PE-1025-76 (2)PRELIMINARY SUBDIVISION AND ZONE CLASSIFICATION UPGRADING
PE- 1025 -76 -- GUTHRIE'S VALLEY VIEW SEVENTH ADDITION: GUTHRIE
ZE- 77 -76 -- AGRICULTURAL TO SINGLE FAMILY RESIDENTIAL (R -1)
Planning Commission Recommendation: Approve, subiect to the following
conditions: Note was unanimous)
A. REASONS:
1. A"logical expansion" of suburban type lot development which can
provide economic housing for the South Opportunity area.
2. The existing school site at Adams and 24th could be used with higher
density development. Also, existing Elementary School serving Vera
Tracts is at capacity with 570 students.
3. Water, power and fire protection have the capability to accommodate
the increased density.
4. Existing roads are appropriate for suburban density, plus subutbap
density development provides for future rights of way necessary for
replatting to higher densities if needed via the platting process which
is not the case with rural density segregations.
B. CONDITIONS:
- 8-
MINUTES
JULY 9, 1976
1. That the plat be designed as Indicated on the preliminary plat of
record and /or attached sheets as noted.
2. That a statement be placed in the dedication to the effect that no
more than one dwelling structure be placed on any one lot, nor shall
any lot be further subdivided for the purposes of creating additional
lots or building sites without filing a reptat.
3. That the plat provide for right of way width for streets as indicated
on the preliminary plat of record.
4. That appropriate provision be made that the following described
property be held in trust until the continuation of the streets be dedicated
or deeded: A 1' strip at the ends or edges of all streets that terminate
or border the plat boundary. (Temporary cul de sacs are required
when streets terminate at the plat boundaries.)
5, That appropriate street names be indicated.
PE- 1025 -76 -- GUTHRIE'S VALLEY VIE'Ar SEVENTH ADDITION (Continued)
6. That appropriate utility easements be indicated on copies of the
u;pproved preliminary plat for distribution to the Planning Department
and the utility companies. Written approval of the easements by the
utility company must be received prior to the submittal of the final plat.
7. That a plan for water facilities adequate for fire protection be approved
by the water supplier and fire protection district. Said water plan must
also have been approved by the appropriate health authorities.
The health authorities, water supplier (purveyor),
and fire protection district will certify, prior to the filing of the final
plat, on the face of said water plan that the plan is in conformance with
their requirements and will adequately satisfy their respective needs.
Said water plan and certification will be drafted on a transparency
suitable for reproduction.
The water supplier (purveyor) will also certify prior to the filing of
the final plat on a copy of said water plan that appropriate contractual
arrangements have 4een made with the plat sponsor for construction of
the water system, in accordance with the approved plan, and in accord-
ance with a time schedule. The time schedule will provide, in any
case, for completion of the water system and inspection by the appro-
priate health authorities prior to application for building permits within
the plat. The contractual arrangements will include a provision holding
Spokane County and the water supplier (purveyor) harmless from claims
by any lot purchaser refused a building permit due to the failure of the
plat sponsor to satisfactorily complete the approved water system.
The plat dedication will contain a statement to the effect that the public
water system as approved by County and State Health authorities and
the local fire district and water supplier (purveyor) will be installed
within this plat, and the subdivider will provide for individual service
to each lot prior to sale of each lot.
NOTE: The Spokane County Health District has determined that the
soil conditions in the plat are suitable for on -site sewage disposal
systems on each lot.
B. That a certificate of title be furnished the Planning Commission prior
to the filing of the final plat.
9. That the preliminary plat be given conditional approval to August 1,1977
10. That streets be improved.to standards established by Spokane County
or a bond to cover the cost of such improvements be furnished the
County Engineer. The bond may also cover the cost of "as built" plans,
engineering costs, and placing of final center line monuments.
-Ba -
MINUTES
JULY 9, 1976
PE- 1025 -76 -- GUTHRIE'S VALLEY VIEW SEVENTH ADDITION (Continued)
11. That profiles of streets, cross sections, proposed grades, and drainage
plan of the plat be submitted and approved by the County Engineer and
by the Planning Director before the final plat is drawn. Prior to
acceptance of the improvements or release of bonds, a certificate by a
registered civil engineer or licensed land surveyor will be required
indicating that all improvements have been installed to the lines and
grades shown on the approved construction plans.
12. Conditional approval of the plat is given subject'to the dedication of
the right of way to the public and approval of the road system in the
plat by the County Engineer.
13. That a name be indicated before the final plat is filed; such name to be
approved by the County Assessor and the Planning Staff.
C. VERA TRACTS DENSITY ANALYSIS:
The purpose of this analysis Is to evaluate the development pressures on the
Vera Tracts and make a recommendation for a density policy to accompany the
Planning Commission's recommendation on this preliminary plat.
The pref character of the Vera Tracts Ls mixed densities with a predominant
rural nature. The existing ownerships range from 10, 000 square feet Single
Family lots to the original Vera Tracts of 10 acres with farming and /or grazing.
The long range land use element of the Comprehensive Plan calls for residential
for these Vera Tracts. The Park and Recreation Plan adopted in 1961 calls for
12, 000 square feet tots or suburban densitiies for elementary school and park
siting within "Airport" neighborhood bounded by 16th, 32nd, Evergreen and
Sullivan.
The circulation element of Comprehensive Plan presentlyiidentlfies 16th and
Sullivan as major arterials, Evergreen and 32nd as secondary arterials, and
Adams and 24th as collectors. The County Engineers are presently proposing
changes for Evergreen and 32nd to be upgraded to major arterials, Adams to be
a secondary arterial.
The public facilities element of Comprehensive Plan calls for an elementary
school be located at Adams and 24th.
The Computer density'summary of Vera Tracts indicates that of the existing
ownerships 41% by number are less than one acre in size and 59% by number
are one acre and larger. The ownership most often occurLng is 1.5 through
5 acres @ 38% of all ownerships. Also, the net density of Vera tracts
ownerships by number is .5 D.U. /acre occupied and .28 D.U. /acre vacant
(No dwelling) making a total net density of .36 D.U. /acre (or 2.7 acres /lot.)
The density map indicated visually the ratios by volume.
- 8 b-
PE- 1025 -76 -- GUTHRIE'S VALLEY VIEW SEVENTH ADDITION (Continued)
Building permits in Vera Tracts since 1972 through 1975 range between 8 to 11
permits each year fora total of 39 building permits. This indicates a
continuing trend to segregrate for purposes of single family dwellings.
Key public services were contacted and responded In writing to the question
of density in the Vera Tracts.
1. Central Valley School District has used a density of approximate! y
4 D.U. /acre in the planning of the future elementary school on the
existing owned 11 acre site at Adams at 24th, but responds to popula-
tion demands to justify construction.
2. Vera Water District & Power has made intensive studies to provide for
ekher suburban or rural type development in Vera Tracts.
3 i ;pckane Valley Fire .Department has indicated Lts ability to provide
adequate fire protect :on for suburban type density developments.
4. Spokane County Engineers indicate that adequate roads exist for subur-
ban population density.
Suburban development surrounds Vera Tracts on the west, north and east; and
one suburban development to the south. Increasing "suburban" type subdivi-
sion activity is present to the northwest with the approved Preliminary Plat
"Early Dawn 1st Addition" and to the north with the approved Preliminary plat
"Si's Subdivi sion ". Also, recent communication with developers indicate
intentions to subdivide west of Sullivan and just north of "Timberlane 1st
Addition" and along 24th Avenue near "McLaughlin Addition ".
D. STAFF ENVIRONMENTAL REVIEW:
As required in WAC 197 - 10 - 320, the staff of the County Planning Commission
reviewed the environmental checklist submitted by Mr. Rick Guthrie for the
Preliminary Subdivision of theGuthrie's Valley View 7th Addition. The propo-
sal is located approximately in the SW 1/4 of the NE 1/4 of Section 26,
Township 25 N., Range 44, E.W.IvI., west of and adjacent to Progress Road;
about 320 feet north of 24th Avenue. The proponent is requesting to subdivide
4.71 acres of land into 14 lots for single family dwellings creating a gross
density of about 3 untis per acre. The site is located on relatively flat
terrain currently covered by active pasture land vegetation.
The staff review has identified four potential areas of environmental impacts.
First, and common to all subdivisions, is the lncease in motor vehicle traffic
and all effects associated therewith. These would include such impacts as
increased air pollution, specifically carbon monoxide, increased noise, and
increased public safety hazards from traffic.
- 8c -.
PE- 1025 -76 -- GUTHRIE'S VALLEY VIEW 7TH ADDITION
MINUTES
JULY 9, 1976
A second potential environmental impact area considered was the increased
demand on public services and utilities. This would include such factors
as increased requirements for police and fire protection, provision of
additional school, park, and recreational facilities, and additional mainten-
ance requirements on all county facilities and roads. This would also
include such impacts as associated with extension of utility lines (power,
natural gas, telephone) and the provision of suitable long term sewerage,
domestic water, storm water runoff, and solid waste disposal.
A third potential environmental impact revealed by the staff evaluation
involves the subsurface injection of sewage effluent and storm water runoff.
This waste water placed at a depth will percolate downward toward the aquifer
rather than evaporating back into the atmosphere as under natural conditions.
A portion of the contaminants will likely be filtered out of this waste water,
but thy resulting quality has not been determined yet. A total of 6.35 acre -
feet of waste water will be generated annually by this plat, 4.25 acre -feet
of which will be storm water runoff.
The final area of potential impact involves the conversion of productive
agricultural land to suburban density residential. Currently all of the 4.71
acre site Ls used as active pasture land and the proposed will replace this
with single family residential uses of a gross density of 3 units per acre.
The conclusion of this environmental checklist review is that no significant
environmental impacts will likely result from the proposal. Therefore, it is
recommended that a Declaration of Non- Significance be issued and an
environmental impact statement not be required.
E. ZONING RECOMMENDATION:
Planning Commission Recommendation: Approve Guthrie's Valley View 7th Addition
as indicated on the preliminary plat of record to Single Family Residential (12-1)
Zone Classification upon the filing of the final plat.
REASONS:
1. The fourteen (14) lots in the subdivision have been disigned to
accommodate single family residences.
2. The Planning Commission has been routinely upgrading similar
residential plats in the area to the Single Family Residential Zone
classification.
3. The Planning Commission is of the opinion that none of the lots within
the subdivision have disadvantaged relationships which would warrant
duplex zoning.
-Sd -
PE- 1025 -76 -- GUTHRIE'S VALLEY VIEW 7th ADDITION (Continued)
4. The Single Family Residential Zone prohibits duplexes, animal keeping
other than household pets, mobile homes, and home occupations.
F. GENERAL DATA:
1. Location: Section 26, Township 25 N., Range 44 E.W.N.
The N 1/2 of Tract 208, Vera, except the North
110 feet of the East 330 feet thereof, and the
East 132 feet of the N 1/2 of Tract 209, Vera.
2. Sponsor: Rick Guthrie
East 12709 Sprague
Spokane, WA 99216
3. Surveyor: Land -Mark Surveyors
S. 726 Liberty Drive
Liberty Lake, WA 99019
4. Site Size: 4.71 acres
5. Number of Lots: 14
6. Land use proposed by sponsor: Single Family Dwellings
7. Existing Zoning: Agricultural, established March 27, 1942
8. Advertised Zone Upgrading: Single Family Residential (R -1)
9. Water Source: Vera Water and Power District
10. School District: Central Valley School District
- 8 e -
STAFF RECOMMENDATIONS
PE- 1025 -76, GUTHRIE'S VALLEY VIEW 7TH ADDITION: GUTHRIE
ZE- 77 -76, AGRICULTURAL TO SINGLE FAMILY RESIDENTIAL (R -1)
VERA TRACTS DENSITY ANALYSIS
The purpose of this analysis is to evaluate the development pressures on
the Vera Tracts and make a recommendation for a density policy to accomp-
any the Planning Commission's recommendation on this preliminary plat.
The present character of the Vera Tracts is mixed densities with. a pre-
dominant rural nature. The existing ownerships range from 10,000 square
feet Single Family lots to the original Vera Tracts of 10 acres with farming
and/or grazing.
The long range land use element of the Comprehensive Plan calls for resi-
dential for these Vera Tracts. The Park and Recreation Plan adopted in 1961
calls for 12,000 square feet lots or suburban densities for elementary
school and park siting within "Airport" neighborhood bounded by 16th,
32nd, Evergreen and Sullivan.
The circulation element of Comprehensive Plan presently identifies 16th
and Sullivan as major arterials, Evergreen and 32nd as secondary arterials,
and Adams and 24th as collectors. The County Engineers are presently
proposing changes for Evergreen and 32nd to be upgraded to major arterials,
Adams to be a secondary arterial.
The public facilities element of Comprehensive Plan calls for an elementary
school to be located at Adams and 24th.
The Computer density summaryofVera Tracts indicates that of the existing
ownerships 41% by number are less than one acre in size and 59% by number
are one acre and larger. The ownership most often occuring is 1.5 thru
5 acres @ 38% of all ownerships. Also, the net density of Vera tracts
ownerships by number is .5 D.U. /acre occupied and .28 D.U. /acre vac-
ant (no dwelling) making a total net density of .36 D.U. /acre (or 2.7 acres/
lot.). The .density map indicated visually the ratios by volume.
Building permits in Vera tracts since 1972 thru 1975 range between 8 to 11
permits each year for a total of 39 bui lding permits. This indicates a con-
tinuing trend to segregate for purposes of single family dwellings.
Key public services were contacted and responded in writing to the question
of density in the Vera Tracts.
-8-
(Coned)
PE- 1025 -76, Guthrie's Valley View 7th Add (Cont'd)
A. Central Valley School District has used a density of approximately
4 D.U. /acre in the planning the future elementary school on the
existing owned 11 acre site at Adams at 24th, but responds to popu-
lation demands to justify construction.
B. Vera Water District & Power has made intensive studies to prbvide for
either suburban or rural type development in Vera Tracts.
C. Spokane Valley Fire Department has indicated its ability to provide
adequate fire protection for suburban type density developments.
D. Spokane County Engineers indicate that adequate roads exist for
suburban population density.
Suburban development surrounds Vera Tracts on the west, north and east; one
suburban development to south. Increasing ''suburban" type subdivision
activity is present to the northwest with the approved Preliminary Plat
"Early Dawn 1st Addition" and to the north with the approved Preliminary
plat "Si's Subdivision ". Also, recent communication with developers
indicate intentions to subdivide west of Sullivan and just north of "Timber -
lane 1st Addition" and along 24th Avenue near "McLaughlin Addition".
Planning Staff Recommends: Approve PE- 1025 -76. Guthrie's Valley View
7th Addition, subject to the below listed conditions and also that the Commission
express a "suburban" density (one acre or less) policy be approved for the portion
of the Vera Tracts lying north of 24th and between 16th, Sullivan and Adams for
the following reasons:
1. A "logical expansion "of suburban type lot development which can
provide economic housing for the South Opportunity area.
2. The existing school site at Adams and 24th could be used with higher
density development. Also, existing Elementary School serving
Vera Tracts is at capacity with 570 students.
3. Water, power and fire protection have the capability to accommodate
the increased density.
4. Existing roads are appropriate for suburban density, plus suburban
density development provides for future rights of way necessary for
replatting to higher densities if needed via the platting process which
is not the case with rural density segregations.
A. CONDITIONS:
1. That the plat be designed as indicated on the preliminary plat of
record and /or attached sheets as noted.
- 8 A - ( Cont'd)
PE- 1025 -75, Guthrie's Valley View 7th Addition (Cont'd)
2. That a statement be placed in the dedication to the effect that no
more than one dwelling structure be placed on any one lot, nor
shall any lot be further subdivided for the purposes of creating
additional lots or building sites without filing a replat.
3. That the plat provide for right of way width for streets as indicated
on the preliminary plat of record,
4. That appropriate provision be made that the following described .
property be held in trust kntil the continuation of the streets be
dedicated or deeded: A 1' strip at the ends or edges of all streets
that terminate or border the plat boundary. (Temporary cul de sacs
are required when streets terminate at the plat boundaries:)
5. That appropriate street names be indicated.
6. That appropriate utility easements be indicated on copies of the
approved preliminary plat for distribution to the Planning Department
and the utility companies. Written approval of the easements by
the utility company must be received prior to the submittal of the
final plat.
7. That a plan for water facilities adequate for fire protection be
approved by the water supplier and fire protection district. Said
water plan must also have been approved by the appropriate health
authorities. The health authorities; water su pplier (purveyor), and
fire protection district will certify; prior to the filing of the final
plat, on the face of said water plan that the plan is in conformance
with their requirements and will adequately satisfy their respective
needs. Said water plan and certification will be drafted on a
transparency suitable for reproduction.
The water supplier (purveyor) will also certify prior to the filing of
the final plat on a copy of said water plan that appropriate contrac-
tual arrangements have been made with the plat sponsor for construc-
tion of the water system, in accordance with the approved plan,
and in accordance with a time schedule. The time schedule will pro-
vide, in any case, for completion of the water system and inspection
by the appropriate health authorities prior to application for building
permits within the plat. The contractual arrangements will include
a provision holding Spokane County and the water supplier (purveyor)
harmless from claims by any lot purchaser refused a building permit
due to the failure of the plat sponsor to satisfactorily complete
the approved water system.
The plat dedication will contain a statement to the effect that the
public water system as approved by County and State Health authori-
ties and the local fire district and water su pplier (purveyor) will be
installed within this plat, and the subdivider will provide for
individual service to each lot prior to sale of each lot.
- 8 B - ( Cont'd)
PE- 1025 -76 Guthrie's Valley View 7th Addition (Cont'd)
NOTE: The spokane County Health District has determined that the
soil conditions in the plat are suitable for c•n -site sewage
disposal systems on each lot.
8. That a certificate of title be furnished the Planning Commission
prior to the filing of the final plat.
9. That the preliminary plat be given conditional approval. to August 1,
1977.
10. That streets be improved to standards established by Spokane
County or a bond to cover the cost of such improvements be furnished
the County Engineer. The bond may also cover the cost of "as
built" plans, engineering costs, and placing of final center line
monuments.
11. That profiles of streets, cross sections, proposed grades, and
drainage plan of the plat be submitted and approved by the County
Engineer and by the Planning Director before the final plat is drawn.
Prior to acceptance of the improvements or release of bonds,
a certificate by a registered civil engineer or licensed land surveyor
will be required indicating that all improvements have been installed
to the lines and grades shown.on the approved construction plans.
12. Conditional approval of the plat is given subject to the dedication
of the right of way to the public and approval of the road system
in the plat by the County Engineer.
13. That a name be indicated before the final plat is filed; such name
to be approved by the County Assessor and the Planning staff.
B. STAFF ENVIRONMENTAL REVIEW:
As required in WAC 197 -10 -320, the staff of the County Planning Commis-
sion reviewed the environmental checklist submitted by Mr. Rick Guthrie
for the Preliminary Subdivision of the Guthrie's Valley View 7th Addition.
The proposal is located approximately in the SW 1/4 of NE 1/4 of Section
26, Township 25 N., Range 44, E.W.M., west of and adjacent to Progress
Road, about 320 feet north of 24th Avenue. The proponent is requesting
to subdivide 4.71 acres of land into 14 lots for single family dwellings
creating a gross density of about 3 units per acre. The site is located
on relatively flat terrain currently covered by active pasture land vegeta-
tion.
The staff review has identified four potential areas of environmental impacts.
First, and common to all subdivisions, is the increase in motor vehicle
traffic and all effects associated therewith. These would include such
(Cont'd)
-8C-
•
PE- 1625 -76, Guthrie's Valley View 7th Addition (Cont'd)
impacts as increased air pollution, specifically carbon monoxide, in-
creased noise, and increased public safety hazards from traffic.
A second potential environmental impact area considered was the increased
demand on public services and utilities. This would include such factors
as increased requirements for police and fire protection, provision of
additional school, park, and recreational facilities, and additional main-
tenance requirements on all county facilities and roads. This would also
include such impacts as associated with extension of utility lines (power,
natural gas, telephone) and the provision of suitable long term sewerage,
domestic water, storm water runoff, and solid waste disposal.
A third potential environmental impact revealed by the staff evaluation
involves the subsurface injection of sewage effluent and storm water run-
off. This waste water placed at a depth will percolate downward toward
the aquifer rather than evaporating back into the atmosphere as under
natural conditions . A portion of the contaminants will likely be filtered
out of this waste water, but the resulting quality has not been determined
yet. A total of 6.35 acre -feet of waste water will be generated annually
by this plat, 4.25 acre -feet of which will be storm water runoff.
The final area of potential impact involves the conversion of productive
agricultural land to suburban density residential. Currently all of the
4.71 acre site is used as active pasture land and the proposed will replace
this with single family residential uses of a gross density of 3 units per
acres.
The conclusion of this environmental checklist review is that no significant
environmental impacts will likely result from the proposal. Therefore, it
is recommended that a Declaration of Non- Significance be issued and an
environmental impact statement not be required.
C. ZONING RECOMMENDATION:
Planning Commission Recommendation: Approve Guthrie's Valley View 7th
Addition as indicated on the preliminary plat of record to Single Family
Residential (R -1) Zone Classification upon the filing of the final plat.
REASONS:
1. The fourteen (14) lots in the subdivision have been designed to
accommodate single family residences.
2. The Planning Commission has been routinely upgrading similar
residential plats in the area to the Single Family Residential Zone
classification.
-8 D-
(Cont' d)
PE- 1025 -76, Guthrie's Valley View 7th Addition (Cont'd)
3. The Planning Commission is of the opinion that none of the lots
within the subdivision have disadvantaged relationships which
would warrant duplex zoning.
4. The Singe Family Residential Zone prohibits duplexes, animal
keeping other than household pets, mobile homes, and home occupa-
tions.
D. GENERAL DATA:
1. Location:
cept the N
Tact 209,
' 2. Sponsor:
3. Surveyor:
Section 26, Township 25 N., Range 44,
E.W.M., The N 1/2 of Tr 208, Vera, ex-
110 ft of E 330 ft thereof, and the E 132 ft of N 1/2 of
Vera .
-8E-
Rick Guthrie
E. 12709 Sprague Ave.
Spokane, WA 99216
Land -Mark Surveyors
S. 726 Liberty Drive
Liberty Lake, WA 99019
4. Site Size: 4.71 acres
5. ' Number of Lots: 14
6. Land use proposed by sponsor: Single Family Dwellings
7. Existing Zoning: Agricultural, established March 27, 1942
8. Advertised Zone Upgrading: Agricultural Suburban
9. Water Source: Vera Water and Power District
10. School District: Central Wiley School District
AGENDA, JULY 9, 1976
SPOKANE COUNTY PLANNING COMMISSION
Time: Friday, July 9, 1976, 9:30 A.M.
Place: Conference Room A, Court House Annex
(Use Mallon Avenue entrance)
PRF,LTMINARY SUBDIVISION AND TONE CLASSIFICATION 'UPGRADING
7, 2F, 1025 -76 Guthrie'SValley View 7th Addition
ZE- 77 -76. Agricultural to Single Family R (R -1)
a, Location:
b, Sponsor:
c. Surveyor:
d,
e .
f,
4.
h.
f,
J.
Site Size:
Number of Lots:
Land Use proposed by Sponsor:
Existing Zoning:
Advertised Zone Upgrading:
Water Source:
School District:
Section 26, Township 25 N,, Range 44, E.W.M.
The N 1/2 of Tract 208, Vera, except the North
110.00 feet of the East 330.00 feet thereof, and
the East 132.00 feet of the N 1/2 of Tract 209,
Vera.
Rick Guthrie
East 12709 Sprague Avenue
Spokane, Washington 99216
Land -Mark Surveyors
South 726 Liberty Drive
Liberty Lake, Washington
4.71 Acres
14
Single Family Dwellings
Agricultural, established March 27, 1942
Agricultural Suburban
Vera Water and Power District
Central Valley School District
- 8 -
TELEPHONE NO.: 456 -2274
AGENDA, JULY 9, 1976
SPOKANE COUNTY PLANNING COMMISSION
Time: Friday, July 9,. 1976, 9:30 A.M.
Place: Conference Room A, Court House Annex
(Use Mallon Avenue entrance)
PRELIMINARY STTRDIVISION ANT) ZONE CLASSIFTCATTON UPGRADING
7. p1`102.5 -76. GuthrieWallev View 7th Addition
• ..
• • .. - .11 t • •
a. Location:
b. Sponsor:
c. Surveyor:
d.
e .
f.
g.
h.
f.
j.
Site Size:
Number of Lots:
Land Use proposed by Sponsor:
Existing Zoning:
Advertised Zone Upgrading:
Water Source:
School District:
TELEPHONE NO.: 456 -2274
Section 26, Township 25 N., Range 44, E.W.M.
The N 1/2 of Tract 208, Vera, except the North
110.00 feet of the East 330.00 feet thereof, and
the East 132.00 feet of the N 1/2 of Tract 209,
Vera.
Rick Guthrie
East 12709 Sprague Avenue
Spokane, Washington 99216
Land —Mark Surveyors
South 726 Liberty Drive
Liberty Lake, Washington
4.71 Acres
14
Single Family Dwellings
Agricultural, established March 27, 1942
Agricultural Suburban
Vera Water and Power District
Central Valley School District
TO
Spokane County Planning. Commission
SPOKANE COUNTY ENGINEER
ROAD DEPARTMENT
SUBDIVISION SECTION
FROM: Robert S. Turner, County Engineer
DATE:
July 6, 1976
SUBJECT: Standard Plat Conditions
•
We recommend approval of the plat of Guthries Valley View 7th Addition PE -1025
subject to the following conditions:
that conditional approval of the plat is given subject to dedication of Right of
Way to the public and approval of the road system in the plat by the County Engineer;
that plans, profiles, and cross sections showing proposed street centerline and curb
grades be submitted to the County Engineer for approval prior to construction and
the filing of a final plat;
that drainage plans and design calculations showing the grades and alignment of drain-
age facilities be submitted to the County Engineer for approval prior to construction
and the filing of a final plat;
construction within the proposed public streets and easements shall be performed
under the direct supervision of a licensed land surveyor, who shall be responsible
for perpetuating all evidence of the location of survey monuments which may be
disturbed during construction and who shall furnish the County Engineer with "As
Built" plans and a certificate in writing that all improvements were installed to
the lines and grades shown on the approved construction plans and that all disturbed
monuments have been replaced; -
no construction work is to be performed within the Public Right of Way until a permit
has been issued by the County Engineer. All work is subject to inspection and approval
by the County Engineer;
all construction within the Public Right of Way is to be completed prior to filing
the final plat or a bond in the amount estimated by the County Engineer to cover the
cost of construction of improvements, construction certification, "As Built" plans,
and monumenting the street centerlines shall be filed with the County Engineer.
In our opinion we have adequate roads in this area to provide circulation for high
population density.
6 od SS
132
70
-47.B
- Ti ---
6-87.8
J.•aa
N. E.C<
a j J',ec.
2 r l. ETo/ RPouE RA 1 I V T 0 MLR R7 y
• V S 6 • e 111111 MNE 27 tl c 1 '
.- 6 • 2 E
.,:. . 2 3 V S 29 22 • 25 24 c a - 6..5
N
i
-,, 1 ivo
f..p '
..
644.75' - r
224
2 27
2 40
G44/
G44.75'
229
- 40
tt?
643.55'
No . 4IZ
64723
207
645.7e
DATE DESCRIPTION BY
6 - 15
206
/
t- t ti /
'•1/
A ZY3B'R1
C. oo'
81
L. t6o.z.'
R.38.1'
- TYP101
Lc,-r S bt<si re
`fia7�,� :Qt2 Q>° PL.NT
4 1-, vt ` tv c? rt
8`t 89
85" . 85' c,-
N / 'o -r ,eicr 2.6
E33a'`
ic'N 7`.62A6r e
T !
r tAi
Vg Rig iQ JV /M Q
'Jo ii-1 /32
�,..1 ®Ai eort k!.
85 t I
(a IN1
8S 6S' ] a5
L dt�� �U i
The P /ot iaa.rr, Yeo,9 )1E/43 /9
fr2v J' 'u/S /Gn Tame. /97
2p :r 0 - C " izr�.c � 20 8 E. Zoct \l .t A
r, c...) 2 Co ;"T n. ) R 4 �4
`01