Loading...
PE-1136-77 (2)AGENDA, SEPTEMBER 2;. A977 SPOKANE COUNTY PLANNING COMMISSION Time: Place: PRELIMINARY SUBDIVISION AND ZONE CLASSJFICATION UPGRADING 6. .6 -77, 7F- 147 -77, Agricultural 3. Location: b. Sponsor: c. Surveyor: d. e . f. g. h. i. Water Source: j. School District: k. Environmental Impact: Pelley Addition to Greenacres Site Size: Number of Lots; Land use proposed by sponsor: Existing Zoning: Advertised Zone Upgrading: - 6 - TELEPHONE NO::. 456 -2274 Friday, September 23, 1977, 9:30 A.M. Conference Room A, County Court House Annex (Use Mallon Avenue entrance) to Single Family Residential and /or Two Family Residential Section 20,Township 25 N. ,Range 45,E.W.M. All of Lots 7, 8, 9 and 10, Block 21 of Corbin Addition to Greenacres, including all of Doak's Greenacres Subdivision. Hodges, Inc. East 12715 Mission Avenue Spokane, WA 99216 Senske and Masgai, P.S. East 9723 Sprague Avenue Spokane, WA 99206 19.85 Acres 53 Single family dwellings and duplexes Agricultural, established September 23, 1958 Single Family Residential and /or Two - Family Residential Consolidated Irrigation District Central Valley School District A topic of discussion at this hearing may be whether or not this proposal will have a significant adverse environmental impact. 1 "= ' I2 Mlf_E G. a , ,to., ewe. te A� .' [..A . IN —11153APYInt— MIGiM'AY N' 90 .n ec. W jy r r .' ) : —,, 1:11 II 177 73 n p6 o - 48,ea iu , W S:6 A`� l ei a zo AGENDA, SEPTEMBER 2;. A977 SPOKANE COUNTY PLANNING COMMISSION Time: Place: PRELIMINARY SUBDIVISION AND ZONE CLASSJFICATION UPGRADING 6. .6 -77, 7F- 147 -77, Agricultural 3. Location: b. Sponsor: c. Surveyor: d. e . f. g. h. i. Water Source: j. School District: k. Environmental Impact: Pelley Addition to Greenacres Site Size: Number of Lots; Land use proposed by sponsor: Existing Zoning: Advertised Zone Upgrading: - 6 - TELEPHONE NO::. 456 -2274 Friday, September 23, 1977, 9:30 A.M. Conference Room A, County Court House Annex (Use Mallon Avenue entrance) to Single Family Residential and /or Two Family Residential Section 20,Township 25 N. ,Range 45,E.W.M. All of Lots 7, 8, 9 and 10, Block 21 of Corbin Addition to Greenacres, including all of Doak's Greenacres Subdivision. Hodges, Inc. East 12715 Mission Avenue Spokane, WA 99216 Senske and Masgai, P.S. East 9723 Sprague Avenue Spokane, WA 99206 19.85 Acres 53 Single family dwellings and duplexes Agricultural, established September 23, 1958 Single Family Residential and /or Two - Family Residential Consolidated Irrigation District Central Valley School District A topic of discussion at this hearing may be whether or not this proposal will have a significant adverse environmental impact. 1 "= ' I2 Mlf_E . X13 MINUTES OF THE PLANNING. COMMISSION HEARING OF SEPTEMBER 23, 1977. WHEREAS, the Spokane County Nanning Commission did hold a public hearing on September 23, 1977 to consider the testimony and requests of several applicants, objectors, and other interested parties concerning the below referenced subdivisions, zone classification upgradings, extensions of time, reconsiderations of conditions, and other items of business, and WHEREAS, at said hearing opportunity was afforded those favoring and those opposing all items of business, and WHEREAS, Mr. McCoury, Mrs. Byrne, Mrs. Rawlings, and the Messrs. M:ain, Quigley and Thomas were in attendance and constituted a quorum, and WHEREAS, the Spokane County Planning Commission fully considered the testimony given, the environmental review, and all other evidence presented, recommends to the Board of County Commissioners the following: 1. PE- 1106 -77 - SALTESE HILLS: BATES and ZE- 84 -77: UNCLASSIFIED TO AGRICULTURAL SUBURBAN: That the application be continued to the October 1977 Planning Commission hearing. The applicant is instructed to pay all advertising costs at the time the item is placed back on the agenda. (Mrs. Rawlings moved, Mr. Quigley seconded motion. Vote was unanimous.) 2. PE- 1112 -77-- MONTE -VISTA ESTATES FIRST ADDITION: KAHUNA LAND CO. and ZE- 97 -77 - UNCLASSIFIED TO AGRICULTURAL SUBURBAN: That the appli- cation be continued to the November, 1977 Planning Commission hearing. The applicant is instructed to pay all advertising costs at the time the item is placed back on the agenda. (Mr. Thomas moved, Mrs. Rawlings seconded the motion. Vote was unanimous.) 3. PN- 1133 -77 WEATHERVANE TERRACE FIRST ADDITION: GOCKLEY and ZN- 144 -77 - AGRICULTURAL TO AGRICULTURAL SUBURBAN: That the application be returned to the sponsor so that the sponsor might further consider the possibilities of a public water system to serve the subdivision, (Mr. Thomas moved and Mrs. Rawlings seconded the motion. Vote was 4 to 1.) 4. PE- 1134 -77 - SINGING HILLS: WOODARDS and ZE- 145 -77: UNCLASSIFIED TO AGRICULTURAL SUBURBAN:. That the preliminary subdivision to be known Singng Hills (file number PE- 1134 -77) be approved subject to the conditions as contained in the Planning Staff's findings, dated September 23, 1977, and that a zone classi fication upgrade be approved to the Agricultural Suburban zone Classification (File number ZE- 145 -77) upon the filing of the final plat, and that a proposed declaration of Non - Significance be issued. (Motion by Mr. Quigley, seconded by Mr. Thomas. Vote was 4 to 1.) 5. PE- 1135 -77 - LIBERTY LAKE HEIGHTS FIRST ADDITION: SCHNEIDMILLER and ZE- 146 -77 - AGRICULTURAL TO SINGLE FAMILY RESIDENTIAL: That the preliminary subdivision to be known as Liberty Lake Heights First Addition be approved subject to the conditions as contained in the Planning Staff's findings, dated September 23, 1977, that a zone classification upgrade to the - 1 - Single Family Residential Zone Classification be approved upon the filing of the final plat, and that a proposed declaration of non - significance be issued. (Mrs. Byrne moved, Mr. Quigley seconded the motion. Vote was unanimous.) 6. PE- 1136 -77 - PELLEY ADDITION TO GREENACRES: HODGES, INC. and ZE- 147 -77 - AGRICULTURAL TO SINGLE FAMILY RESIDENTIAL and /or TWO - FAMILY RESIDENTIAL: That the proposal be denied and returned to the applicant because of density, too many duplexes, and incompatil ility with the area. (Mrs. Rawlings moved, Mrs. Byrne seconded the:motion. Vote was 4 to 1.) PE- 1137 -77 - DORN COURT: CROSBY and 2E- 148 -77 -- AGRICULTURAL SUBUR BAN TO SINGLE FAI✓IILY RESIDENTIAL: That the preliminary subdivision to be known as Dorn Court be approved subject to the conditions as contained in the Planning Staff's Findings, dated September 23, 1977, and that a proposed declaration of non - significance be Issued and that the following condition - be imposed: That the specified road improvements of Dorn Court north to Boone Avenue, by the County Engineer's Office be met. (Mrs. Rawlings moved, Mrs. Byrne seconded the motion. Vote was unanimous.) 8. PE- 1138 -77 - PARKWATER INDUSTRIAL PARK ADDITION: BURLINGTON NORTH- ERN, INC.: That the preliminary subdivision to be known as Parkwater Indus- trial Park be approved, subject to the conditions as contained in the Planning Staff's findings dated September 23, 1977 and that a proposed declaration of non- significance be issued. (The motion was made by Mr. Thomas and seconded by Mrs. Rawlings. Vote was unanimous.) 9. PN- 912B -73 - GLENEDEN FOURTH ADDITION: NELSON and ZN- 88B -73 - AGRICULTURAL TO SINGLE FAMILY RESIDENTIAL: That the sponsor be allowed to increase the number of lots in Gleneden Fourth Addition to 146, all for single family dwellings. The applicant is further instructed to contact the Mead School District and attempt to solve the need for a school site In the area, and that a proposed declaration of non - significance be issued. (Mrs. Rawlings moved and Mr. Quigley seconded the motion. Vote was unanimous.) 10. PW- 1098 -77 - PINE ROCK RANCHETTES: ROBBINS and ZW -77 -77 - AGRICUL - TURAL TO AGRICULTURAL SUBURBAN: That the applicant's request for a relaxa- tion in fire flow requirement as contained in the original conditions of approval be approved, subject to approval of the final design by the appropriate agencies, and that a proposed declaration of non - significance be issued. (Motion made by Mr. Main and seconded by Mr. Thomas. Vote was 5 to 1.) 11. PN- 1100 -77 - GLENCREST ADDITION: NELSON and ZN -79 -77 - AGRICUL- TURAL TO SINGLE FAMILY RESIDENTIAL AND AGRICULTURAL SUBURBAN: That the sponsor's request to increase the number of lots to 51 be approved, and that a proposed declaration of non - significance be issued. (Motion made by Mr. Thomas seconded by Mr. Main. Vote was unanimous.) 12. PE- 1031 -76 - RIEGEL HEIGHTS ADDITION: RIEGEL and 2E -90 -76 - AGRICUL- TURAL SUBURBAN TO SINGLE FAMILY RESIDENTIAL: That an extension of time be granted to October 1, 1978. (Mrs. Rawlings moved and Mrs. Byrne seconded the motion. Vote was unanimous.) - 2 - /ART F v. Lt s v a .4 v. - 8,4.8 I.s-i t?—B a - L i13s". - i379 w_49_y emu. - .QA2sS1?___24..a A_P J 9 2y - ._s._7 .v 64 aS Ls, 1 ( j j m m e att_._6e..crii =.naoa ,fl J _ M%3s4-rt, Alta, O .)%c. - ea Inter- office Communication To From Subject PLANNING COMC[ISSION OPTICE OF COUNTY ENn1NEER SPOKANE COUNTY, WASHINGTON Date GARY KENNALY; PLANNING & •TRAFFIC DIVISION ENGINEER. �Ja�1►�. Roan CO F FOR PE if3(o -Peuz`f t oDtrtor4 *'CONDITIONS CIRCLED APPLY TO FLAT UDDER CONSIDERATION • A-0 Li ST 2 ,7977 that conditional approval of the plat is given subject to dedication of Right of Way to the public and approval of the road system in the plat by the County Engineer; that plans, profiles, and cross sections showing proposed street centerline and curb grades be submitted to the County Engineer for approval prior to construction and the filing of a final plat; that drainage plans and design calculations showing the grades and ali of drain- age facilities be submitted to the County Engineer for approval prior to construction and the filing of a final plat; . construction within the proposed public streets and easements shall be performed' under the direct supervision of a licensed land surveyor,. who shall be responsible for perpetuating all evidence of the location of survey monuments which may be, disturbed during construction and who shall furnish the County Engineer with "As guilt" plans and a certificate in writing that all improvements were installed to - -the lines and,grades shown on the approved construction plans and that all disturbed monuments have been. replaced; . o construction_ work is to be performed within the Public Right of Way until a pa_rrit has been issued by the County Engineer. All cork is subject to inspection and approve by the County Engineer; all construction within the Public Right of Way is to be completed prior to filing '. the final plat or a bond in the amount estimated by the County Engineer to - cover the. cost of construction of improvements, construction certification, "As Built" plans, and monumenting the street centerlines shall be filed with the County Engineer_ E.7 -no direct access from lots to 1/2 right of ways until such time as additional ways are dedicated and roads are established as County Roads. E 8-no direct access from lots to Stub Road connections until such roads are constructed to County Standards and established as County Roads. E 9 -road design, rough grading construction, and drainage control for 1/2 rights of ways and Stub Road connections are the responsibility of the Developer.. E 10 -that the Sponsor shall prepare and submit to the County Engineer a design proposal accept- . able to the State Highway Department of the proposed State Highway - County Road inter- - section. State Highway Department approval of the proposed design must be received prior to,the filing of the final plat. Improvements to the State Highway are to be the respon- sibility of the Sponsor and may either he constructed or a bond to cover the cost of such improvements furnished to the County Engineer in the amount as determined by the - County - Engineer and the State Highway Department. that all roads within the plat be curbed and /or paved to the' specifications of the County -_ Engineer. Existing County roads providing direct access to lots of the plat shall be. paved and /or curbed to the standards of the County Engineer. - No otn -.Cc n - tt. /-N Lots' t SP24cU6 4 e"itlt; • It a,4RJt 2. • I2, • ti 90 3/9" 2 O Z 3i9 0 I 0 P /af /.94 UG 1 51977 4.;s SPO A tE COUP;TY PLA'3NING CEPAWiMENi 640,3' - 1 `1 r. es ied 2 / � y 90 ' 9% r 00 230 94 /00 /00 a o 272. 20'. //0.45 tept 2S ' A 4) ■ r / ■v. 0 br n '') y , A y 5 041 5 po tN c X 56' P c >' (yy,'IJ lEr 3 C 1 1 VEA/ .7 i11) S:._ v� )� U0 ® • ?' ~ O1 a 40- AVE 20 V°443r iron pipe 40 4, 5 • 2/w 2451 r 8 AU N ° ` `6$ Atom 14 54 . 55 o tr E S Gi=1`.T N° 1 689 — 45' RECEIVED AU G 1 51977 SPOKANE COUNTY PLANNING DEPARTMENT P'EL/M/ij.R PLJT OF 30• 0 2 c , 3o zo 3 0' 30' z zo /0 ' /0' 95' 7 /0 86' 75 75' 95 // /0 75 9.2 9 9,2 /2 9,2' 95' 95' 9 95' /o6' /06' 8 0 0 4 Tf' PELLEY ADDITION TO 9z' 8 92' /3 92' 95' 3 95' 8 95' S R G u s R Y6,41 /06' /06' : .......... : ':.......... ..... • ........... 9 "YYY��eh"s ,•rr`Y ............... ..... 0 0 89" 1 8 9 /0' 65" 87' 2 8 7' 0 / 87' 0 8 7• 3 87' 0 9 87' 0 87' 4 87' 0 8 87' 0 - 4- Cr- I • /05' 5 /25 /,25' /05' Fz . 7 92' 92' 95' 95• Vt /VC/E GREENACRES 95 il E . %, SEC. , D, T. ,25A4 2 45 WI /06' /06' 0 0 0 / 92• 92' 75' 5 l5 95' 6 75 0 :rr /06' /06' / 05" 0 5' ROD / r/cAr /R z. ,t'c,q o DEO /cq rio.v // 92' 9R' I6 0 0 w /20' /20 /2 /3 /25' /4- /25 /5 /05' /25' /05' / 2 /25 /OS' /O5' 95 /7 95 100' 30 m 0 0 0 a PGRr .t10, OF LOTS TyP�cRc Cor 5125 RYE, LoT PROLrtrrRGE To r,q . Pc,Qr RieER 53 92'x /4 '/. 3 R c, 92' /9,85gc. PREP,q,PED /cl TNe OFF /CES OF t&/DE,c TAE .D /,eecriD,tl OF Senske & Masgai