PE-1127-77AGENDA, JULY 15, 1977 ( ,-
SPOKANE COUNTY PLANNING COMMISSION
Time: (PLEASE NOTE TIME)
Place:
PRET,TMINARY STTRDIVISION AND ZONE CT,ASSTFICATION TTPGRADING
15 pE- 1177 -77. Gremv Addition
7E 123 -77, Aarici ltural to Single Family Residential
a. Location: Section 7, Township 25 N. ,Range 45,E.W.M.
The West 310 feet of Tract 24, Plat A, Green -
acres Irrigation District, in the South 1/2 of
Section 7.
Gremy, Inc.
c/o Frank C. Cobb
East 11202 - 18th Avenue
Spokane, WA 99206
Clarence E. Simpson Engineers, Inc.
North 909 Argonne Road
Spokane, WA 99206
d. Site Size: 4.55 Acres
e. Number of Lots: 12
f. Land use proposed by sponsor: Single family dwellings
g. Existing Zoning: Agricultural, established July 30, 1957
h. Advertised Zone Upgrading: Single Family Residential
i. Water Source: Consolidated Irrigation District
j. School District: Central Valley School District
k. Environmental Impact: A topic of discussion at this hearing may be
whether or not this proposal will have a significant adverse environmental impact.
b. Sponsor:
c. Engineers:
Friday, July 15, 1977, 8:30 A.M.
Conference Room A, County Court House Annex
(Use Mallon Avenue entrance)
- 15 -
TE•. #HONE NO.: 456 - 2274
z_ mite-
Inter-office Communication
0:r9CE OF COUNTY ENCI,INEE'a
SPOKANE COUNTY, WASHINGTON
Date 1) (14L‘i . 6) , 19 7 7
To PLANNING COMISSION
From GARY KENNALY, PLANNING & TRAFFIC DIVISION ENGINEER . . .
MAAEC..
Subject
*cnNDTTTons CIRCLED APPLY TO ?LC TEER CONSIDERATION
that conditional approval of the plat is given subject to dedication of Right of
- Jay to the public and approval of the road systen in the plat by the County Engineer
•
that plans, profiles, and cross sections showing proposed street centerline and curb
grades be submitted to the County Engineer for approval prior to construction and
the filing of a final plat; •
that drainage plans and design calculations showing the grades and alignment of drain-
age facilities be submitted to the County Engineer for approval. prior to construction
and-the filing of a final plat;
construction within the proposed public streets and easements shaLl-be performed .-
under the direct supervision of a licensed land surveyor, .who. shall be responsible
for perpetuating all evidence of the location of survey monuments which may
disturbed during construction and who shall furnish the County Engineer with "As
;Built" plans and a certificate in writing that all improvements were installed to
the lines and grades shown on the approved construction plans and that all cltsturbed
monuments have been replaced;
no construction work is to be performed . within the Public Right: of Way until apart:it
has been issued by the County Engineer. All Work is subject to inspection and approve
.by the County Engineer;
all construction within the Public Right of Way is to be completed prior to filingr - -
the final plat or a bond in the amount estimated by the County Engineer to :cover the:-
cost of construction of improvements, construction certification, "As Built" plans, •
and monumenting the street centerlines shall be filed with the County Engineer.
(in73.-no direct access from lots to 1/2 right of ways until such time as additional right of ./
ways are dedicated and roads are established as County Roads.'
•
E 8-no.direct access from lots to Stub Road connections until such are constructed
to County Standards and established as County Roads.
oad design, rough grading construction, and drainage control for 1/2 rights of ways
and Stub Road connections are the responsibility of the Developer.
E 10-that the Sponsor shall prepare and submit to the County Engineer a design proposal accept
.
able to the State Highway Department of the proposed State Highway-County Road inter-
section. State Highway Department approval of the proposed design must be received prior
to„the filing of the final plat. Improvements to the State Highway are to be the respon-
sibility of the Sponsor and may either he constructed or a bond to cover the cost of such
improvements furnished to the County Engineer in the amount as determined by the County
Engineer the State Highway Department.
•
•
•
INDIAkA
13
0
88 . ,D6'W
,
ro_ , _ ____ _____ .. .
`'6 I 608 4
x '
i
SPOKANE COUNTY
PLANNING DEPARTMENT
09
607 4
PE-(11
IVE
JUN 1 5 1977
EUCLID
N 89 47 W
90
0
0
cc
6
5 \ • '
nJ
/02
/0
660'
28
35
660'
/6
AVE NUE
660'
MISSION
aD
CD
0
0)
SIE39° 451 E
-
0
(.0
7
34
630'
0)
C0
SEC.
S 89
AVENUE
TW P.
0
0
0
99
s 6°
27
36
2634.1'
0
/7
660
660'
AVENUE
0
98
2.
/8
INDIANA
630
37
630'
V \,
,/ AVENUE
0
00
_ QC)
o
z
0
0)
0
a 30° Rt.
630'
7
630'
630
AVENUE
Q.
a) N
co
0 0,
q
0 4
V 0)1' ,b%()'
/
3
. /
No. 1E389-60'
: • • •
1.„ •,„
/9
4
565'
6
0
0
S 89 58' E
660'
• : • •• :
2
No. 1889 — 4o'
660 , 0
0
, -,
M
L
2,c)
9
2
3.
1 26i9.
0
S 86 174 400 8'
H
2/
F
E
7
EL. e
• 15 16
96
s 79° 5 3 ‘w 6
D
598'
A
OD
0
0
0
QC
97 LLJ
00
PO.T.84 +02.62
30 15 ',V f Easl '/4Cor.
8
30 --
I I
i 2 111
8 ,
0
r.660'
0
23
0
0)(
40
660'
;1
601'
22
30'—.-
0
0
0
(0
4/
609 8'
7 TP
- 30'
1:0 +51= T.P C.R.P No. 141'
110+522 C.P.H. 52"B"
A.P. A = t° 55'Rt.
■- N End of Br.
Bridge No. 5503
79 +72 S. End of Br.
1—
0
z
73 -1-50 A.P.
, 1° 38' Lt.
30'
8
17
574-59.2 A.P.
90 02' Lt.
5' - r E:. DP,
r PE.tN1 N .`KS
NVM'i 6E.R JF LC:1TS
1
TYPICAL Lt::) 1zE
TYPICp,I_. Lc ' ` - .etsiVf& .
l pt 4
Tz57 F ARE C7F* r\-
4 1-.SS Ater.S
i
1
v ‘' -'
1 E\ .
(
i. y..� 4..f
M
O
1t0
i 3c
13fl
13th
1
� o R K Cage
0
4
S
T .
Zs
3
O
D
130
130
130
410
O
5C+
O
0
LY
PE-tit
PEuMN ARY PLAT
G MY A\ CDC) 4T1ON
l..E CzAL C)E.5 C,S7kc>"74
The. West S p c=.-C 24 , P 1 aV
Sov1 V : ? _ Sic. T -2 N .. 2- 4S EWM
1 5 \n /c.s
Scr.le 1' 50'
May 3\
B Y--<-'
CLARENCE E. SIMPSDN 'ENVINE E 4 NC.
N NE_ RoAe
Jr-usNIN/ 9.ab6