08-179.00 Red Diamond Const: Broadway Rehabilitation Ph 1t ' , S v • CTTY OF Public Works Department pokane Capital Improvement Program ,,;oOValley 11707 E Sprague Ave Suite 106 ♦ Spokane Valle y WA 99206 509.921.1000 ♦ Fax: 509.921.1008 1 cityhatt@spokanevalley.org Memorandum Date: October 6, 2008 To: Steve Worley, Neil Kersten From: Craig Aldworth Re: Change Order 3 for Broadway Rehabilitation Project, C I P No. 0068 Budget Account No: 303.303.068.595.30.63.00 lZiOttl AwS.ewl Contract 08 -018 When the bituminous surfacing was removed to the plan depth of 3 inches on the north side of Broadway, the depth of the existing asphalt surfacing was discovered to be 3 to 4 inches thick, less than the assumed depth of 5 inches. The remaining asphalt depth of 0 to 1 inches thick has been severely damaged by construction of the waterline. This change order pays for the reconstruction of the north side of the road from Centerline (21' from North Face of Curb) from Station 97 +50 to Station 105 +84 plus street approaches on Lily Rd, Girard Rd and Bowman Rd by removing a total 5 inches of existing material and reconstructing the road so the new section consists of 4 inches of compacted crushed surfacing top course, surfaced with 4 inches of Hot Mix Asphalt. The Change Order also pays for placing a full depth patch to match existing thick HMA pavement on the west end of the project constructed by WSDOT when the Broadway bridge over 190 was constructed. Total cost (incl. tax) for this Change Order work is $20,387.00, paid for by the City of Spokane Valley and a Spokane Regional Transportation Council Urban Preservation Grant (SRTC 06 -9) of $641,100 containing Federal Funds. There are sufficient funds in the project budget to cover these costs. The City portion of the project (Schedule A) bid price = $328,234.83 Prior Change Order Cost (CO 1 + CO2) _ $ 14,950.67 Change Order 3 Cost $ 20.387.00 Schedule A Project Cost including Change Order 3 = $363,572.50 15% of Original Contract amount = $ 49,235.22 Remaining Public Works Director Contract Authority after CO2 = $ 34,284.55 Change Order 3 Cost = $ 20,387.00 Remaining Public Works Dkctor Contract &thAty after CO3 = $ 13,897.55 Public Works ect Manager C)8-171 SP I , 65.k Federal Aid Project No.: STPUS - 3846(007) Local Agency Agreement LA -6673 Local Agency Project No.: SRTC 06-9 CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 08-018 )EPARTMENT OF PUBLIC WORKS IROJECT: Broadway Rehabilitation Project - Phase 1 CONTRACT DATE: 9/8/2008 , ONTRACTOR: Red Diamond Construction, Inc. CHANGE ORDER NO: 3 ,APITAL IMPROVEMENT PROJECT NO: 0068 31D NO.: 08 -018 DESCRIPTION OF CHANGES This Change Order pays for the following: Roadway Reconstruction Work per Field Statement 4, from Ste 97 +50 LT to Sta 105 +84 LT : $18,467.00 Full Depth Waterline Patch, Roadway Ex (Inc]. Haul)per Field Statement 5, from Sta 91 +80 RT to 95 +60 RT: 1$ .920.00 Subtotal $20,387.00 Total Amount of this Change Order( Incl. Tax): $20,387.00 SUBSTANTIAL COMPLETION Original Date: 10/24/2008 Prior to this Change Order: 10/24/2008 Including this Change Order: 10/28/200 riginal Working Days: 25 Working Days Added by this CO: 2 Working Days including this CO: 2' CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF SCH A CONTRACT PRICE: ORIGINAL CONTRACT SCH A AMOUNT .......................................................................................... ..........................._$., 328,234 TOTAL PRIOR SCH A CHANGE ORDER AMOUNT $ 14,131 ............................................................................. ............................... CONTRACT SCH A PRICE PRIOR TO THIS CHANGE ORDER (through) ............................. $ 342,365 NET SCH A THIS CHANGE ORDER $ 20,387 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CONTRACT SCH A AMOUNT INCLUDING THIS CHANGE ORDER $ 362,752 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF SCH B CONTRACT PRICE: ORIGINAL CONTRACT SCH B AMOUNT $ 150,749.00 TOTAL PRIOR SCH B CHANGE ORDER AMOUNT ................................. $ 0.00 SCH B PRICE PRIOR TO THIS CHANGE ORDER $. 150,749.00 NET SCH B THIS CHANGE ORDER ..................................................................................................... ............................... $ 0.00 CONTRACT SCH B AMOUNT INCLUDING THIS CHANGE ORDER ............................................... ..............................$ $ 150,749.00 8.6% TAX .................................................... ............................... 12,964.41 CONTRACT SCH B AMOUNT (INCLUDING THIS CHANGE ORDER AND,TAXES ) .... $ 163,713.41 CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 478,983 . . . . . . . TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT .............................................................................. ............................... 14,131 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 493,114 NET THIS CHANGE ORDER $., 20,387 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 513,501 TOTAL TAX (SCHEDULE B + CO 2) ................................................. ..........................._$., 13,784 CONTRACTOR ACCEPTANCE: IDr MAPRI_AM/1/Y y The contractor hereby accepts this adjustment under the terms of the original contract for all work perfomed. RECOMMENDED BY: APPROVED BY: DATE: DATE: DATE: 1 0 V APPROVED BY: DaAd DATE: ATTACHMENTS: CopyofField Statements 4 & 5 ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office, PW Project File COPIES TO: PW Proiect File P. Public Works/Purcham9iCO (9n8noc7) S CITY OF 00^%,M� pdWane ,; o O Valleys Public Works Capital Improvement Program 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhatt@spokanevalley.org FIELD STATEMENT No. 4 Project: Broadway Rehabilitation Project - Phase 1 CIP No.: 0068 Date: October 3, 2008 Issued By: Craig Aldworth, P.E., COSV Project Manager Plan Ref: Plan Sheets 3, 4 & 5 Specification Ref: 5 -04 TOPIC: North Side Road Reconstruction ACTION: When the bituminous surfacing was removed to the plan depth of 3 inches on the north side of Broadway, the depth of the existing asphalt surfacing was discovered to be 3 to 4 inches thick, less than the assumed depth of 5 inches. The remaining asphalt depth of 0 to 1 inches thick has been severely damaged by construction of the waterline. Instead of placing an overlay on the damaged surface it is preferable to reconstruct the north side of the road by removing a total 5 inches of existing material and reconstructing the road so the new section consists of 4 inches of compacted crushed surfacing top course, surfaced with 4 inches of Hot Mix Asphalt. The area of the road reconstruction is from Centerline (21' from North Face of Curb) from Station 97 +50 to Station 105 +84 plus street approaches on Lily Rd, Girard Rd and Bowman Rd. The quantity has been adjusted by removing the waterline patch area paid for under Bid Item B13, 2" ACP Surface Restoration The following work is covered by existing contract unit bid prices: Schedule A Existing Contract Unit Bid Work Bid Item Description Quantity Unit Unit Cost Cost 11 HMA CL 1/2" PG 64 -28 85 TN $83 $7,055.00 15 Crushed Surfacing Top Course 143 TN $27 $3,861.00 Total $10,916.00 Actual payment will be based on truck tickets for actual material installed. k Field Statement No. 2 October 3, 2008 Page 2 The proposed work also includes the following bid item that is not part of the existing contract. The following work is described by the WSDOT Standard Specifications. Roadway Excavation (Incl. Haul) shall be paid for by the stated neatline quantity. The calculation of the quantity is attached. I have inserted a unit price in agreement with the attached recent WSDOT unit bid ranges. Schedule A: New Unit Bid Item Work Prop. Bid Item Description Quanti Unit Unit Cost Cost 41 Roadway Excavation Incl. Haul) 123 CY $30 $3,690.00 Total The work is summarized in the table below. Summa Schedule Work Type Cost A Existing Contract Unit Bid Work $14,777.00 A New Unit Bid Item Work $3,690.00 Total $18,467.00 Please review. If you disagree, please provide justification from WSDOT bid records for an increased price. If you approve I will prepare Change Order 3. 0 JC OF ;!)POR�an�e�� ,;oOV91eys Public Works Capital Improvement Program 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhatt@spokanevalley.org FIELD STATEMENT No. 5 Project: Broadway Rehabilitation Project - Phase 1 Date: October 6, 2008 Issued By: Craig Aldworth, P.E., COSV Project Manager CIP No.: 0068 Plan Ref: Plan Sheets 3 & 4, Trench Section Sheet B3 Specification Ref: 5 -04 TOPIC: Waterline Trench Excavation Station 91 +80 RT to 95 +60 RT ACTION: When the waterline was excavated in this portion of Broadway Avenue the existing pavement depth was discovered to be approximately 7 to 8 inches thick. Two inches have been removed by planing prior to waterline construction. The waterline trench excavation on Sheet B3 calls for patching back with six inches of crushed surfacing top course under a 2 inch Hot Mix Asphalt (HMA) patch below the overlay. The City desires to match the existing pavement depth within the patch in this area. In this area, place 6 inches of crushed surfacing top course (CSTC) on top of the trench backfill to the bottom of existing asphalt. The CSTC shall be paid for under Schedule A, Crushed Surfacing Top Course. Actual payment will be based on truck tickets for actual material installed. Place HMA to match the full depth of the existing asphalt section. The bottom 2 inches shall be paid for under Schedule B , Item 13, 2" ACP Surface Restoration, calculated by neatline, 9 feet wide. The remaining HMA will be paid for under Schedule A, Item 11, HMA Cl. 1/2" PG 64 -28. Actual payment will be based on truck tickets for actual material installed. The removal of excess trench backfill shall be paid for by neatline measurement, 6 inches deep, 9 feet wide, by 380 linear feet for 64 CY, paid at $30/ CY under Change Order 3. Prop. Bid Item Description Quantity Unit Unit Cost Cost 41 Roadway Excavation Incl. Haul 64 CY $30 $1,920.00 Please review. If you disagree, please provide justification from WSDOT bid records for an increased price. If you approve I will prepare Change Order 3.