Loading...
ZE-70-84Zoning Hearing Examiner Committee Actions of October 4, 1984 (continued) 3) ZE- 83 -84, Agricultural to Local Business and Multiple Family Suburban: Al sacker Location: Generally located at the southeast corner of Fourth Avenue and Sullivan Road in Section 24- 25 -44. Proposal: Convenience Store and 138 -Unit Apartment Complex. /Action: Approval. (Vote: 3 - 0) 4) ZE- 70 -84, Agricultural, Residential Office, Local Business, and Commercial to Commercial: Unicume Location: Generally bounded by Argonne Road, Mullan Road, and Valley Way; approximately 900 feet south of Broadway Avenue in Section 17- 25 -44. Proposal: Commercial Complex consisting of Four Buildings. Action: Approval. (Vote: 3 - 0) 5) ZE- 25A -79, Change of Conditions in the Commercial Zone: Moduline International, Inc. Location: Generally located north of and adjacent to Sprague Avenue, and approximately 300 feet west of Evergreen Road in Section 15- 25 -44. Proposal:. To review a new site development plan for a manufactured housing model display in a previously approved Commercial Zone. Action: Approval. (Vote: 3 - 0) 6) ZW- 132A -78, Change of Conditions in the Mining Zone: Central Pre -Mix Concrete Location: Generally located south of and adjacent to Fort Wright Road, and approximately 1,600 feet easterly of the intersection of Fort Wright Road and Government Way in Section 11- 25 -42. Proposal: To review a new site development plan to allow mining operations to within 100 feet of a residential zone within an existing Mining Zone. Action: Application Withdrawn by the Applicant. (Consensus of the Committee to accept the application withdrawal - Vote: 3 - G) If further information is desired, contact the Planning Department's office. SPH:cmw A. INTRODUCTION ZONE RECLASSIFICATION NO.: ZE -70 -84 SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER This matter having come before the Zoning Hearing Examiner Committee on October 4, 1984, and the members of the Committee present being Kenneth Kennedy, Chairman, F. Lynn Tennican and Richard L. Skalstad. B. PROPOSAL The sponsor, Ed Unicume, is requesting approval of a zone reclassification, File No. ZE- 70 -84, Agricultural, Residential Office, Local Business and Commercial to Commercial, for the purpose of developing a Commercial Complex consisting of four buildings. C. FINDINGS OF FACT 1. That the existing land use in the area is residential, commercial, church, and vacant. 2. That the Comprehensive Plan designates this area as appropriate for Major Commercial development. 3. That the existing zoning of the property described in the application is Agricultural, Residential Office, Local Business, and Commercial. 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with, and the Committee concurs with the Declaration of Non - Significance. 5. That the proper legal requirements for advertisement of the Agenda Item have been fulfilled. 6. That the land in this area is suitable for the proposed use, or uses within the proposed Zone Classification. 7. That the applicant has demonstrated that conditions have substantially changed since the original zoning of this area and accordingly, the proposed rezone is justified. 8. That the proposed use is compatible with existing uses in the area. D. CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL a) COUNTY PLANNING DEPARTMENT 2 ZONE RECLASSIFICATION NO. ZE -70 -84 C. FINDINGS OF FACT (continued) 9. That the owners of adjacent lands expressed neither approval nor disapproval of the proposed use; and, in fact, there was no testimony from the public. 10. The Hearing Examiner Committee finds the proposed use to be in harmony with the general purpose and will not be otherwise detrimental to the public health, safety, and welfare. 11. The following are additional findings of fact considered by the Hearing Examiner Committee: a) That imposed conditions associated with signage, landscaping, usage, and phasing should mitigate impacts and insure compatibility of this Commercial Zone with development trends in the Argonne /Mullan Roads corridor. (All Conditions imposed by the Zoning Hearing Examiner Committee shall be binding on the "Applicant ", which term shall include the owner or owners of the property, heirs, assigns, and successors.) 1. Approval by the Zoning Administrator of a specific lighting and signing plan for the described property prior to the release of any building permits. 2. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. Landscaping shall be installed and maintained such that sight distance at access points is not obscured or impaired. 3. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Variations when approved by the Zoning Administrator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. ZONE RECLASSIFICATION NO. ZE -70 -84 a) COUNTY PLANNING DEPARTMENT (continued) 4. Direct light from any exterior area lighting fixture shall not extend over the property boundary. 5. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permits. 6. All current standards of the Commercial Zone, as amended, shall be complied with in the development of this site. 7. That the - project is subject to Section 4.16A:050, the Aquifer Sensitive Area Overlay Zone of the Spokane County Zoning Ordinance, which sets forth various measures for Aquifer protection; specifically, measures dealing with wastewater disposal, spill protection measures, and stormwater runoff. 8. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff. 9. Any division of land for the purpose of sale, lease or transfer, shall comply with RCW 58 -17 and the Spokane County Platting Ordinances prior to issuance of building permits. 10. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners Resolution #77 -1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on -site improvements, or file appropriate documents to the effect that the NOTICE OF ACTION is waived in accordance with Spokane County Commissioners' Resolution #82 -0458 dated May 4, 1982. 11. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAC 197 -10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non - significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and /or public testimony contain information regarding assessment of the proposal's likely significant adverse impacts to the physical environment; a finding is hereby made that no probable significant adverse impacts upon the physical environ ment are anticipated as a result of the project; and a final declaration of non - significance is hereby to be issued. 12. Signs for this project shall conform to standards as set forth in Section 4.09.125 Signs (Local Business Zone). 3 4 a) COUNTY PLANNING DEPARTMENT (continued) 13. All open areas shall be landscaped, planted, and maintained in properly cared for lawn, shrubbery, and trees except for necessary access driveways, access points, and parking areas. An automatic sprinkler system shall be provided. 14. That use of the property, if developed with the total square footage and limited parking area proposed to the Hearing Examiner Committee, may be restricted from having retail and commercial uses due to the higher parking ratios required for such uses. 15. That this proposal be developed in phases. The first phase shall consist of Buildings 'B' and 'C' and use of the existing structure per any time period or construction schedule. Building 'A' is considered the second phase and shall not be considered for approval until all portions of the first phase are completed. Approval of the second phase will be required through a public hearing review before the Hearing Examiner Committee. Purpose of the review will be to ascertain that all conditions have been met in the first phase; that parking requirements in relation to use are compatible and adequate; and consideration of other concerns associated with the site and proposal. b) COUNTY ENGINEERING DEPARTMENT ZONE RECLASSIFICATION NO. ZE -70 -84 Prior To The Issuance Of A Building Permit: 1. Access permits for approaches to the County Road System shall be obtained from the Spokane County Engineer. 2. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on -site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. 3. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. b) COUNTY ENGINEERING DEPARTMENT ZONE RECLASSIFICATION NO. ZE -70 -84 4. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 5. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction, and other applicable County standards and /or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 6. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners'Resolution No. 80 -1592 as amended. c) COUNTY UTILITIES DEPARTMENT 1. Pursuant to Board of County Commissioners Resolution No. 80 -0418, the use of on -site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of permits by the Health District. 2. The owner(s) or Successor(s) in interest agree to authorize the County to place their name(s) on a petition for the formation of a ULID by petition method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROVIDED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improvements called for in conjunction with the formation of a ULID by either petition or resolution method under RCW Chapter 36.94. 3. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as amended. 4. Each unit shall be double - plumbed for connection to future areawide collection systems. 5 d) COUNTY HEALTH DISTRICT 1. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an individual on -site sewage system may be authorized. 4. Water service shall be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social and Health Services. 6. Use of private wells and water systems is prohibited. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. e) COUNTY BUILDING AND SAFETY DEPARTMENT 1. The site is located in Fire District # 1. ZONE RECLASSIFICATION N0. ZE -70 -84 2. Fire hydrants which meet the fire flow are required to be installed prior to any construction. These hydrants shall be placed so that no portion of the building exterior is more than 175 feet from the hydrant. The bottom of the lowest outlet of the hydrant shall be no less than 18 inches above grade. A water plan showing each fire hydrant (specifying the gallons per minute for each fire hydrant) and meeting the requirements in Chapter 10.04 of the Uniform Fire Code is required prior to construction of the water service. All required fire protection facilities shall be installed and made serviceable prior to and during the time of construction. 3. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. 4. Trash enclosures shall not be located adjacent to combustible construction or underneath windows or nonprotected eaves. 5. A land use permit will be required for each structure. 6 f) WATER PURVEYOR g) ZONE RECLASSIFICATION NO. ZE -70 -84 1. Water Purveyor is Modern Electric Water Company, and they will supply the site with adequate water for domestic, fire and irrigation uses. COUNTY AIR POLLUTION CONTROL AUTHORITY 1. Air pollution regulations require that dust emissions during demolition, excavation and construction projects be controlled. This may require use of water sprays, tarps, sprinklers, or suspension of activity during certain weather conditions. Haul roads should be treated and emissions from the transfer of earthen material must be controlled as well as emissions from all other construction related activities. 2. Measures must be taken to avoid the deposition of dirt and mud from unpaved surfaces onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be taken immediately to clean these surfaces. 3. All travelled surfaces (ingress, egress, parking areas, access roads) must be paved and kept clean. 4. Some objectionable odors will likely result during the construction phase of the project and from motor vehicles using the site following completion of the project and from occupants of. the proposed project. 5. All air pollution regulations must be met. 6. Additional Comments: Federal National Emission Standards for Hazardous Air Pollutants (NESHAPS) must be followed for demolition of the existing church. Forms and information are available at SCAPCA offices. E. ORDER The Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Ed Unicume, for a zone reclassification as described in the application should be APPROVED. Motion by: Tennican Seconded by: Skalstad Vote: Tennican - Aye Skalstad - Aye Kennedy - Aye Unanimous to APPROVE to the COMMERCIAL ZONE - ( 3 - 0 ) 7 E. ORDER (continued) ATTEST:' For WALLIS D. HUBBARD Planning Director By SIEVE P. HOROB!OWSKI Zoning Administrator Date: /9er 4 /4 ZONE RECLASSIFICATION NO. ZE -70 -84 8 HEARING EXAMINER COMMITTEE HEREBY ATTEST TO THE ABOVE FINDINGS, ORDER, AND VOTE SPOKANL CI)lif:i'i %!r!i:ifl 11(!J+ IxAMIir'LR Lwrim Iii! f 1 Li'tititii. NO 456 -220 Place: brUudwuy i.t ILC4: hui:dinq, :, I luor North 721 Jcl Irl::rul : 5!,o4.1nr. WA 9`12uu (Continued tr0ln eau' 01) ZONE RECLASS 1 F f CA! ! IIN': 3. ZL -83 -84 AGk1CULlURAL 10 LOCAL BUSINESS AND MULTIPLE FAMILY SUBURBAN (Generally located at the southeast corner of Fourth Avenue and Sullivan Road in Section 24- 25 -44.) V 4. 1E -70 -84 Comprehensive Plan: Proposed Use: Site Size: Applicant: Site Size: Applicant: Sitr Size: Applicant: Suburban Convenience Sture and 138 -Unit Apartment Complex. Approximately 7.16 Acres DON ALSACKER c/o D. J. Hume 500 Columbia Building Spokane, WA 99204 AGRICULTURAL, RESIDENTIAL OFFICL COMMERCIAL TO COMMERCIAL (Generally bounded by Argonne Road, Mullan Road, and Valley Way; approximately 900 feet south of Broadway Avenue in Section 17- 25 -44.) Comprehensive Plan: Proposed Use: LOCAL BUSINESS, AND Major Commercial Commercial Complex consisting of 4 Buildings. Approximately 2.37 Acres ED UNICUME North 408 Mullan Road Spokane, WA 99206 5. ZE- 25A -79 CHANGE OF CONDITIONS IN THE COMMERCIAL ZONE (Generally located north of and adjacent to Sprague Avenue, and approximately 300 feet west of Evergreen Road in Section 15- 25 -44.) Comprehensive Plan: Change of Condition Request: Major Commercial To review a new site development plan for a manufactured housing model display in a previously approved Commercial Zone. Approximately 2.06 Acres MODULINE 1N1FRNA1lONAL, INC. P. O. Box 3000 Lacey, WA 98503 (LOn 1llM,•d ) 6. 7. 8. OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON TO: Spokane County Planning Department FROM: County Engineer's Department SUBJECT: Conditions of Approval -Zone Change -- Number: Zes _ _70_-8y Applicant's Name // Sectionf7 Township_g N, Range «K EWM The following "conditions of approval" for the above - referenced zone change are submitted to the Spokane County Hearing Examiner Committee for inclusion in the staff analysis and "findings and order" of the hearing scheduled( kM2 4/, 19 /95 Prior To The Issuance Of A Building Permit 1. Applicant shall dedicate feet on for right -of -way prior to any use of the property. 2. Applicant shall dedicate feet on 3. 4. for right -of -way and slope easements as necessary prior to any use of the property. Applicant shall dedicate a_ foot radius on and prior to any use of the property. Applicant shall dedicate _feet on and a foot radius on and for right -of -way prior to any use of the property. 42 Access permits for approaches to the County Road System shall be obtained from Spokane County Engineer. Access permits and improvements to by the Washington Department of Transportation. Access permits and improvements to by the City of (c) Applicant shall improve County TYPICAL roadway section No. (d) Applicant shall improve County TYPICAL roadway Section No. (e) Other specific improvements: The applicant County Health disposal plan property. JwIAMM • • shall submit for approval by District a detailed combined for the entire pr prior (a) Applicant shall improve in a County TYPICAL roadway section No. minimum (b) Applicant shall improve County TYPICAL roadway section No. minimum in a manner consistent in a minimum Cep_ti-dert l9 i98` manner consistent paving width paving width the . must be approved must be approved with Spokane with Spokane manner consistent with Spokane paving width in a manner consistent with Spokane minimum paving width 9 Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plans prior to the issuance of a building permit on the property. the Spokane County Engineer and the Spokane on -site sewage system plan and surface water on the to the issuance of any building permit I A parking plan and traffic circulation plan shalt be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or travelled by vehicles. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 13 : To construct the road improvements stated herein, the applicant may, with the approval of, , the County Engineer, join in and be a willing participant in any petition or resolution `, which purpose is the formation of a Road Improvement District (RID) for said improvement pursuant to RCW 36.88, as amended. Spokane County will not participate in the cost of . these improvements. 14. As an alternative method of constructing the road improvement stated herein, the appli- cant may, with the approval of.the County Engineer, accomplish the road improvements stated herein by joining and participating in a County Road Project (CRP) to the extent of the required road improvement. Spokane County will not participate in the cost 'of these improvements. 5, The construction of the road improvements stated herein shall be accomplished as ap- proved by the Spokane County Engineer. All required improvements shall conform to the current State Of Washington Standard Specifications for Road and Bridge Construction, and other applicable county standards and or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 17. Applicant shall file a petition for the vacation of _ prior to any use of the property. 18. Applicant shall construct a paved and delineated access approach(s) to meet the existing pavement on 19. Access to Road shall be prohibited until such time as specifically authorized by the Spokane County Engineer. 20 Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners Resolution No. 80 -1592 as amended. [i ST. AGENDA, OCTOBER 4, 1984 - 2 SPOKANE COUNTY ZONING HEARING EXAMINER COMMITTEE Place: Broadway Centre Building, Second Floor North 721 Jefferson Street, Spokane, WA 99260 (Continued from Page #1 ZONE RECLASSIFICATIONS 3. ZE -83 -84 4. ZE -70 -84 5. ZE- 25A -79 AGRICULTURAL TO LOCAL BUSINESS AND MULTIPLE FAMILY SUBURBAN (Generally located at the southeast corner of Fourth Avenue and Sullivan Road in Section 24- 25 -44.) Comprehensive Plan: Proposed Use: Site Size: Applicant: Site Size: Applicant: Site Size: Applicant: TELEPHONE NO.: 456 -2205 Suburban Convenience Store and 138 -Unit Apartment Complex. Approximately 7.16 Acres DON ALSACKER c/o D. J. Hume 500 Columbia Building Spokane, WA 99204 AGRICULTURAL, RESIDENTIAL OFFICE, LOCAL BUSINESS, AND COMMERCIAL TO COMMERCIAL (Generally bounded by Argonne Road, Mullan Road, and Valley Way; approximately 900 feet south of Broadway Avenue in Section 17- 25 -44.) Comprehensive Plan: Proposed Use: Major Commercial Commercial Complex consisting of 4 Buildings. Approximately 2.37 Acres ED UNICUME North 408 Mullan Road Spokane, WA 99206 CHANGE OF CONDITIONS IN THE COMMERCIAL ZONE (Generally located north of and adjacent to Sprague Avenue, and approximately 300 feet west of Evergreen Road in Section 15- 25 -44.) Comprehensive Plan: Change of Conditions Request: Major Commercial To review a new site development plan for a manufactured housing model display in a previously approved Commercial Zone. Approximately 2.06 Acres MODULINE INTERNATIONAL, INC. P. 0. Box 3000 Lacey, WA 98503 (continued) Date: Name of Applicant: F-1 V11MICUP1ir Street Address of Applicant: //OV k City: SPOKANE COUNTY PLANNING DEPARTMENT APPLICATION FOR ZONE RECLASSIFICATION 4— 90 -cY9 Application No • Name of Property Owner(s): So ✓n t Authorized Agent representing Owner (if other than owner): Existing Zoning Classification: Date Existing Zone Classification Existing Use t of Property: Proposed Zone Classification: Proposed Use of Property: Legal Description of Property: •Property Size: State: AI h r Zip Code: C79 .20t! Tele. No. C /ZJ/ -- SSZJL. AG, co n J 4 Established: C kMuPHN 0Ornri 0 r - r ICES ALL OF THE FOLLOWING QUESTIONS MUST BE ANSWERED: Section: Township: Range: Source of Legal: Assessor's Parcel No: (See tax statement) 31 2 k7 /6 . Frontage: 3 on: 41"j01 n c ) 11 (/(4 •t Total _ amount of adjoining land controlled by this owner or sponsor: no e • Street Address of the Property: L1 /S /V hly 64n 'P If you do not hold title to the property affected by this appiication, what is your interest in it? f) crrCt,A r e 61 tO7m /ro.,cl t i, Please list previous Planning Department actions involving this property: 1. What are the changed conditions of the � $ite area, whit you feel make this • proposal warranted? _tfla /t c J e(/e/UQ cc/ CDff1t'ntvc.c./ C /S(', 2. What effect will the proposed zone reclassification have on the adjacent properties? /8ii Rev. 2/3/81 rJ APPLICATION FOR ZONE RECLASSIFICATION-- continued-2 This section of the application will provide the Planning Department's Staff with written verification that the applicant has had preliminary consultation with the agencies identified. R4sults of the preliminary consultation should be incorporat- ed in the proposal before final submittal to the Planning Department. COUNTY ENGINEER'S OFFICE A preliminary consultation has been held to discuss the proposal. Our requirements for submittal of this proposal for rezone have been satisfied. (Signature) (Date) COUNTY 'UTILI' IES OFFICE A preliminary consultation has been held to discuss the proposal. Our requirements for submittal of this proposal for rezone have been satisfied. The designated water purveyor for this site is - b'1 -/ it> �y e— , " .. 7. ., Lam" , 4 - D 5 � V (Signature) (Date) 3. WATER PURVEYOR (NAME) a) The proposal (is) (is not) located within the boundary of our service area. b) Satisfactory arrangements (have) (have not) been made to serve this proposal. c) We (are) (are not) able to serve this site with adequate water. (Signature) (Date) BUILDING AND SAFETY DEPARTMENT A preliminary consultation has been held to discuss the proposal. Our requirements for submittal of this proposal for rezone have been satisfied. This proposal is located in Fire District # (Signature) (Date) 5. COUNTY HEALTH DISTRICT A preliminary consultation has been held to discuss the proposal. The applicant has been informed of our requirements and standards. (Signature) (Date) I, THE UNDERSIGNED, SWEAR UNDER THE PENALTY OF PERJURY THAT THE ABOVE RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOW- LEDGE. 1 FURTHER SWEAR THAT I AM THE OWNER OF RECORD OF THE SITE PRO- POSED FOR ZONE RECLASSIFICATION, OR, IF NOT THE OWNER, ATTACHED HEREWITH IS WRITTEN PERMISSION FROM SAID OWNER AUTHORIZING MY ACTIONS ON HIS OR HER BEHALF. NOTARY SEAL: (Signed) (Address) NOTARY Date SIGNATURE OF APPLICANT OR AGENT Date: Phone: Zip: Dale: Rev. 2/3/81 1 A. Project r:.,!Ilc: r//7 PROPOSAL Numht!: e -3 / ti.:rl ()II ( 7 - -- _ .. L_ N., R. 4/44 E.W.M.; Quarter 1 2 3 4 DEVELOPER Name: Phone: Cr MU i - t` LI !!'/ C' or Address: _ - - - §,, '7 1 / P /c/ // G AGENT Phon Busin C�..: t/ -� . f-- __Ho OWNER ENGINEER Remarks: PRELIMINARY CONSULTATION: Date: U' 1-7 57 .{S V By: Preliminary a) Right -of -Way /'O Conditions b) Curb i!-G c) Sidewalk A n d) Pave Ai e) Approaches (120.114 l S j?o. 's_J /2 -P. f) Drainage -a_ - /-k pl; s g) State /City Review Yes ( J' No A') NOTE: This proposal must comply with Spokane County Regulations for Roads, Ap- proach and Drainage in New Construction; Board of County Commissioners Resolution No. 80 -1592 as amended. Conditions are preliminary and may change after field in- spection and review of County records., C. INSPECTION D. SPECIFIC CONDITIONS: Fee fain: Yes Nu Ann ijri( Planning Application Si,yteil: Uate / 7 by E. FINAL PLAT CHECKS S 3 a5 i U 7 / 5� S P O K A N E C O U N T Y E N G I N E E R - - -f R E L 1 1 1 1 N A R Y C O N S 11 L T A T I O N - -- Name: Add re::::: Phone: business Name: Address: Phone: business Home Date: / / By: Remarks: Fee P.tid: 11., t.•• Amount' —'- M.11.1 it:m iI 1 •. ,I:I VI.'YI.q• Choi: kt, : Nn. I h ai n`. N,I. .1 pale It ' .... _ _. .. I).ii .• Ii: Atli 1 l 1, i „1 !u „I I!.•ii ; .I! Ht.1 :CH t..'y i!!,' Chi'. l(S: y I). Check Home Ntu,ib .:. Cnsh___ — __ Check F Am t .', I'1 .I•,i. R•4 AO .:•1)1 .I':I. Ior .1!n. Fee . nit ..\ it . i ',1 . _ - .. . 1 .; 1 • ACCOUNT AMI. OF ACCOUNT AMT PAID BALANCE DUE 8K808 iREt OfM)Q. RECEIPT Received From _C/vi Address..._ 1 GUV & I612C. fir' Fwat of f Interstate nto N,A ingerstate Spokane Valley Washington, N.A Spokane, W shington 99210 Bank CASH CHECK MONEY ORDER t (Myf P PTO Tilt: DEN ( • Date l - a5" HOW PAID � By 192 8901 to /' _Dollars "c7COlgLir For Z C SPOKANE COUNTY ENGINEER N, ai 1 - 3EfFfft99\ SPOKANE, WASHINGTON 99260 ✓ �/ 6 ! ' tea- van. -:.:+ o�- :-wkly.:.rnw®::7.7.oic:..:nl11.4: wwF a;•; Iali.:c: m a..::was.:.::m.d:..ocM_.:_W11.: UNWU\IE (.2(1NSTItuU17(.)N 91111 N. PIES nom' 924.5506 SPon A N E, %VA \111 XIL 'Kos: 911206 .01) O e( 19.28/1250 MARK UNICUME 1141 ; 11 '0000 i 14 I l l ' 1 : 1 25000 2861: 78 022 5 L S O mm 1 AGENDA, OCTOBER 4, 1984 - 2 - SPOKANE COUNTY ZONING HEARING EXAMINER COMMITTEE Place: Broadway Centre Building, Second Floor North 721 Jefferson Street, Spokane, WA 99260 (Continued from Page #1) ZONE RECLASSIFICATIONS 3. ZE -83 -84 AGRICULTURAL TO LOCAL (Generally located at Sullivan Road in Sect Comprehensive Plan: Proposed Use: Site Size: Applicant: 4. ZE -70 -84 AGRICULTURAL, RESIDENTIAL OFFICE, LOCAL BUSINESS, AND COMMERCIAL TO COMMERCIAL (Generally bounded by Argonne Road, Mullan Road, and Valley Way; approximately 900 feet south of Broadway Avenue in Section 17- 25 -44.) Comprehensive Plan: Proposed Use: Site Size: Applicant: 5. ZE- 25A -79 CHANGE OF CONDITIONS IN THE COMMERCIAL ZONE (Generally located north of and adjacent to Sprague Avenue, and approximately 300 feet west of Evergreen Road in Section 15- 25 -44.) Comprehensive Plan: Change of Conditions Request: Site Size: Applicant: TELEPHONE NO.: 456 -2205 BUSINESS AND MULTIPLE FAMILY SUBURBAN the southeast corner of Fourth Avenue and ion 24- 25 -44.) Suburban Convenience Store and 138 -Unit Apartment Complex. Approximately 7.16 Acres DON ALSACKER c/o D. J. Hume 500 Columbia Building Spokane, WA 99204 Major Commercial Commercial Complex consisting of 4 Buildings. Approximately 2.37 Acres ED UNICUME North 408 Mullan Road Spokane, WA 99206 Major Commercial To review a new site development plan for a manufactured housing model display in a previously approved Commercial Zone. Approximately 2.06 Acres MODULINE INTERNATIONAL, INC. P. 0. Box 3000 Lacey, WA 98503 (continued) .5* DATE: OCTOBER 4, 1984 TO: FROM: SUBJECT: I. GENERAL INFORMATION APPLICANT: REQUESTED ZONING: EXISTING ZONING: PROPOSED USE: EXISTING USE: SITE SIZE: STAFF REPORT HEARING EXAMINER COMMITTEE PLANNING DEPARTMENT STAFF ZONE RECLASSIFICATION NUMBER: ZE -70 -84 ED UNICUME Commercial Agricultural (established in 1947) Residential Office (established in 1976) Local Business (established in 1982) Commercial (established in 1983) (with ASA Overlay Zone - Yes) Offices and General Retail Uses Church, New Hope Training Center, Aluminum Recycling Operation, and Single Family Approximately 2.37 Acres COMPREHENSIVE PLAN DESIGNATION: Major Commercial PRIORITY SEWER SERVICE AREA: Yes AQUIFER SENSITIVE AREA: Yes PROJECT LOCATION: Generally bounded by Argonne Road, Mullan Road and Valley Way, approximately 900 feet south of Broadway Avenue in Section 17- 25 -44. II. BACKGROUND ANALYSIS 1) COMPREHENSIVE PLAN: The Major Commercial category of the Comprehensive Plan is suitable for a variety of non - residential uses under various zone classifications. Determining factors of use and zone are generally related to site specific considerations. Measures for buffering and landscaping are encouraged to mitigate potential or real compatibility problems. II. BACKGROUND ANALYSIS (continued) 2) ZONING: North Local Business, Established, 1979 Commercial, Established, 1983 East Residential Office, Estab. 1974 and 1980 Agricultural, Established, 1948 West Residential Office, Established, 1970 Agricultural, Established, 1947 South Agricultural, Established, 1947 Local Business, Established, 1981 3) HISTORY OF LAND USE ACTIONS: The Argonne /Mullan Road corridor has been subject to more and more land use intense actions since adoption of the Comprehensive Plan. Generally, to be consistent with the Plan, the more intense Local Business and Commercial Zones have been approved in the corridor's interior. Signs in the commercial zones have been limited to the Local Business standards. Zone combinations of Local Business and Residential Office, with special conditions, have been used as a buffer on the corridor's flanks. The most recent Commercial Zone proposal, for a grocery store north of Broadway Avenue, was denied. The Main reason was the use and its incompatibility with the area. The present proposal is an attempt to unify several small parcels, with four different zones, into a single office /retail complex. 4) LAND USE: Site Church, Training Center, Recycling Center, Single Family Residential, and Vacant North Vacant, Duplexes, Day Care, and Batting Cage East Day Care, Offices, and Vacant South Vacant and Single Family Residential West Offices and Single Family Residential 14, ZONE RECLASSIFICATION NO. ZE -70 -84 III. SITE ANALYSIS ZONE RECLASSIFICATION NO. ZE -70 -84 II. BACKGROUND ANALYSIS (continued) 5) NEIGHBORHOOD CONSIDERATIONS: Land in the corridor and on the east side is being developed primarily to offices, with some scattered retail uses. The west side of Argonne Road has remained predominantly residential. Access from the two arterials is good. A small sight distance problem exists south of Valley Way at Mullan Road due to undeveloped property south of Valley Way. All adjoining County roads are fully improved. 1) SITE CHARACTERISTICS AND CONSIDERATIONS: The site contains a variety of uses; both residential and non - residential. The proposal would redevelop the entire site with three new buildings, while retaining one existing structure. 2) AGRICULTURAL SUMMARY: Major Commercial category not intended for agricultural protection. 3) SITE PLAN INFORMATION: SITE SIZE: Approximately 2.37 Acres EXISTING BUILDINGS: 3 Major Structures PROPOSED BUILDINGS: 4 (3 New and 1 Existing) Total Floor Area: 73,000 Sq.Ft. (Total on All Floors) 29,000 Sq.Ft. (Building Footprints) Total Site Coverage: Approximately 28 %. Maximum Structure Height: 3 Stories (Proposed for 1 Building) PARKING AREA: Parking Required: 183 (At Full Office) or 365 (At Full Retail) Parking Provided: 186 (50 of these are proposed in an Underground Garage.) III. SITE ANALYSIS (continued) ZONE RECLASSIFICATION NO. ZE -70 -84 BUFFERING TECHNIQUES: None have been indicated on the site plan. Suggest that all perimeter areas around the site be provided with planted and maintained landscape strips. Additional landscaping should be provided around buildings in all areas not used for parking or access. Reviews and approvals should be administrative. OTHER SITE PLAN CONSIDERATIONS: If constructed as proposed, the relationship between building area and available parking area would limit use to only offices. Any retail use would exceed minimum parking requirements. Signs in a Commercial Zone are not limited. Previous decisions have put limits on amount of signage in the corridor. Suggest, at a minimum, that Local Business sign standards be imposed. The proposed three story structure is only permissible in the Commercial and Local Business Zones. The Residential Office Zone limits to two stories. IV. CONCLUSION: The Commercial Zone, as well as other non - residential zones, would De consistent with the Comprehensive Plan. Site specific considerations influence the most appropriate zones and uses. Commercial zones have been approved in the corridor with limitations; while at least one such proposal was denied partially on proposed use and its impacts. If approved, as proposed, suggestions are made to condition as to use, landscaping and signage. These should insure compatible redevelopment of this site with the area. V. RECOMMENDED AGENCY CONDITIONS, IF APPROVED: (All Conditions imposed by the Zoning Hearing Examiner Committee shall be binding on the "Applicant ", which term shall include the owner or owners of the property, heirs, assigns, and successors.) a) COUNTY PLANNING DEPARTMENT 1. Approval by the Zoning Administrator of a specific lighting and - signing plan for the described property prior to the release of any building permits. a) COUNTY PLANNING DEPARTMENT (continued) ZONE RECLASSIFICATION NO. ZE -70 -84 2. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. Landscaping shall be installed and maintained such that sight distance at access points is not obscured or impaired. 3. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Variations when approved by the Zoning Administrator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. 4. Direct light from any exterior area lighting fixture shall not extend over the property boundary. 5. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permits. 6. All current standards of the Commercial Zone, as amended, shall be complied with in the development of this site. 7. That the project is subject to Section 4.16A.050, the Aquifer Sensitive Area Overlay Zone of the Spokane County Zoning, Ordinance, which sets forth various measures for Aquifer protection; specifically, measures dealing with wastewater disposal, spill protection measures, and stormwater runoff. 8. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff. 9. Any division of land for the purpose of sale, lease or transfer, shall comply with RCW 58 -17 and the Spokane County Platting Ordinances prior to issuance of building permits. .19 ZONE RECLASSIFICATION NO. ZE -70 -84 a) COUNTY PLANNING DEPARTMENT (continued) 10. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners Resolution #77 -1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on -site improvements, or file appropriate documents to the effect that the NOTICE OF ACTION is waived in accordance with Spokane County Commissioners' Resolution #82 -0458 dated May 4, 1982. 11. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAC 197 -10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non - significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and /or public testimony contain information regarding assessment of the proposal's likely significant adverse impacts to the physical environment; a finding is hereby made that no probable significant adverse impacts upon the physical environ ment are anticipated as a result of the project; and a final declaration of non - significance is hereby to be issued. 12. Signs for this project shall conform to standards as set forth in Section 4.09.125 Signs. 13. All open areas shall be landscaped, planted, and maintained in properly cared for lawn, shrubbery, and trees except for necessary access driveways, access points, and parking areas. An automatic sprinkler system shall be provided. 14. That use of the property, if developed with the total square footage and limited parking area proposed to the Hearing Examiner Committee, may be restricted from having retail and commercial uses due to the higher parking ratios required for such uses. b) COUNTY ENGINEERING DEPARTMENT Prior To The Issuance Of A Building Permit: 1. Access permits for approaches to the County Road System shall be obtained from the Spokane County Engineer. 2. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on -site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. g)to b) COUNTY ENGINEERING DEPARTMENT ZONE RECLASSIFICATION NO. ZE -70 -84 3. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 4. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 5. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction, and other applicable County standards and /or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 6. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners'Resolution No. 80 -1592 as amended. NJ, 9n'.9& c) COUNTY UTILITIES DEPARTMENT 1. Pursuant to Board of County Commissioners Resolution No. 80 -0418, the use of on -site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application,approval and issuance of permits by the Health District. 2. The owner(s) or Successor(s) in interest agree to authorize the County to place their name(s) on a petition for the formation of a ULID by petition method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROVIDED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improvements called for in conjunction with the formation of a ULID by either petition or resolution method under RCW Chapter 36.94. *1 c) COUNTY UTILITIES DEPARTMENT (continued) 3. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as amended. 4. Each unit shall be double - plumbed for connection to future areawide collection systems. d) COUNTY HEALTH DISTRICT 1. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an individual on -site sewage system may be authorized. 4. Water service shall be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social and Health Services. 6. Use of private wells and water systems is prohibited. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. e) COUNTY BUILDING AND SAFETY DEPARTMENT 1. The site is located in Fire District # 1. ZONE RECLASSIFICATION NO. ZE -70 -84 2. Fire hydrants which meet the fire flow are required to be installed prior to any construction. These hydrants shall be placed so that no portion of the building exterior is more than 175 feet from the hydrant. The bottom of the lowest outlet of the hydrant shall be no less than 18 inches above grade. A water plan showing each fire hydrant (specifying the gallons per minute for each fire hydrant) and meeting the requirements in Chapter 10.04 of the Uniform Fire Code is required prior to construction of the water service. All required fire protection facilities shall be installed and made serviceable prior to and during the time of construction. e) COUNTY BUILDING AND SAFETY DEPARTMENT (continued) 3. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. 4. Trash enclosures shall not be located adjacent to combustible construction or underneath windows or nonprotected eaves. ZONE RECLASSIFICATION NO. ZE -70 -84 5. A land use permit will be required for each structure. f) WATER PURVEYOR 1. Water Purveyor is Modern Electric Water Company, and they will supply the site with adequate water for domestic, fire and irrigation uses. g) COUNTY AIR POLLUTION CONTROL AUTHORITY 1. Air pollution regulations require that dust emissions during demolition, excavation and construction projects be controlled. This may require use of water sprays, tarps, sprinklers, or suspension of activity during certain weather conditions. Haul roads should be treated and emissions from the transfer of earthen material must be controlled as well as emissions from all other construction related activities. 2. Measures must be taken to avoid the deposition of dirt and mud from unpaved surfaces onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be taken immediately to clean these surfaces. 3. All travelled surfaces (ingress, egress, parking areas, access roads) must be paved and kept clean. 4. Some objectionable odors will likely result during the construction phase of the project and from motor vehicles using the site following completion of the project and from occupants of the proposed project. 5. All air pollution regulations must be met. 6. Additional Comments: Federal National Emission Standards for Hazardous Air Pollutants (NESHAPS) must be followed for demolition of the existing church. Forms and information are available at SCAPCA offices. �3 Si- DATE: OCTOBER 4, 1984 TO: FROM: SUBJECT: I. GENERAL INFORMATION APPLICANT: REQUESTED ZONING: EXISTING ZONING: II. BACKGROUND ANALYSIS STAFF REPORT HEARING EXAMINER COMMITTEE PLANNING DEPARTMENT STAFF ZONE RECLASSIFICATION NUMBER: ED UNICUME Commercial Agricultural (established in 1947) Residential Office (established in 1976) Local Business (established in 1982) Commercial (established in 1983) (with ASA Overlay Zone - Yes) PROPOSED USE: Offices and General Retail Uses EXISTING USE: Church, New Hope Training Center, Aluminum Recycling Operation, and Single Family SITE SIZE: Approximately 2.37 Acres COMPREHENSIVE PLAN DESIGNATION: Major Commercial PRIORITY SEWER SERVICE AREA: Yes 'AQUIFER SENSITIVE AREA: Yes PROJECT LOCATION: Generally bounded by Argonne Road, Mullan Road and Valley Way, approximately 900 feet south of Broadway Avenue in Section 17- 25 -44. 1) COMPREHENSIVE PLAN: The Major Commercial category of the Comprehensive Plan is suitable for a variety of non - residential uses under various zone classifications. Determining factors of use and zone are generally related to site specific considerations. Measures for buffering and landscaping are encouraged to mitigate potential or real compatibility problems. II. BACKGROUND ANALYSIS (continued) ZONE RECLASSIFICATION NO. ZE -70 -84 2) ZONING: North Local Business, Established, 1979 Commercial, Established, 1983 East Residential Office, Estab. 1974 and 1980 Agricultural, Established, 1948 West Residential Office, Established, 1970 Agricultural, Established, 1947 South Agricultural, Established, 1947 Local Business, Established, 1981 3) HISTORY OF LAND USE ACTIONS: The Argonne /Mullan Road corridor has been subject to more and more land use intense actions since adoption of the Comprehensive Plan. Generally, to be consistent with the Plan, the more intense Local Business and Commercial Zones have been approved in the corridor's interior. Signs in the commercial zones have been limited to the Local Business standards. Zone combinations of Local Business and Residential Office, with special conditions, have been used as a buffer on the corridor's flanks. The most recent Commercial Zone proposal, for a grocery store north of Broadway Avenue, was denied. The Main reason was the use and its incompatibility with the area. The present proposal is an attempt to unify several small parcels, with four different zones, into a single office /retail complex. 4) LAND USE: Site Church, Training Center, Recycling Center, Single Family Residential, and Vacant North Vacant, Duplexes, Day Care, and Batting Cage East Day Care, Offices, and Vacant South Vacant and Single Family Residential West Offices and Single Family Residential S4 II BACKGROUND ANALYSIS (continued) 5) NEIGHBORHOOD CONSIDERATIONS: Land in the corridor and on the east side is being developed primarily to offices, with some scattered retail uses. The west side of Argonne Road has remained predominantly residential. Access from the two arterials is good. A small sight distance problem exists south of Valley Way at Mullan Road due to undeveloped property south of Valley Way. All adjoining County roads are fully improved. III. SITE ANALYSIS 1) SITE CHARACTERISTICS AND CONSIDERATIONS: The site contains a variety of uses; both residential and non - residential. The proposal would redevelop the entire site with three new buildings, while retaining one existing structure. 2) AGRICULTURAL SUMMARY: Major Commercial category not intended for agricultural protection. 3) SITE PLAN INFORMATION: SITE SIZE: EXISTING BUILDINGS: PROPOSED BUILDINGS: Total Floor Area: Total Site Coverage: Maximum Structure Height: 3 Stories (Proposed for 1 Building) PARKING AREA: Parking Required: 183 (At Full Office) or 365 (At Full Retail) Parking Provided: J7 ZONE RECLASSIFICATION NO. ZE -70 -84 Approximately 2.37 Acres 3 Major Structures 4 (3 New and 1 Existing) 73,000 Sq.Ft. (Total on All Floors) 29,000 Sq.Ft. (Building Footprints) Approximately 28 %. 186 (50 of these are proposed in an Underground Garage.) III, SITE ANALYSIS (continued) ZONE RECLASSIFICATION NO. ZE -70 -84 BUFFERING TECHNIQUES: None have been indicated on the site plan. Suggest that all perimeter areas around the site be provided with planted and maintained landscape strips. Additional landscaping should be provided around buildings in all areas not used for parking or access. Reviews and approvals should be administrative. OTHER SITE PLAN CONSIDERATIONS: If constructed as proposed, the relationship between building area and available parking area would limit use to only offices. Any retail use would exceed minimum parking requirements. Signs in a Commercial Zone are not limited. Previous decisions have put limits on amount of signage in the corridor. Suggest, at a minimum, that Local Business sign standards be imposed. The proposed three story structure is only permissible in the Commercial and Local Business Zones. The Residential Office Zone limits to two stories. IV, CONCLUSION: The Commercial Zone, as well as other non - residential zones, would be consistent with the Comprehensive Plan. Site specific considerations influence the most appropriate zones and uses. Commercial zones have been approved in the corridor with limitations; while at least one such proposal was denied partially on proposed use and its impacts. If approved, as proposed, suggestions are made to condition as to use, landscaping and signage. These should insure compatible redevelopment of this site with the area. V. RECOMMENDED AGENCY CONDITIONS, IF APPROVED: (All Conditions imposed by the Zoning Hearing Examiner Committee shall be binding on the "Applicant ", which term shall include the owner or owners of the property, heirs, assigns, and successors.) a) COUNTY PLANNING DEPARTMENT 1. Approval by the Zoning Administrator of a specific lighting and signing plan for the described property prior to the release of any building permits. a) COUNTY PLANNING DEPARTMENT (continued) .39 ZONE RECLASSIFICATION N0. ZE -70 -84 2. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. Landscaping shall be installed and maintained such that sight distance at access points is not obscured or impaired. 3. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Variations when approved by the Zoning Administrator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. 4. Direct light from any exterior area lighting fixture shall not extend over the property boundary. 5. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permits. 6. All current standards of the Commercial Zone, as amended, shall be complied with in the development of this site. 7. That the project is subject to Section 4.16A.050, the Aquifer Sensitive Area Overlay Zone of the Spokane County Zoning Ordinance, which sets forth various measures for Aquifer protection; specifically, measures dealing with wastewater disposal, spill protection measures, and stormwater runoff. 8. Applicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff.. 9. Any division of land for the purpose of sale, lease or transfer, shall comply with RCW 58 -17 and the Spokane County Platting Ordinances prior to issuance of building permits. b) COUNTY ENGINEERING DEPARTMENT ZONE RECLASSIFICATION NO. ZE -70 -84 a) COUNTY PLANNING DEPARTMENT (continued) 10. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners Resolution #77 -1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on -site improvements, or file appropriate documents to the effect that the NOTICE OF ACTION is waived in accordance with Spokane County Commissioners' Resolution #82 -0458 dated May 4, 1982. 11. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAC 197 -10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non - significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and /or public testimony contain information regarding assessment of the proposal's likely significant adverse impacts to the physical environment; a. finding is hereby made that no probable significant adverse impacts upon the physical environ ment are anticipated as a result of the project;, and a final declaration of non - significance is hereby to be issued. 12. Signs for this project shall conform to standards as set forth in Section 4.09.125 Signs. 13. All open areas shall be landscaped, planted, and maintained in properly cared for lawn, shrubbery, and trees except for necessary access driveways, access points, and parking areas. An automatic sprinkler system shall be provided. 14. That use of the property, if developed with the total square footage and limited parking area proposed to the Hearing Examiner Committee, may be restricted from having retail and commercial uses due to the higher parking ratios required for such uses. Prior To The Issuance Of A Building Permit: 1. Access permits for approaches to the County Road System shall be obtained from the Spokane County Engineer. 2. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on -site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. b) COUNTY ENGINEERING DEPARTMENT c) ZONE RECLASSIFICATION NO. ZE -70 -84 3. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 4. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 5. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction, and other applicable County standards and /or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 6. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners'Resolution No. 80 -1592 as amended. COUNTY UTILITIES DEPARTMENT 1. Pursuant to Board of County Commissioners Resolution No. 80 -0418, the use of on -site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of permits by the Health District. 2. The owner(s) or Successor(s) in interest agree to authorize the County to place their name(s) on a petition for the formation of a ULID by petition method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROVIDED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improvements called for in conjunction with the formation of a ULID by either petition or resolution method under RCW Chapter 36.94. c) COUNTY UTILITIES DEPARTMENT (continued) 3. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as amended. 4. Each unit shall be double - plumbed for connection to future areawide collection systems. d) COUNTY HEALTH DISTRICT 1. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an individual on -site sewage system may be authorized. 4. Water service shall be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social and Health Services. 6. Use of private wells and water systems is prohibited. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. e) COUNTY BUILDING AND SAFETY DEPARTMENT ZONE RECLASSIFICATION NO. ZE -70 -84 1. The site is located in Fire District # 1. 2. Fire hydrants which meet the fire flow are required to be installed prior to any construction. These hydrants shall be placed so that no portion of the building exterior is more than 175 feet from the hydrant. The bottom of the lowest outlet of the hydrant shall be no less than 18 inches above grade. A water plan showing each fire hydrant (specifying the gallons per minute for each fire hydrant) and meeting the requirements in Chapter 10.04 of the Uniform Fire Code is required prior to construction of the water service. All required fire protection facilities shall be installed and made serviceable prior to and during the time of construction. e) COUNTY BUILDING AND SAFETY DEPARTMENT (continued) 3. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. 4. Trash enclosures shall not be located adjacent to combustible construction or underneath windows or nonprotected eaves. 5. A land use permit will be required for each structure. f) WATER PURVEYOR 1. Water Purveyor is Modern Electric Water Company, and they will supply the site with adequate water for domestic, fire and irrigation uses. g) COUNTY AIR POLLUTION CONTROL AUTHORITY 1. Air pollution regulations require that dust emissions during demolition, excavation and construction projects be controlled. This may require use of water sprays, tarps, sprinklers, or suspension of activity during certain weather conditions. Haul roads should be treated and emissions from the transfer of earthen material must be controlled as well as emissions from all other construction related activities. 2. Measures must be taken to avoid the deposition of dirt and mud from unpaved surfaces onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be taken immediately to clean these surfaces. 3. All travelled surfaces (ingress, egress, parking areas, access roads) must be paved and kept clean. 4. Some objectionable odors will likely result during the construction phase of the project and from motor vehicles using the site following completion of the project and from occupants of the proposed project. 5. All air pollution regulations must be met. ZONE RECLASSIFICATION NO. ZE -70 -84 6. Additional Comments: Federal National Emission Standards for Hazardous Air Pollutants (NESHAPS) must be followed for demolition of the existing church. Forms and information are available at SCAPCA offices. 3