Loading...
ZE-57-83 & ZE-57A-830TELEPHONE HH(i.: 456 -220` AGENDA, AUGUST 4, 1983 - 2 SPOKANE COUNTY ZONING HEARING EXAMINER COMMITTEE Place: Broadway Centre Building, Second Floor 1 North 721 Jefferson Street, Spokane (Continued from Page #1) 3. ZN- 154A -81 CHANGE OF CONDITIONS IN RESTRICTED INDUSTRIAL ZONE (WITH AIRPORT OVERLAY ZONE (Generally located south of and adjacent to Thorpe Road at the southeast corner of the intersection of Grove Road and Thorpe Road in Sections 34 -25 -42 and Section 3- 24 -42.) Proposal: A Change of Conditions to review a site plan consistent with zone change approval and to eliminate the need for public review of future site development plans. Site Size: Approximately 29 Acres Owner /Applicant: OLYMPIC F00DS; INC. c/o Charles Killian North 605 Fancher RoaU Spokane, WA 99206 4. ZE- 57 -83\ AGRICULTURAL AND TWO- FAMILY RESIDENTIAL (R -2) TO LOCAL BUSINESS AND RESIDENTIAL OFFICE • (Generally located along the south side of Main Avenue between Mullan Road and Willow Road in Section 17- 25 -44.) Proposed Use: Office Buildings Site Size: Approximately 43,960 Square Feet Owner /Applicant: PROKEY ARGER c/o Greg Arger East 13803 Sprague Avenue, Suite B Spokane, WA 99216 5, ZE -32 -83 AGRICULTURAL TO LOCAL BUSINESS (Generally located along the north side of Trent Road, approximately 1/2 mile east of Campbell Road and approximately 1/2 mile west of Harvard Road in Section 33- 26 -45.) Proposed Use: Multi- Service Fruit Stand Site Size: Approximately 1.4 Acres Owner /Applicant: DARL WHEELER c/o D. J. Hume Company 1260 Seafirst Financial Center Spokane, WA 99201 5:00 P.M. - - - ADJOURNMENT Except when an Environmental Impact Statement (EIS) has been prepared, a proposed declaratio of non - significance (a preliminary decision, which may be reversed, that an EIS is not needer has been administratively issued. This insures the applicant of a timely processing of his!: proposal at the time of the public hearing. BUI, a major purpose of the public hearing is tt afford the opportunity to present the decision makers with infornotion as to whether or not a potentially SIGNIFICANT ADVERSE impact upon the physical environment will result from implen- tation of the proposal, thus resulting in the need for an EIS. However, most "change of con tions' are exempt from the provisions of -SFPA: check with the Planning Department staff. if Zoning Hearing Examiner Committee Actions of August 16, 1983 6 5 -3.3 (continued) r 3). ZW- 154A -81, Change of Conditions in Restricted Industrial Zone (With Airport Overlay Zone): Olympic Foods, Inc. Location: Generally located south of and adjacent to Thorpe Road at the southeast corner of the intersection of Grove Road and Thorpe Road in Sections 34 -25 -42 and Section 3- 24 -42. Proposal: Review a Specific Site Plan for a portion of the rezoned site and a request to delete Planning Condition #1 requiring site plan review by the Zoning Hearing Examiner Committee on the remainder of the site. Action: Approval of Site Plan. (Vote: 3 - 0) Denial of Deletion of Planning Condition #1. (Vote: 3 - 0) Any future development plans for the remainder of the property will be reviewed by the Hearing Examiner Committee at a public hearing, thus insuring compatibility with adjoining uses and consistency with Decision Guidelines as specified in the Industrial category of the Spokane County Generalized Comprehensive Plan. 4) ZE- 57 -83, Agricultural and Two - Family Residential (R -2) to Local Business and Residential Office: Arger Location: Generally located along the south side of Main Avenue between Mullan Road and Willow Road in Section 17- 25 -44. Proposal: Office Buildings. Action: Approval to Local Business zoning on the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the East 100 feet in Section 17- 25 -44. Approval to Residential Office zoning on the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the West 190 feet in Section 17- 25 -44. (Vote: 3 - 0) 5) ZE- 32 =83, Agricultural to Local Business: Wheeler Location: Generally located along the north side of Trent Road, approxi- mately 1/2 mile east of Campbell Road and approximately 1/2 mile west of Harvard Road in Section 33- 26 -45. Proposal: Multi- Service Fruit Stand Action: Approval. (Vote: 3 - 0) If further information is desired, contact the Planning Department's office. SPH:cmw 2 - 711 : 1 1 :41; o e r z l i fri 15E HS'+I'Q ' LL �',. FUt - a SPOKANE COUNTY COURTHOUSE August 16, 1983 Gentlemen: PLANNING DEPARTMENT TO: Board of Spokane County Commissioners FROM: 491 Steve P. Horobiowski, Zoning Administrator SUBJECT: Zoning Hearing Examiner Committee Actions of August 4, 1983. y e s BROAOWAY CENTRE BUILDING N, 721 JEFFERSON STREET PHONE 456 -2205 SPOKANE, WASHINGTON 99260 On August 4, 1983, the Zoning Hearing Examiner Committee met at 9:00 A.M. to con- sider four new zone reclassification applications and one change of conditions application. Members present: Mr. Skalstad, Chairman; Mrs. Myers and Mr. Williams. Following are the applications in sequence and the action taken by the Committee. If not appealed, these decisions will become final on August 22, 1983. All Findings and Order for this hearing were signed on August 11, 1983. 1) ZE - 29 -83, Multiple Family Suburban to Commercial and WVE- 27 -83, Waiver of Violation to Allow a Continued Five Foot Rear Setback: Balch Location: Generally located at the northwest corner of Harrington Avenue and Hutchinson Street in Section 18- 25 -44. Proposal: Warehouse and Office Complex Action: Approval to Commercial Zone. (Vote: 3 - 0) The Zoning Adjustor's decision was for Approval for the Waiver of Violation to allow an existing five foot rear yard setback to continue for a structure on -site. 2) ZE- 60 -83, Single Family Residential (R -1) to Two - Family Residential (R -2): Wolfland, Inc. Location: Generally located on the north side of Mission Avenue at the intersection of Mission Avenue and Glenn Road in Section 9- 25 -44. Proposal: Duplex Lots. Action: Approval. (Vote: 3 - 0). (contd.) A, INTRODUCTION SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER ZONE RECLASSIFICATION NO.: ZE -32 -83 This matter having come before the Zoning Hearing Examiner Committee on August 4, 1983, and the members of the Committee present being Richard L. Skalstad, Chairman, Jane E. Myers and Jerry Williams. B. PROPOSAL The sponsor, Darl Wheeler, is requesting approval of a zone reclassifica- tion, File No. ZE- 32 -83, Agricultural to Local Business, for the purpose of continuation of an existing Multi- Service Fruit Stand. C. FINDINGS OF FACT (5 -3 1. That the existing land use in the area is residential, commercial, agricultural, Trent Road, Railroad tracks, and industrial uses. 2. That the Comprehensive Plan designates this area as appropriate for Semi - Rural development. 3. That the existing zoning of the property described in the application is Agricultural. 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with, and the Committee concurs with the Declaration of Non - Significance. 5. That the proper legal requirements for advertisement of the Agenda item have been fulfilled. 6. That the land in this area is suitable for the proposed use, or uses within the proposed Zone classification. 1 (contd.) C. FINDINGS OF FACT (continued)_ a), COUNTY PLANNING DEPARTMENT ZONE RECLASSIFICATION NO.: ZE -32 -83 7. That the applicant has demonstrated that conditions have substantially changed since the original zoning of this area and accordingly, the proposed rezone is justified. 8. That the proposed use is not totally incompatible with existing uses in the area.. 9. That the owners of adjacent lands and /or their representatives expressed neither approval nor disapproval of the proposed use. 10. The Hearing Examiner Committee finds the proposed use to be in harmony with the general purpose and will not be otherwise detrimental to the public health, safety, and welfare. 11. The following are additional findings of fact considered by the Zoning Hearing Examiner Committee: a) That the requested zone change is necessary, at a minimum, to legalize the existing operation from the standpoint of zoning regulations. It was felt that conditions requiring public hearing review of any physical expansion or change in use would adequately protect the area from incompatible uses. D. CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL 1. All current standards of the Local Business Zone, as amended, shall be complied with in the development of this site. 2. Signs for this project shall conform to standards as set forth in Section 4.09.125 Signs. Compliance with this condition must be accomplished within six (6) months of rezone finali- zation. 2 (.contd.) COUNTY PLANNING DEPARTMENT (continued) ZONE RECLASSIFICATION NO.: ZE -32 -83 3. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (MAC 197 -10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non - significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and /or public testimony contain information regarding assessment of the proposal's adverse impacts to the physical environment; a finding is hereby made that no potentially significant adverse impacts upon the physical environment are anticipated as a result of the project; and a final declaration of non - significance is hereby to be issued. 4. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.210.080 RCW and the Board of Spokane County Commis- sioners' Resolution #77 -1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on -site improvements, or file appropriate documents to the effect that the NOTICE OF ACTION is waived in accordance with Spokane County Commissioners' Resolution #82 -0458 dated May 4, 1982. 5. Any division of land for the purpose of sale, lease, or transfer shall comply with RCW 58 -17 and the Spokane County Platting Ordinances prior to issuance of building permits. The following Planning Conditions shall also be complied with at the time that building permits are requested to expand existing buildings, add buildings to the site, or change the existing use: 1. The Zoning Administrator shall approve a specific exterior lighting plan for the approved area prior to installation of such lighting. (Such plan shall attempt to confine illumina- tion to the area with full consideration to adjacent properties.) 2. Approval by the Zoning Administrator of a specific lighting and signing plan for the described property prior to the release of any building permits. 3. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. 4. Direct light from any exterior area lighting fixture shall not extend over the property boundary. 3 (contd.) a) COUNTY PLANNING DEPARTMENT (continued) ZONE RECLASSIFICATION NO.: ZE -32 -83 5. The specific development plan will be submitted for public hearing review and approval prior to issuance of building permits. 6. A 6 -foot sight- obscuring cyclone fence and landscape screen shall be provided along the west, north and east boundaries of this proposal to provide a buffer for the existing uses lo- cated immediately adjacent to this site. A comparable substi- tute to the cyclone fencing may be approved by the Zoning Administrator. 7. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for run- off. 8. Applicant shall comply with all agency's regulations as amended prior to issuance of building permits. b) COUNTY ENGINEERING DEPARTMENT 1. Access permits and improvements to Trent Road - SR 290 must be approved by the Washington Department of Transportation. 2. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on -site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any build- ing permit on the property. 3. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accord- ance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 4. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 5. Applicant shall construct a paved and delineated access approach(s) to meet the existing pavement on SR 290. 6. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners' Resolution No. 80 -1592, as amended. 4 (contd.) c) COUNTY HEALTH DISTRICT 1. Appropriate utility easements shall be indicated, 2. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 3. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County, 4. Subject to specific application approval and issuance of permits by the Health Officer, project is authorized the use of an individual on -site sewage system. 5. Water service shall be coordinated through the Director of Utilities, Spokane County. 6. Water service shall be by an existing public water supply when approved by the public water purveyor. 7, Disposal of sewage effluent beneath paved surfaces is currently prohibited. COUNTY BUILDING AND SAFETY DEPARTMENT 1. The site is located in Fire District fll. ' 2. Mains and hydrants to be installed, in accordance with the Spokane County Department of Building and Safety and Fire District #l. 3. Reclassification of an existing building shall require an application for change of occupancy permit, and subsequent inspection for approval, WATER PURVEYOR ZONE RECLASSIFICATION NO.: ZE -32 -83 1. Purveyor is Consolidated Irrigation District 3119, and they will supply the site with adequate water for domestic, fire and irrigation uses. 2. Existing structure is serviced and no modifications are anticipated. 5 (contd.) f) COUNTY AIR POLLUTION CONTROL AUTHORITY E. ORDER ZONE RECLASSIFICATION NO.: ZE -32 -83 1. That the access off Trent Road and the parking area used by clients of the fruit stand be paved or controlled measures, such as oiling, be used to control dust. g) COUNTY UTILITIES DEPARTMENT 1. Pursuant to the Board of County Commissioners' Resolution No. 80 -0418, the use of on -site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of permits by the Health District. 2. The Owner(s) or Successor(s) in interest agree to authorize the County to place their name(s) on a petition for the formation of a ULID by petition method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROVIDED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improvements called for in conjunction with the formation of a ULID by either petition or resolution method under RCW Chapter 36.94. 3. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as amended. The Zoning Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Darl Wheeler for a zone reclassification as described in the application should be APPROVED. Motion by: Myers Seconded by: Williams 6 (contd.) • • t. ■ E. ORDER (continued) ATTEST: VOTE: Myers - Aye Williams - Aye Skalstad - Aye Unanimous to Approve For WALLIS D. HUBBARD Planning Director !! J. ' '1( c,_.:� By STEVE P. HOROBIOWSKI Zoning Administrator Date: ter, 4, /9.f3 N APPROVE TO LOCAL BUSINESS ZONE 7 ZONE RECLASSIFICATION NO.: ZE -32 -83 - 0) HEARING EXAMINER HEREBY ATTEST TO FIN , ORDER COMMITTEE THE ABOVE ND V Chairman ( 5 1,-- 4---kLAL-) 2� 1, DATE: TO: FROM: SUBJECT: II. August 4, 1983 ZONING HEARING EXAMINER COMMITTEE PLANNING DEPARTMENT STAFF ZONE RECLASSIFICATION NUMBER: ZE -57 -83 GENERAL INFORMATION APPLICANT: STATUS OF APPLICANT: PROPERTY OWNERS: REQUESTED ZONING: EXISTING ZONING: PROPOSED USE: PROJECT LOCATION: south side of Main Avenue Section 17- 25 -44. SITE PLAN INFORMATION SITE SIZE: STAFF REPORT 4, PROKEY ARGER Purchaser Kerman C. and Dorothy E. McDuffie Local Business on the West 190 Feet Residential Office on the East 100 Feet Agricultural (established in 1948) Two - Family Residential (estab. in 1972) Offices This site is generally located along the between Mullan Road and Willow Road in Approximately 1.01 Acres (Approximately 43,960 Square Feet) SITE CHARACTERISTICS: The site is currently vacant and relatively flat. Mullan Road, adjoining on the west, is paved with three lanes, curbing, and sidewalks. Main Avenue is on the north with paving and curbs, and Willow Road to the east is only paved. Mullan Road is a major arterial, while Main Avenue and Willow Road are local access roads serving residential areas to the east of the Argonne /Mullan Road corridor. NEIGHBORHOOD CHARACTER: Areas to the north and south, along the Argonne /Mullan Road corridor, have systematically changed from residential uses to office and retail uses. Very few residential uses continue to exist along the corridor. Generally to the east of Willow Road, the use is predominately single family residential. There are some areas, to the southeast of this site, that have been reclassified and currently exist as multi - family properties. (contd.) II. SITE PLAN INFORMATION (continued) ZONE RECLASSIFICATION NO.: ZE -57 -83 AGRICULTURAL SUMMARY: Designated as being committed to URBAN use by the U. S. Department of Agriculture - Soil Conser- vation Survey. ZONING: North Local Business, established, 1982 Residential Office, established, 1974, 1981, and 1983 East Two - Family Residential, estab., 1972 West Local Business, established, 1981 Commercial, established, 1981 Residential Office, established, 1969 South Agricultural, established, 1948 Two - Family Residential, estab., 1972 Multiple Family Suburban, estab., 1962 LAND USE: Site Vacant North Office /Retail Complex, Single Family, Minor Emergency Facility East Single Family Residential West Office /Retail Complex, Vacant South Vacant, Single Family 1981 COMPREHENSIVE PLAN DESIGNATION: COMMERCIAL on West 2/3 URBAN on East 1/3 NUMBER OF EXISTING BUILDINGS: 0 NUMBER OF BUILDINGS PROPOSED: 2 Total Square Feet Approximately 30,000 Sq.Ft. Total Percent of Site Covered Approximately 28 % MAXIMUM HEIGHT OF STRUCTURES: PARKING REQUIRED /PROVIDED: site plan review. So 2 Stories To be determined at detailed (contd.) ( ti II. SITE PLAN INFORMATION (continued) ZONE RECLASSIFICATION NO.: ZE -57 -83 PARKING REQUIRED /PROVIDED: (continued) (n o t e: The sponsor has submitted a very general site plan. A review of a detailed and specific site plan would be required prior to release of building permits.) III. BACKGROUND /ANALYSIS al COMPREHENSIVE PLAN - The site is definitely within a transition area as defined by the Spokane County Comprehensive Plan; the West 2/3 within Commercial and the East 1/3 within Urban. The sponsor's proposal to rezone as Local Business and Residential Office proportionately follows the Compre- hensive Plan designations. The Local Business rezone would be consistent with the Commercial designation of the Comprehensive Plan. The Residential Office portion of the rezone, while somewhat at odds with the existing Urban designation, would logically and physically serve as a buffer in the transition area. SITE CONSIDERATIONS - As proposed, the more intense uses possible under Local Business would be adjacent to heavily traveled Mullan Road, A buffering effect, between Mullan Road and residential uses to the east, would be accomplished through the Residential Office zoning and its permitted uses. In short, it's a good transitional plan for this site and is mirrored by the site directly to the north. Special considerations related to access points and physical landscape buffering should be implemented to protect resi- dential areas to the east, along Willow Road, and to the south. Landscape screens, consisting of fencing and /or dense planting, should be located along the east and south property lines. Access to the site, from Willow Road, should be prohibited due to the existing single family uses in the area. HISTORY OF OTHER LAND USE ACTIONS - The site has been zoned as Agricultural since 1948, as were other sites along the Argonne /Mullan Roads corridor. Starting in the mid -70's, most of the properties in the corridor have been up -zoned to Residential Office, Local Business, and Commercial. Most areas to the northeast, east, and southeast have remained Two - Family Residential (R -2) since 1972. A rezone to Multiple Family Suburban, to the southeast along Willow Road, was approved in June, 1983. 3/ (contd.) III. BACKGROUND /ANALYSIS (.continued] ZONE RECLASSIFICATION NO.: ZE -57 -83 d) CONCLUSION - The proposal is consistent with past land use actions along the Argonne /Mullan Roads corridor. In keeping with the Comprehensive Plan designations, it has been proposed as a transitional development plan. If conditioned to protect existing uses, it can be compatible with the area. IV. AGENCIES RECOMMENDED CONDITIONS, IF APPROVED a) COUNTY PLANNING DEPARTMENT 1. The Zoning Administrator shall approve a specific exterior lighting plan for the approved area prior to installation of such lighting. (Such plan shall attempt to confine illumination to the area with full considera- tion to adjacent properties.) 2. Approval by the Zoning Administrator of a specific lighting and signing plan for the described property prior to the release of any building permits. 3. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. 4. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Variations when approved by the Zoning Administrator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. 5. Direct light from any exterior area lighting fixture shall not extend over the property boundary. 6. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permits. 7. All current standards of the Local Business and Resi- dential Office Zones, as amended, shall be complied with in the development of this site as follows: 3°t (contd.) Y a) COUNTY PLANNING DEPARTMENT (continued) ZONE RECLASSIFICATION NO.: ZE -57 -83 Local Business Zone over the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the East 100 feet; and Residential Office Zone over the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the West 190 feet. 8. Landscaping shall be provided for this site, in conformance with Standards as identified in Section 4.07A.120 Landscaping. 9. A 6 -foot sight- obscuring cyclone fence or dense land- scape screen shall be provided along the east and south property lines of this proposal to provide a buffer for the existing uses located immediately east and south of this site. A comparable substitute to the cyclone fencing may be approved by the Zoning Administrator. 10. Applicant shall comply with '208' recommendations con- cerning stormwater runoff and provide necessary land- scaping for runoff. 11. Any division of land for the purpose of sale, lease, or transfer shall comply with RCW 58 -17 and the Spokane County Platting Ordinances prior to issuance of building permits. 12. Applicant shall comply with all agency's regulations as amended prior to issuance of building permits. 13. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners' Resolution #77 -1392 be initiated by the project applicant within thirty (30) days of final dispo- sition of this application, and prior to any on -site improvements, or file appropriate documents to the effect that the NOTICE OF ACTION is waived in accordance with Spokane County Commissioners' Resolution #82 -0458 dated May 4, 1982. 14. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines -(WAC 197 -10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non - significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and /or public testimony contain information re- garding assessment of the proposal's adverse impacts to the physical environment; a finding is hereby made that no potentially significant adverse impacts upon the physical environment are anticipated as a result of the project; and a final declaration of non - significance is hereby to be issued. (contd.) a) COUNTY PLANNING DEPARTMENT (continued) ZONE RECLASSIFICATION NO.: ZE -57 -83 15. That access to the site be restricted from Willow Road. b) COUNTY ENGINEERING DEPARTMENT 1. Applicant shall dedicate 10 feet on Willow Road for right of way prior to any use of the property. 2. Access permits for approaches to the County Road System shall be obtained from the Spokane County Engineer. 3. Applicant shall improve Willow Road in a manner con- sistent with Spokane County TYPICAL roadway section No. 1 minimum paving width Access Standard. 4. Other specific improvements: Applicant shall construct Spokane County standard Portland Cement concrete side- walk along Main Avenue. 5. Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plans prior to the issuance of a building permit on the property. 6. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on -site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. 7. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 8. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 9. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction, and other applicable County standards and /or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. .311 (contd.) COUNTY ENGINEERING DEPARTMENT (continued) 10. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners Resolution No. 80 -1592, as amended. c) COUNTY HEALTH DISTRICT ZONE RECLASSIFICATION NO.: ZE -57 -83 1. Appropriate utility easements shall be indicated. 2. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 3. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 4. Subject to specific application approval and issuance of permits by the Health Officer, the proposal is authorized the use of an individual on -site sewage system. 5. Water service shall be coordinated through the Director of Utilities, Spokane County. 6. Water service shall be by an existing public water supply. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. d) COUNTY BUILDING AND SAFETY DEPARTMENT 1. The site is located in Fire District #1. 2. Installation of fire hydrants to be in accordance with the requirements of the Spokane County Department of Building and Safety and Fire District #1. e) WATER PURVEYOR 1. Purveyor is Modern Electric Water Company, and they will supply the site with adequate water for domestic, fire and irrigation uses. (contd.) g) COUNTY AIR POLLUTION CONTROL AUTHORITY 1. Regulations require that dust be controlled during all phases of the project. 2. Further require that all parking areas and access roads be paved and kept clean. Measures must be taken to avoid the deposition of dirt from unpaved surfaces onto paved surfaces. COUNTY UTILITIES DEPARTMENT 1. Pursuant to the Board of County Commissioners' Resolution No. 80 -0418, the use of on -site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of permits by the Health District. 2. The Owner (s) or Successor(s) in interest agree to authorize the County to place their name(s) on a petition for the formation of a ULID by petition method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROVIDED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improvements called for in conjunction with the forma- tion of a ULID by either petition or resolution method under RCW Chapter 36.94. 3. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as amended. 4. Each unit shall be double - plumbed for connection to future areawide collection systems. 36 ZONE RECLASSIFICATION NO.: ZE -57 -83 a 3 SPOKANE COUNTY PLANNING DEPARTMENT APPLICATION FOR ZONE RECLASSIFICATION Date: June 17 Application No: ZE 57 - Name of Applicant: Street Address City: Spokane Name of Property Prokey Arger . of Applicant: E. 13808 Sprague Avenue, Suite B State: WA Zip Owner(s): Kerman C. & Dorothy E. McDuffie Authorized Agent representing Owner (if other than owner): Greg Arger Existing Zoning Classification: AG & R - Date Existing Zone Classification Established: Existing ' Use of Property: Vacant Code: 99216 Tele. No. 926 -5311 Proposed Zone Classification: LB for the W 2/3, RO for E 1/3 Proposed Use of Property: Office Buildings approximately 30,000 Legal Description of Property: S 200 feet of East one half, Block 140, ALL Opportunity, except street Section: 17 1. What are the changed conditions of proposal warranted? Inral husiness. is now prevalent in the area. The 2. What effect properties? should have little impact to the area. Township: 25 Range: 44 Source of Legal: Ti tle Company Assessor's Parcel No: (See tax statement) 17543 - 1310 Property Size: 43,960 S.F. ApprwFrontage: 280 Feet on: Main Street Total amount of adjoining land controlled by this owner or sponsor: Street Address of the Property: If you do not hold title to the property affected by this application, what is your interest in it? upon arrent.anra of zQnina. analicant will act as developer of proposal. Please list previous Planning Department actions involving this property: None OF THE FOLLOWING QUESTIONS MUST BE ANSWERED: of the site on the Argonne /Mullan corridor, this the site area, which you feel make this commercial and residential office zoning site is currently vacant, but 1:he1:OCatioe will the proposed zone reclassification have on fe .edjacent.`':f The trent in the area is to the above listed zoninas. iaoposal S.F. • use is appropriate and.compatTble. Rev. 2/3/81 % APPLICATION FOR ZONE RECLASSIFICATION -- continued -2 This section of the application will provide the Planning Department's Staff with written verification that the applicant has had preliminary ,consultation with the agencies identified. Results of the preliminary consultation should be incorporat- ed in the proposal before final submittal to the Planning Department. 1. COUNTY ENGINEER'S OFFICE A preliminary requirements ; submit • of this proposal S gnature 2. COUNTY UTILITIES OFFICE A preliminary consultation has been held requirements for submittal of this proposal The designated water purveyor for this site (Signature) = t - T •—b UItI ViwFt7:N V 1 t --vc.r rtnr -t•,• w.. (Signature) NOTARY -SEAL: consultation has been held I, THE UNDERSIGNED, SWEAR UNDER THE ABOVE RESPONSES ARE MADE TRUTHFULLY LEDGE. I FURTHER SWEAR THAT I AM THE OWNER POSED FOR ZONE RECLASSIFICATION, OR, HEREWITH IS WRITTEN PERMISSION FROM ACTIONS ON HIS OR HER BEHALF (Signed NOTARY (Address) E. 13808 Sprague Avenue Spokane, WA 99216 to discuss the proposal. Our ; 'c for rezone have been satisfied. (Date) to discuss the proposal. Ou ry I • for rgga�o,ne have beer? satisfied: ,. ' is !//D()1 =R/ C./ec e/G . (Date) 3 WATER PURVEYOR (NAME) m4i U W Z E 5"7 g3 (Signature) (Date) 5. COUNTY HEALTH DISTRICT (Date) <V11/4 l? f<4 i. ilan - 4 7 9,6u Date: ATURE APPLICANT AGENT 17. 1983 C. , is in the service area of the Modern Electric Water Company. It is entitled to the company's electric and water services. Prior to ser vice, the company requires completion of a Service Application, a mechanical plan and a building plot plan showing location of drywells, septic tanks, sewer pipelines and•.' drainfields. Presently there is no charge for the_,,.Service Application. There are charges fo water services, water pipelines, fire hydrants and some. electrical in- a1 Z t eel (2. Signature 1 4 - t Dkte A preliminary consultation has been held to discuss the proposal. Our - requirements for submittal of this proposal for rezone have been satisfied.. This proposal is located in Fire District it • A preliminary consultation has been held to discuss the proposal. applicant has been informed of our requirements and standards. PENALTY OF PERJURY THAT THE AND TO THE BEST OF MY KNOW- OF RECORD OF THE SITE PRO -' IF NOT THE OWNER, ATTACHED SAID OWNER AUTHORIZING MY Date: 6/16/83 Phone: 926 -5311 Zip: 99216 6/16/83 Date: 6/16/83 Rev. 2/3/81 • LI r.' I C3 CENTER POINTE PARK BUSINESS • ANGER DDDDD OPMENT • IS •• 55 ea 555 • _triti MAIN AVE .. 1. . 1......waawiikialaut NU, 'il I O . 10 - 4 111o1111 LJsiUiLt cilc.-•,i • - s • ",- • ;••• - • ;:: — LI' . 4.; t„ •.%; NIXON AVE 40* 1 A. PROPOSAL DEVELOPER or AGENT NOTE: This proposal must comply with Spokane County Regulations for Roads., Ap- proach and Drainage in New Construction; Board of County tommissioners Resolution No. 80 -1592 as amended. Conditions are preliminary and may change after field in- spection and review of County records. s; OWNER ENGINEER B. PRELIMINARY Remarks: e Preliminary Conditions Zoning E. FINAL Fee P Mathe N N N Add i t S P n 1 — P i t t I 1M Project Ndnte �2.-4/2e / CUJ / /ow_ Jo/ir _ /11reilezt -v Number of Pd, Le 1'.. ONC Section /77 1. aq N., R. E.bI.M.; Quarter t 1 Name: Address: Phone: Business Home Name: Pro( /whiz F• Address: c /38 t a e Phone: Business qaG -- S A Home Name: Address: Phone: Business 81(808 — 1 CONSULTATION: Date: o / /7 / eg t tJ //o �v a) Right -of -Way /o Fr b) Curb P2'5 c) Sidewalk —'-- - hfS d) Pave Y�5 e) Approaches tRm,7s ;13getia f) Drainage 2Egu.Yd zc vat 5 g) State /City RevieW Yes ( ) 3Q0 MIILLAN LTD. PARTNERSHIP H. 13808 SPRAGUE 926 -5311 SPOKANE, WASHINGTON 99216 SPOKANE COUNTY ENGINEERING DEPARTMENT Tug M h J,t , ONS Valley Financial Canter Otl N. aons Bank Spokane, Washington 99208 0000 198 1 :125100031.0: 163 2111 2B 2111811' For f _ ACCOUNT HOW AID ., AMT OF ACCOUNT AMT. PAID BALANCE DUE CASH CHECK MONEY ORDER Home 3 By: a9 r No e /tic Yrew.• No (i - • 9 ze 3n 3 June 17 83' RECEIPT Date la 19 5'3 Received From AI / /AA) 472/ Address zE 57 c ? S -- SPOKANE -GER/ Y-ENG, N. 811 JEFFERSON By INGTON Y • a • 7 4' , n 28- 3/1251 1 6873 Dollars $.2 $ i..9-271111,i • Zoning Hearing Examiner Committee Actions of August 16, 1983 (continued) 31 ZW- 154A -81, Change of Conditions in Restricted Industrial Zone (With Airport Overlay Zone): Olympic Foods, Inc. Generally located south of and adjacent to Thorpe Road at the southeast corner of the intersection of Grove Road and Thorpe Road in Sections 34 -25 -42 and Section 3- 24 -42. Review a Specific Site Plan for a portion of the rezoned site and a request to delete Planning Condition #1 requiring site plan, review by the Zoning Hearing Examiner Committee on the remainder of the site. Approval of Site Plan. [Vote: 3 - 0) Denial of Deletion of Planning Condition #1. (Vote: 3 - 0) Any future development plans for the remainder of the property will be reviewed by the Hearing Examiner Committee at a public hearing, thus insuring compatibility with adjoining uses and consistency with Decision Guidelines as specified in the Industrial category of the Spokane County Generalized Comprehensive Plan. 4) CZE=57-83,JAgricultural and Two - Family Residential (R -2) to Local Business and - Office: Arger SPH:cmw Location: Proposal: Action: Location: Proposal: Action: 5) ZE- 32 -83, Location: Proposal: Action: Generally located along the south side of Main Avenue between Mullan Road Willow Road' in Section 17- 25 -44. Office Buildings. Approval to Local Business zoning on the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the East 100 feet in Section 17- 25 -44. Approval to Residential Office zoning on the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the West 190 feet in Section 17- 25 -44. (.Vote: 3 - 0) Agricultural to Local Business: Wheeler Generally located along the north side of Trent Road, approxi- mately 1/2 mile east of Campbell Road and approximately 1/2 mile west of Harvard Road in Section 33- 26 -45. Multi- Service Fruit Stand Approval. (Vote: 3 - 0) If further information is desired, contact the Planning Department's office. 2 i..n ; of Y ,I., 1 „ iL ` ;imS 110 0 CC old 20/0 BR •'\i AY F o .N o tr U CENTER POINTE BUSINESS PARK ANGER OCV(LOPMLNT 26-5 . r,,.e...sq",...7 I r O ■ ••• •wwoww■ [ B f Rjf .:.- - • 20 40 SO 00 100 MAIN AVE NIXON AVE e :1) TO: Spokane County Planning Department FROM: County Engineer's Department -1IY\C SUBJECT: Conditions of Approval -Zone Change--Number: Z E 7- S3 Applicant's Name A R E_!Z Section /7 Township_jjN, Range 4 9(li .t The following "conditions of approval" for the above - referenced zone change are submitted to? the Spokane County Nearing Examiner Committee for inclusion in the staff analysis and "findings and order" of the hearing scheduled A1usT t( Prior To lice Ieemance Of A Building Permit 1. Applicant shall dedicate /0 feet on 10 (,J R04OGl for right -of -way prior to any use of the property. $ . Applicant shall dedicate feet on 0 for right - of-way and slope easements as necessary prior is any use of the property. - Applicant shall dedicate a foot radius on and prior to any use of the property. 4. Applicant shall dedicate' feet on and a foot radius on and for right-of-way prior to any use of the proparty.; Access permits for approaches to the County Road System shell be obtained from the r Spokane County Engineer. 6. Access permits and improvements to by the Washington Department of Transportation.: '• 7. Access permits and improvements to by the City of (a) Applicant shall improve �133/4Q W County TYPICAL roadway section No. 10 (b) Applicant shall improve County TYPICAL roadway section No. (c) Applicant shall improve____________ County TYPICAL roadway section No. (d) Applicant shall improve________ County TYPICAL roadway Section No. The applicant shall submit for approval by County Health District a detailed combined disposal plan for the entire project oriot property. OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON l 4MJV�� 7u11_ 1.5_ 19 A must be approved must be approved d in a manner consistent with Spokane minimum paving width AaasS STd in a manner consistent with Spokane minimum paving width in a manner consistent with Spokane minimum paving width ___ in a manner consistent with Spokane minimum paving width Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plane prior to the issuance of a building permit on the property. (e) Other specific improvements:.____________ qq _ � fA a 5* �L t'Qorisev 0 Parr ego CitaeR A / 0 Ava - - - - -- the Spokane County Engineer and the Spokane :n -site sewage system plan and surface water the issuance of any building permit on the The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. sot. PC' t4� 4 A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer,' will be required for any portion of the project which is to be occupied or travelled' by vehicles. 4. 13. To construct the road improvements stated herein, the applicant may, with the approval o the County Engineer, join in and be a willing participant in any petition or resolution, which purpose 1s the formation of a Road Improvement District (RID) for said laproveman" 'ot pursuant to RCW 36.88, as amended. Spokane County will not participate in the cost x :�. these improvements. 14. As an alternative method of constructing the road improvement stated herein, the appli—; cant may, with the approval of the County Engineer, accomplish the road improvement stated herein by joining and participating in a County Road Project (CRP) to the **ten', of the required road improvement. Spokane County will not participate in the cost of these improvements. 15. The construction of the road improvements stated herein shall be aceomplished as ap— proved by the Spokane County Engineer. •� ^- - • All required improvements shall conform to the current State Of Washington Standard Specifications for Road and Bridge Construction, and other applicable, county standards and or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. prior to 17. Applicant shall file a petition for the vacation of any use of the property. 18. Applicant shall construct a paved and delineated access approsch(s) to suet the existin; pavement on 19. Access to Road shall be prohibited until such time as specifica43 authorized by the Spokane County Engineer. Roadway standards, typical roadway sections and drainage plan requirements are found 1n "r Spokane Board of County Commissioners Resolution No. 80 -1592 as amended. T; A, INTRODUCTION B. PROPOSAL C. FINDINGS OF FACT SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER s -17 ZONE RECLASSIFICATION NO.: ' =57 -83 This matter having come before the Zoning Hearing Examiner Committee on August 4, 1983, and the members of the Committee present being Richard L. Skalstad, Chairman, Jane E. Myers and Jerry Williams. The sponsor, Prokey Arger, is requesting approval of a zone reclassifica- tion, File No. ZE- 57 -83, Agricultural and Two - Family Residential (R -2) to Local Business and Residential Office for the purpose of developing Office Buildings. 1. That the existing land use in the area is residential, commercial, offices, and vacant. 2. That the Comprehensive Plan designates this area as appropriate for Commercial and Urban development. 3. That the existing zoning of the property described in the applica- tion is Agricultural and Two - Family Residential (R -2). 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with, and the Committee concurs with the Declaration of Non- Significance. 5. That the proper legal requirements for advertisement of the Agenda items have been fulfilled. 6. That the ,land in this area is suitable for the proposed use, or uses within the proposed Zone classification. 1 (contd.) C. FINDINGS OF FACT (continued) ZONE RECLASSIFICATION NO.: ZE -57 -83 7. That the applicant has demonstrated that conditions have substan- tially changed since the original zoning of this area and accord- ingly, the proposed rezone is justified. 8. That the proposed use is compatible with existing uses in the area. 9. That the owners of adjacent lands and /or their representatives expressed neither approval nor disapproval of the proposed use. 10. The Hearing Examiner Committee finds the proposed use to be in harmony with the general purpose and will not be otherwise detri- mental to the public health, safety, and welfare. 11. The following are additional findings of fact considered by the Zoning Hearing Examiner Committee: a) That the applicant expressed his willingness to construct a sidewalk in cooperation with the County Engineer's required condition. D. 'CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL a) COUNTY PLANNING DEPARTMENT 1. The Zoning Administrator shall approve a specific exterior lighting plan for the approved area prior to installation of such lighting. (Such plan shall attempt to confine illumina- tion to the area with full consideration to adjacent properties.) 2. Approval by the Zoning Administrator of a specific lighting and signing plan for the described property prior to the release of any building permits. 3. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. 2 (contd.) COUNTY PLANNING DEPARTMENT (continued) ZONE RECLASSIFICATION NO.: ZE -57 -83 4. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Variations when approved by the Zoning Administrator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All varia- tions must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the develop- ment plans shall be maintained. 5. Direct light from any exterior area lighting fixture shall not extend over the property boundary. 6. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permits. 7. All current standards of the Local Business and Residential Office Zones, as amended, shall be complied with in the develop- ment of this site as follows: Local Business Zone over_the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the East 100 feet; and Residential Office Zone over the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the West 190 feet. 8. Landscaping shall be provided for this site, in conformance with Standards as identified in Section 4.07A.120 Landscaping. 9. A suitable dense landscaping screen shall be provided along the east and south property lines of this proposal to provide a buffer for the existing uses located immediately east and south of this site. 10. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff. 11. Any division of land for the purpose of sale, lease, or trans- fer shall comply with RCW 58 -17 and the Spokane County Platting Ordinances prior to issuance of building permits. 12. Applicant shall comply with all agency's regulations as amended prior to issuance of building permits. 3 (contd.) C COUNTY PLANNING DEPARTMENT ZONE RECLASSIFICATION NO.: ZE -57 -83 (continued) 13. That the provisions of SEPA 's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners' Resolution #77 -1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on -site improvements, or file appropriate documents to the effect that the NOTICE OF ACTION is waived in accordance with Spokane County Commissioners' Resolution #82 -0458 dated May 4, 1982. 14. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAC 197 -10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non - significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and /or public testimony contain information regarding assessment of the proposal's adverse impacts to the physical environment; a finding is hereby made that no potentially significant adverse impacts upon the physical environment are anticipated as a result of the project; and a final declaration of non - significance is hereby to be issued. 15. That the design of the rear parking area and access onto Willow Road be made in such a way to minimize the traffic flow onto Willow. Compliance shall be determined by the Zoning Adminis- trator at site plan review prior to release of building permits. b) COUNTY ENGINEERING DEPARTMENT 1. Applicant shall dedicate 10 feet on Willow Road for right of way prior to any use of the property. 2. Access permits for approaches to the County Road System shall be obtained from the Spokane County Engineer. 3. Applicant shall improve Willow Road in a manner consistent with Spokane County TYPICAL roadway section No. 1 minimum paving width Access Standard. 4. Other specific improvements: Applicant shall construct Spokane County standard Portland Cement concrete sidewalk along Main Avenue. 5. Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plans prior to the issuance of a building permit on the property. 4 (contd.) COUNTY ENGINEERING DEPARTMENT (continued) ZONE RECLASSIFICATION NO.: ZE -57 -83 6. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on -site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any build- ing permit on the property. 7. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accord- ance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 8. The word " applicant" shall include the owner or owners of the property, his heirs; assigns, and successors. 9. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construc- tion, and other applicable County standards and /or adopted resolutions pertaining to Road Standards and Stormwater Manage- ment in effect at the date of construction, unless otherwise approved by the County Engineer. 10. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners' . Resolution No. 80 -1592, as amended. c) COUNTY HEALTH DISTRICT 1. Appropriate utility easements shall be indicated. 2. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 3. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 4. Subject to specific application approval and issuance of permits by the Health Officer, the proposal is authorized the use of an individual on -site sewage system. 5. Water service shall be coordinated through the Director of Utilities, Spokane County. 5 (contd.) c) HEALTH DISTRICT (continued) d) COUNTY BUILDING AND SAFETY DEPARTMENT e) WATER PURVEYOR f) COUNTY AIR POLLUTION CONTROL AUTHORITY g) COUNTY UTILITIES DEPARTMENT ZONE RECLASSIFICATION NO.: ZE -57 -83 6. Water service shall be by an existing public water supply. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. 1. The site is located in Fire District #1. 2. Installation of fire hydrants to be in accordance with the requirements of the Spokane County Department of Building and Safety and Fire District #1. 1. Purveyor is Modern Electric Water Company, and they will supply the site with adequate water for domestic, fire and irrigation uses. 1. Regulations require that dust be controlled during all phases of the project. 2. Further require that all parking areas and access roads be paved and kept clean. During the construction period, measures must be taken to avoid the deposition of dirt from unpaved surfaces onto paved surfaces. 1. Pursuant to the Board of County Commissioners' Resolution No. 80 -0418, the use of on -site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of permits by the Health District. 6 (contd.) E. ORDER Williams Aye Myers - Aye Skalstad - Aye Unanimous to Approve - (3 - 0 ) ZONE RECLASSIFICATION NO.: ZE -57 -83 g). COUNTY UTILITIES DEPARTMENT (continued) 2. The Owner(s) or Successor(s) in interest agree to authorize the County to place their name(s) on a petition for the forma- tion of a ULID by petition method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the signing of a protest petition against the formation of a ULID by resoltuion method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROVIDED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improve- ments called for in conjunction with the formation of a ULID by either petition or resolution method under RCW Chapter 36.94. 3. Any water service for this project shall be provided in accord- ance with the Coordinated Water System Plan for Spokane County, as amended. 4. Each unit shall be double - plumbed for .connection to future areawide collection systems. The Zoning Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Prokey Arger for a zone reclassification as described in the application should be APPROVED. Motion by: Williams Seconded by: Myers VOTE: APPROVE TO LOCAL BUSINESS AND RESIDENTIAL OFFICE ZONES Local Business: The South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the East 100 feet in Section 17- 25 -44. RESIDENTIAL OFFICE: The South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the West 190 feet in Section 17- 25 -44. 7 (contd.) E. ORDER (continued) ATTEST: For WALLIS D. HUBBARD Planning Director. t C /eACrGakIlit- By STEVE P. HOROBIOWSKI Zoning Administrator Date: 76:_ f %/ /i/5 8 ZONE RECLASSIFICATION NO.: ZE -57 -83 HEARING EXAMINER HEREBY ATTEST TO FINDI S, ORDER, COMMITTEE THE ABOVE AND VO E Chairman • I I k SI? , 4, .„••••.- • . .; — • .. . :4.... ' “••• • • • , • 4 • . J J . 1 1 ‘ : • 1 ,; - • ' . -■ - 1 JRIGHT OF WAY DLO) . , ____ —...... _________-.---- . - , e.:• • : . Z 1 E 754 57 3 " 1 83 31d P . 41 ,,,._ __•__ __ • • __ . _____. ._ . - 5 . • ... • , . . • , , • • • ' i t : 1 4 . • . . - : . fj" r 7 - 40G IU ‘.1 - T.:1 • • • • • I • ■ • • 1 N 1'111'; NI ATT VIZ tit thy ' • Willow Road t:„ I 01-K K Nt ) \‘'. vI NI I..N By 1111 'I 1 , 10 .1 s i.:N i .s . i h B .C. 83-2, a Washington Limited .• ‘X,1 Partnership ., bib Wilt, Ill the Curly tit Sy■ikitt■e. •• ' - . .' 111 lily St Zat• W itslling ton. in 'I.:••tistii, latitin (if the henetats and I II ilr i V .■ILialle const■IcI.1110115:;:inillik ,y • •• if i One and no/100 • 1) l'A ill the 1:y the 'Cuunty .“1S0,1 ' ' 1,-?'-'• . the receipt whereni 12, het eby an Icitim Icilged. have g raided, bargained, sold and cdnvey ea, 'apd la •,',, . ' ;..,,," . . ' •1, By:scuts (1,, gizintbarg.iiii sell .11111 tunvey untip said Suukune Ctaility, the 10114155111g dtheithett pared' of lantli ......„.: • 7:,. . situ at:I in Siuthatic C..iitity, in the, State oi Washingtial. tu wit . .- • • Iv• .. .. , ThaCpbrtion of' Parcel -"A" described as follows: The East 5 feet, and-that .r; -t"I. ... portion lying Northeast of an arc concave to the Southwest, with "a radius 1:)f..... 20 feet, at the Northeast corner therof; the ends of said arc being tangent with the North line, and also being tangent with a" li ne ' paral 1 el to and 5 • . ; feet West of the 'East line of said Parcel .A. . . . .: ,.' , p ,O...I.I0 ' • ' : •• • k •t ThdXsouth * ' • • • ,:.• , . '' .157 feet of the East Half (E!1) of Tract 140, OPPORTUNITY, accorino • ' 4. .:, ' •.. 1 ... • to plat filed in Volume "K" of Plats, Page 20, Spokane County, • '' "-, it 4 , •r.a : , EXtEPT. •the West . 30feet : thereof . :' . ,• . . All in Section 17, Township 25 North, Range .44 E.W.M. • , , • , • :: 4 ' • • ' ...4,‘,; ''.; • '. ..(" •< . - ■• • . . . 44- ' il4 ) ., . r I • , • • . • i • • 1 • ' of Section 1 7 ..rownship 2 5 Notth. Ranee ; E•W• • • a • TO HAVE: ANL) TO HOLD the same, unto the ,and Spokane County for the purposes of . a public•road..,0 forever: -• ' • .4:: In witnes "whereof I have hereunto set my •and__ and sealL..._ i1l1- ' '' 12 t i l l " ----. .:.... • • ..f. '.''. .... .day of • Anvil • . • ( 22 \ . c ..../...... . t ..• R. E. Excise lax Exempt c . . • , - aDate 9C 19eP,5/ \ Spokane County Trees. . 4 4 4 .•',-:... - • (NOTE? &fried. angst be signed by both husband and *I(s.) Rv k ••••• - • i CI 64(1 4130239 cara #5 NOTICE IO THE PUBLIC KNOW ALL MEN BY THESE PRESENTS, That hC q� a Washington T,iwited , • • being the owners of the following described lands in :consideration of mutual benefits ' to be hereafter, derived do for themselve, their heirs, grantees and assigns, hereby ? - .agree to the following: To authorize the County to place their name(s) on a petition for the formation of a ULID by petition method pursuant to RCM 36.9 which.the :. petition includes the Owner(s) property and further not to object by `• the signing of a protest petition against the formation of a ULID'by . resolution "method pursuant to RCW Chapter 36.94 which includes' the . , Owner(s) property. PROV1DED,, this condition shall • not prohibit' the. Owner(s) or Successor(s) from objection to ariy.assessment.(s).ion,,the - 'property as a result of improvements called for in conjunction' the formation of a ULID by either petition or:resolutioh method - under:, RCW.Chaoter 36.94. This statement .involv,es the following described property: • 'The South,,157 feet Of the East Half,.(E- )'of Tract 140, OPPORTUNITY, ' 'according to plat!fil'ed in. Volume "K" of Plats, P Snnkane County Washington. EXCEPT•the•West 30' feet' thereof. All.in Section 17,, Township 25 North,; Range, 44 E.W. t' - These','reduirements are-,and shall run with'the land and shall betiindin4 "upon'the' owners, their heirs, successors or assigns,. 1 . ; ti ;'1' . County__Engineer j1 1. t fir• Fe i3 3 53 1.5 B Main Avenue No.2163` ZE 57 83 17543-1310 p OL. 687 PATE IN (WITNESS WHEREOF, said corporation has caused this instrument to be executed by its proper officers and its corporate sit1-9 be hpreanto WOW this 12th day of Apii1. 1984 • ;Al= , 'Cii:-.HUE R t U C i l C" Secretary. SPCKAN: COt.!! Y. WASH. tt _' �:; xxx t•l'I :Il x a STATE OF County of On this 12th day of April. 1934 .._ _ ._ __a r,._ .r._ o,,. ,.r !•;rah duly commissioned and sworn, personally appeared Reg Court House , before me, the undersigned; t s STATE OF WASHINGTON AB' ..540 Main Ave No 2103 ZE57E3 17543 1310 !iFF. f +p EASEMENT YOII. 687" PASE ..The,Grantor(s) B.C. Investments, a Washington Limited Partnership' of the County of Spokane, State of Washington for and in consideration of One.and: no/100...(81.00) to them in hand paid, and the reoeipt of which -is hereby 'L. aoknowledged, grants to Spokane County, a municipal corporation, State of Washington,' a. ,p} an easement to use the following described real property situated in..the_ County Hof • , Spokane, and—State of Washington, k •TO4litt The North 2 feet, and that portion lying'Northwesterly of a i line.beginnnq a point 7 feet South' of the Northwest corner; thence Northeasterly to a point 12 fret Fast of said Northwest cnrner'. „ ''4 ) :AND ALSO the West 2 feet of the East 7 feet, and that portion lying „Northeast -' : A e'nl,y of an arc concave to '.the Southwest, with a radius of 20 feet at the North- . .east corner thereof, the ends of said arc being tangent, with the North1'ine;and, ' also ,being tangent with a line parallel and 7feet West of the East.1J e ; of said Parcel' "WC' , Parcel "A” ti ''The;South'157 feet of the East_Nal .(Eh)' of ..Tract •140,,.OPPORTUNITY, to plat recorded °in Volume "K" of Plats,,Page °20, Spokane. County, Washington,. EXCEPT' the West,30 feet thereof. . '. .Y' ., - . All in. Section.17;' Township 25 North, Range, 44`'ElW. • ' R. E. Excise Tax Exempt ' , Data C' .0 :C7' 99.r SPokano County, Treas.,' @�/. This easement grants to: Spokane, County and ita'authorized agents the richt • .and egress to,ovei, and from' said easement-for the (installation), (opei^ation),t. • (maintenance), and "(repair) of traffic signs =and siunals . • (installed 'or in the future installed under County 21Q3 , and .knoin as Ma Avenue • Reg Court House . This easement shall apply to all interest now owned or hereafter acquired iii the••,'; above desoribed properties. .._vLwix.4.- uugi„cc ern 13 3 53 Ni ` t W I_u. 1, 4ijifl [ Fl„ SPOF;AN: �1rYAA §b: • xxx Zoning Hearing Examiner Committee Actions of August 16, 1983 (continued) ZW- 154A -81, Location: Change of Conditions in Restricted Industrial Zone (With Airport Overlay Zone): Olympic Foods, Inc. Generally located south of and adjacent to Thorpe Road at the southeast corner of the intersection of Grove Road and Thorpe Road in Sections 34 -25 -42 and Section 3- 24 -42. Review a Specific Site Plan for a portion of the rezoned site and a request to delete Planning Condition #1 requiring site plan ., review by the Zoning Hearing Examiner Committee on the remainder of the site. Approval of Site Plan. (Vote: 3 - 0) Denial of Deletion of Planning Condition #1. (Vote: 3 - 0) Any future development plans for the remainder of the property will be reviewed by the Hearing Examiner Committee at a public hearing, thus insuring compatibility with adjoining uses and consistency with Decision Guidelines as specified in the Industrial category of the Spokane County Generalized Comprehensive Plan. 4) ZE 57 -83, Agricultural and Two - Family Residential (R -2) to Local Business and -- Residential Office: Arger SPH:cmw Proposal: Action: Location: Proposal: Action: 5) ZE- 32 -83, Proposal: Action: i7 Generally located along the south side of Main Avenue between Mullen Road and Willow Road in Section 17- 25 -44. Office Buildings. Approval to Local Business zoning on the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the East 100 feet in Section 17- 25 -44. Approval to Residential Office zoning on the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the West 190 feet in Section 17- 25 -44. (Vote: 3 - 0) Agricultural to Local Business: Wheeler Location: Generally located along the north side of Trent Road, approxi- mately 1/2 mile east of Campbell Road and approximately 1/2 mile west of Harvard Road in Section 33- 26 -45. Multi- Service Fruit Stand Approval. (Vote: 3 - 0) If further information is desired, contact the Planning Department's office. 2 ingir NA .7,74k mW4 uHO , ' '�r117iry Ira i i .*'� \I •' IWrail'Nf }ul�'{�. ;1 =s, SPOKANE COUNTY COURTHOUSE August 16, 1983 Gentlemen: SR B AD )111.41 4, PLANNING DEPARTMENT } s'�t''ifin'tift BROADWAY CENTRE BUILDING N. 721 JEFFERSON STREET PHONE 456 -2205 SPOKANE, WASHINGTON 99260 TO: Board of Spokane County Commissioners FROM: 491 Steve P. Horobiowski, Zoning Administrator SUBJECT: Zoning Hearing Examiner Committee Actions of August 4, 1983. On August 4, 1983, the Zoning Hearing Examiner Committee met at 9:00 A.M. to con- sider four new zone reclassification applications and one change of conditions application. Members present: Mr. Skalstad, Chairman; Mrs. Myers and Mr. Williams. Following are the applications in sequence and the action taken by the Committee. If not appealed, these decisions will become final on August 22, 1983. All Findings and Order for this hearing were signed on August 11 - , 1983. 1) ZE - 29 -83, Multiple Family Suburban to Commercial and WVE- 27 -83, Waiver of Violation to Allow a Continued Five Foot Rear Yard Setback: Balch Location: Generally located at the northwest corner of Harrington Avenue and Hutchinson Street in Section 18- 25 -44. Proposal: Warehouse and Office Complex Action: Approval to Commercial Zone. (Vote: 3 - 0) The Zoning Adjustor's decision was for Approval for the Waiver of Violation to allow an existing five foot rear yard setback to continue for a structure on -site. 2) ZE - 60 - 83, Single Family Residential (R -1) to Two - Family Residential (R -2): Wolfland, Inc. Location: Generally located on the north side of Mission Avenue at the intersection of Mission Avenue and Glenn Road in Section 9- 25 -44. Proposal: Duplex Lots. Action: Approval. (Vote: 3 - 0) (contd.) A. INTRODUCTION This matter having come before the Zoning Hearing Examiner Committee on August 4, 1983, and the members of the Committee present being Richard L. Skalstad, Chairman, Jane E. Myers and Jerry Williams. B. PROPOSAL The sponsor, Prokey Arger, is requesting approval of a zone reclassifica- tion, File No. ZE- 57 -83, Agricultural and Two - Family Residential (R -2) to Local Business and Residential Office for the purpose of developing Office Buildings. C. FINDINGS OF FACT SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER ZONE RECLASSIFICATION NO.: ZE -57 -83 1. That the existing land use in the area is residential, commercial, offices, and vacant. 2. That the Comprehensive Plan designates this area as appropriate for Commercial and Urban development. 3. That the existing zoning of the property described in the applica- tion is Agricultural and Two - Family Residential (R -2). 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with, and the Committee concurs with the Declaration of Non - Significance. 5. That the proper legal requirements for advertisement of the Agenda items have been fulfilled. 6. That the land in this area is suitable for the proposed use, or uses within the proposed Zone classification. 1 (contd.) C. FINDINGS OF FACT (continued) ZONE RECLASSIFICATION NO.: ZE -57 -83 7. That the applicant has demonstrated that conditions have substan- tially changed since the original zoning of this area and accord- ingly, the proposed rezone is justified. 8. That the proposed use is compatible with existing uses in the area. 9. That the owners of adjacent lands and /or their representatives expressed neither approval nor disapproval of the proposed use. 10. The Hearing Examiner Committee finds the proposed use to be in harmony with the general purpose and will not be otherwise detri- mental to the public health, safety, and welfare. 11. The following are additional findings of fact considered by the Zoning Hearing Examiner Committee: a) That the applicant expressed his willingness to construct a sidewalk in cooperation with the County Engineer's required condition. D. CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL a). COUNTY PLANNING DEPARTMENT 1. The Zoning Administrator shall approve a specific exterior lighting plan for the approved area prior to installation of such lighting. (Such plan shall attempt to confine illumina- tion to the area with full consideration to adjacent properties.) 2. Approval by the Zoning Administrator of a specific lighting and signing plan for the described property prior to the release of any building permits. 3. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. 2 (contd.) -COUNTY PLANNING DEPARTMENT (continued) ZONE RECLASSIFICATION NO.: ZE -57 -83 4. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Variations when approved by the Zoning Administrator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All varia- tions must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the develop- ment plans shall be maintained. 5. Direct light from any exterior area lighting fixture shall not extend over the property boundary. 6. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permits. 7. All current standards of the Local Business and Residential Office Zones, as amended, shall be complied with in the develop- ment of this site as follows: Local Business Zone over the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the East 100 feet; and Residential Office Zone over the South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the West 190 feet. 8. Landscaping shall be provided for this site, in conformance with Standards as identified in Section 4.07A.120 Landscaping. 9. A suitable dense landscaping screen shall be provided along the east and south property lines of this proposal to provide a buffer for the existing uses located immediately east and south of this site. 10. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff. 11. Any division of land for the purpose of sale, lease, or trans- fer shall comply with RCW 58 -17 and the Spokane County Platting Ordinances prior to issuance of building permits. 12. Applicant shall comply with all agency's regulations as amended prior to issuance of building permits. 3 (contd.) ZONE RECLASSIFICATION NO.: ZE -57 -83 COUNTY PLANNING DEPARTMENT (continued) 13. That the provisions of SEPA 's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners' Resolution #77 -1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on -site improvements, or file appropriate documents to the effect that the NOTICE OF ACTION is waived in accordance with Spokane County Commissioners' Resolution #82 -0458 dated May 4, 1982. 14. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAG 197 -10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non - significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and /or public testimony contain information regarding assessment of the proposal's adverse impacts to the physical environment; a finding is hereby made that no potentially significant adverse impacts upon the physical environment are anticipated as a result of the project; and a final declaration of non - significance is hereby to be issued. 15. That the design of the rear parking area and access onto Willow Road be made in such a way to minimize the traffic flow onto Willow. Compliance shall be determined by the Zoning Adminis- trator at site plan review prior to release of building permits. b) COUNTY ENGINEERING DEPARTMENT 1. Applicant shall dedicate 10 feet on Willow Road for right of way prior to any use of the property. 2. Access permits for approaches to the County Road System shall be obtained from the Spokane County Engineer. 3. Applicant shall improve Willow Road in a manner consistent with Spokane County TYPICAL roadway section No. 1 minimum paving width Access Standard. 4. Other specific improvements: Applicant shall construct Spokane County standard Portland Cement concrete sidewalk along Main Avenue. 5. Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plans prior to the issuance of a building permit on the property. 4 (contd.) COUNTY ENGINEERING DEPARTMENT (continued) c) COUNTY HEALTH DISTRICT ZONE RECLASSIFICATION NO.: ZE -57 -83 6. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on -site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any build- ing permit on the property. 7. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accord- ance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 8. The word " applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 9. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construc- tion, and other applicable County standards and /or adopted resolutions pertaining to Road Standards and Stormwater Manage- ment in effect at the date of construction, unless otherwise approved by the County Engineer. 10. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners' Resolution No. 80 -1592, as amended. 1. Appropriate utility easements shall be indicated. 2. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 3. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 4. Subject to specific application approval and issuance of permits by the Health Officer, the proposal is authorized the use of an individual on -site sewage system. 5. Water service shall be coordinated through the Director of Utilities, Spokane County. 5 (contd.) c) HEALTH DISTRICT (continued) 6. Water service shall be by an existing public water supply. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. d) COUNTY BUILDING AND SAFETY DEPARTMENT 1. The site is located in Fire District #1. 2. Installation of fire hydrants to be in accordance with the requirements of the Spokane County Department of Building and Safety and Fire District #1. e) WATER PURVEYOR ZONE RECLASSIFICATION NO.: ZE -57 -83 1. Purveyor is Modern Electric Water Company, and they will supply the site with adequate water for domestic, fire and irrigation uses. f) COUNTY AIR POLLUTION CONTROL AUTHORITY 1. Regulations require that dust be controlled during all phases of the project. 2. Further require that all parking areas and access roads be paved and kept clean. During the construction period, measures must be taken to avoid the deposition of dirt from unpaved surfaces onto paved surfaces. g) COUNTY UTILITIES DEPARTMENT 1. Pursuant to the Board of County Commissioners' Resolution No. 80 -0418, the use of on -site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of permits by the Health District. 6 (contd.) E. ORDER ZONE RECLASSIFICATION NO.: ZE -57 -83 g) COUNTY UTILITIES DEPARTMENT (continued) 2. The Owner(s) or Successor(s) in interest agree to authorize the County to place their name(s) on a petition for the forma- tion of a ULID by petition method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the signing of a protest petition against the formation of a ULID by resoltuion method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROVIDED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improve- ments called for in conjunction with the formation of a ULID by either petition or resolution method under RCW Chapter 36.94. 3. Any water service for this project shall be provided in accord- ance with the Coordinated Water System Plan for Spokane County, as amended. 4. Each unit shall be double - plumbed for connection to future areawide collection systems. The Zoning Nearing Examiner Committee, pursuant to the aforementioned, finds that the application of Prokey Arger for a zone reclassification as described in the application should be APPROVED. Motion by: Williams Seconded by: Myers VOTE: APPROVE TO LOCAL BUSINESS AND RESIDENTIAL OFFICE ZONES Local Business: The South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the East 100 feet in Section 17- 25 -44. RESIDENTIAL OFFICE: The South 200 feet of the East 1/2 of Block 140, Opportunity EXCEPT the West 190 feet in Section 17- 25 -44. Williams - Aye Myers Aye Skalstad - Aye Unanimous to Approve - (3 - 0 ) 7 (contd.) E. ORDER (continued) ATTEST: For WALLIS D. HUBBARD Planning Director By STEVE P. HOROBIOWSKI Zoning Administrator Date: 8 ZONE RECLASSIFICATION NO.: ZE -57 -83 HEARING EXAMINER HEREBY ATTEST TO FIB S, ORDER, Chairman c (: / COMMITTEE THE ABOVE AND VO E S 1 41— 1 /44C Lot) g Q ( &0/ _ 8 60530047c ROAD NAME i vo t NO. 5 PARCEL NO. /75 f 3 -/ j c zE -io3 s T: NOTICE TO THE PUBLIC sE ze— SSA- j C ✓C - d' 5 - KNOW ALL MEN BY THESE PRESENTS, That BC Investments 83 — Two Limited Partnership being the owners of the following described lands in consideration of mutual benefits c- to be hereafter derived do for themselves, their heirs, grantees and assigns, hereby ►R agree: To authorize the County to place their name(s) on a petition for the formation of a ULID by petition method pursuant to RCW 36.94 which the petition includes the Owners property and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW • Chapter 36.94, which includes the Owner(s) property. PROVIDED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assess- ment(s) on the property-as d result of improvements called for in conjunction with the formation of a ULID by either petition or resolution method under RCW Ch 3A.94. This stateme i c the following described property: Lot 1, Block 141, OPPORTUNITY, as recorded in Volume "K" of Plats, Page 20, in Spokane County, Washington. In Section 17, Township 25 North, Range 44 E.W.M. REQUEST ST OE .Goo . nt-y. -Engineer MAY 30 4 34 PH lb WILLIAM C. DUNAlluE AUDITOR i$POKANE COUNTY. WASH.' UFPUTY f \ tt A Interoffice xxx These requirements are and shall run with the land and shall be binding unon the Owner(s), their heirs, successors or assigns. Dated this 27th day of May 19 86 BC INVESTMENTS 83-TWO LIMITED PARTNE R$HIP e �ro•e . -s ra per t repo it ./61 -c er -j rartner STATE OF WASHINGTON ) ss COUNTY OF SPOKANE ) On this 27thday of May 19 86 , before my personally appeared Prokey Arger and Gregory Arger of BC Investments 83 — Two Limited Partnership personally known to me to be the individual(s) described herein who executed the foregoing instrument and acknowledged the said instrument to be the free and volun- tary act and deed of said individual(s), for the uses and purposes herein mentioned. IN WITNESS WHEREOF, I have set my hand and affixed my official seal this day and year first above written. \�^J R/W 1/1/85 % of "")9k e Q /Tl�rt� Notary Public, In & nd for the State of•Washington, residing in Spokane, hashington , ,RIGHT OF WAY DEED 8605300,1'7S IN THE MATTER of Willow Road No. 1201 — KNOWN ALL MEN BY THESE PRESENTS, that BC Investments t33 —Two Limited Partnership =MOM of the County of Spokane, in the State of Wahington, in consideration of -the benefits and other valuable considerations, and the sum of One and no /100 - - - Dollars, paid them by the County of Spokane, the receipt whereof is hereby acknowledged, have granted, bargained, sold and conveyed, and by these presents do grant, bargain, sell and convey unto said Spokane County, the following described parcel of land, situated in Spokane County, in the State of Washington, to -wit: The East 5 feet of Lot 1, Block 141, OPPORTUNITY, as recorded in Volume "K of Plats, Page 20, in Spokane County, Washington. "∎' of Section 17, Township 25 North, Range 44 , E.W.M. TO HAVE AND TO HOLD the same, unto the said Spokane County for the purposes of a public road forever. IN WITNESS WHEREOF we have hereunto set our hand s and seal s this27thday of May 19 36 R/W 1/1/85 " sl A i 3 Moz-b , Su, ire 2o✓, S J, " "' 9720e, afrite, sot -n / 751 .. J PAC.' .(c5 / BC INVESTMENTS 83 — TWO LIICITED ?ARTNERS rr/ kcgy argE@ / }� tne'r J ��� ! .�`�L�f /t egory IAr — /Prtner 1 Zoning Hearing 8) ZE- 99 -85, ZE- 42A -71 and ZE- 35A -78, Location: Proposal: Action: rrrriivia� FE[ .> 13 1JH(j County Engineering Examiner Committee Actions of February 6, 1986 #2 (continued) 4) ZE- 62 -85, Agricultural to Residential Manufactured Home (RMH): Ring Location: Generally located north of and adjacent Alki Avenue, approximately 100 feet east of Dick Road in Section 18- 25 -44. Proposal: 2 -Unit Manufactured Home Park Action: Denial. (Vote: 3 - 0) The Hearing Examiner Committee found that the proposed density would be excessive with adjoining properties in the area and that the proposed 50 -foot stall widths would be inconsistent with existing lot frontages of the neighborhood. 5) ZE- 103 -85, Agricultural and Two - Family Residential (R -2) to Local Business and Residential Office: Arger ZE- 57A -83, Change of Conditions in the Local Business and Residential Office Zon VE- 164 -85, Variance to Allow Off -Street Parking Area to Occupy Front,Yard Setbac Location: Generally located south of and adjacent to Main Avenue, between Mulla Road and Willow Road in Section 17- 25 -44. Proposal: Office Building. The Change of Conditions request was to review a new Site Development Plan. The request for a Variance was to allow Off- Street Parking Area to Occupy the Front Yard Setback. Action: Approval. (Vote: 3 - 0) (The Hearing Examiner Committee is now authorized to hear and make a decision on Variance applications when combined with a zone reclassi- fication by recent amendment to the Spokane County Zoning Ordinance and the Hearing Examiner Committee Ordinance.) 6) ZE- 97 -85, Agricultural and Commercial to Regional Business (B -3) Zones: Smith Location: Generally located north of and adjacent Sprague Avenue, approximately 750 feet west of Flora Road in Section 13- 25.44. Proposal: Auto Body Repair, Painting, Sale and Rentals. Action: Approval. (Vote: 3 - 0) 7) ZE- 98 -85, Agricultural to Commercial: Mielke Location: Generally located at the northwest corner of Sprague Avenue and Progress Road in Section 14- 25 -44. Proposal: General Retail and Warehouse Uses. Action: Approval. (Vote: 3 - 0) Local Business to Commercial: Shopko and Tombari Change of Conditions in the Commercial Zone Generally located south of and adjacent to Sprague Avenue, between McDonald Road and Blake Road in Section 22- 25 -44. Retail Shopping Center. Also, a Change of Conditions request to review a new Site Development Plan to accommodate a total project of a 19 -Acre Retail Sales Center in existing Commercial Zones. Approval. (Vote: 3 - 0) e k n A. INTRODUCTION ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER This matter having come before the Zoning Hearing Examiner Committee on February 6, 1986, and the members of the Committee present being Kathleen M. Carstens, Chairperson, Jane E. Myers and Ron Odell. B. PROPOSAL The sponsor, Prokey G. Arger, is requesting approval of a zone reclassification, File No. ZE- 103 -85, Agricultural and Two - Family Residential (R -2) to Local Business and Residential Office, for the purpose of developing an office building. A Change of Conditions request, ZE- 57A -83, in existing Local Business and Residential Office Zones for the purpose of reviewing a new site development plan. Also, a Variance request, VE- 164 -85, to allow an off - street parking area to be within 5 -feet of the east property line, whereas the Spokane County Zoning Ordinance, Section 4.07A.110 -(a) requires a 20 -foot front yard landscaped setback. C. FINDINGS OF FACT 1. That the existing land use in the area is residential, office complex, and vacant. 2. That the Comprehensive Plan designates this area as appropriate for Major Commercial and Urban development. 3. That the existing zoning of the property described in the application is Agricultural and Two - Family Residential (R -2). 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with, and the Committee concurs with the Determination of Non - Significance. 5. That the proper legal requirements for advertisement of the Agenda Item have been fulfilled. 6. That the land in this area is suitable for the proposed use, or uses within the proposed Zone Classification. C. FINDINGS OF FACT (continued) ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 7. That the applicant has demonstrated that conditions have substantially changed since the original zoning of this area and accordingly, the proposed rezone and change of conditions are justified. 8. That the proposed use is compatible with existing uses in the area. 9. That the owners of adjacent lands expressed disapproval of the parking situations and safety, and that the applicant has agreed to provide as many parking spaces as can be made available. 10. The Hearing Examiner Committee finds the proposed use to be in harmony with the general purpose and will not be otherwise detrimental to the public health, safety, and welfare. 11. The following are additional findings of fact considered by the Hearing Examiner Committee: a) That the Variance request to allow an off - street parking area to within 5 -feet of the required front yard is hereby Approved. b) That the proposed Variance is not detrimental to and is compatible with the public health, safety and welfare. c) That a planted screen along the east and south property lines will provide a buffering between the proposed office and residential uses. d) That the requested Variance is necessary to provide the maximum number of parking spaces within the site and should help to resolve street parking within the area. e) That all three requests are consistent with past actions within this immediate area, and if properly buffered to the residences to the east, the proposal can be consistent with the Comprehensive Plan. D. CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL (All Conditions imposed by the Zoning Hearing Examiner Committee shall be binding on the "Applicant ", which term shall include the owner or owners of the property, heirs, assigns, and successors.) 1. Add Engineering Department Condition #10 as follows: "That the applicant shall dedicate 5 -feet on Willow Ropad for right of way and easements as necessary prior to any use of the property." D. CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL (continued) 2. Add Planning Department Condition #9 as follows: "That the applicant work with the Zoning Administrator in providing as many additional parking spaces as can be made available to the site." a) COUNTY PLANNING DEPARTMENT ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 1. Approval by the Zoning Administrator of a specific lighting and signing plan for the described property prior to the release of any building permits. 2. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. Landscaping shall be installed and maintained such that sight distance at access points is not obscured or impaired. 3. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Variations when approved by the Zoning Administrator iwill.be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance, The original intent of the development plans shall be maintained. 4. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permits. 5. All current standards of the Local Business and Residential Office Zones, as amended, shall be complied with in the development of this site. Legal descriptions of the proposed zones are as follows: Residential Office: The East 94 feet of Lot 1, Block 141, Opportunity in Section 17- 25 -44. Local Business: The West 186.5 feet of Lot 1, Block 141, Opportunity in Section 17- 25 -44. 6. That the project is subject to Section 4.16A.050, the Aquifer Sensitive Area Overlay Zone of the Spokane County Zoning Ordinance, which sets forth various measures for Aquifer protection; specifically, measures dealing with wastewater disposal, spill protection measures, and stormwater runoff. ZONE RECLASSIFICATION N0. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 a) COUNTY PLANNING DEPARTMENT (continued) 7. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff. 8. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners' Resolution #77 -1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on -site improvements. b) COUNTY ENGINEERING DEPARTMENT Prior To The Issuance Of A Building Permit: 1. Access permits for approaches to the County Road System shall be obtained from the Spokane County Engineer. 2. Applicant shall improve Willow Road in a manner consistent with Spokane County TYPICAL roadway section No. 1 minimum paving width Access Standard. 3. Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plans prior to the issuance of a building permit on the property. 4. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined pn -site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. 5. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 6. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 7. The construction of the road improvements stated herein shall be accomplished as approved by the Spokane County Engineer. 4 b) COUNTY ENGINEERING DEPARTMENT (continued) 8. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction, and other applicable County standards and /or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 9. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners' Resolution No. 80 -1592 as amended and are applicable to this proposal. c) COUNTY UTILITIES DEPARTMENT 1. No new recommendations. d) COUNTY HEALTH DISTRICT ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 1. A combined surface water and sewage disposal detailed plan shall be approved by the Spokane County Engineer and the Spokane County Health District prior to the issuance of any building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an on -site sewage disposal system may be authorized. 4. Water service shall be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social and Health Services. 6. Use of private wells and water systems is prohibited. 7. Disposal of sewage effluent beneath prohibited. Note: The sponsor has not reserved TWacement on -site sewage disposal fails to function properly. 5 paved surfaces is currently sufficient space for a system when the original e) COUNTY BUILDING AND SAFETY DEPARTMENT 1. The site is located in Fire District # 1. ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. YE- 164 -85 2. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. 3. Trash enclosures shall not be located adjacent to combustible construction or underneath windows or nonprotected eaves. 4. Building permits will be required for each structure. 5. Fire hydrants which meet the fire flow are required to be installed prior to any construction. These hydrants shall be placed so that no portion of the building exterior is more than 175 feet from the hydrant. The bottom of the lowest outlet of the hydrant shall be no less than 18 inches above grade. A water plan showing each fire hydrant (specifying the gallons per minute for each fire hydrant) and meeting the requirements in Chapter 10.04 of the Uniform Fire Code is required prior to construction of the water service. All required fire protection facilities shall be installed and made serviceable prior to and during the time of construction. f) WATER PURVEYOR 1. Water Purveyor is Modern Electric Water Company, and they will supply the site with adequate water for domestic, fire and irrigation uses, but satisfactory arrangements have not been made to serve this proposal. g) COUNTY AIR POLLUTION CONTROL AUTHORITY 1. Air pollution regulations require that dust emissions during demolition, excavation and construction projects be controlled. This may require use of water sprays, tarps, sprinklers, or suspension of activity during certain weather conditions. Haul roads should be treated and emissions from the transfer of earthen material must be controlled as well as emissions from all other construction related activities. 2. Measures must be taken to avoid the deposition of dirt and mud from unpaved surfaces onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be taken immediately to clean these surfaces. 6 g) COUNTY AIR POLLUTION CONTROL AUTHORITY (continued) E. ORDER 3. All travelled surfaces (ingress, egress, parking areas, access roads) must be paved and kept clean. 4. Some objectionable odors will likely result during the construction phase of the project and from motor vehicles using the site following completion of the project and from occupants of the proposed project. 5. All air pollution regulations must be met. 6. Additional Comments. National Emission Standards must be followed for handling and removal of asbestos. The Zoning Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Prokey G. Arger for a zone reclassification as described in the:application should be APPROVED to the LOCAL BUSINESS and RESIDENTIAL OFFICE ZONES. Also, that the Change of Conditions request as described and the Variance request to allow an off -street parking area to within 5 -feet of the required front yard setback should be APPROVED. Motion by: Myers Vote: Myers - Aye Odell - Aye Carstens - Aye ZONE RECLASSIFICATION N0. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 Seconded by: Odell Unanimous to APPROVE to the LOCAL BUSINESS and RESIDENTIAL OFFICE ZONES, the Change of Conditions and the Variance Request - ( 3 - 0 ) 7 E. ORDER (continued) ATTEST: For WALLIS D. HUBBARD Planning Director Ada f ' 1 Y Zoning Administrator Date: •EN Co /92.4 ZONE RECLASSIFICATION N0. ZE- 103 -85 CHANGE OF CONDITIONS N0. ZE- 57A -83 VARIANCE N0. VE- 164 -85 8 HEARING EXAMINER COMMITTEE HEREBY ATTEST TO THE ABOVE FINDINGS, ORDER, AND VOTE n C!!•• J2fr.. / 2;tia ../) CKaltperson SPOKANE COUNTY PLANNING DEPARTMENT APPLICATION FOR ZONE RECLASSIFICATION Date: December 12, 1985 3 Application No• 7E R5 Name of Applicant: Prokey G. Arger Street Address of Applicant: N. 300 Nullan Road, Suite 204 City: Sookane State: WA Zip Code: 99206 Tele. No. 926 -5311 Name of Property O wner(s): Jerry L. & Bonnie R. Downie Authorized Agent representing Owner (if other than owner): G. Arger Company Real Estate , Inc. (fly A A . dJ .&�-Z 61;74 U Date Existing Zone Classification Established: Existing Use of Property: Closed rental house and vacant area Proposed Zone Classification: LB for West 2/3 (200'), RO for East 1/3 (90') Proposed Use of Property:Two story office building approx. 18,000 square feet Legal Description of Property: Opportunity Lot 1, Block 141, Except Street Existing property N. 200 Mullan Road: S. 200' of E'; Block 140, Opportunity, except streets Existing Zoning Classification: Section: 17 Township: 25 Range: 44 Source of Legal: Ticor Title Assessor's Parcel No: (See tax statement) 17543 - 1401 Property Size: 1F;_53n Frontage: 130 Feet on: Mullan Road Total amount of adjoining land controlled by this owner or sponsor: 3 Acres Street Address of the Property: N. 700 Mullan Road If you do not hold title to the property affected by this application, what is your interest in it? Upon acceptance of zone change, applicant will act as developer of project Please list previous Planning Department actions involving this property: ALL OF THE FOLLOWING QUESTIONS MUST BE ANSWERED: 1. What are the changed conditions of the site area, which you feel make this proposal warranted? Local business and residential office zoning is now prevalent in the area. This site is south of and ajoins the existing 200 Hullan building allowing an additional wing to be added to the current building. 2. What effect will the proposed zone reclassification have on the adjacent properties? None, this proposal is compatible with the land use in the area. This land is within an existing businesspark area. Rev. 2/3/81 APPLICATION FOR ZONE RECLASSIFICATION -- continued -2 This section of the application will provide the Planning Department's Staff with written verification that the applicant has had preliminary consultation with the agencies identified. Results of the preliminary consultation should be incorporat- ed in the proposal before final submittal to the Planning Department. 2 r/ 1 COUNTY ENGINEER'S OFFICE ri n 0 A preliminary consultation has been held to discuss the proposal. Our 7 requirements for submittal of this proposal for rezone have been satisfied. .V Signature 5 E L'',N 2. (Signature) (Date) 'hb:dr 3. WATER PURVEYOR (NAME) MOWN El aMicn a) The proposal (is) (;, riuL) located within the boundary of our service area. 1„1 4. cT neon. 'CC0 JLY s (" 64". 5. COUNTY UTILITIES OFFICE Li y'C A preliminary consultation has been held requirements for submittal of this proposal The designated water purveyor for this site b) Satisfactory arrangements 4Msvej- (have not) been made to serve this proposal. c) We (are) (eee- ritltrable to serve this site with adequate water. ignatur BUILDING AND SAFETY DEPARTMENT A preliminary consultation has been held to discuss the proposal. Our requirements for submittal of this proposal for rezone have been satisfied. This proposal is located in Fire District # (Signature) COUNTY HEALTH DISTRICT A preliminary consultation has been held to discuss the propo ap• 0 nt has been knf med of our requirements and standards. lin 91) • I, THE UNDERSIGNED, SWEAR UNDER THE PENALTY OF PERJURY THAT T E ABOVE RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOW- LEDGE. 1 FURTHER SWEAR THAT I AM THE OWNER POSED FOR ZONE RECLASSIFICATION, OR, HEREWITH IS WRITTEN PERMISSION FROM ACTIONS ON HIS OR HER BE NOTARY SEAL: (Signed) (Address) N. 300 11ullan Sookane. WA TL RE OF A PLICANT OR AGENT (Date) to discuss the proposal. Our for rezone have been satisfied. is Dec /3 /e s'S (Date) / (Date) (Date) OF RECORD OF THE SITE PRO - IF NOT THE OWNER, ATTACHED SAID OWNER AUTHORIZING MY Date: Road, Suite 204Phone: Zip: December 12. 1985 926 -5311 99206 ` NOTARY ,% 0,r,A,° /?,; 7,th ,, Date: December 12, 1985 J Date: December 12, 1985 Rev. 2/3/81 • Certificate of Exemption #: Name:of,:Applicant: Prokey G. Arger N. 300 Mullan Road, Suite 204 State: WA Zip Code: Street Address: City: Spokane Name of,Property Owner(s): Jerry L. and Bonnie R. Downie REQUESTED ACTION(S) ariance(s)::) '.Waiver of Yi,olation * * * * * * ** * FOR STAFF *Cite Ordinance Section: *Section Township * *Existing Zoning: * *PSSA: Y N UTA: Y N * *Hearing Date: ** * * * * * * * * * * * * * * * * * * * Existing Use of Property: Describe Intended Proposal: adjacent property Parcel #: 17543 -1401 I SWEAR, UNDER THE PENALTY OF PERJURY, THAT: (1 ZED AGENT FOR THE PROPOSED SITE; (2) IF NOT THE OWNER AUTHORIZING MY ACTIONS ON HIS /HER BEHALF RESPONSES AND THOSE ON SUPPORTING DOCUMENTS MY KNOWLEDGE. SPOKANE•COUNTY PLANNING DEPARTMENT'r. , APPLICATIONS BEFORE THE ZONING ADJUSTOR /BOARD OF ADJUSTMENT (Circle Appropriate Action): Conditional Use Permit Notary: Date: USE ONLY Old Code: Range (over 99206 Application #:` VE- 164 -85 Temporary Use /Structure Other: * * * * * * * * * * * * * * * * * * * * * * * * F.L.U.P. Designation: ASA: Y N FIRE DIST.: LEGAL CHECKED BY: *' Staff taking in Application: * * * * * * * * * * * 1 * * * * * * * * * * * Vacant - closed up rental home. Expansion of existing 200 Mullan Office Building to Street Address of Property: N. 200 Mullan Road Legal Description of Property (Include easement if applicable): Lot 1, Block 141, Opportunity except streets ExistinG 200 i'lullan Building: South 200' of Ez of Block 140, Opportunity, except streets Non - Conforming Lot /Use Source of Legal: Ticor Title Total amount of adjoining land controlled by this owner /sponsor: 3 acres What interest do you hold in the property: Proposed Developer Please list previous Planning Department actions involving this property: , December 12, 1985 Phone No.: 926 -5311 0 Property Size I AM THE OWNER OF RECORD OR AUTHORI- OWNER, WRITTEN PERMISSION FROM SAID IS ATTACHED; AND (3) ALL OF THE ABOVE E TRUTHFULLY AND TO THE BEST OF Signed Address N 300 Mullan Road. Sr ite 204 Spokane 992 Phone No.: 926 - 5311 Date: 12/12/85 NAME: / Gtle.Gl . J.i': i' of FILE #: VE- / /09 • I. VARIANCES The County Zoning Ordinance, Section 4.03.020 (64); clarifies that variance is an adjustment made to a "dimensional" regulation. Websters New Collegiate Dictionary (1979) defines "dimension" as a measure in one direction (and therefore.includes "area "). a State Law (36.70.020 (14) RCW)... Is the subject property deprived of privileges commonly enjoyed by other properties in same vicinity and zone and does the variance remedy the difference in privileges? If so, what privileges ? :: This facility is an expansion of an existing building which is utilizing the same variances previously granted as requested herein. This variance is compatible with all other variances granted within immediate area. The variance would allow' for a better designed parking area utilizing more off street parking while providing a safety driveline for fire protection. 1. Driveway area off of Willow Road (20' setback flanking street) Because of special circumstances applicable to subject property, including size, shape, topography, location or surroundings, does strict application of' the dimensional regulation deprive the subject property of rights /privileges enjoyed by other properties in vicinity under IDENTICAL zones? If yes, what special circumstances exist? After losing 5' for dedication, the remaining site allows for the expansion into existing 200 i1ullan Building, the land area behind building is restricted . in size creating a necessity to utilize the 20' setback area to facilitate the driveway area around building. Without variance, the parking area and drive - through would be seriously restricted. Will granting of the variance be materially detrimental to public welfare OR injurious to property or improvements in the vicinity and zone in which the subject property is located? No, it will enhance neighborhood by increasing the off street parking while providing a driveway around the building allowing for better exiting and fire protection. The driveway area will be densely buffered with landscaping along Willow Road minimizing impact from cars. BURDEN OF PROOF It is necessary for the applicant or his /her representative to establish the reasons why the requested proposal should be approved and to literally put forth the basic case. Accordingly, you should have been given •a form for your requested action (variance, conditional use, etc.) designed to help you present your case in a way which addresses the criteria which the Zoning Adjustor must consider. Please fill the form out and return it with your application. If you didn't get a form, ask the Planning Department personnel for advice on how to proceed. B. SIGN -OFF BY COUNTY DEPARTMENTS COUNTY HEALTH DISTRICT - A preliminary consultation has been held to discuss the p " osal. The app.li- can •a- n informed of requirements and st dar s.. . r (Signature) v (Date) -O (Sign -off Waived) COUNTY ENGINEER'S DEPARTMENT A preliminary consultation has been held to discuss the proposal. The appli- cant has b informed of requirements and standards. �4aLt f S gnatu C , (Date) (Sign -off Waived) COUNTY UTILITIES DEPARTMENT (Waive if outside WMAB) [ ] A preliminary consultation has been held to discuss the proposal. The applicant has been informed of requirements and standards. (Signature) (Date) (Sign -off Waived) [ ] The applicant is required to discuss the proposal with to become informed of requirements and standards. (.District Signature) (Date) (Sign -off Waived) l . WATER PURVEYOR (Waive if outside CWSSA) NAME: &1UinF¢ ELECTRII netTER en a) The proposal 4s444=ge4 located within the boundary of our future service' area. b) The proposal is /i- s--net located within the boundary of our current district. c) We are/arr -rcpt able to serve this site with adequate water. d) Satisfactory arrangements Aare /have not been made to serve this proposal. k. /3 /ler i g iat 14) (Date) ' (Sign -off Waived) S P O K A N E C O U N T Y E N G I N E E R - - P R E L I M I N A R Y C O N S U L T A T 10 N— Number )(= /0 .3 —b5 A. Project Name: 7tinrr C64-1/4 PROPOSAL Number of Parcels: / Section /7 T. N., R. /pi E.W.M.; Quarter 1 2 3 4 DEVELOPER Name: ?yoke., x Or Address: l — I1 AGENT Phone: Business Home OWNER ENGINEER Name: Address: Phone: Business S Re1,i G Name: 4 57 .,,e k / /erfe Address: Phone: Business Home Home B. PRELIMINARY CONSULTATION: Date: /2- /73 / . -5 By: ^I& ( 4szvil Remarks: Anflow Preliminary a) Right-of -Way ) s ;f /, /air Conditions b) Curb y: 5 c) Sidewalk ft d) Pave 0r 5 e) Approaches i ✓Nf+ ,F'0,-l./f# S f) Drainage An R T_'! & /P'c ✓7: ypa,/, g) State /City Review Yes r-n ) No X) // / NOTE: This proposal must comply with Spokane County Regulations for Roads, Ap- proach and Drainage in New Construction; Board of County Commissioners Resolution No. 80 -1592 as amended. Conditions are preliminary and may change after field in- spection and review of County records. C. INSPECTION Date: / / By: Remarks: D. SPECIFIC CONDITIONS: c?/ Fee Paid: Yes No Amount $ ZOO. Cash Check 5/7 Planning Application Signed: Date / / By: E. FINAL PLAT CHECKS Fee Paid: Date Amount Check Cash Mathematical & Surveying Checks: No. 1 Date By No. 2 Date By No. 3 Date By Additional mathematical and Surveying Checks: No. 4 Date By Fee Amt. &Dt.Pd. No. 5 Date By Fee Amt. &Dt.Pd. No. 6 Date By Fee Amt. &Dt.Pd. No. 7 Date By Fee Amt.6Dt.Pd. 1 /81 Pay to the 1 order of Fr' 88808 • RECEIPT Date /Z -- /3 '' � Received From_ C - �"��- "sr`'� -,,re5 AddrP« • For ACCOUNT AMT I ACCOUNT I AMT. PAID I BALANCE DUE nak-cann Qt) Zone change HOW PAID CASH CHECK -2 / MONEY ORDER BC INVESTMENTS 83 -2 LTD. NORTH 300 MULLAN ROAD SUITE 204 926-5311 SPOKANE, WASHINGTON 99206 Spokane County Engineers ORS Vallov Financial Canter OW NannnalBa k Spokane. Washington 99206 Two Hundred and no /100ths 11'0003 L911' 1: L 25 L0003to: L63410 19 _`f 7283 Dollars $ 1 200. r �L= /c'5 - 5 12 December 19 85 200.00 00319 28- 3/1251 Dollars Zoning Hearing Examiner Committee Actions of February 6, 1986 #2 (continued) 4) ZE- 62 -85, Agricultural to Residential Manufactured Home (RMH): Ring Location: Generally located north of and adjacent Alki Avenue, approximately 100 feet east of Dick Road in Section 18- 25 -44. Proposal: 2 -Unit Manufactured Home Park Action: Denial. (Vote: 3 - 0) The Hearing Examiner Committee found that the proposed density would be excessive with adjoining properties in the area and that the proposed 50 -foot stall widths would be inconsistent with existing lot frontages of the neighborhood. ZE-103-85, Agricultural and Two - Family Residential (R -2) to Local Business and Residential Office: Arger Change of Conditions in the Local Business and Residential Office Zone Variance to Allow Off - Street Parking Area to Occupy Front Yard Setback Generally located south of and adjacent to Main Avenue, between Mullan Road'and Willow Road in Section 17- 25 -44. Office Building. The Change of Conditions request was to review a new Site Development Plan. The request for a Variance was to allow Off- Street Parking Area to Occupy the Front Yard Setback. Approval. (Vote: 3 - 0) (The Hearing Examiner Committee is now authorized to hear and make a decision on Variance applications when combined with a zone reclassi- fication by recent amendment to the Spokane County Zoning Ordinance and the Hearing Examiner Committee Ordinance.) 6) ZE- 97 -85, Agricultural and Commercial to Regional Business (B -3) Zones: Smith ZE- 57A -83, VE- 164 -85, Location: Proposal: Action: Location: Proposal: Action: 7) ZE- 98 -85, Agricultural to Commercial: Mielke Location: Proposal: Action: 8) ZE- 99 -85, ZE- 42A -71 and ZE- 35A -78, Location: Proposal: Action: Generally located north of and adjacent Sprague Avenue, approximately 750 feet west of Flora Road in Section 13- 25.44. Auto Body Repair, Painting, Sale and Rentals. Approval.. (Vote: 3 - 0) Generally located at the northwest corner of Sprague Avenue and Progress Road in Section 14- 25 -44. General Retail and Warehouse Uses. Approval. (Vote: 3 - 0) Local Business to Commercial: Shopko and Tombari Change of Conditions in the Commercial Zone Generally located south of and adjacent to Sprague Avenue, between McDonald Road and Blake Road in Section 22- 25 -44. Retail Shopping Center. Also, a Change of Conditions request to review a new Site Development Plan to accommodate a total project of a 19 -Acre Retail Sales Center in existing Commercial Zones. Approval. (Vote: 3 - 0) SHARP tiN • ..r. - • EL 20/0 CP n a AIKI J �� V u 0 0 < 0 0 CC DE SwtT it • 1 y ■ MULLAH ROAD Oirlap0446) PROIllty L.WIL 157 C.i IST a. SPOKANE CO{JNTV coURT NOUSE P L A N N I N G R E P O R T Date: FEBRUARY 6, 1986 TO: SPOKANE COUNTY ZONING HEARING EXAMINER COMMITTEE FROM: Spokane County Planning Department SUBJECT: Rezone #ZE- 103 -85; AGRICULTURAL and TWO - FAMILY RESIDENTIAL (R -2) to LOCAL BUSINESS and RESIDENTIAL OFFICE Change of Conditions #ZE- 57A -83; in the Local Business and Residential Office Zones Variance #VE- 164 -85; To allow off - street parking area to occupy Front Yard setback area. note: The Hearing Examiner Committee is now authorized to hear and decide on Variance applications when combined with a zone reclassification by recent amendment to the Spokane County Zoning Ordinance and the Hearing Examiner Committee Ordinance. I. GENERAL INFORMATION Applicant: PROKEY G. ARGER Owners: Jerry L. and Bonnie R. Downie S a'e'k�` 4 - N r 11 4 .. , ll CCt'rJ ✓t!l.b sv` r BROADWAY CENTRE BUILDING N 721 JEFFERSON STREET PHONE 456 -2205 SPOKANE, WASHINGTON 99260 Proposal: A request to rezone an approximate 1.8 Acre site from Agricultural and Two - Family Residential (R -2) to Local Business and Residential Office for the purpose of developing an office building. A request for a Change of Condition in existing Local Business and Residential Office Zones for the purpose of reviewing a new site development plan. A request for a Variance from Section 4.07A.110 -(a) of the Spokane County Zoning Ordinance to allow an off - street parking area to be within 5 -feet of the east property line, whereas the Zoning Ordinance requires a 20 -foot landscaped setback. *6 PLANNING DEPARTMENT ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 I. GENERAL INFORMATION (continued) Location: The site is generally located south of and adjacent to Main Avenue, between Mullan Road and Willow Road in Section 17- 25 -44. II. SITE ANALYSIS Comprehensive Plan: MAJOR COMMERCIAL and URBAN Categories - Inside General Sewer Service Area (GSSA) Boundary - Inside Priority Sewer Service Area (PSSA) Boundary Inside Urban Impact Area (UTA) Boundary This site is within the transition area as defined by the Spokane County Comprehensive Plan; the West 2/3 within the Commercial category and the East 1/3 within the Urban category. The sponsor's proposal to rezone to Local Business and Residential Office, proportionately follows the Comprehensive Plan designations. The Residential Office portion of the rezone is somewhat at odds with the Urban category but if properly buffered by dense landscaping, may provide a suitable transition between the high density uses along Mullan and the existing residences along Willow Road to the east. Zoning: Existing on SITE: Residential Office (established 1972) Agricultural (established 1948) and within: Aquifer Sensitive Area Overlay Zone To the NORTH: Local Business and Residential Office (established 1983) To the SOUTH: Agricultural (established 1948) Two - Family Residential (R -2) ( estab. 1972) To the EAST: Two- Family Residential (R -2) (estab. 1972) To the WEST: Residential Office (established 1969) Commercial (established 1981) Uses within the Argonne - Mullan Corridor have changed from older residential to office and commercial uses. Past decisions have established the Commercial Zone within the Corridor with Local Business and Residential Office Zones along the flanks. Site access and buffering to the residences east of this proposal are the major considerations of the Hearing Examiner Committee. II. SITE ANALYSIS (continued) Land Use: Existing on SITE: i To the NORTH: To the SOUTH: To the EAST: To the WEST: ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 Single family residences, outbuildings, and vacant Office complex Single family residences and firewood sales Single family residences Office building under construction and vacant Proposed zone changes and change of conditions are consistent with development trend to north and within Argonne - Mullan Corridor. Dense landscape screens and fencing should be located along the east property line to buffer the existing single family residences. Site Characteristics: Change of Conditions Site Size: Approximately 30,000 Square Feet Existing Buildings: One Rezone Site Size: Approximately 1.8 Acre Existing Buildings: One Single Family Residence Topography: Gentle Slope Vegetation: Residential Landscaping Agricultural Summary: Major Commercial and Urban categories not intended to protect agricultural land. Adjoining Streets: Mullan Road to the west of the site is a 55 -foot County -right of way improved with 3 lanes and sidewalks. Main Avenue to the north of the site is a 50 -foot County right of way improved with 2 lanes and sidewalks. Willow Road to the east of the site is a 40 and 50 -foot County right of way improved with 2 lanes and north portion is with sidewalks. Proposed Site Plan: Use: Business Park Proposed Buildings: Add on to existing Office Building Building(s) Footprint Area: 37,570 Square Feet Structure Height: 2 Stories / 27 -Feet Building Setbacks: PROPOSED REQUIRED Front Yard 30' 30' Parking Setback:: 5' 20' Total Parking Spaces U 106 94 st ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE N0. VE- 164 -85 II. SITE ANALYSIS (continued) Proposed Buffering Techniques: Detailed landscape plan to be approved prior to release of building permits. Site plan proposes 5 -feet dense arborvitae screen along the east and south property lines. Site Plan Considerations: The proposed change of conditions regards a new site development plan which expands the existing building, parking and an existing shrub screen planted at mid -site to be relocated to the southern boundary of the project. n o t e: - The site plan submitted for review by the Zoning Hearing Examiner Committee is general in nature. Detailed review to determine compliance with all Ordinance regulations and conditions of approval is recommended to be administrative and to occur at the Building Permit stage. III. SITE DEVELOPMENT RECOMMENDATIONS Design: Project expands existing office building. Local Business Zone allows some retail uses. Buffering: Is needed along the east and south property lines; should include fence - are required by Residential Office Zone. Landscaping: Detailed plan to be reviewed prior to issuance of building permits. Landscaping should be located along Mullan, Main, Willow, and next to building. Signage: Local Business Zone allows up to 150- square foot sign detached; Residential Office Zone limits sign to 30- square feet attached flat against building. Circulation /Access: Three access points to Mullan, two to Main and two to Willow Road. Stormwater Drainage: Compliance with '208' standards. Sewage Disposal: Septic tank and drainfield system allowed until Regional sewer system available; double plumbing required. Sponsor has not reserved sufficient space for a replacement on -site sewage disposal system. Water Supply: Provided by Modern Electric Water Company. Fire Protection: District # 1. 349 IV. SEPA ENVIRONMENTAL REVIEW ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 An Environmental Checklist was submitted by the sponsor and was reviewed by the County Planning Department. The review considered the specifics of the proposal, other available information, County ordinances, other regulations and laws, possible standard Conditions of Approval, the Generalized Comprehensive Plan, and other County policies and guidelines. The Zoning Administrator has determined that "No probable significant adverse impacts" would result from the proposal being developed and has issued a Determination of Non- Significance ( "DNS "). The "DNS" was circulated to eight other agencies of jurisdiction and other agencies /departments affected by the future development for review and comment. The "DNS" comment period ends February 5, 1986, and was advertised 15 calendar days before said date in the newspaper, by letter to adjacent property owners within 400 feet of the proposal, and by notice on a sign posted on the proposal site. The Hearing Examiner Committee may consider additional environmental related testimony and the "DNS" at the public hearing. V. VARIANCE REQUEST The sponsor is requesting a 15 -foot Variance which would allow the parking area to be within 5 -feet of the east property line for that portion of the site seeking the Residential Office zone change. A Variance to allow the parking area to be within 5 -feet of the west property line has already been granted for that portion of the site requesting the Change of Condition on a new site plan. Also, the same type Variance request was approved for the property located at the northwest corner of Main and Willow. The need for the Variance is due to the design and number of parking spaces being provided which, if approved, will add more parking spaces and should reduce parking on Willow Road. VI. PLANNING SUMMARY All three requests are consistent with the past actions within this immediate area, and if properly buffered to the residences to the east, the proposal can be consistent with the Comprehensive Plan. ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 VI. CONDITIONS OF APPROVAL (All Conditions imposed by the Zoning Hearing Examiner Committee shall be binding on the "Applicant ", which term shall include the owner or owners of the property, heirs, assigns, and successors.) a) COUNTY PLANNING DEPARTMENT 1. I Approval by the Zoning Administrator of a specific lighting and ' signing plan for the described property prior to the release of any building permits. 2. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. Landscaping shall be installed and maintained such that sight distance at access points is not obscured or impaired. 3. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Variations when approved by the Zoning Administrator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. 4. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permits. 5. All current standards of the Local Business and Residential Office Zones, as amended, shall be complied with in the development of this site. Legal descriptions of the proposed zones are as follows: Residential Office: The East 94 feet of Lot 1, Block 141, Opportunity in Section 17- 25 -44. Local Business: The West 186.5 feet of Lot 1, Block 141, Opportunity in Section 17- 25 -44. 6. That the project is subject to Section 4.16A.050, the Aquifer Sensitive Area Overlay Zone of the Spokane County Zoning Ordinance, which sets forth various measures for Aquifer protection; specifically, measures dealing with wastewater disposal, spill protection measures, and stormwater runoff. y a) COUNTY PLANNING DEPARTMENT (continued) 7. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff. 8. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners' Resolution #77 -1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on -site improvements. COUNTY ENGINEERING DEPARTMENT ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 Prior To The Issuance Of A Building Permit: 1. , Access permits for approaches to the County Road System shall be obtained from the Spokane County Engineer. 2. Applicant shall improve Willow Road in a manner consistent with Spokane County TYPICAL roadway section No. 1 minimum paving width Access Standard. 3. ° Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plans prior to the issuance of a building permit on the property. 4. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on -site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. 5. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 6. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 7. The construction of the road improvements stated herein shall be accomplished as approved by the Spokane County Engineer. b) COUNTY ENGINEERING DEPARTMENT (continued) 8. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction, and other applicable County standards and /or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 9. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners' Resolution No. 80 -1592 as amended and are applicable to this proposal. c) COUNTY UTILITIES DEPARTMENT 1. No new recommendations. d) COUNTY HEALTH DISTRICT 1. A combined surface water and sewage disposal detailed plan shall be approved by the Spokane County Engineer and the Spokane County Health District prior to the issuance of any building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an on -site sewage disposal system may be authorized. 4. Water service shall be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public approved by the Regional Engineer (Spokane), Social and Health Services. 6. Use of private wells and water systems is prohibited. 7. Disposal of sewage effluent beneath prohibited. Note: The sponsor has not reserved reap acement on -site sewage disposal fails to function properly. J(g ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS N0. ZE- 57A -83 VARIANCE NO. VE- 164 -85 water supply when State Department of paved surfaces is currently sufficient space for a system when the original ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 e) COUNTY BUILDING AND SAFETY DEPARTMENT 1. The site is located in Fire District # 1. 2. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. 3. Trash enclosures shall not be located adjacent to combustible construction or underneath windows or nonprotected eaves. 4. Building permits will be required for each structure. 5. Fire hydrants which meet the fire flow are required to be installed prior to any construction. These hydrants shall be placed so that no portion of the building exterior is more than 175 feet from the hydrant. The bottom of the lowest outlet of the hydrant shall be no less than 18 inches above grade. A water plan showing each fire hydrant (specifying the gallons per minute for each fire hydrant) and meeting the requirements in Chapter 10.04 of the Uniform Fire Code is required prior to construction of the water service. All required fire protection facilities shall be installed and made serviceable prior to and during the time of construction. f) WATER PURVEYOR 1. Water Purveyor is Modern Electric Water Company, and they will supply the site with adequate water for domestic, fire and irrigation uses, but satisfactory arrangements have not been made to serve this proposal. g) COUNTY AIR POLLUTION CONTROL AUTHORITY 1. Air pollution regulations require that dust emissions during demolition, excavation and construction projects be controlled. This may require use of water sprays, tarps, sprinklers, or suspension of activity during certain weather conditions. Haul roads should be treated and emissions from the transfer of earthen material must be controlled as well as emissions from all other construction related activities. 2. Measures must be taken to avoid the deposition of dirt and mud from unpaved surfaces onto paved- surfaces. If tracking or spills occur on paved surfaces, measures must be taken immediately to clean these surfaces. adit ZONE RECLASSIFICATION NO. ZE- 103 -85 CHANGE OF CONDITIONS NO. ZE- 57A -83 VARIANCE NO. VE- 164 -85 g) COUNTY AIR POLLUTION CONTROL AUTHORITY (continued) 3. All travelled surfaces (ingress, egress, parking areas, access roads) must be paved and kept clean. 4. Some objectionable odors will likely result during the construction phase of the project and from motor vehicles using the site following completion of the project and from occupants of the proposed project. _ 5. All air pollution regulations must be met. 6. Additional Comments. National Emission Standards must be followed for handling and removal of asbestos. ?ro ?cM 2vdr 11 `\ t . Pro � v Z g a 2 - ti 360 \\,\ c AetA � cx:� I eeL o • • �Q. a/cat_ ° QtPc — ( \�G �''`�,, c6 � \ Vl e O ar-W.v� I L* t ti� • c5 pp n'_I.W :V , 1 J � } l� \LX,O-uy2ct O-td ' `� , V p� { _ 04-e W! OMB Q0. • @o-y LcLe-k ctl- r-ka-± c4 U °d 0 T(1: Spokane ( i. v Planning Ik'p.lt tineut FRnpl: Comity F:ng Inerr's irr p.l rtme SUBJECT: Condit Inns of Approval Chanp'e-- Ntuntao •_ ZP 57 5 _103 -- 85 _ Applicant au1 Name aIr N Range a 7 Seri Inn / . To wnsh1 p 2 , . �f4 EWr, The following "conditions of approval for the al+. teler 7,nne cPm'» Are submitted to the Spokane County Hearing Examiner Grmmlttee for Inclusion In the staff analysts and "findings and order of the hearing scheduled Feb. b , 19 Prior To The Issuance Of A Building Permit Appllcant shall dedicate feet on for t�_.,f -v nitr to any use of the property. App i cant shall dedicate feet on Lj)'i1 and n'A� for right-of-way Y s-{i't+e' easements as necessary prior to any use of the property. 3. Applicant shall dedicate a foot radius on and 4 . Applicant shall dedicate and n. Access permits for approaches to the Glunty Rnad System shall he obtained from the Spokane County Engineer. . Access permits and improvements to by the Washington Department of Transport a t (nn. 1. Access permits and improvements to by the City of (a) Applicant shall improve (1Q40;.t RnpG+ In a manner consistent with Spokane 1 County TYPICAL roadway section No. 1 minimum paving width (.1LGe} fjPQA S}D.N.- (b) Applicant shall Improve ____ in a manner consistent with Spokane County TYPICAL roadway section Nn. minimum paving width (c) Appllcant shall improve lu A manner consistent with Spokane Gannty TYPICAL roadway section tkr. minimum paving width (d) Applicant shall Improve In a manner consistent with Spokane County TYPICAL roadway Sect Ion tir. minimum paving width (e) Other specific improvements: OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON 7bH�t� 1� 1y�L(2_ prior to any use of the property. feet on and a foot radius on for right -of -way prior to any use of the property. most be approved must be approved App 11 rapt sh.t Il .nhmr r 1.. a pl'r ova 1 by rho Sp..b Ginn! y I nl:Inr.•t rn.nt, 11.11 nary , r Arrr••rq pl.uts pr for 1•. 1 1 n• Is•:..:unv• '.1 a hill Ih I "' rinlr ..n thr p1 np.'r t v. The appl lrant 41,..11 •:10. 1n, rppr..v 11 by 11. ' y •.. l ,i.• fi. nnty E.' YAM'. .1,1'I the :11.r E.1ne• r :.nnry r •L•rall.••I ,omhIlwil on -vii.• <.1•e syylem plan 11.1 •.''111rc w.ttel dlspnsrll plan 1..1 •t/Id rot i rr I.r r jrr pr for t . r h. 14sir elf ,toy Ind !Ain't ; •,n the pr n port y. Page 11 A parking plan and ti.rltlr itrculat loni plan shall be nobmit ltd and approved by the Sp)kane. (oi hng!neer prior to the Issuance of a building 1 r.•r m!1 on the property. The design, location, and arrangement of pat king stalls shall ht in .n.rordance with standard traffic engineering practices. Paving or surfacing as approved hy the Ginnty Engineer, will he required for any portion of the ' which is to be occupied or travelled by vehicles. 12. The word - applicant - shall Include the owner or assigns, and successors. owners of t property, his heirs, 13. To construct the road improvements stated herein, the applicant may, with the approval of the County Engineer, Join In and he a willing patticipant in any petition or resolution which purpose is the formation of a Road Improvement RIstrlct (RID) for said improvement pursuant to RCW 36.88, as amended. Spokane G,unty w111 out participate in the coat of these improvements. 14. As an alternative method of c nst uctiug the road improvement stated herein, the appli- cant may, with the approval of the G,unty Engineer, accomplish the road improvements stated herein by Joining and participating to a Giunty Road Project (CRP) to the extent of the required road improvement. Spokane County will not participate In the cost of these improvements. 15 The construction of the road improvements stated herein shall he accomplished as ap- proved by the Spokane County Engineer. 115 All required improvements shall conform to the current State Of Washington Standard Specifications for Ruad and Bridge Construction, and other applicable county standards and or adopted resolutions pertaining to Road Standards and Sto mwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 11. Applicant shall file a petition for the vacation of prior to any use of the property. 18. Applicant shall construct a paved and delineated access approach(e) to meet the existing pavement on 19. Access to Road shall be prohibited until such time as specifically authorized by the Spokane G,unty Engineer. Roadway standards, typical roadway sections and diainage plan requirements are found 10 Spokane Board of Granny Gnumissloners Resolution No. 80 -1591 au amended and are applicable to this proposal. 11. This plat or development 'proposal Is Ioe,. rd within a drainage h.t.; ill has t.oc identified by the Sl.,kane Gusty Enginerr's entice as having storm+:ater runoff problems. Since this plat or devt•lupntnt proposal is affected by or Is it contributor Co sturmwater flows, property owners should participate In the planning and implementation of a future basinwide stornrwater management system. lh.• following "Condition of Approval shall he required: That the owner(s) of successor(a) In interest agree to Info In any County approved Stormwat,r Management I'roguarn and to pay such rates and charges as may he fixed through public hearings for service or benefit obtained hy the planning, design, con - struc't1ng, maintaining, or operation id stormwatet conteol totllltlen. 9 [U: Spokane (m Planning Department FRntl: County h:lg Iii • ' s Pt' t Men(' tV ( %r-r- Z e 57A SUBJECT: Condit Iona ul Aijnev.al -Zone Change -- ,'lamb,•, 7F to3 -8 App ll ran Try Name 4II16nc '_ Se Inn_ /7_lownshlp2 N , Range .44 EWM the fol lnwl ng •• condt t inns of npprnva l" for the .I h„ r e f,:r ' zone change arc submitted to the Spokane County Ilear ing Examiner Comm(t tee for Inc l ns Inn in Ile staff ann 1 ysls and "findings and order" of the hearing scheduled Feb. 6 , 1 986. Prior To The Issuance Of A Building Permit 1. Applicant fo r .. .ht shall dedicate feet on way prior to an I. Applicant s a .e ca Applicant shall dedtZvte feet on for right -of -way and siop.e easements as necessary prior to any use of the property. / and and 1. Access permits and Improvements to by the City of Ilt her 9 per f lc Improvement 9: OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON • L LY prior to any use of the property. • 4 . Applicant shall dedicate feet on 9 .a6_ and a foot radius on for right -of -way prior to any use of the property. Access permits for Approaches to the County Road System shall he obtained from the Spokane County Engineer. Access permits and improvements to by the Washington Department of Transportation. must 1* approved must be approved Applicant shall Improve W Re0.0 'e0.0 In a manner consistent with Spokane County TYPICAL roadway section No. 1 minimum paving width Access S}f�Ftf�AQtI• Applicant shall improve In a manner consistent with Sjnkane County TYPICAL roadway section No. minimum paving width Applicant shall Improve ^ __ __ n manner eonsl4tenl with Spokane County TYPICAL roadway net Ni. - -- minImum paving width Applicant shall Improve .1 manner <vnAt 4l enl with Sjx,kane County TYPICAL roadway Section No. `.- ___ m1it1mnm pav ing wtd Appl Irani 9 h.. 11 .n h m lr 1 RN" by Ilu• `y ,.. t, • . y Ill' lne.'r 1 ,1, d, .Iln:lf:••, and ACrn94 pIam; prinr t Ih. Iv•:n:nlc.• ni ., hill 1.11.1', poi int r nil Ills• I■npel l J. The app I•ant ch.111 ntonll Inr ., 1 1 by 1h• 1 ;1 ,,, I(.1114` I' h.n l;lneel .ut.l I1. ■j.,k.nl.• r'nunry H.•nith hl•:t .. , I „ t.11l , -.? r,mhl u,•.1 „n- ..:i •:. w.l•o f pi 1,1 , .f •.nl Ia,e wit et dfApn 9:il pl.tn I•o Ih, nt ire j jert pr Inr 1 III- Ito-at tiler. of .toy hid 1.11111 ,.'r snit nn ill.• property. (O yr. UZ' I'age ll 911/4 A parkin l•I. .ana train,' circulation plan shall be sobmitl.•.I .anti .appanvad by the Spokane Comity Engineer pt for to th,! issuance of n building pot alit on the property. The design, location, and arrangomunt of parking stalls shall h2 in accordance with standard traffic engineering, practices. Paving or surfacing as approved by the County Engineer, will be required for any pinion of the pto jest which in to he orcopled or travelled by vehicles. The w.ird - applicant - shall Include the owner or °WUCIS of the property, his heirs, assigns, and successors. 13. To construct the road Improvements stated herein, the applicant may, with the approval of the County Engineer, Jofn In and be a willing participant in any petition or resolution which purpose Is the formation of a Raad Improvement Dlstrlet (RID) fur said Improvement pursuant to RCW 76.88, as amended. Spokane County will not participate in the Cost of these improvements. 14. As an alternative method of constructing the road improvement stated herein, the appli- cant may, with the approval of the Grunty Engineer, accomplish the road improvements stated herein by joining and participating to a thunty Road Project (CRP) to the extent of the required road Improvement. Spokane County will not participate In the cost of these Improvements. 15 The construction of the road Improvements staled herein shall be accomplished as ap- proved by the Spokane County Engineer. 16 All required improvements shall conform to the current State Of Washington Standard Specifications for Ruad and Bridge Construction, and other applicable county standards and or adopted reaolutlons pertaining to Road Standards and Stormwater Management In effect at the date of construction, unless otherwise approved by the County Engineer. 17. Applicant shall file a petition for the vacation of prior to any use of the property. 18. Applicant shall construct a paved and delineated access approach(a) to meet the existing pavement un 19. Access to Road shall be prohibited until such time as specifically authorized by the Spokane Grunty Engineer. Roadway standards, typical roadway sections and drainage plan requirements are found In Spokane &urrd of County Grmmisstoners Resolution No. 8f)i'92 as amended and are applicable to this proposal. 21. This plat or development 'pr „pisal Is Heated within a drainage basin which has brie•❑ Identified by the Spokane (-aunty Engineer 's r)ttice as having aturmwatrr runoff problems. Since this pint or d evelopment proposal is affected by or is a contrth for to stormwater flows, property owners should participate in the planning and implementation of a future haslnwlde stnrnn✓arer manag.•in.•ut system. 7hr• following ° Gmdlt ton of Approval shall he required: That the owner(s) or surer ssor(s) In interest agree to join In any (iluuty approved Stormwater Management 1'rogrrnn and to pay such rates and charges as may be fixed through public hearings fur aery lee or benefit obtained by the planning, design, con - structing, maintaining, of „ penal t ni sloe mwat,I Contr Intl Ili lrs. D r -� TO: Slvrk.lne (homy Planning lk•pai tment ERIN: County f:npine.•r's I)cp•It Unenr —VCO-ctisjib z& 57A - g3 SUBJECT: C of Approval- %one Change—Number • 2U6 103-95 App 1 l can is Nam,• A Y •J BiC _ Section /7 . _Township 2 N, Range 414 EWM the following "conditions of approval for the .rhrve lone change are submitted to the Spokane Gnnnty (tearing Examiner G+mmlttee for Inclusion In the staff analysis and "findings and order" of they hearing scheduled Feb. 6 , 19$6. Prlor To The Issuance Of A Building Permit 1. Applicant shall dedicate feet on f r rigt- ofjway prior to any use of the property. .3 .G i i 4 Applicant shall dedicAte cj feet on U11160 Room" for right -of -way and nI-ite easements as necessary prior to any use of the property. 3. Applicant and shall dedicate a font radius on prior to any use of the property. • 4. Applicant shall dedicate feet on r,. and OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON _Jiig.\.y- _AA 19$( and a foot radius on for right -of -way prior to any use of the property. Access permits for approaches to the G)unty Road System shall he obtained from the Spokane County Engineer. Access permits and improvements to must be approved by the Washington Department of Transportation. 1. Access permits and improvements to must he approved by the City of Applicant shall Improve 1,10A Rnpl in n manner consistent with Spokane County TYPICAL roadway section No. 1 minimum paving width !-1rce55 S4nt•[do,Qd• Applicant shall lmprnve County TYPICAL roadway section No. Applicant shall improve County TYPICAL roadway section No. Other spec Ile (mptnvement s: The applicant L6.,ll snl.mll for apptnt•.1 by Grimly Health HJ.:rrirt •lera111 rrnh1n...l dlspn¢ :II plan 1..r ell. ..11 f ro I.rojorl pr for proper y. _____ _ in a manner consistent with Spokane minimum paving width • In n manner consistent with Spokane _ -- min i mom pnv1ng width Applicant shall Improve _ _ _ In a manner Culsl stent with Spokane County TYPICAL roadway Sect 10o No. _ - _m10 room pav1fly: width • Appl 1••ant ch., 11 cnh111t or : 1I by tiu• SI•., Line Count y Pn); hirer ro.ed , .11.11 n.wo , and aernyy pI.I1114 pr 1 t.■ 1In• Iv•:+u.pr,,. rot .1 hull lul per Tait Sul (I linl•r t r. 1 1. ,'.I,..k.un• (inmt y Erg pomp . the ISp.,k. .u+ •,it.• s. •a.1,•r , .ystom pl.ln old •: fire water to rho Ict of my hnl Kline ;Herrlt on the (o 11 13. To construct the road improvements stated herein, the applicant may, with the approval of the County Engineer, "loin in and be a willing participant in any petition or resolution which purpose 1s the formation of a Road Imp)nvement hlstrlet (RID) for said improvement pursuant to HCW 76.88, as amended. Spokane County will not participate In the cost of these improvements. 14. As an alternative method of constructing the road improvement stated herein, the appli- cant may, with the approval of the County Engineer, accomplish the road improvements stated herein by joining and participating In a Grunty Road Project (CRP) to the extent of the required road improvement. Spokane Grunty will not participate In the cost of these Improvements. The construction of the read improvements stated herein shall he accomplished as ap- proved by the Spokane County Engineer. 16 All required lmproveme'nts shall conform to the current State Of Washington Standard Specifications for Road and Bridge Construction, and other applicable county standards and or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the G.unty Engineer. 17. Applicant shall file a petition for the vacation of prior to any use of the property. 113. Applicant shall construct a paved and delineated access approach(a) to meet the existing pavement on ci Page 2 11. The word "applicant shall include the owner or owners of the property, his heirs, assigns, and successors. '111/4 A parking plan and I roll t 1, cir cul.tt ion plan sh.i l l he ruhml t t.• 1 and approved by the Spokane Gaunt y Engine pt lnr to Ih.t issuance of a hid 'ding pet mit in the property. The d e s i g n , l o c a t i o n , and a r i d lgem.•tit of parkin,: stalls shall he in accordance with standard tratfIc englneet lug practices. laving or sufficing as approved by the Gnrnty Engineer, will he tegnired for any portion of the project which is to he occupied or travelled by vehicles. 19. Access to W)ad shall he prohibited until such time as specifically authorized by the Spokane Grunty Engineer. Roadway standards, typical roadway sections and dt)t ln..ge plan requirements are found in Spokane Board of Grunty G)mmisaloners Resolution No. 80 -1592 au amended end are applicable to this proposal. 21. This plot or development 'proposal is looted within a drainage basin which has been Identified by the Spokane (;,,only E:nglneet 's office an having stormwnter runoff problems. Since this plot or development proposal 1s affected by or is a contributor to atornmater flows, property owners should participate In the planning and implementation of a future baslnwi'de stornwater management system. lhe following `Cndttlon of Approval" shall he required: That the owner(s) nl successor(s) In intetest agree to Iota In any (i)unty approved Stormwater tl.nragt a It Program and to pay such rotes and .harg.•a aN may be fixed through public hearing's for service of benefit obtained by the planning, design, con- structing, maintaining, or operation nl storm,.•nteI control Inrl lit1es. AGENDA, FEBRUARY 6, 1986 SPOKANE COUNTY ZONING HEARING Place: Broadway Centre Buil North 721 Jefferson (Continued from Page #2) ZONE RECLASSIFICATIONS 5. ,ZE- 103 -85 ZE- 57A -83 VE- 164 -85 AGRICULTURAL and TWO- FAMILY RESIDENTIAL (R -2) TO LOCAL BUSINESS CHANGE OF CONDITIONS IN THE LOCAL BUSINESS and RESIDENTIAL OFFICE ZONE VARIANCE TO ALLOW OFF- STREET PARKING AREA TO OCCUPY FRONT YARD SETBACK (Generally located south of and adjacent to Main Avenue, between Mullan Road and Willow Road in Section 17- 25 -44.) Comprehensive Plan: Proposed Use: Change of Conditions Request: Variance Request: Site Size: Applicant: n o t e: This application is a request for three separate actions; a zone change, change of conditions, and a variance. The three items will be heard concurrently by the Zoning Hearing Examiner Committee. .6. ZE- 97 -85 AGRICULTURAL and COMMERCIAL TO REGIONAL BUSINESS (B -3) ZONE (Generally located north of and adjacent Sprague Avenue, approximately 750 feet west of Flora Road in Section 13- 25 -44.) Comprehensive Plan: Proposed Use: Site Size: Applicant: -3- EXAMINER COMMITTEE ding, Second Floor Street, Spokane, WA 99260 TELEPHONE NO. 456 -2205 Major Commercial /Urban Office Building To review new Site Development Plan. To allow off - street parking area to occupy required front yard setback, whereas the Spokane County Zoning Ordinance, Section 4.07A.110 -(a) requires a 20 -foot front yard setback. Approximately 1.8 Acres PROKEY G. ARGER North 300 Mullan Road, Suite 204 Spokane, WA 99206 Major Commercial Auto Body Repair, Painting, Sale, and Rentals Approximately 1.49 Acres H. J. SMITH East 11205 - 33rd Avenue Spokane, WA 99206 (continued) SHARP EL 29/0 ea 7th El GH 0 101 API. o 4 im o-1 DESMET I. . 1:1000 8 TH AVE. So :i 0 z 4 HAY WI COUNTY ZE -103- 85-rect 2E57A83" -\ \ . AVE VE- 164 -85 AVE • th 0 4 d 8 TH C° 7 /� N � Z E ry !{ d f y 4 � `, ':' )� U ,, S c `I LI) W7 SPOKANE C R N E Y V J Y.-E /APARTMENT awg ewe „. nnFF((;1l ��q9p$ G DDARTMENT URbo.� . APPLICATION FOR CHANGE OF C6tTCTITPO1 5 ON PREVIOUSLY APPROVED ZONING SPOKANE COUNTY PLANNING DEPARTMENT Date: December 12, 1985 Application No.: zE S% Y4 - 33 Name of Applicant: Prokey G. Amer Street Address of Applicant: N. 300 Flullan Road. Suite 204 City: Spokane State: WA Zip Code: 39206 Tele.No. 926 -5311 Existing Zone Classification: At}r cult,.FL`� R 2 L-3 — R Date Existing Zone Classification Established: IS83 »,9 / - /1Sri' Legal Description of Property: t 1 ni nrI- r : , s;; ;1 ..Le yt, «> Existing property - Iii. 200 Nullan Building: South 200' of E of Block 140, Opportunity, except streets PROPOSED CHANGE OF CONDITIONS: Z22 /Z -c SIGNATURE OF APPLICANT OR AGE Address, if different than Applicant) Section: 17 Township: 25 Source of Legal: ¢¢��(( Assessor's Parcel No.: (See Tax Statement) 17543 - iii' — i310 Range: 44 Reference specific "Condition(s)" of original approval. (Cite the applicable condition from the Findings and Order of the HEARING EXAMINER COMMITTEE's public hearing.) /%irnnii, 47/. ! II- V enZeile /t/� -&1 /2, 1df'a Sown/ mei& �v . 4,7 c- Teti r - . _e/, . i, . t J �a'�.rr �ia�c -estztR- w/szctt Give detailed explanation of request for change in the status of the proposal. This change of conditions request would allow for the expansion of the existing 200 iiullan office building. The existing parking lot, landscape plan, and property line buffers would be modified per the new site plan to allow for the expansion extending onto the property to the south as a continuation of the original project. IF DEVELOPMENT OF THE SITE WILL BE CHANGED SUBSTANTIALLY BY THIS REQUEST, OR THE PROPERTY HAS BOUNDARIES DIFFERENT THAN ORIGINALLY PROPOSED, A REVISED DEVELOPMENT PLAN !...t SUBMITTED. DEC 13 1985 Certificate of Exemption #: Application #: arunxnt WLJNTY Name of Applicant: Prokey G. Arg1NANNING DEPARTMENT Street Address: City: Spokane State: WA Zip Code: 99206 Name of Property Owner(s): Jerry L. and Bonnie R. Downie REQUESTED ACTION(S) (Circle Appropriate Action): r�ance(s� Conditional Use Permit Waiver of Violation Temporary Use /Structure Other: ************ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * FOR STAFF USE ONLY * * *Cite Ordinance Section: 4,074. Old Code: C----- New -6odwc * *Section /7 Township Z Range u`i Property Size:i55 * Existin Zoning: // \ OtJr 4 __at * 4. *Existing 9 :�'z���i °S��'�a ° � F.L.U.P. Designation: Z i *PSSA: 1( N ` * *Hearing Date: ** * * * * * * * Existing Use of Describe Intended Proposal: Expansion of existing 200 Mullan Office Building to adjacent property Street Address of Property: N. 200 Mullan Road Legal Description of Property (Include easement if applicable): Lot 1, block 141, Opportunity except streets Parcel #: 17543 -1401 L/ Total amount of adjoining land controlled by this owner /sponsor: 3 acres What interest do you hold in the property: Proposed Developer Please list previous Planning Department actions involving this property: I SWEAR, UNDER THE PENALTY OF PERJURY, THAT: (1) I AM THE OWNER OF RECORD OR AUTHORI- ZED AGENT FOR THE PROPOSED SITE; (2) IF NOT THE OWNER, WRITTEN PERMISSION FROM SAID OWNER AUTHORIZING MY ACTIONS ON HIS /HER BEHALF IS ATTACHED; AND (3) ALL OF THE ABOVE RESPONSES AND THOSE ON SUPPORTING DOCUMENTS i'IE T'UTHFULLY AND TO THE BEST OF MY KNOWLEDGE. Existing 200 Mullan Building: &..w 2D0' o f r ,- ,.f B 11C, : tiles` - 9 t 1.. LUr v4'Jro , a � APPLICATIONS YYA BEFORE T Z04FII JUS B D F ADJU M T . m R � N. 300 Mullan Road, Suite 204 UTA: ASA: N FIRE DIST.:i LEGAL CHECKED BY: .q A 1:731‘ Staff taking in Application: * * * * * * * * * * * * * * * * * * * t * * * * * * * * * * *> * t Property: Vacant - closed up rental home. Signed Address. 1. 100 iiullan Road. Suite 204. Spokane 59206 Phone No.: 925 -5311 Date: 12/12/85 Notary: 2;', ..ry. :y Date: December 12, 1985 (over VE- 164 -85 Non - Conforming Lot /Use Source of Legal: Ticor Title Phone No.: 926 -5311 krG .a /o-rr * A. BURDEN OF PROOF It is necessary for the applicant or his /her representative to establish the reasons why the requested proposal should be approved and to literally put forth the basic case. Accordingly; you should have been given a form for your requested action (variance, conditional use, etc.) designed to help you present your case in a way which addresses the criteria which the Zoning Adjustor must consider. Please fill the form out and return it with your application. If you didn't get a form, ask the Planning Department personnel for advice on how to proceed. B. SIGN -OFF BY COUNTY DEPARTMENTS COUNTY HEALTH DISTRICT COUNTY ENGINEER'S DEPARTMENT S gnatu ignatu standards. Si gbatIk consultation has been held to discuss the prpposal. The appli- informed of requirements and st dar s. A /�> (Da e) The—applicant is required to discuss the to become (Distric S1Vgni atuf f (Date) 4. WATER PURVEYOR (Waive if outside CWSSA) NAME: g"-1V r% A cifiC� (Date) Sign -off Wai ved) A preliminary consultation has been held to discuss the proposal. The appli- cant has b-n informed of requirements and standards. , e GLA;v,g/ (Date) (Sign -off Waived) COUNTY UTILITIES DEPARTMENT (Waive if outside WMAB) prelimina consultation has been held to discuss the proposal. The ap:ijic -.t rs be - informed of requirements and standards. (Sign -off Waived) . I t : . al with rmed of requirements and (Sign -off Waived) WE ELECTRIC WATE,4 en a) The proposal located within the boundary of our future service area. b) The proposal is/is-net located within the boundary of our current district. c) We are/are -rtet able to serve this site with adequate water. d) Satisfactory arrangements e've /have not been made to serve this proposal. .ULL i3 /ger (Date) ' (Sign -off Waived) NAME: /no'ktc/ 4(4424, J a FILE #: I. VARIANCES The County Zoning Ordinance, Section 4.03.020 (64), clarifies that variance is an adjustment made to a "dimensional" regulation. Websters New Collegiate Dictionary (1979) defines "dimension" as a measure in one direction (and therefore includes "area "). State Law (36.70.020 (.14) RCW)... Is the subject property deprived of privileges commonly enjoyed by other properties in same vicinity and zone and does the variance remedy the difference in privileges? If so, what privileges? This facility is an expansion of an existing building which is utilizing the same variances previously granted as requested herein. This variance is compatible with all other variances granted within immediate area. The variance would allow for a better designed parking area utilizing more off street parking while providing a safety driveline for fire protection. 1. Driveway area off of Willow Road (20' setback flanking street) /B:/ Because of special circumstances applicable to subject property, including size, shape, topography, location or surroundings, does strict application of the dimensional regulation deprive the subject property of rights /privileges enjoyed by other properties in vicinity under IDENTICAL zones? If yes, what special circumstances exist? After losing 5' for dedication, the remaining site allows for the expansion into existing 200 Mullen Building, the land area behind building is restricted in size creating a necessity to utilize the 20' setback area to facilitate the driveway area around building. Without variance, the parking area and drive - through would be seriously restricted. 6 Will granting of the variance be materially detrimental to public welfare OR injurious to property or improvements in the vicinity and zone in which the subject property is located? No, it will enhance neighborhood by increasing the off street parking while providing a driveway around the building allowing for better exiting and fire protection. The driveway area will be densely buffered with landscaping along Willow Road minimizing impact from cars. R ECEIVE E : o r ks SPOKANE COUNTYDEItAfl4 DEPARTMENT ,-L JP? 4 4 APPLICATION FOR - ZONE R LASSIFICATION oRbowi Date: December 12, 1985 PLANNING PAR I�T No: 7E.- /Q3€3 Name of Applicant: Prokey G. Arger Street Address of Applicant: N. 300 ilullan Road, Suite 204 City: Spokane State: WA Zip Code: 99206 Tele. No. 926 - 5311 Name of Property Owner(s): Jerry L. & Bonnie R. Downie Authorized Agent representing Owner (if other than owner): G. Arger Company Real Estate , Inc. 0pyJ Existing Zoning Classification: Z( pi-- ,Q -Z (5g74 c 0.. u - Date Existing Zone Classification Established: /egg, /9 Existing Use of Property: Closed rental house and vacant area Proposed Zone Classification: LB for West 2/3 (200'), RO for East 1/3 (90') Proposed Use of Property:Two story office building approx. 18,000 square feet Legal Description of Property: Opportunity Lot 1, Block 141, Except Street Existing property N. 200 Mullan Road: JJ�V� c r unlC n�,.Y LS/ ,ge i ✓ /'A WL Section: 17 Township: 25 Range: 44 Source of Legal: Ticor Title / Assessor's Parcel No: (See tax statement) 17543 - 1401 I/ Property Size: 36.530 Frontage: 130 Feet on: Mullan Road Total amount of adjoining land controlled by this owner or sponsor: 3 Acres Street Address of the Property: N. 700 Mullan Road If you do not hold title to the property affected by this application, what is your interest in it? Upon acceptance of zone change, applicant will act as developer of proiect Please list previous Planning Department actions involving this property: ALL OF THE FOLLOWING QUESTIONS MUST BE ANSWERED: 1. What are the changed conditions of the site area, which you feel make this proposal warranted? Local business and residential office zoning is now prevalent in the area. This site is south of and ajoins the existing 200 Mullan building allowing an additional wing to be added to the current building. 2. What effect will the proposed zone reclassification have on the adjacent properties? None, this proposal is compatible with the land use in the area. This land is within an existing businesspark area. Rev. 2/3/$, APPLICATION FOR ZONE RECLASS,{FI .7TION � continued -2 J �, m This section of the application will provide the Planning tepartm�nt'staff witd Jj written verification that the applicant has had preliminary consultation with the agencies identified. Results of the preliminary consultation should be incorporat- ed in the proposal before final submittal to the Planning Department. 1., COUNTY ENGINEER'S OFFICE 9 A preliminary consultation has been held to discuss the proposal. Our 100 f 4 . requirements for submittal of this proposal for rezone have been satisfied. e rr ■!, av - - //z x i „ -7-r / /3 . c . -- N --" (Signatuy (Date) 2. COUNTY UTILITIES OFFICE C .. T rf,�it A preliminary consultation has been held to discuss the proposal. Our regu' ents for s bmittal of this proposal for rezone have been satisfied. Th ig ted fifer p for this site is Rovie•(J gnature 3. WATER PURVEYOR a) The proposal (is) f4, " located within the boundary of our service area. b) Satisfactory arrangements l re - (have not) been made to serve this proposal. c) We (are) (eee- rr6tjable to serve this site with adequate water. ignatur 4. BUILDING AND SAFETY DEPARTMENT A preliminary consultation has been held to discuss the proposal. Our requirements for submittal of this proposal for rezone have been satisfied. This proposal is located in Fire District # f S..4. Pr 12.4AI `' C (Signatur FRE Flow) IS 35co GPM PMED Nl Srtt PLOW, ( Date) ALL minimum CODCS(BUIILWC7 MELHNWcAS PGLm HYDRANT bcnwjs, w NyDRANT /dtIMsERS) SNAIL 95 SATISFIer) Rr of r$RMfr APPLIcPno$. NOTARY SEAL: u r tcC'- S. COUNTY HEALTH DISTRICT A preliminary consu tation /Z (12ate (NAME) WOOF N QEClmN' I!atr) nn has been held to discuss the propo The ap• nt has been 'nf med of our requirements and standards. V & A (4Q.09--- A 9' -- / -r - �C • a — re) i\ (Date) Dec /3 / as (Date) / 1, THE UNDERSIGNED, SWEAR UNDER THE PENALTY bF PERJURY THAT T E ABOVE RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOW- LEDGE. I FURTHER SWEAR THAT I AM THE OWNER OF RECORD OF THE SITE PRO- POSED FOR ZONE RECLASSIFICATION, OR, IF NOT THE OWNER, ATTACHED HEREWITH IS WRITTEN PERMISSION FROM SAID OWNER AUTHORIZING MY ACTIONS ON HIS OR HER BE (Signed) 1 ) ° ' �� Date: December 12, 1985 (Address) N. 300 14ullan Road. Suite 204Phone: 926 -5311 Spokane. WA Zip: 99206 NOTARY %./ /;,> ' ;;,/ /; G /i; Date: December 12, 1985 TURE OF A PLICANT OR AGENT Date: December 12, 1985 Rev. 2/3/81 I��