Loading...
ZE-48-71 (2)IS L ) J o u-tz.SCeob Ave 4.5 o T -t be "T ‘w& pL_A pJ �F 1v.)Tcr.-1 \ iuti) QL�.. r C . X%S Vtvh Suit s C P+ -MUA-5 "To TN-c Gar4 n YL TrV'ur>'�J./ � �. `o W * e Ot) -9 +'"G Tom.` ANl ISLoc..1 7Ci off. C W44)c 6 -p tJta-c ? r tUs gcs uL.'tvv1 uo SITS 4Nn 1t) sT; a> A. wrt to q 6 To - 4 -9. A_&&f rre;l - r ) •ok) S) I +vtrnw- wncri+rS tA,rLC. - be 5oLe-LT OCTOBER AGENDA SPOKANE COUNTY PLANNING COMMISSION Time: Place: ZONE CHANGE Friday, October 29,_1971, 9:00 A.M. Assembly Room, County Court House 3. (ZE 48 - 71, Agricultural Sub. &Res. Industrial to Residential Mobile Home (Postponed from September 24,11971) a. Location: - Section :, Township 5 N , Range 4, E.W.M. BeginSin 150 feet sou and 125.7 west of the NE corner of Government Lot 3 in 18; thence South 526.5 feet; thence West 825 feet; thence North 163.78 feet; thence West 488 feet more or Tess to the East line of Park Road; thence North to a point 307 feet South of the North line of said Government Lot 3; thence East 180 feet; thence North 165 feet; thence East 120 feet; thence South 8 feet; thence East to the point of beginning. b. Applicant: Brent Homes West, Inc: East 14208 Sprague Avenue Spokane, Washington c. Site Size: Approximately 11 acres v d. Existing Zoning: Agricultural Suburban, established July 15, 1958 and December 29, 1959. Restricted Industrial (Sly 10 feet of property), established April 23, 1958 e. Proposed Zoning: Residential Mobile Home Zone f. Proposed Use of Property: Trailer Court g. Application of Zoning Provision: Chapter 4.21, Section 4.21.030 - c. w Pc /• c c CSS r 1QtnM L %.L ' J'i h t •0-�e C N t0 C-� sir t.S StrezT) b ? L o lvc pewit ALs nnif2 ;a [ ktlt. urn ! M¢t< ec' 3 r.ceut 7cmowTS - ' flan u } TELEPHONE NO.: 456 -2274 c s Cs. AL. KI 7/ Bs7 76 esr07,9re c 4 ,000 °- ZONE CHANGE ZE -4 8 -71 - AGRICULTURAL SUBURBAN AND RESTRICTED INDUSTRIAL TO RESIDENTIAL MOBILE HOME: BRENT HOMES WEST, INC. Planning Commission Recommendation: Continue to the October hearing to allow the applicant to submit a revised development plan providing for appropriate screening from adioinina residential properties, control of storm drainage, and Possible elimination of one access point on Ella Road. A. General Data: MINUTES September G4, 1971 1. Location: Section 18,Township 25 N.,Range 44,E.W.M, Beginning 150 feet south and 125.7 feet west of the NE corner of Government Lot 3 in Section 18; thence South 526.5 feet; thence West 825 feet; thence North 163.78 feet; thence West 488 feet more or less to the East line of Park Road; thence North to a point 307 feet South of the North line of said Government Lot 3; thence East 180 feet; thence North 165 feet; thence East 120 feet; thence South 8 feet; thence East to the point of beginning. 2. Applicant: Brent Homes West, Inc. East 14208 Sprague Avenue Spokane, Washington 3, Site Size Approximately 11 acres 4. Existing Zoning: Agricultural Suburban, established July 15, 1958 and December 29, 1959. Restricted Industrial (Sly 10 feet of property), established April 23, 1958 5. Proposed Zoning: Residential Mobile Home Zone 6. Proposed Use of Property: Trailer Court 7. Application of Zoning Provision: Chapter 4.21, Section 4,21.030 -8- ZONE CHANGE MINUTES October 29, 1971 ZE -48 -71 - AGRICULTURAL SUBURBAN AND RESTRICTED INDUSTRIAL TO RESIDENTIAL MOBILE HOME ZONE: BRENT HOMES WEST. INC. (Continued from the September hearing) Planning Commission Recommendation: Approve to Residential Mobile Home Zone. subject to the followfna conditions: A. Conditions: 1. Dedication and improvement to Spokane County standards of the West 5 feet of the advertised property alono Park Road for R /W. Improve- ments shall include curb. sidewalk. drainage control. and paving to existing oil. 2. Approval of access points by the Spokane County Engineer's Office. The submitted design does not contemplate the use of the Springfield Avenue stub street. 3. Approval of a trailer court design for the advertised property by the Zoning Adjustor. (Such application shall be made within six (6) months. Such design shall be in substantial conformance with the amended development plan reviewed at the October, 1971 hearing. (The lots designated "EA" and "EB" shall be eliminated from the final plan.) The Zoning Adjustor shall also review the density of the project and provisions for landscaping, screening, and drainage control. 4. Sight- obscuring fencing shall be incorporated with the landscape treatment along the north and east boundaries of the trailer court project. 5. Provisions shall be made for fire hydrants in accordance with the requirements of the Spokane Valley Fire Marshal. 6. Approval of sewage disposal facilities by the Spokane County Health District. B. Reasons: The advertised property cordorms to the locational criteria repeatedly suggested by the Commission for evaluating high density residential developments; namely: a) Its location on a major arterial (Park Road). b) Its location on the edge rather than toward the interior of a residential neighborhood. - 4 - (contd.) ZE -48 -71 - AGRICULTURAL SUBURBAN AND RESTRICTED INDUSTRIAL TO RESIDENTIAL MOBILE HOME ZONE (contd.) c) Its proximity to shopping and other community facilities (Sprague Avenue). 2. The advertised parcel is situated between a vacant property zoned Restricted Industrial and residential properties fronting on Broadway Avenue. The Planning Commission is of the opinion that the advertised parcel is not conducive to single family residential or multiple family development because of its proximity to industrial properties to the south and west. The Planning Commission also contends that industrial development of the subject property would be more detrimental to the residential properties fronting on Broadway Avenue than mobile home development. 3. The Planning Commission is of the opinion that required site improve- ments such as landscaping, fencing, drainage control, etc. would lessen the trailer court development's impact on adjoining residential properties. C. General Data: Section 18,Township 25 N.,Range 44,EWM. Beginning 150 feet south and 125.7 feet west of the NE corner of Government Lot 3 in Section 18; thence South 526.5 feet; thence West 825 feet; thence North 163.78 feet; thence West 488 feet more or less to the East line of Park Road; thence North to a point 307 feet South of the North line of said Government Lot 3; thence East 180 feet; thence North 165 feet; thence East 120 feet; thence South 8 feet; thence East to the point of beginning. 1. Location: 2. Applicant: 3•. Site Size: 4. Existing Zoning: 5. Proposed Zoning: 6. Proposed Use of Property: 7. Application of Zoning Provision: - 5 - Brent Homes West, Inc. East 14208 Sprague Avenue Spokane, Washington Approximately 11 acres Agricultural Suburban, est. July 15, 1958 and December 29, 1959 Restricted Industrial (Sly 10 feet of property), established April 23, 1958 Residential Mobile Home Zone Trailer Court Chapter 4.21, Section 4.21.030 SEPTEMBER AGENDA TELEPHONE NO.: 456 -2274 SPOKANE COUNTY PLANNING COMMISSION Time: Place: ZONE CHANGE Friday, September 24, 1971, 9:00 A.M. Assembly Room, County Court House gio ea ?hex 5. ZE- 48 -71, Agricultural Suburban & Restricted Industrial to Residential Mobile Home a. Location: Section 18, Township 25 N., Range 44, E.W.M. Beginning 150 feet south and 125.7 feet west of the NE corner of Government Lot 3 in Section 18; thence South 526.5 feet; thence West 825 feet; thence North 163.78 feet; thence West 488 feet more or less to the East line of Park Road; thence North to a point 307 feet South of the North line of said Government Lot 3; thence East 180 feet; thence North 165 feet; thence East 120 feet; thence South 8 feet; thence East to the point of beginning. b. Applicant' Brent Homes West, Inc. East 14208 Sprague Avenue Spokane, Washington c. Site Size: Approximately 11 acres d. Existing Zoning: Agricultural Suburban, established July 15, 1958 and December 29, 1959. Restricted Industrial (Sly 10 feet of property), established April 23, 1958 e. Proposed Zoning: Residential Mobile Home Zone f. Proposed Use of Property: Trailer Court g. Application of Zoning Provision: Chapter 4.21, Section 4.21.030 5 o RT I_ =lad ) RIGHT OF AY DEED 7611090203 292 PAGE 553 IN THE MATTER of the PARK ROAT' No. 129 -S KNOW ALL MEN BY THESE PRESENTS, That ,T.v /w /7,o /, (0/ • and _/4 ' /a f ( ., % �L v� , hi w o f th County of Spokane, in the State of Washington, in consideration of the benefits and other valuable considerations, and the sump of One and no /100 Dollars, paid them by the County of Spokane, the receipt whereof is hereby acknowledged, have granted, bargained, sold and conveyed, and by these presents do grant, bargain, sell and convey unto said Spokane County, the following described parcel of land, situated in Spokane County, in the State of Washington, to-wit: #i;t }14, -lam - foot 40 c'doh.and-par.allrl.with ----- _lino nfsairl - 4e?d-e o-w :t -' the- prarnrty Q1. H r ntar _iiesvithn..SaitL i•ifbot -sEr -as -stw eyeelr-reeeeded- ftr-the,-abocc-merrtiorred-road, TM °1r.,n.. +n- Ire- fieiei -ne -otr +keo€4'3e4t4- &t-44ierc f as --i-le in - Eke- of4'4ee pC 3 FetwA�r_ggiaaeety-e.ver a tack- ftegteas• The West five (5) feet of that Portion of : 18. Township 25 Nnrrb, Range 44 Pncr W At docrrihorl nc fnrrn„c Beginnin 150 south and 125.7 feet west of the NE corner of Gnvornmenr Lot 1 in said Section 18: thence South 526.5 feet: thence West 825 feet: thence North 163.78 feet; thence West 488 feet more or less to the East line of Park Road: thence, North to a point 307 feet South of the North line of said Government I.ot 3: thence East 180 feet; thence North 165 feet; thence East 120 feet: thence South 8 feet: thence East to the point of beginning. are ?a r r -fl -., Tee Fvcrns. fly C vv =now cn nW ifeaswgr day of March 19 76 . (NOTE: Form 6558 n ZF— /.R •71 JF ':FILtU_U$ NkGUti000 RERUEStOF �" ' lI y tt !Li 3 3 c9T Isii ,VERHCH W.DHLAWAUDiT0,4, coPK±ua ttpmir:we.cic. DEPUj}Y RP; count II^t'v.. xxx of Section 1R , Township 25 North, Range. 44 , E.W.M. TO HAVE AND TO HOLD the same, unto the said Spokane County for the purposes of a public road forever. In witness whereof We have hereunto set our hands and seals this 9th r AIJ „,/` / /l . /AC,/ MAO If married, must be signed by both husband and wife.)) Date: • A G R E E M E N T The undersigned, being the Developer of a Mobile Home Park as approved Planning Commission under ZE 48 -71, hereby County Planning himself, by the r and Y agrees for himself, his heirs, and 1 . Upon development of the second phase of the proposed Mobile Home Park along Park Road, that he will, at his expense, cause the improvement of Park Road by grading, draining, construction of cement concrete curb crete pavement and other work in connection therewith in accordance with Plans and Specifications sidewalk, asphalt con - prescribed by the Spokane County Engineer; o 2. Upon demand of the County Engineer, pay into the County amount, as estimated by the County Engineer, ments as set forth in Y Road Fund the then a ments (1) above, as his of the cost participation the improve - County Road improvement share of the cost and project on Park Road, participation in This Agreement under ZE 48 -71 Zone Change ZE being in consideration for approval of the Phase 1 site development and in lieu of immediate improvement of Park Road as required b a i. plan y the Wm. Fergen', Building Official Turner /wale',- "Circle J" Mobile Home :Park- J. Olinger April 26 . • 77 a t` The improvements required' in the'approval'of-the subject' site have been checked' and are not in compliance.with the plan.' It is.recommended that no 'further occupancy,... be these' requirements -- are 'satisfied, and that the permits previously " issued be suspended pending - compliance. • 1• k LN -6 r at\LCe. -- 0 fts1 c 9 ' • ‚7- t t. 0 7 9\ -/- ta e 9 N!L 40" The undersigned, being the Developer of a Mobile Home Park as approved by the Spokane County Planning Commission under ZE 48 -71, hereby agrees for himself, his heirs, and • assigns, to �7i7�rN- �a2coN2 /z-¢�— _ a-0 u-e-c- 1. Upon development of the second phase of the proposed Mobile Home Park along Park Road, that he will, at his expense, cause the improvement of Park Road by grading, draining, construction of cement concrete curb, sidewalk, asphalt con- crete pavement and other work in connection therewith in accordance with Plans and Specifications prescribed by the Spokane County Engineer; or 2. Upon demand of the County Engineer, pay into the County Road Fund the then current amount, as estimated by the County Engineer, of the cost for the improve- ments as set forth in (1) above, as his share of the cost and participation in a County Road improvement project on Park Road. This Agreement being in consideration for approval of the Phase 1 site development plan under ZE 48 -71 and in lieu of immediate improvement of Park Road as required by the Zone Change ZE 48 -71. Date: /// / // iL�� ) ( Developer: 0,„.0 & �,� �✓ 0 4 . 1 / e s r £p /E/ ee A G R E E M E N T The undersigned, being the Developer of a Mobile Home Park as approved by the Spokane County Planning Commission under ZE 48 -71, hereby agrees for himself, his heirs, and .assigns, to 1. Upon development of the second phase of the proposed Mobile Home Park:along .Park Road, that he will, at his expense, cause the improvement of Park Road by grading, draining, construction of cement concrete curb, sidewalk, asphalt con- crete pavement and other work in connection therewith in accordance with Plans and Specifications prescribed by the Spokane County Engineer; or 2. Upon demand of the County Engineer, pay into the County Road Fund the then current amount, as estimated by the County Engineer, of the cost for the improve- ments as set forth in (1) above, as his share of the cost and participation in a County Road improvement project on Park Road. This Agreement being in consideration for approval of the Phase 1 site development plan under ZE 48 -71 and in lieu of immediate improvement of Park Road as required by the Zone Change ZE 48 -71. Date: Developer: A G R E E M E N T SPOhANE COUNTY COURTHOUSE Mr. Theodore Batz N. 623 Ella Road Spokane, WA 99206 Dear Mr. Batz: We have your letter expressing concern about changes to the drainage pattern in your area. Someone from this office will contact you soon to discuss this matter so that we fully understand what your concerns are. Thank you for writing. You will hear from us soon. Sp il ' m y'l•g'i k , I Cie );,men SIl*0 ataga€ ,WA9nXNGTOY 99201 February 2, 1976 To rs ' Robe Turner; Spokane County Engineer CD() (D •n ° Cco..) A C T ) i , fe-e /-1-1 Cc,acci2.N 430Vr 1)/2 in- fl66f. At+.D T2nI t rc R. p61-+2-jC 2ron1C crp16A/thL at icaee i 2 .2Lc 0 E LA , DEVCCp LAMAS r0 50 ' 1 /7C4'✓ 136 -F ate E peen i ro ca,sr,24 issubo /iAKC 5 u @ D R /A.4 -6,C /S 7//GLf/,OeD 0 2J e. OFFICE OF COUNTY ENGINEER ROBERT S. TURNER COUNTY ENGINEER Mr. Robert Turner, P.E. Spokane County Engineer Spokane County Court House Spokane, WA 99201 RE: Zone Change ZE- 48 -71, 11 -Acre Tract Bounded by E. Broadway, Valleyway, Ella Road and Park Ave. Dear Mr. Turner: gZ 4.06061 N. 623 Ella Road Spokane, WA January 28, 1976 I am a resident of Spokane County and herewith express my concern for maintaining adequate drainage facilities across my property. A natural swale runs across my property which provides the natural native drainage for the area east of Ella Road to Vista, and between Dick and Broadway Avenue. This runoff drains across my property to the west, across Park Ave., and eventually into the local gravel borrow source west of Park Ave. This natural drainage is very critical to the surrounding neighborhood, the growing vehicle and pedestrian traffic on Ella, and especially my garage, gardens and home. The heavy runoff of the Winter of 1968 -69 highlights my concern for the provision and maintenance of adequate drainage for the area. It is understood that the intent is to build a three -foot high embankment across the swale. This would necessitate the provision and maintenance of an 18" culvert under this embankment through to Park Avenue. • CI am requesting that-you don`tactme and •review - this7a_rea with me prio r_ to _approving'cons.tructiori'acro §s this natural drainage ' swale. Sincerely, Theodore Batz .arbt Ca d i ctk .58.4 L cuss Sw«,(e_ 7re'? romN 0 0 p '11 SB.(o5 L OW c err M -m 58. ore_ rod s L4 L0t..3 tco# e cSir octo` �IZ 60. JAMES D. OLINGER AND JANNETTE C. OLINGER KNOWN ALL MEN BY THESE PRESENTS, that we, & CIRCLE J MOBILE HOME PARK of Spokane, Washington, as principal, and NATIONAL SURETY CORPORATION a corporation organized and existing under the laws of the State of WASHINGTON and authorized to transact a surety business in the State :of Washington, as Surety, are held and firmly bound unto the COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON, as Obligee, in the penal sum of TWENTY TWO THOUSAND THREE HUNDRED NINETY TWO ($22.392) DOLLARS, lawful money of the United States of America, for the payment of which, well and truly to be made, the Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. SIGNED, SEALED AND DATED this 19th day of OCTOBER , 1976. WHEREAS, the said Principal is the owner of a tract of land in Spokane County divided into lots and known as CIRCLE J. MOBILE HOME PARK being platted in Section 18 , T. 25 N., R 44 E.W.M. Said County of Spokane has required that a bond be furnished in an amount sufficient cost of completion of required paving of parking and driveway areas and landscaping as indicated on the approved development plan not later than 1977 unless said date be extended at the option of the Zoning Administrator.. If work is completed as stated, the County will notify the Bonding Company. And ' Surety hereby waives any right to release from this obligation by reason of such extension and performance time without notice. NOW, THEREFORE, if the said PRINCIPAL shall comply with the above requirements of Spokane County, then this obligation shall be null and void, otherwise to remain in full force and effect, until such requirements have been complied with, when this bond shall be APPROVED AS TO FORM puty Prosecuting Attorney` 3605 -15 (H0)— Np-1 -73 4% terminated. Princ pale r .kt� (• -. to pay the the required October 19. NATIONAL SURETY CORPORATION Surgty (Attorney-in-fact) H. BROWNE, Asauta t Sec-ratan and �. t Inter- office Communication To Wm. Fereen, Riril? fficial From Turner /Smale � CriP / ns Form.327 —CR .• OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Data April 26 19 _ Subja& "Circle J "' Mobile Home Park — J. Olinger The drainage improvements required in the approval of the subject site have been checked and are not in compliance with the plan. It is recommended that no further occupancy be allowed until these requirements are satisfied, and that the permits previously issued be suspended pending compliance. 7 RIGIIT OF WAY DEED IS THE MATTER of the KNOW ALL AMEN BY THESE PRESENTS, and l y o r •7 i� r Cvn;�.. Ter., Cv.ni% 4 7— 14 �C, down Trfdamaft Of Section TO HAVE AND TO HOLD the sane, unto forever. In witness whereof we day of March (NOTE: If married, must be signed Form 655. ZE -48 -71 JF have hereunto set 19 by both husband and 7611090203 PARK-ROAD D That ,To iv, (72:_, in the State of' Washington, in consideration of the benefits and other valuable considerations, and_ the s+ni of One and no /100 Dollars, paid them by the County of Spokane, the receipt whereof is hereby acknowledged, have granted, bargained, sold and conveyed, and by these presents do grant, bargain, sell and convey unto said Spokane County, the following described parcel of land, situated in Spokane County, in the State of Washington, to-wit: _ -6t p,- cif - aril• € a44e -.o�- - sJAa_at.�ad�.u•�].1e�.ui'H - - - - - -- 1Lae_a£ssi4t —sex r yP:npf x.'.L r...L the f ,+tozazl3vs yitLth. SairL • f e.t. -sty.i esnrrc yed reeerrleci- fQr- .hr-abvee- nerri...,ed rant as- shonTrirr- 4hrfieiei-na6ee- arch - etr+he- o-ff4e qtr- t44eecof as -File in- thebf4'§ee -ei =Pie- s4eple e femAT- Sigitieerr-e m4- aeress The West five (5) feet of that portion gf 18, Township 25ANnrrh, Rango 44 Foci to M dog.., - ti, e.7 aoll.,,.,o Beginnin 150 f eet south and .12 7 feet west of the NE corner of Government T.n in said Section 18: thence - South 52'6.5 feet: thence West 825 feet: thence North 163.78 feet; thence West 488-feet more or less to the East line Park Road; thence, North � a point 307 feet of the North line of said Government Lot 3: thence .t.- East 180 feet; North 165 feet; thence East 120 feet: thence South 8 feet; thence East to the point of beginning. . 18 :VERNON W:oHLANO:AUdITOa cJ4K ! Ur.Opft87t ;WA.cti.: BE(41,1Y�' R P 9 0.u , Township 25 North, Range. 44 , E.W.M. the said Spokane County for the purposes of a public road OUr hands and seals this 9th v im +Crv. (SFAX) YFI: 292 PACE . 553 No. 129 -S , his wife, of the County of Spokane, F:ILEU_UR NgtiUFtU6U. REQUEST-OF u uuuuy >;rigineer Nui 3 3 2.91M 4 XXX (SEAL) // ss-ei II - t -c) Data December 19 Form 327 -C R OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON 19 77 Inter - office Communication T. Building Dept. and Pla�� De pt. From Engineers/ V. Smale Sub** Circle J. Mobile Home Park - Olinger ZE 48 - 71 We have checked the subject property for conformance with the approved drainage plan. The drain- age improvement does not conform to the approved plan as submitted by the developer, however, it appears, from surveyed elevations and inspection during the heavy rains of December 14 and 15, that the grading and elevations of improvements as they are as of this date will not substantially -block the drainage from passing through the site, there is localized ponding on the property, but this is generally in the unimproved earth areas. The developer has been very obstinant and uncooperative in preparing and submitting a drainage plan and in the completion of the improvements in accordance with the plan. Even after being personally advised that the grading was not correct, he proceeded with paving. The dffficient areas in the grading and paving have been adjusted and should now function and while not really satisfactory seem passible. The performance bond may be released as pertains to the drainage requirement. AG RE EMEtiT The undersigned, being the Developer of a Mobilettome Park as approved by the Spokane County Planning Commission under ZE 48 -71, hereby agrees for himself, his heirs, and assigns, to 1. Upon development of the second phase of the proposed Mobile Home Park along Park Road, that he will, at his expense, cause the improvement of Park Road by grading, draining, construction of cement concrete curb, sidewalk, asphalt con- crete pavement and other work in connection therewith in accordance with Plans and Specifications prescribed by the Spokane County Engineer; or 2. 'Upon demand of the County Engineer, pay into the County Road Fund the then Current amount, as estimated by the County Engineer, of the cost for the improve- ments as set forth in (1) above, as his share of the cost and participation in a County Road improvement project on Park Road. This Agreement being in consideration for approval of the Phase 1 site development plan undei ZE 48 -71 and in lieu of immediate improvement of Park Road as required by the Zorie Change ZE 48 -71. :7 Date': j % 7' i1�� (- , Developer. SPOMANC COUNTY COURT HOUSE December 23, 1977 Mr. Carlis Landa Pacific 1st Federal Savings & Loan West 726 Riverside Avenue Spokane, WA 99201 ,ARE: ZE 48 -71 CIRCLE J. MOBIL HOME PARK Dear Mr. Landa: Attached for your information is a copy of Memo to the Building Department and Planning Department regarding the approval of the drainage improvement in Circle J. Mobil Home Park. The paving has been done, however it is up to the owner to signify acceptance of this work. Very truly yours, Robert S. Turner, P.E. Spokane County Engineer Verril /Smale Assistant Office Engineer n s cc: Inland Asphalt Company Planning Department !.51" 1 ( l 1 COUNTY ENGINEER ROBERT S. TURNER COUNTY ENGINEER SYO KSATE 'WAS Nor 1)92(11 SPONANC COUNTY COURT NOUSC Mr. James D. Olinger North 4912 Sipple Road Spokane, Washington 99206 BJF:jmw CC: Jerry Neal, Prosecutor's Office Verril Smale, Assistant, Engineer's Office BUILDING CODES DEPARTMENT BUILDING —SIGN BOARD—GAS—HEATING—PLUMBING 811 North Jefferson Street — Spokane, Washington 99201 Telephone: 456 -3675 BILL J. FERGEN, Director Dear Mr. Olinger: We received a copy of the letter from the Spokane County Engineer's office addressed to you, relating to your Circle J. Mobile Home Park which is located east of Park Road. We have been notified by the County Engineer's office to wittald any further occupancy approvals until the required drainage improve- ments have been completed to the requirements of the County Engineer.. Therefore, since the Land Use Permit has been issued to you, subject to adherence of all conditions of Zone Change ZE 48 -71, we request that no further occupancies of your Mobile Home Park be allowed until you have complied with the County Engineer's requirements. Yours truly, May 4, 1977 Bill J. ergen Building Codes Director A G R E E M E N T The undersigned, being the Developer of a MobileHome Park as approved aounty Planning Commission under ZE 48 -71, hereb C ounty s, an imsl, by the Spokane an hereby agrees for and himself, his heirs, and 1 . Upon development of the second phase of the proposed Mobile Home Park along Park Road, that he will, at his expense, cause the improvement of Park Road by grading, draining, construction of cement concrete curb crete pavement and other work in connection therewith in accordance with Plans and Specifications prescribed by sidewalk, asphalt con- y the Spokane County Engineer; or 2. Upon demand of the County Engineer, pay into the Count current amount, as estimated by the County Engineer, ments as set forth in of the improve- Y Road Fund the then a County 1) above, as his share cf the cost for the i In y Road improvement project on Park Road. e cost and participation in This Agreement being in c onsideration for approval of the Phase under ZE 48 -71 and in lieu of immediate improvement of Park Road as required b Zone Change ZE 48-71. 1 site development plan y the Date: Developer: