Loading...
ZE-13-83May 12, 1983 TO: FROM: SUBJECT: Gentlemen: 1) SPOKANE COUNTY COUNT HOVSC 2) CzE- f3 -83, Location: Proposal: Action: 54 t• S PLANNING DEPARTMENT PUBLIC WORKS BUILDING N. 811 JEFFERSON STREET PHONE 488 -2274 SPOKANE. WASHINGTON 89201 Board of Spokane County Commissioners Steve P. Horobiowski, Zoning Administrator Hearing Examiner Committee Actions of May 6, 1983. IREr' *tor or ,nun1i tn6lniti I itAA Y20!983 On May 6, 1983, the Hearing Examiner Committee met at 9:00 A.M. to consider eight new zone reclassification applications. Members present: Mr. McVicker, Chairman; Mrs. Myers and Mr. Kennedy. Following are the applications in sequence and the action taken by the Committee. If not appealed, these decisions will become final on May 23, 1983. All Findings and Order for this hearing were signed on May 12, 1983. (contd.) ZE- 10 -83, Multiple Family Suburban to Residential Office and CUE -7 -83, Conditional Use Permit for a Beauty Salon: Loosmore, Jr. (Continued from the April 7, 1983, Hearing) Location: Generally located on the north side of Main Avenue and on the east side of Raymond Road in Section 17- 25 -44. Proposal: Beauty Salon. Action:0 Approval to Residential Office Zone. (Vote: 3 - 0) The Zoning Adjustor's decision was for Approval of the Conditional Use Permit in accordance with Sections 4.07A.140 -( and 4.24.420 of the Spokane County Zoning Ordinance and subject to the Conditions attached to the zoning approval for File ZE- 10 -83. Agricultural Suburban to Residential Office: Horn ti Generally located on the south side of Broadway Avenue, west of Ella Road in Section 18- 25 -44. Office. Approval. (Vote: 3 - 0) I AGENDA, MAY 6, 1983 SPOKANE COUNTY HEARING EXAMINER COMMITTEE Place: 9:00 A.M. Broadway Ce North 721 ZONING APPLICATIONS WI RECESS FROM 12:00 NOON PRIOR TO THE 5:00 P.M. BY THE CHAIRMAN OF THE LEGAL DESCRIPTIONS AND PLANNING DEPARTMENT'S Proposed Use: Site Size: Applicant: fi r '7 1 0 SNIA • • in 4;1 t n1,i1' p r , TELEPHONE NO.: I APR2 51983 ntre Building, Seconcrw..s -- Jefferson Street, Spokane LL BE HEARD IN THE FOLLOWING ORDER. THE HEARING EXAMINER COMMITTEE WILL, TO 1:30 P.M. FOR LUNCH AT A PLACE TO BE ANNOUNCED. ITEMS NOT HEARD ADJOURNMENT, WILL BE CONTINUED TO THE NEXT AVAILABLE DATE 'AS ANNOUNCED 4 HEARING EXAMINER COMMITTEE. PROJECT DETAILS FOR THESE PROJECTS ARE ON FILE AND AVAILABLE IN THE OFFICE. 456 - 2205 7; A. ZONE RECLASSIFICATIONS, 1. ZE -10 -83 MULTIPLE FAMILY SUBURBAN TO RESIDENTIAL OFFICE - and CUE -7 -83 CONDITIONAL USE PERMIT FOR A BEAUTY SALON (Continued from the April 7, 1983, Hearing) (Generally located on the north side of Main Avenue and on the east side of Raymond Road in Section 17- 25 -44.) • Proposed Use: Beauty Salon. The Spokane`County Zoning Ordinance Sections 4.07A.140 -(g) and 4.24.420 allow a beauty, salon as a Conditional Use in the Residential Office Zone. Site Size: 14,210 Square Feet Owner /Applicant: EastA10007 - I8thRAvenue Spokane, WA ,99206'° note: This application is a' request for two separate actions. v.. The first, a zone change, will be heard by' the,Hearin9 Examiner; Committee..,, second, a Conditional Use Permit, for a beauty; salon,'wili be before the Zoning Adjustor. The two items be heard concurrently by both Boards. 2. ZE -13 -83) AGRICULTURAL SUBURBAN TO RESIDENTIAL OFFICE (Generally located on the south side of Broadway Avenue, of Ella Road in Section 18- 25 -44.) Office Approximately BILL HORN East 5219 - 4th Avenue Spokane, WA 99206 .26 Acre ! . PR AGUE Ave. Y _ D r 4 l ;5Po•rone /+M l N.1 PP' CATL.LDO (.• AVE . r L f 1 4 L Q al• 41 OI ?: Z j >- :: • Q :I DESMET r l 4 �.. •: : • 'Slow 0 I H,> 4"q O N : 1000 I. GENERAL INFORMATION STAFF REPORT DATE: May 6, 1983 TO: HEARING EXAMINER COMMITTEE FROM: PLANNING DEPARTMENT STAFF SUBJECT: ZONE RECLASSIFICATION NUMBER: \ZE -13 -83 APPLICANT: BILL HORN PROPERTY OWNERS: Horn, Norton, Bushee, and Clow REQUESTED ZONING: Residential Office EXISTING ZONING: Agricultural Suburban (established in 1959) PROPOSED USE: Office PROJECT LOCATION: The site is generally located in the Spokane Valley at the southwest corner of Broadway and Ella Road. II. SITE PLAN INFORMATION SITE SIZE: Approximately 11,480 Square Feet SITE CHARACTERISTICS: Contains existing residence with attached garage; residence and driveway facing Broadway with fenced yard. Within PSSA. NEIGHBORHOOD CHARACTER: Mixed uses in character with established residences along Broadway, apartments, school, and vacant lands. AGRICULTURAL SUMMARY: Committed to URBAN use by Soil Conserva- tion Service, U. S. Department of Agriculture. 10 (contd.) II. SITE PLAN INFORMATION (continued) ZONING: North Agricultural Suburban, established, 1957 Residential Office, established, 1979 East Agricultural, established, 1948 Residential Office, established, 1978 Multiple Family Suburban, est. 1971 West Agricultural Suburban, established, 1959 South Agricultural, established, 1948 Agricultural Suburban, established, 1957 Residential Manufactured Home, est. 1971 LAND USE: Site North East West South 1981 COMPREHENSIVE PLAN DESIGNATION: NUMBER OF EXISTING BUILDINGS: NUMBER OF BUILDINGS PROPOSED: Total Percent of Site Covered 14.5 PARKING REQUIRED: PROVIDED: BACKGROUND /ANALYSIS ZONE RECLASSIFICATION NO.: ZE -13 -83 Residence Residence, Residence, Residence Residence, housing Junior High School, Apartments Vacant, and Able Claims Service Manufactured Home Park and Ware- INDUSTRIAL 1 Residence 1 to Remain 6 Spaces 6 Spaces a) COMPREHENSIVE PLAN - The Comprehensive Plan recognizes that small scale activities related to industrial uses such as cafes, service stations, parts and service stores would be found in Industrial categories. The Text further states residential development, shopping centers and most recreational uses would not be appropriate within Industrial areas. Section 7.2.1 suggests changing the intensity of land uses as a technique of buffering. This project would serve that purpose. 7/ (contd.) III. BACKGROUND /ANALYSIS (continued) b) SITE CONSIDERATIONS - Broadway is four lanes; parking access from Ella. Zoning Ordinance requires fencing and landscaping of site to mitigate its impacts to adjacent properties (Condi- tions have been attached). c) HISTORY OF OTHER LAND USE ACTIONS - Residential Office, Residential Manufactured Home, Multiple Family Suburban, Local Business, and Commercial zoning have occurred within this general area. d)0 CONCLUSION - Unless new information is presented at the public hearing to warrant reconsideration, the staff finds that this proposal is feasible in that compliance with the Comprehensive Plan can be demonstrated, and that with the attachment of condi- tions, compatibility with surrounding properties can be assured. IV. AGENCIES RECOMMENDED CONDITIONS, IF APPROVED a) COUNTY PLANNING DEPARTMENT ZONE RECLASSIFICATION NO.: ZE -13 -83 1. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. 2. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Variations when approved by the Zoning Administrator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. 3. All current standards of the Residential Office Zone, as amended, shall be complied with in the development of this site. 4. Landscaping shall be provided for this site, in conformance with Standards as identified in Section 4.07A.120 Land- scaping. 5. Applicant shall comply with '208' recommendations concern- ing stormwater runoff and provide necessary landscaping for runoff. lot (contd.) a) COUNTY PLANNING DEPARTMENT (continued) ZONE RECLASSIFICATION NO.: ZE -13 -83 6. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners Resolution #77 -1392 be initiated by the project applicant within thirty (30) days of final disposi- tion of this application, and prior to any on -site improve- ments, or file appropriate documents to the effect that the NOTICE OF ACTION is waived in accordance with Spokane County Commissioners' Resolution #82 -0458 dated May 4, 1982. 7. That an ornamental masonry fence (or as approved by the Planning Director) 42 inches in height be provided along the periphery of the parking area adjoining any residential zone. b) COUNTY ENGINEERING DEPARTMENT 1. Access permits for approaches to the County Road System shall be obtained from the Spokane County Engineer. 2. Applicant shall improve Ella Road in a manner consistent with Spokane County TYPICAL roadway section No. 1 minimum paving width Access Standard. 3. Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plans prior to the issuance of a building permit on the property. 4. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on -site sewage system plan and surface water disposal plan for.the entire project prior to the issuance of any building permit on the property. 5. A parking plan and traffic circulation plan shall be sub- mitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or travelled by vehicles. 6. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 7. The construction of the road improvements stated herein shall be accomplished as approved by the Spokane County Engineer. !3 (contd.) b) COUNTY ENGINEERING DEPARTMENT (continued) 8. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction, and other applicable County standards and /or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of con- struction, unless otherwise approved by the County Engineer. 9. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners Resolution No. 80 -1592 as amended. c) COUNTY UTILITIES DEPARTMENT 1. Pursuant to the Board of County Commissioners Resolution No. 80 -0418, the use of on -site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and .subject to specific application approval and issuance of permits by the Health District. 2. The owner, his heirs or successors shall join and partici- pate in any petition or resolution which purpose is the formation of a utility local improvement district (ULID) pursuant to RCW Chapter 36.94, as amended. The owner, his heirs and successors shall further agree not to oppose or protest any legal assessments for any utility local improvement district (ULID) established pursuant to RCW Chapter 36.94, as amended. 3. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County. d) COUNTY HEALTH DISTRICT I* ZONE RECLASSIFICATION NO.: ZE -13 -83 1. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of UTILITIES, Spokane County. (contd.) d) COUNTY HEALTH DISTRICT (continued) 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an individual on -site sewage system may be authorized. 4. Water service must be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social and Health Services. 6. Use of private wells and water systems is prohibited. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. COUNTY BUILDING AND SAFETY DEPARTMENT 1. The site is located in Fire District #1. 2. Mains and hydrants to be installed, in accordance with the Spokane County Department of Building and Safety. 3. Reclassification of an existing building shall require an application for change of occupancy permit, and sub- sequent inspection for approval. f) WATER PURVEYOR g) 1. This proposal is located within the Washington Water Power service area, and arrangements have been made to serve this project. COUNTY AIR POLLUTION CONTROL AUTHORITY 1. Require that dust be controlled during all phases of the project. 2. Also, that all parking areas be paved and kept clean. ZONE RECLASSIFICATION NO.: ZE -13 -83 OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON _Q�2tZij. .1.5 _ Spokane County Planning Department County Engineer's Department Imee u Conditions of Approval -Zone Change---N _ _7 _I5_ X53-- - Applicant's Name f/02N Section / Township ; 5__N, Range c/LEWM The following "conditions of approval" for the above - referenced zone change are submitted to the Spokane County Hearing Examiner Committee for inclusion in the staff analysis- and "findings and order" of the hearing scheduled Ma 5 , 1985. TO: FROM: SUBJECT: Prior To The Issuance Of A Building Permit 1. Applicant shall dedicate feet on for right -of -way prior to any use of the property. 2. Applicant shall dedicate feet on for right -of -way and slope easements as necessary prior to any use of the property. 3. Applicant shall dedicate a foot radius on and prior to any use of the property. 4. Applicant shall dedicate feet on and a foot radius on and for right -of -way prior to any use of the property. SQ Access permits for approaches to the County Road System shall be obtained from the Spokane County Engineer. 6. Access permits and improvements to by the Washington Department of Transportation. must be approved 7. Access permits and improvements to by the City of must be approved 0 (a) Applicant shall improve .E /A_ a4e1 in a manner consistent with Spokane County TYPICAL roadway section No. 2 minimum paving width 4cc,cc.St4 vdgad. (b) Applicant shall improve County TYPICAL roadway section No. minimum paving width with Spokane (c) Applicant shall improve ___ in a manner consistent with Spokane County TYPICAL roadway section No. minimum paving width (d) Applicant shall improve County TYPICAL roadway Section No. (e) Other specific improvements: Applicant shall submit access plans prior to The applicant shall su County Health District disposal plan for the property. for approval by the the issuance of a bu bmit for approval by a detailed combined entire project prior in a manner consistent with Spokane minimum paving width Spokane County Engineer road, drainage, and tiding permit on the property. the Spokane County Engineer and the Spokane on -site sewage system plan and surface water to the issuance of any building permit on the ad ER 11 A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or travelled by vehicles. 12 The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 13. To construct the road improvements stated herein, the aPplicant may, with the approval of the County Engineer, join in and be a willing participant in any petition or resolution which purpose is the formation of a Road Improvement District (RID) for said improvement • pursuant to RCW 36.88, as amended. Spokane County will not participate in the cost of these improvements. 14. As an alternative method of constructing the road improvement stated herein, the appli- cant may, with the approval of the County Engineer, accomplish the road improvements stated herein by joining and participating in a County Road Project (CRP) to the extent of the required road improvement. Spokane County will not participate in the cost of these improvements. 15 The construction of the road improvements stated herein shall be accomplished as ap- proved by the Spokane County Engineer. 16 All required improvements shall conform to the current State Of Washington Standard Specifications for Road and Bridge Construction, and other applicable county standards and or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer.' 17. Applicant shall file a petition for the vacation of prior to any use of the property. • 18. Applicant shall construct a paved and delineated access approach(s) to meet the existing pavement on 19. Access to Road shall be prohibited until such time as specifically authorized by the Spokane County Engineer. 20 Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners Resolution No. 80 -1592 as amended. Date: t23 Name of Applicant: Street Address of Applicant: • SPOKANE COUNTY PLANNING DEPARTMENT APPLICATION FOR ZONE RECLASSIFICATION _ Application No: A/7/ trE3'v City: S©n/ A-2L'! State: C0# Zip Code: 47xDC Tele. No.S3' Name of Property Owner(s): /ill; M4,/1&t,7JI!jOsig , &li«) Authorized Agent representing Owner (if other than owner): Existing Zoning Classification: - 4-6 cos Date Existing Zone Classification Established: Existing ' Use of Property: S (Xi 8 t c r A� i i_ > Jets t6tz)e Proposed Zone Classification: ,C 0 Proposed Use of Property: 2>6 zf7oft- ,1AP2 el' Legal Description of Property: LOT ( t'CC-FflT c i /c.c1rT 6/& &,bubo-)' I/ ; ctc) <f)LL J_F7/ Section: /'' Township: ..Z Y . Range: � t 9 Source of Legal: - 717 - ZG- - CD41/1A-:rJ)' Assessor's Parcel No: (See tax statement) /5J G Property Size: q6 )( /? .o Frontage: 95.7 Feet on: AP- ,04-6/ - Y Total amount of adjoining land controlled by this owner or sponsor: t1/4/G-" Street Address of the Property: 73?/6 . /1d,4- LAPP If you do not hold title to the property affected by this application, what is your interest in it? Please list previous Planning Department actions involving this property: x/11» ALL OF THE FOLLOWING QUESTIONS MUST BE ANSWERED: 1. What are the changed conditions of the site area, which you feel make this proposal warranted? ("oo,u? -- Y 0OQIArilit /5 - /a4 - //,. /J.0 - Pit . -z_ c-:7) 72o0 /LY'7t'T t'A/LB/,. 2. What effect will the proposed zone reclassification have'on the adjacent properties ?' /2 /7nAL - Rev. 2/3/81 Date: . Name of Applicant: , SPOKANE COUNTY PLANNING DEPARTMENT APPLICATION FOR ZONE RECLASSIFICATION Application No: // Street Address of Applicant: r; ^ ^ . { %.'._ _ - - - t , l - f �; "CC < City: State: (0' Zip Name of Property Authorized Agent (if other than Existing Zoning Date Existing Zone Classification Property Size: c '7 ( /?-v Code: Tele. No -4 :)C.i) n-S Owner(s): rill,:; ,/ � i /: t, (`iLlee representing Owner owner): Classification: Established: SMJt5c • , C-- CUA Legal Description of Property: LOr 1 /20 betin ✓ ; Ctc) SU'Ss fr( ,=-4.31/ 7 y ,C/_S /?• -;CCc Existing Use of Property: Proposed Zone Classification: Proposed' Use of Property: 46s (be tMt /�f Lam' a -/CtrinT j >2cirT Section: /'S' Township: ..Z c Range: 9 V Source of Legal: 77 rf -G Coo) pin , chr Assessor's Parcel No: (See tax statement) / 7 — Cc faS Frontage: 9i.7 Feet on: Aknethieft Y Total amount of adjoining land controlled by this owner or sponsor: 4.TQ /(s Street Address of the Property: 7`5(i6 42�,4 04Y If you do not hold title to the property affected by this application, what is your interest in it? • Please list previous Planning Department actions involving this property. /(jG/E ALL OF THE FOLLOWING QUESTIONS MUST BE ANSWERED: 1. What are the changed conditions of the site area,_ which .\ n ' f ^ ^' proposal warranted? ,' <.. _- - a, e. 2. What effect properties? � ' B. W. CL(Ow I IZINIAI AGIUUNI >Iq L. 10U1:111 A \I. 53C-1116" ' j' )1:ANI, WASHING-11)k '1'1201, fl l'ay to toe. ' _.} y L a Jur 1: L 25 71, LI: v.LLIY OF ?K! FARMERS 6 MERCHANTS BANK 105 366 6u 0I. 1 284 98-574/1251 arN i.auur w ii t •ovide the Planning Department's Staff with . wr•itrap verification that the app.;cant'ihas had preliminary consultation with the ;.age s identified. Results pf the preliminary consultation should be incorporat- ed ire the proposal before final submittal to the Planning Department. 1. COUNTY ENGINEER'S OFFICE A preliminary consultation has been held to discuss the proposal. Our requireme for submittal of this proposal for rezone have been satisfied. c Sig • atu G (Date) / 2. COUNTY UTILITIES .OFFICE A preliminary consultation has been held' to discuss the proposal. Our requirements for submittal of this proposal for rezon# have•bee� satisfied. 1j die designated water ,t rveyor for this site is tda. w (Date) R ature 3. . WATER PURVEYOR (NAME) a) The proposal (is) (is not) located within the boundary of our service area. b) Satisfactory arrangements (have) (have not) been made to serve this proposal. �) We (are) (are not) able to serve this site with adequate water. (Signature) , . (Date) 4. BUILDING AND SAFETY DEPARTMENT �, -,r �j ova fr'a A preliminary consultation has been held to discuss the proposal. Our requirements for submittal of this proposal for rezone have been satisfied. This proposal is located in Fire District 4t (Signature) 5. COUNTY HEALTH DISTRICT A preliminary consultation has been held to discuss the proposal. The applicant has been informed of our requirements and standards. (Signature) (Date) I, THE UNDERSIGNED, SWEAR UNDER THE PENALTY OF PERJURY THAT THE ABOVE RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOW- LEDGE. I FURTHER SWEAR THAT I AM THE OWNER OF RECORD OF THE SITE PRO- POSED FOR ZONE RECLASSIFICATION, OR, IF NOT THE OWNER, ATTACHED HEREWITH IS WRITTEN PERMISSION FROM SAID OWNER AUTHORIZING MY ACTIONS ON HIS OR HER BEHALF. (Signed) Date: (Address) Phone: Zip: NOTARY Date: NOTARY SEAL: i449# (Date) SIGNATURE OF APPLICANT OR AGENT Date: Rev. 2/3/81 A. PROPOSAL DEVELOPER or AGENT OWNER ENGINEER B. PRELIMINARY CONSULTATION: Date: s 2 /)3 / t3 By: Preliminary a) Right -of -Way A/A At.41 Conditions b) Curb NW /E5 AMA Aes.5 ' R DIC,E'P' Jgrreea,'a.y7 .UA YES J aER , s Ke w.eed foe. A%i/y .tetsi • Remarks: D. SPECIFIC CONDITIONS: Fee Paid: 'Yes ) No Planning - Cation Signed: E. FINAL PLAT CHECKS Fee Paid: Date S P O K A N E C O U N T Y E N G I N E E R - - -P R E L 1 14 1 N A R Y C O N S U L T A T I 0 11 - -- Project Name: �o4,2s _ / e __ Number of Parcels:_ / / __1,1 L __/ - F-- . 5 - V,.3 — D C/10,5 Section /e T. - oZ_$ _N., R. y M.; Quarter 1 3 4 Name: g i /Y /4 Address: ,x' /9 e. S "7 Phone: Business Home Name: Address: Phone: Business Name: Address: Phone: Business c) Sidewalk d) Pave e) Approaches f) Drainage g) State /City Review Amount C. INSPECTION I Date: / / By: Remarks: Amount $a00. Date 2. /23 / e3 By: Home Home csC,6 C/0 7 ri (Jr'�E /3 J S -35 - n2 NOTE: This proposal must comply with Spokane County Regulations for Roads, Ap- proach and Drainage in New Construction; Board of County Commissioners Resolution No. 80 -1592 as amended. Conditions are preliminary and may change after field in- spection and review of County records. ash Check —`O 5/ Check Cash Mathematical & Surveying Checks: No. 1 Date By No. 2 Data BY No. 3 Data By Additional mat.hematikdd dnd Surveying Checks: Nu. 9 I�atr By _ Fee Anrt.&Dt.Pd. -- _ No. 5 1 Deft By Fee Amt. &Dt.Pd. No. 6 I By Fee Amt. &Dt.Pd. No. / lieu By Fee Amt. & Dt.Pd. -_- --_______