-) � 7 & / q % [ A_ ( \ c 3 < k k_ Q 9ƒ � o 2 / o Q = ] A E ty } � I } \ § � / C / � _ 2 k ` ° § § \ ? ( - \ § 0 4 _ 00 g _�§.� � _ V 0 . § O CD CD § ] @ CD 0 \ \ LA ; « , \ § @ k \ k ( 2 Ma k | 2 / \ a E / / / q-) � 7 & / q % [ A_ ) \ c 3 \�Q � k k / Q = ] A ty } G :. -D A ~ _ /(° �� ? E 4 \ 00 g � V 0 2 g § ] @ \ \ LA ; « , § @ k \ k ( 2 Ma k | 2 / \ a E \ k k ) ! 2 �. k f § � 7 & / q % [ ) 0 � \ k k ) ! 2 �. k f § q % ) 0 k k Q = ] § } G :. -D A _ �� ? E m V 0 2 g § ] @ \ \ LA ; « , **PEFfK** 61850 LES SPC0*0225 11/28/91 07:37:46 50630 LES SPCQ *0225 11/20/91 07:37:41 .. 59260 LES SPCQ *0225 11/2.91 07:37:35 61820 LES SPCQ *0225 - 11/28/91 07:37:30 60770 LES SPCQ *0225 11/28/91 07:37: 58590 LES SPCQ *0225 11:26/91 07:37:13 *PERY,** 33 PSI SPCOQ226 12r= ! �I�l ' �1 �• a V,� VL t Vim. * *PERK ** B51SO LES SPc0 *:0226 12 /i�€ 41 04:37:02 33650 LBS SPOO *022/.. FE�k 12;06/91 04:36:5-, 2516 PSI SPCQ*0225 1��,f31 Vi=a �;°15pm, - 1 * *PERK ** 71140 LES SPCD +0225 11/2$x91 07 :36 :21 70100 LES SPCQ *0225 11/2 07:36 :16 71120 LES SPC'0 *0225 11/28/91 07:36:11 70600 LES SPCC *0225 11!22/91 07:36:06 69270 LES SK0 *0225 11�28,�91 07:36:01 67300 LES SPCI] *=0225 1 i /28/Sl 07:35:'55 64790 LES SPCQ *0225 11/28/91 07.3 5:50 61800 LES SPCD *0225 11/28/91 07:35544 58440 LES SFCO *0225' 11/28/91 07:35:39 54850 LES SPCC" 11/28/91 07:35:34 'r 50970 LES SPCD *0225 11/28/91 07:35:25 46760 LBS SPCQ *0225 11/28/91 07:35:23 94610 LES SPCQ *0226 12/06131 04 :36:53 90880 LBS SPCQ= *0226 12/06.91 04:36: 40 65730 LETS SPCD: *0226 12/06/91 04:36:43 79720 LES spec: *0226 12/06/91 04:36:37 73220 LES SPCQ +0226 12/06/81 04:36:31 .. 66340 LES SPCi *02'26 12/06.91 04:36:'26 53160 LBS SpCO *0226 1l 04:36:21 51770 LES SPCO *0226 12/06/91 04:35:15 44170 LES SPCQ *0226 12/06/Si 04:36:10 . LES sF'CO *:0'22: 12/06/91 04:36:05 23680 LES SF *0226 12106/31 04:36:00 21620 LES SPCQ *0226 12/06, 91 04: 35:54 13500 LES SPCO *0226 12/06/91 04:35:49 < 15850 LBS SPCQ *0226 12/06/91.04:3 .— 42370 LES SPCD- +0225 11/28/31 07:35:18 37750, LES SPCO *0225, ._ 11/28/51 07:35:12 i 32550 LES SPr0 *0225 11 /28rSi 07135:07 27840 LES SPCO *0225 11/28/91 07:35:01 22910 LES SPCO*0225 11/28. 07:34:55 17900 LBS SP'CP *0225 11/28/91 07 :34:56 13060 LBS SPCO *0225 , 11/28/91 07:34:45 21190 LES SFCO *0225 11/26/91 07:34:39 . * +PEHK ** �2��9I91 'sq g?° ^.C E5 SPCD *0227 13:35:5'2 - - 36370+ L85 spcO *0227 12/417, 91 13: 1 °1:4'3 41230 LETS 5FCO>I <0227 +- *PEE/ 12/07/91 13:35:43 5'' ' 12.'07 46430 LES SPCD *0227 � -- 12. -91 13:35:36 3789E 12.07 5271 €+ LBS SFCO *0227 1.2/07:31 1 : 35:33 83150 LES SPCO *0227 12:07/91 13:35:28 . 08030 LES spc.0*0227 12/0. /91 1 83540 LES SPCO *O227 12/07, Si 13:'5:16 77270 LES SPCD *0227 12/07/SQ 13:35:11 70430 LBS SPCO . 7 12 /Ci ? /vi 13:35:06 6311.0 LES SPLO* 227 13:35:00 55350 LES Sp C4 >0227 12/07;51 1,:'34:55 47000 LES SPCQ *0227 12 ✓07/91 13 :34:50 338650 LES SPCO= *0227 12/07: 91 13:3445 301SCa LES SpoCi*0227 12,07/ °1 13: 34:3: 21670 LES SpcOr0227 12/C+: /31 13:34:33 13590 LBS sPLFS *0227 /2/0x/91 13:-34:283