Loading...
PE-993-76AGENDA, FEBRUARY 13 1976 SPOKANE COUNTY PLANNING COMMISSION Time: Place: TELEPHONE NO.: 456 -2274 Friday, February 13 1976 ,'9:30 A.M. Conference Room A, County Court House Annex (Use Mallon Avenue entrance) PRELIMINARY SUBDIVISION AND ZONE CLASSIFICATION UPGRADING 5. PE- 993 -76, Wilbur Addition ZE- 12 -76, Agricultural to Singl Fam. Residential and /or Two Familv Residential a. - Location: Section 9, Township 25 N., Range 44, E.W.M. The North 317 Feet of Lots 59 , 60, and 61 of Pinecroft First Addition b. Sponsor: Ben G. Schmidt East 13604 Nora Avenue Spokane, Washington 99216 C. Engineers: Clarence E. Simpson Engineers, Inc. North 909 Argonne Road Spokane, Washington 99206 d. Site Size: 2.4 acres e. Number of Lots: 6 f. Land use proposed by sponsor: Duplexes g. Existing Zoning: Agricultural, established April 24 1942 h. Advertised Zone Upgrading: Single Family Residential (R -1), except for Lot 1, Block of the preliminary plat of record (existing duplex) which is proposed for Two - Family Residential, or, Two - Family Residential (R -2) for the entire plat. i. Water Source: Modern Electric Company j. School District: Central Valley School District > P R T• 'k KlowN .0"LA :l" 4a�' 5 MINUTES FEBRUARY 13, 1976 PRELIMINARY SUBDIVISION AND ZO CL'_,_S IFICATION UPGRADING PE-993-76- WILBUR ADDITION• SCHMIDT 12 -76 - Planning Commission Recommendation: Approve, subject to the following conditions. (Vote was unanimous.) A. CONDITIONS: 1. That the plat be designed as indicated on the preliminary plat of record and /or attached sheets as noted. 2. That a statement be placed In-the dedication to the effect that no more than one dwelling structure bo placed on any one lot, nor shall any lot be further subdivided for the purposes of creating additional lots or building sites without filing a replat. 3. That the plat provide for right of way v *.h for streets as indicated on the preliminary plat of record. A. That appropriate provision be made that the following described property be held in trust until the continuation of the streets be dedicated or deeded: A 1' strip at the ends or edges of all streets that terminate or border the plat boundary. (Temporary cul de sacs are required when streets terminate at the plat boundaries.) 5. That appropriate street names be indi '. 6. That appropriate utility easements be indicated on copies of the approved preliminary plat for distribution to the Planning Department and the utility companies. Written approval of the easements by the utility company must be received prior to the submittal of the final plat. 7. That a plan for water facilities adequate for fire protection be approved by the water supplier and fire protection district. Said water plan must also have been approved by the appropriate health authorities. The health authorities, water supplier (purveyor), and fire protection district will certify, prior to the filing of the final plat, on the face of said water plan that the plan is in confonnanco with their requirements and will adequately satisfy their respective neods. Said water plan and certifi- cation will be drafted on a transparency suitable for reproduction. (Cont'd) -18•• PE- 993 -76 - WILBUR ADDITION (Cont'd) The water supplier (purveyor) an,' ;.i!:.e certify prior to the filing of the final plat on a copy of said water plan that appropriate contractual arrangements have been made with the plat sponsor for construction of the water system, in accordance with the approved plan, and in accor- dance with a time schedule. The time schedule will provide, in any case, for completion of the water system and inspection by the appro- priate health authorities prior to application for building permits within the plat. The contractual arrangements will include a provision holding Spokane County and the water supplier (purveyor) harmless from claims by any lot purchaser rof used a building permit due to the failure of the plat sponsor to satisfactorily complete the approved water system. The plat dedication will contain a statement to the effect that the public water system as approved by County and State Health authorities and the local fire district and water supplier (purveyor) will be installed within this plat, and the subdivider will provide for individual service to each lot prior to sale of each lot. NOTE: The Spokane County Health District has determined that the soil conditions in the plat are suitable for on -site sewage disposal systems on each lot. 8. That a certificate of titie be furnished *'. Planning Commission prior to the filing of the final plat. 9. That the preliminary plat be given conditional approval to Ihiarch 1, 1977. 10. That streets be improved to standards established by Spokane County or a bond to cover the cost of such improvements be furnished the County Engineer. The bond may also cevar the cost of "as built" plans, engi- neering costs, and placing of final C t:iGr line monuments. 11. That profiles of streets, cross sectio:,s, proposed grades, and drainage plan of the plat be submitted and approved by the County Engineer and by the Planning Director before the final plat is drawn. Prior to accept- ance of the improvements or release of bonds, a certificate by a rogis- tered civil engineer or licensed land surveyor will be required indicating that all improvements have been installed to the lines and grades shov7n on the approved construction plans. 12. Conditional approval of the plat is given subject to the dedication of the right of way to the public and approval of the road system in the plat by the County Engineer. (Cont'd) -1S- PE- 993 -76 - WILBUR P.- DDITION (Cont'd) 13. That a name be indicated b,,fore Cinal plat is filed; such name to be approved by the County l.ssossor and the Planning staff. B. ENVIRONMENTAL ASSESSMENT: The proposed preliminary plat is situated within the urbanized portion of the Spokane Valley. The proposed plat would not have any greater effect upon the topography, geology, biological and botanical characteristics, atmos- pheric and aquatic conditions and other natural development than similar residential development established in the area. If the proposed plat is approved andde ✓ eloped In accordance with the attached conditions, the effects upon the environment would not be significant. The staff, therefore, concludes that an environmental impact statement is not required in con- junction with the approval of the preliminary plat. C. TONING RECOMMENDATION: Staff Recommendation: Approve Wilbur Addition as indicated on the . pre- liminary plat of record to the Two Family Residential (R-2) Zone classificati won filing of the final plat REASONS 1. The lots in Wilbur Addition have boon designed to accommodate duplexes, i.e., All of the lots would have at least 90 feet of frontage and 11, 000 square feet cf area. 2. The plat is situated on the edge of a residential neighborhood between Mission Avenue and Interstate 90. Sovoral duplexes have been constructer in the area. The staff is of the opin - i_hat the site is sufficiently disadvantaged by the freeway to war;:, it .iuplex development. 3. The Two Family Residential (R -2) zone prohibits mobile homes, animal keeping other than household pets, and certain home occupations. D. GENERAL DATA: 1. Location: Section 9, Township 25 N., Range 44, EWM The North 317 feet of Lots 59, 60, and 61 of Pinecroft First Addition 2. Sponsor: Ben G. Schmidt East 13604 Nora Avenue Spokane, WA 99216 (Cont'd) -20- PE- 993 -76 - WILBUR hDDITION (Cont'd) 3. Engineers: 4. 5. 6. 7. 8. 9 10 Site Size: Number of Lots: Land use proposed by sponsor: Existing Zoning: Advertised Zone Upgrading: Water Source: School District: E. Simpson Engineers, Inc. North 909 Argonne Road Spokane, WA 99206 2.4 acres 6 Duplexes Agricultural, established April 24, 1942 Single Family Residential (R -1), except for Lot 1, Block 2, of the preliminary plat of record (existing duplex) which is pro- posed for Two Family Residential (R -2) or, Two Family Residential (R -2) for the entire plat Modern Electric Company Central Valley School District -21- �i i lt SPG J$a2 lY'ab tw1 'to Plt Via GDaD Fo l . s Fort T �aL�4 T. kl E7 4g 4,Ooo 44AO R_ c.lePT Foxe r2ern eqjtC. J4, 14-AO NOT R .eCE6.1 " ?A^n 7WtS OFF /GL (-VNy wfl�t ie..Aj Foe Ooa/D 4.4 1 SPECt FILa AS Tp r,JA+4 *r 14i WAS To Co STA-Jt -T A. o 7 CQ,/ NOT 49;2C:E0 to So +nil H-rN6 t+ ++A::� r"o tC/M Ly- 0; Tµ cS 'DAJe2 Wf 2a-c tS %o-o)12Or2'7'ANF ?"41L S012C rta ADD or PLATS AeL Co�EtcD,�i� ri OFNIC£ OF COUNTY ENGINEER ROBERT S. TURNER COUNTY ENGINEER Smm]W-m -w E 9 �' �avrvro� srJ3o1 January 6, 1977 Pacific First Federal Savings & Loan Assn. East 12005 Sprague Avenue Opportunity, Washington 99214 Attention: Virginia M. Blount Assistant Manager Gentlemen: We have inspected the roads within the plat of Wilbur Addition and find they were constructed in substantial conformance to the approved construction plans. Please consider this letter as your authorization and consent to cancel the enclosed assignment of savings account #569131 -6 in the face amount of $ +,000.00. If we may be of further assistance to you in this matter, please call 456 -3600. Very truly yours, cc: Ben G. Schmidt Robert S. Turner, P.E. SpoVane county Engineer Gerald D. Masgai, L.S� Plat Supervisor G,1 /mm SPOnANE COUNTY C:UTT CUSS 3 f A 11COR mMnANY Pioneer National Title Insurance Company WEST R21 FIRST AVENUE -SPOKANE, WASH INOTION 88210 . TELEPHONE (508) O3B•E281 CHARLES U. ANDERSON VICE PRESIDENT AND COUNTY MANAGER REPORT FOR PLAT CERTIFICATE REFER TO: C- 102434 PROPOSED PLAT OF: WILBUR ADDITION BEN SCHMIDT EAST .13604 NORA CC: CLARENCE E. SIMPSON SPOKANE, WA THIS IS A REPORT FOR PLAT CERTIFICATE AS OF AUGUST 31, 1 976, AT 8:00 A.M., COVERING THE FOLLOWING PROPERTY: THE NORTH 317 FEET OF TRACTS 59, 60 AND 61, PINECROFT FIRST ADDITION, ACCORDING TO PLAT RECORDED IN VOLUME IIM OF PLATS, PAGE 35, I.N SPOKANE COUNTY, WASHINGTON. RECORD TITLE IS VESTED IN BEN SCHMIDT AND ALMA SCHMIDT, HIS WIFE. SUBJECT TO: I. LAST HALF GENERAL TAXES FOR 1976, IN THE SUM OF $40.06. (ASSESSOR'S PARCEL NO. 09544 -0579) 2. FOR EASEMENTS, RESTRICTIONS AND OTHER EXCEPTIONS, SEE SCHEDULE 11 B -1 ATTACHED. NOTE: 1. INQUIRY SHOULD BE MADE AS TO ANY UNPAID CHARGES BY MODERN ELECTRIC WATER COMPANY. THIS REPORT SHALL HAVE NO FORCE OF EFFECT EXCEPT AS A BASIS FOR THE'CERTIFICATE APPLIED FOR. PIONEER NATIONAL TITLE INSURANCE COMPANY SPOKANE COUNTY OFFICE,�,,r AUTHORIZED SIGNATORY CHARGE: NONE MKS /NM SCHEDULE "I -1 1. RIGHTS OF WAY FOR DITCHES AND PIPELINES, PROVIDED FOR IN CONTRACT DATED NOVEMBER h, IT) WITH MODERN CI_ECTRIC WATER COMPANY, RECORDED IN VOLUME "E" OF CONTRACTS, PAGE 267. 0 0 0 . " MI _ S 89 E _ AVENU n _ 9 15 I S 89 38' 40" E 349.03 j I 2510O 112.03' 106.00' I 106.00' I i BLOC K I I O I I t I w I w I o O N 1 = I I 0 I 0 f N p O 0 0 1 _ C'i N o l0 r4 co � I Kj I I M I 2 N IM 3 m - — I I 0 1 I d o 0 0 . O z I 0 ti O I P '`�.ti� I . Z I M I 91.32' 1 106.00' I ' 106.00' 1 NORA S 8 9 0 3 8' 40" E I 348.05 _I - _ - -310.63'-- I _AV i �`37.42� 3 tt ,`i4 I g N O 90.77 I 106,00 I 106.00' N I _ 0, I N I I 3 2 0 ! w W I 0 0 I 0 i i - 1 2 N l0 3 I 0 I (D N M I — N t V m l I w "_' B L O C K o Z _ 0 0 I to 1 1 i Z —� 3 1 �'i I I 110.06' I 106.00 I 106,00' AVENUE ' I N 89 Q 38' 40" W 347.06' I I I I I 15' I I I I I I 1 I I I I I 1 fO I 1 I I _ —� I �N O O " I e I I I I I 130.6 ACTUAL_ I 1 99.92'ACTUAL I I 99.92 ACTUAL_ 130_7 MAP — _ _ _ — _— _ — 100.00'•MAP — — _� _ _ 100,00 MAP - 0 0 . " MI _ S 89 E _ AVENU n _ 9 W SPO{AT.iE COLNTY ENGINEER ROAD DEPARTME.Fr SUBDIVISION SECTION �O: Charles L Hu airs, Direc of Plannin FRO`i: Robert. S. Turner, County EnQi_n SUIT ECT: Standard Plat Conditio We reco=end approval of the plat of subject to the following conditions: Wilbur Addition PE -993 DATE: February 11, 1976 that coadit_ional approval of the plat is given subject to dedication of fiigb.t of Way to the public and approval of the road system in the plat by the County Engineer; that plans, profiles, and cross sections shooing proposed street centerline and curb grades be submitted to the County Engineer for approval prior to construction and the filing of a final plat; that drainage plans and design calculations showing the grades and alignment of drain- age facilities be submitted to the County Engineer for approval prior to constr- action and the filing of a final plat; construction within the proposed public street: and easements shall be performed under the direct supervision of a licensed land surveyor, who shalt be responsibl for perpetuating all evidence of the location of survey mo=ments which may be disturbed during construction and who shat; furnish the County Engineer with "As Built" plans and a certificate in writing that all improvements were irstallcd to the lines and grades shown on the approved construction plans and that all disturbed mom —ants have been replaced; no construction work is to be per ormed within the Public Right of Way until a permit has been issued by the County Engineer. All work is subject to inspection and approval by the County Engineer; W all construction within the Public Right of Way is to be completed prior to filing the final plat or a bond in the amount estimated by the County Engineer to cover the cost of construction of improvements, construction certification, "As Built" plans, and monumenting the street centerlines, shall be filed with the County Engineer. SUBDIVISION ROADWAY and SANITARY SEWER IMPROVEMENT BOND KNOW ALL MEN BY THESE PRESENTS, that we, the laws of the State of of Spokane, Washington, as PRINCIPAL and a corporation organized and existing under I and authorized to transact a surety business in the State of Washington, as SURETY, are held and firmly bound unto the Board of County Commissioners of Spokane County, Washington, as OBLIGEE, in the penal sum of �8 ) DOLLARS, lawful money of the United States of America, for the payment of which, well and truly to be made, the PRINCIPAL and SURETY bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. SIGNED, SEALED AND DATED this day of 19 WHEREAS, the said PRINCIPAL is the owner of a tract of land in Spokane County divided and platted into lots and known as and being located in Section , Township North, Range E.W.M., in Spokane County, Washington and said County has required that a bond be furnished in an amount sufficient to pay the construction costs for the installation of a sanitary sewer system as approved by the County Road Engineer, and also the costs of grading and surfacing to the approved grades and typical section the roadways of said plat and the installation of drainage structures and such other work as is incidental and necessary thereto all in accordance with those Plat Roadway Improvement Specifications dated 19 , and to the satisfaction of the County Road Engineer; such improvements to be completed not later than 19 unless said date be extended at the option of the County Road Engineer. Upon failure of the PRINCIPAL to comply with the requirements stated herein within the time authorized, the OBLIGEE shall look to the SURETY for satisfaction to the extent of this BOND. The obligation of this BOND shall be kept in full force and effect until, in the opinion of the OBLIGEE, the requirements herein stated have been satisfied in which event written release will be given by the OBLIGEE, the OBLIGEE having sole right to grant such release and the SURETY hereby waives all rights to release from the obligation except as herein stated. Principal APPROVED AS TO FORM Surety Deputy ProsecuLing Attorcey cy-i:: -fac SUBDIVISION ROADWAY and SANITARY SEWER IMPROVEMENT BOND KNOW ALL MEN BY THESE PRESENTS, that we, of Spokane, Washington, as PRINCIPAL and a corporation organized and existing under the laws of the State of and authorized to transact a surety business in the State of Washington, as SURETY, are held and firmly bound unto the Board of County Commissioners of Spokane County, Washington, as OBLIGEE, in the penal sum of ($ ) DOLLARS, lawful money of the United States of America, for the payment of which, well and truly to be made, the PRINCIPAL and SURETY bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. SIGNED, SEALED AND DATED this day of 19 . WHEREAS, the said PRINCIPAL is the owner of a tract of land in Spokane County divided and platted into lots and known as and being located in Section , Township North, Range E.W.M., in Spokane County, Washington and said County has required that a bond be furnished in an amount sufficient to pay the construction costs for the installation of a sanitary sewer system as approved by the County Road Engineer, and also the costs of grading and surfacing to the approved grades and typical section the roadways of said plat and the installation of drainage structures and such other work as is incidental and necessary thereto all in accordance with those Plat Roadway Improvement Specifications dated 19 , and to the satisfaction of the County Road Engineer; such improvements to be completed not later than 19 unless said date be extended at the option of the County Road Engineer. Upon failure of the PRINCIPAL to comply with the requirements stated herein within the time authorized, the OBLIGEE shall look to the SURETY for satisfaction to the extent of this BOND. The obligation of this BOND shall be kept in full force and effect until, in the opinion of the OBLIGEE, the requirements herein stated have been satisfied in which event written release will be given by the OBLIGEE, the OBLIGEE having sole right to grant such release and the SURETY hereby waives all rights to release from the obligation except as herein stated. Principal APPROVED AS TO FORM Deputy Prosecuting AL" Zr' e; Surety (Atto: nc;; -iu .acL -- TRAVERSE ANALYSIS OF WILBUR ADDITION Ogg 4 SURVEYOR: CLARENCE E SIMPSON N909 ARGONNE RD SPOKANE WN 99206 -.. 926 -1322 CHECKED BY: GERALD D MASGAI LS -• I - - -- LATITUDES - - - -1 - 1 - -- DEPARTURES - - - -1 BLCK LOT BEARING DISTANCE N G R T H S O U T F E A S T W E S T -- -- - - -- -- -- -- - -- - - -- - - -- --- - - - - -- ---- - -- -- -- ------- -- -- - ---- PLA BC N 0 0 OE 3 17.000 317.000 O.0 PLAT BDRY S 89 38 40E 34S:G3L 2.166 349.023 °- PLAT BCRY S 0 21 2GW 317.000 316.994 324.C24 1.967 ,.. PLAT BDRY N 89 38 40W 347.060 2.154 132.997 347.053 -_- 1, CL S 0 21 20W 25.000 319.154 31(;.160 345.023 349.020 € CL N 89,38 0 40W 348.05C AREA = 110331. SG FT ( 2.53 ACRES) ` 1 CL N 0 G OE 158.000 158.000 C.0 - -.. 1 CL S 89 38 40E 25.CCC 0.155 25.000 -• 1 CL S 89 38 4CE 324.030 2.011 324.C24 0.825 1 CL S 0 21 20W 133.000 1.882 132.997 0.825 -_- 1, CL S 0 21 20W 25.000 2C.000 25.000 0.124 0.155 1 CL N 89,38 0 40W 348.05C 2.160 0.000 348.043' +CURVE: DELTA = = 89 38 -40 40 RADIUS = 160.160 160.163 349.023 349.024 AREA = 55069. SC FT ( 1.26 ACRES) 1, SL N 0 G, GE 113.12C 113.12C C.0 1 SL S 89 38 40E 324.030 2.011 324.024 1 SL S 0 21 20W 133.000 132.997 0.825 1 SL N 89 38 40W 303.320 1.882 303.314 - 1 SL N 0 21 20E 20.000 2C.000 0.124 1 SL' ''S S 90 0 OW "' 2C.000 0.000 2C.COC +CURVE: DELTA = = 89 38 -40 40 RADIUS = 20.000 LENGTH = -- 31.292 TANGENT = 19.87E --- - -- - -- - -- 135.002 - - - - -- - 135.008 -- --- --- 324.148 --- - - - - -- 324.140 - AREA = 42956. SO FT i 0.99 ACRES) -- 1 1 N 0 0 CE 113.120 112.120 0.0 -- 1 1 S 89 38 40E 112.030 0.695 112.C28 • -• 1 1 S 0 21 20 W 133.000 132.997 0.825 1 1 N 89 38 40W 91.32C 0.567 91.318, • -- 1 1 N 0 21 20E 20.000 20.000 0.124' -• 1 1 S 90 0 OW 20.000 0.000 20.CCC +CURVE: _... DELTA = 89 38 40 RADIUS = 20.000 LENGTH -- -- - - --- --- = 31.292 --- --- TANGENT = -- ------- -- 19.876 - -- ---- 133.686 133.693 112.152 112.144 AREA = 14760. SQ FT ( 0.34 ACRES) 1 2 N 0 21 20E 133.000 132.997 3 0.825 89 1 2 S 89 38 40E 106.000 21 0.658 105.998_ 40W 1 2 S 0 21 20W 133.000 40W 132.997 25.00C 0:825 1 2 N 89 38 40W 106.000 --- - 0_65E 1.879 302.764 105.99E 2 SL S 0 21 20W 134.000 133.655 133.655 106.823 106.823 i 2 SL N 89 38 40W 222.G6C AREA = 14098. SC FT ( 0.32 ACRES) -. 1 3 N 0 21 20E 133.COC 132.997 0.825 •- 1 3 S 89 38 40E 106.000 0.656 105.598 1 3 S 0 21 2OW 133.000 132.997 G.825 40W 3 322.054 89 38 40W 106.000 0'.65E 105.99E 133.655 133.655 106.823 106.823 AREA = 14C98. SO FT ( 0.32 ACRES) E CL N 0 0 OE 159.000 159.000 C.0 CL S 89 38 40E 348.C50 2.160 34E.043 2 CL S 0 21 20W 25.000 25.000 0.155 2 CL S 0 21 2OW 134.000 133.997 0.832 2 CL N 89 38 40W 322.C60 1.999 322.054 2 CL N 89 38 40W 25.00C C.155 25.00C 161.154 161.157 34E.G43 348.040 AREA = 55262. 5C FT ( 1.27 ACRES) 2 SL N 0 0 CE 113.880 113.88C C.0 2 2 SL SL S N 90 0 0 21 OE 20E _ 2C.000 '20.000 '�'� 20:000.,, "' °_�._._,.__ 0.000 ...., 2C.000 � G "7124 +CURVE: DELTA = 90 21 20 RADIUS = 20.000 LENGTH = 3 TANCENT = 2C.124 2 SL S 89 38 40E 302.770 1.879 302.764 2 SL S 0 21 20W 134.000 133.997 0.832 i 2 SL N 89 38 40W 222.G6C 1.999 322.054 135.87E 135.876 322.88E 322.E85 AREA = 43125. SC FT ( 0.99 ACRES) 2 1 N 0 0 OE 113.880 113.880 C.0 2 1 S 9G 0 C E X .000 C.GOG X .000 2 1 N 0 21 2 O 20.000 20.000 C.124 +CURVE: DELTA = 90 21 20 RADIUS = 20.000 LENGTH = 31.540 TANGENT = 20.124 - 2 1 S 89 38 40E 90.770 0.563 9C.7E8 • 2 1 S 0 21 20W 134.000 133.997 0.832 • 2 1 N 89 38 40W 11C.C60 0.683 110.056 • 134.563 134.561 11C.E92 110.E89 AREA = 14717. SC FT ( 0.34 ACRES) "l J L L N V CL LUt 139.UVV 133.44( 1.031 2 2 5 89 38 40E 106.000 C.658 105.598 2 2 S 0 21 20W 134.000 133.997 0.832 2 2 N 89 38 40W 106.000 0.65E 105.59E 134.655 134.655 AREA = 14204. 106.830 106.830 2 3 N 0 21 20E 134.000 133.997 0.832 2 3 S 89 38 40E 106.000 0.658 105.998 2 3 5 0 21 20W 134.000 133.997 0.832 2 3 N 89 38 40W 106.000 0.65E 105.998 - --- --- - - - -- 134.655 -- -- -- 134.655 -- --- - --- 106.830 -- ----- -- 106.830 AREA = 14204. SO FT ( 0.33 ACRESI -1.0.1-ARE A-S-TA:U.S-T-I.C.S FO.R? W.IL.BUR_AD_DI -T_ION OQ/_1_7-/76 BLOCK 1 AREA = 42956. SO FT ( 0.99 ACRES) ACCUM AREA = 42956. SO FT ( 0.99 ACRES) DIFFERENCE = 0. SO FT - -- BLOCK 2 AREA = 43125. SO FT ( 0.99 ACRES) ACCUM AREA = 43125. SO FT ( 0.99 ACRES) -.. DIFFERENCE = 0. SO FT GROSS DENSITY: 2 LOTS /ACRE NET DENSITY: 3 LOTS /ACRE - LARGEST LOT: 14760. SO FT SMALLEST LOT: 14098. SO FT AVERAGE LOT: 14347. SO FT # OF LOTS: 6 • a DEDICATION I' L c; ; ( Map 333.9 I ti :: cr I Set 3/4 Pipe .- 15' I S 89° 38' 40" E 349.03' I FovND t� La' P,t3ou� I 25!Od 112.03' 106.00' 1 106.00 KNOW ALL MEN BY THESE PRESENTS, that Ben Schmidt and Alma Schmidt, husband and wife, have caused to be t' 1 ' Czz��..tn ResET Wtt'k1 I le R�.pAilr. Ta.�, No,Zov o:.atted into lots, blocks, and streets the land shown hereon as "WILBUR ADDITION" and described as follows: `= I I BLOCK O and 61 Pinecroft First Addition, according to plat recorded in Volume W I _ The North 317 feet of Tract 59, 60, , +, q I a0 I I w "M" of Plats, Page 35 , in Spokane County, Washington. 1 0 o Lot 4 Block I as shown hereon, s dedicated to Spokane County to be deed for road purposes forever, at such ( n !,_ !" ''� o f N 0 1 N l0 0 time as adjacent property is platted. o _ 10 No more than one dwellingstructure be placed on any one lot, nor shall any lot be further subdivided for " I L a o o o I N Ki ' d' sites without fill lat. ' I "-� ( o m I 2 o (M 3 M _ I the purposes of creating additional lots or building � a re plat. 0 A public water system as approved by County and State Health authorities and the local fire district and �� ( ' I 0 I o 1 0 O I water supplier (purveyor) will be installed within this plat, and the subdivider will provide for individual sarvtca. , 0 e. ( ti to each lot rior to sale of each lot. (O I �' ,� z I z [Temporary Cul de sac M I _ P The plattor does hereby dedicate forever the streets shown hereon for public road purposes and do also dedicate �� I �" temporar Cul de sac easement as shown hereon, over and across Lot 3, Block I and Lot 3, Block r � I ~ I 91.32' 1 106.00' 1 106 00' �� j150' Map to the public the p ry 1 This temporary Cul de sac - easement is granted for road purposes until such time as the road is continued as a _ - - -- I M I I full width right. of way,.at which time it will be vacated, I I I ;��� t -- o, I Strip f six foot easement. is hereby provided on the lots as shown and shat) be used for utility purposes. tP - - SS WHEREOF we have hereunto set our hand and affixed our seal this ! s '1t� day '�er�nb�r 1976 , Set 3/4 P' e I I NORA S 8 9° 3 40" E I 348.05 AV ENUE Lot 4 Block I I I IN WITNESS ��i ' I - - - - 5 . � flf - 310.63'- ( ( ' 1 .� � `37.42 !_ct 54 I ( I I I I 1 I - - - -� _I I 90.77' 106.00' I ��06.00' , 49 1 Ben Schmidt A Sch .dt I = 1 _ - [Temporary Cul de sac e W I W ( 0 I _ I N I i^ �� t� i _ r �I:I:Qrtanit�� I i ru t ( 4 a� , :3 - K t I Z O I o I = J 2- O I 0 C\J O I (n I 0. I I o 2 N l0 3 0 ,, 01 10 0 N M I <<,,: ao M I N I 't `t O a cr. ' O O I I r !e Y m� I BLOC K 0 0 O I 1 1 y ACKNOWLEDGEMENT 3 I 1 z [ I L,,�- 25100 6 Utilit eas's,me�nt 1 ----- If0:06 - - - - -- 1 -- "� I -- - = Set 3/4 Pi p e sue• - 1 "O AU GUSTA AVENUE M N 89 * 38' 40 Wl 347.06' I -• ,�. - �J Found Spik(z I 1 I ''.�.•`. , N STATE OF WASHINGTON) SS ( I ( ` I I I ( , COUNTY OF SPOKANE On this 1 7th day of SeFten6e , 1976, before me personally appeared Ben Schmidt and I ( ( I Alma Schmidt, husband and wife, as the individuals who executed the within and foregoing instrument and acknowledged said instrument to be their free and voluntary act and deed for the uses and purposes �' ' I herein :mentioned. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first t I 1 above written. I I I I I I - 150 I to SCALE: 1 "= 50' .vrn�yaa,•� My commision expires 8 -1 Notary Public in and Por the State of Washington 1 N IN ( 1 00 I residing at Spo ne � ka , Washington 1 I _ I I I I I-- , I I N I r• .. / �� 1 I I L, I i ( I ( The Bearing of North on Wilbur Road, per Augusta Subdivision, c was used as the basis of bearing for this map. I I I 1 r0 gy p° 9 I 115 I _ _ I _ I ENGINEER'S CERTIFICATE - - - - 130 MAP AU -- _ _ 1 99.92; ACTUAL_ 1 99.0' MAP 150 Map ' ACT AL 130.7 MAP - - 100.00 MAP - - -" 100,00 _ � 333.9 I LEGEND - - - - $, -475 V- MI SSIO N s £39 � 3�8' 4 0" E AVENU M S. S -475 nn gT • MON. 8k CORNERS FOUND ( NOTED) ~� -- 34s.zto Ac <va� - - - 533.9 N1A"t_ ^ ' � ` \Found Corkage Bolt 345.53 tiAY • I, Clarence E. .Simpson, a licensed Civil Engineer and Land Surveyor, hereby certify that this plat o MON. a CORNERS SET 1/2. REBAR TAG 706 Found 5/8" Rebar s33 -nom a«�A� represents a true copy of the official record and survey made by me, and that the lot corners and - SUBDIVISION BOUNDARY monuments have been set. Clarence E. Simpson Professional Engineer and Lan urveyor FINAL PLAT COUNTY OFFICIALS I hereby certify that the required taxes on the herein platted land have been paid this day of ) 1976 By Spokane County Treasurer Deputy Examined and approved this day of ,1976 By . Spokane County Assessor Deputy Examined and approved this day of Examined and approved this day of Examined and approved this day of Examined and approved this day of , 1976 Spokane County Engineer 1976 1976 1976 WILBUR ADDITION A REPEAT IN A PORTION OF LOTS 59, 60, AND 61 IN PINECROFT FIRST ADDITION By Spokane County Planning Commission Chairman Planning Director , SEPTEMBER, 1976 Spokane County Commissioners Chairman SCALE I" = 50 Spokane County Health Distr4ct Health Officier I SECTION SPOKANE 9, T. 25 N., R-44 E.W.M. COUNTY, WASHINGTON CLA RENCE E. SIMPSON ENGINEERS, INC. SPOKANE, WASHINGTON e 'tJ 4-) 1 . - 0 4 Q N O t 0 Ld z ti nl wi SEG.9 ..... ....... . .. ... ........................ .. ... .... ; ... 6SIS 3 .......... ................. .......... . ...... ...... ... ..... . ... - L _LL___LLJ_U 743 7 -'*."""-.'..*' . c,,o uwo 6l lf 1 , . . .. . ............ I. .... . ......... .......... b 33. ... ....... . ....... -4 B si ......................... ........... .... BS . 34 to N ...... It ..... . .... I ....... ....... ..... 3zi-9 . o543 SZ '01 b . .... ...... 0 5 AA 1 ::3: 00 :::oo .. .... . Al -os '�3. 10' . 557 j C5 1 60 Coy. FS Z AT, AVENUE 0 6 15 0 4A CO o c,, 4-1 '11) o7!57 DATE DES CR I P rl0l%l 6 rl-41s sEcriolv REPRODUCED FROM L1,VEN TO MYLA R. G .,Ray 3 2q I N 4 19 7 Go ..... ....... . .. ... ........................ .. ... .... ; ... 6SIS 3 .......... ................. .......... . ...... ...... ... ..... . ... - L _LL___LLJ_U 743 7 -'*."""-.'..*' . c,,o uwo 6l lf 1 , . . .. . ............ I. .... . ......... .......... b 33. ... ....... . ....... -4 B si ......................... ........... .... BS . 34 to N ...... It ..... . .... I ....... ....... ..... 3zi-9 . o543 SZ '01 b . .... ...... 0 5 AA 1 ::3: 00 :::oo .. .... . Al -os '�3. 10' . 557 j C5 1 60 Coy. FS Z AT, AVENUE 0 6 15 0 4A CO o c,, 4-1 '11) o7!57 DATE DES CR I P rl0l%l 6 rl-41s sEcriolv REPRODUCED FROM L1,VEN TO MYLA R. G .,Ray 3 06 +20.3 0 Z: [ I Z .64+9 P - r. Al A O� 0 /<^10>< ^10 - 173.5 -E ( I Z w Z � II I M / SS / D N'� �I ti h) � W 2 5 6 - 15 - 7Z "_ 0 G. Ray � I Q' I X � I 2 I 1 i 3 �I m N� U) 1P 0 0� I p QN •,I ,• " ! B CJGfCE YE N td /° 0 Qo 0 0 N p I N /.Y � /j /6 /7 Ciy O I, j MONT60 1AERY I G!R O C OW" B 81 /<^10>< ^10 - 173.5 -E ( I Z w Z � II I M / SS / D N'� �I ti h) � W 2 , nct"'Irt n I of n . D E S C / P T/ O N 6 - 15 - 7Z THI;; SECTION REPRODUCED FROM LINEN TO MYL.AR. G. Ray r b �• c s •� 3 U) z ,• " ! /g , nct"'Irt n I of n . D E S C / P T/ O N 6 - 15 - 7Z THI;; SECTION REPRODUCED FROM LINEN TO MYL.AR. G. Ray �9 ck St ke s y' 3 z ,• " ! ' i /° // / z /s /.Y � /j /6 /7 /d0 /5 /6 G!R C a B z , nct"'Irt n I of n . D E S C / P T/ O N 6 - 15 - 7Z THI;; SECTION REPRODUCED FROM LINEN TO MYL.AR. G. Ray ir 9 19 ,7 y' 3 z ,• " ! ' i Z /o /I I /z /3 /} /5 /6 : �:• a B G EY R ta z so , nct"'Irt n I of n DATE . D E S C / P T/ O N 6 - 15 - 7Z THI;; SECTION REPRODUCED FROM LINEN TO MYL.AR. G. Ray 9 19 ,7 y' 3 z ,• " ! ' i Z /o /I I /z /3 /} /5 /6 : �:• a E. EN i R ta z so DATE . D E S C / P T/ O N 6 - 15 - 7Z THI;; SECTION REPRODUCED FROM LINEN TO MYL.AR. G. Ray ,• " ! ' i Z /o /I I /z /3 /} /5 /6 : W A EN i E DATE . D E S C / P T/ O N 6 - 15 - 7Z THI;; SECTION REPRODUCED FROM LINEN TO MYL.AR. G. Ray /o /I I /z /3 /} /5 /6 : W A EN i E 19 7 DATE . D E S C / P T/ O N 6 - 15 - 7Z THI;; SECTION REPRODUCED FROM LINEN TO MYL.AR. G. Ray SEC T 2 5 N. R 44E IOG +20.3 A.P- Sec.Cc.•. Q A 0-05'R+. �0 rg I 1� m 0 ZQ )) = �S A� WQ Zq 00 0 Jq j QW 2I) l I za' 8�it93.i I�:T. -•. 145.5' t m tt � 1 i E.�� Co`: ors N:g9 ° 02 i , , ' I ` 1 e _ �C� r J R . ,MeNSFiQLO a�.8' 12 .... •.....:::.. `.; .: •::. •::.... do. /SO7 ... . ..... . . ......:::::::::::.::::.:.:::... t '' , : ............... :::: ... .. . ... .. ........ ::::::..... ... ..... ..... ............ I ^ 1 S- 20.3 ' A.P• = Sec. Con M /5slON I A 0 O Ey i-t,. 15 W 2 0- /VOTE SHADED AREA �E•SIG^iATES IJVA,--A7/Onr// , W � -�, . "Ai i N4 19 7 - IOG +20.3 A.P- Sec.Cc.•. Q A 0-05'R+. �0 rg I 1� m 0 ZQ )) = �S A� WQ Zq 00 0 Jq j QW 2I) l I za' 8�it93.i I�:T. -•. 145.5' t m tt � 1 i E.�� Co`: ors N:g9 ° 02 i , , ' I ` 1 e _ �C� r J R . ,MeNSFiQLO a�.8' 12 .... •.....:::.. `.; .: •::. •::.... do. /SO7 ... . ..... . . ......:::::::::::.::::.:.:::... t '' , : ............... :::: ... .. . ... .. ........ ::::::..... ... ..... ..... ............ I ^ 1 S- 20.3 ' A.P• = Sec. Con M /5slON I A 0 O Ey i-t,. 15 W 2 0- /VOTE SHADED AREA �E•SIG^iATES IJVA,--A7/Onr// C 1 f7 DEDICATION KNOW ALL MEN BY THESE PRESENTS, that Ben Schmidt and Alma Schmidt, husband and wife, have caused to be ni -atted into lots, blocks, and streets. the.land shown hereon as "WILBUR ADDITION" and described as follows: The North 317 feet of Tract 59, 60, and 61, Pinecroft7irst Addition, according to plat recorded in Volume "M" of plats, Page 35, in Spokane County, Washington. L.ot 4 Block I as shown hereon is dedicated to Spokane County to be deed for road purposes forever at such time as adjacent property is platted. No more than one dwellingstructure be placed on any one lot, nor shall any lot be further subdivided for the purposes of creating additional lots or building sites without filing a replat. A public water system as approved by County and State Health authorities and the local fire district and water supplier (purveyor) will be installed within this plat, and -the subdivider will provide for individual sarvsca to each lot prior to sale of each lot. The plattor does hereby dedicate forever the streets shown hereon for public road purposes and do also dedicate to the public The temporary- Cu I I .de sac easement as shown hereon, over avid across Lot 3, Block 1 and Lot 3, Block 2 This temporary Cul de sac easement is granted for road purposes until such time as the road is continued as a full width right. of way,,at which time it will be vacated. A six foot easement. Is hereby provided on the lots as shown and shall be used for utility purposes. IN WITNESS WHEREOF, we have ,hereunto set .our hand and affixed our seal this 1"I"' day of a"i%m6tr , 1976 kv op z a 'or Ben Schmidt ma Sc dt ACKNOWLEDGEMENT STATE OF WASHINGTON) SS COUNTY OF SPOKANE ) On this 17th day of SZpP embe , 1976, before me personally appeared Ben Schmidt and Alma Schmidt, husband and wife, as the individuals who executed the within and foregoing instrument and acknowledged said instrument to be their free and voluntary act and deed for the uses and purposes herein :mentioned, IN WITNESS WHEREOF, I have hereunto set my hand and affixed my.official seal the day and year first `' .. above written. ky commision expires 8 Notary Public in and tor the State of Washington residing at Spok , Washington ENGINEER'S CERTIFICATE I, Clarence E. Simpson, a licensed Civil Engineer and LAnd Surveyor, hereby certify that this plat represents a true copy of the official record and survey made by me, and that the lot corners and monuments have been set. Clarence E. Simpson Professional Engineer and Lan urveyor Ll ` . 333.9' V 1 t. tt r t I" Set 314 Pipe - - Is' I S 89 3$ 40 E 349.03 I 2s�od 112.03 1 406.00' I 106.00 =%ErET tic, 660k BLOCK O I I I Pt c�'E "`s 3 , o . w I � I �= <t Q i 1 I = = I r a: O I O I ! 1_ Lo ) r_ 1 - O I N O N O O - _ o I - Io 0 I !2 2 o IM 3 M p I I I ti 10 I �' z I z (Temporary Cul de sac I t_ M i 91.32' 1 106.00' 1 106.00' �� ( I CS o I Strip Set 3/4 p Pipe�� I NORA 8 9 0 3 40" E I - 348.05 AV ENUE "� Lot 4 Block I I `i4 I -1 - -- 310.63' -- I I �� �37.42� 1 i I N p I I 90.77' i 106.00' I X06.00 , . N ; 1:�r:t -249 I 1 � % = I l o N I F-- I �'! %, I (Temporary Cul de sac o ( i I 0 I ' W i w I O 'rtu.rI fy I Tract ( 5; d I N - O I 2 N I O 3 O 4 ' ( O I I O O I I - - Co N ( N D 1 I = B L O C K Z I O _ i i i Z , �;,� - - - -- I 25!00' 6' Utility eas�,ment - I I Set 3 /4'Pipe - Q 1 - - - - - 7� - -- 106:00 - -- I ---- r0�,0 - 0 AU GUSTA AVENUE M ' N 89 G 38' 40" W' 34706' i Found Spi k¢ 1 I I I 1 15 1 ; >cj I - - - - -- I I I I ( I I , I I i I i I I it I I I I c` o (o I I - - - - -{ to i I i I I SCALE: I "= 50' 1 N I N ( i -0 I I I o F- . I I �; I I ' ►� f I i I I The Bearing of North on Wilbur Road, per Augusta Subdivision, was used as the basis of bearing for this map. 1 `' I I �„t, 0 0 1 I 1 1 I I5 I 130.6' ACTUAL - 1 - 99.92' ACTUAL I 99.92' ACT _A ' L I -- - 130_7' MAP ' - - - - 100.00 MAP ' - -�� - 100 00' MAP _ - 333.9 I 150 map -- - - -- - -- - - - - -- - - - -- - -- -- - --�-- - ---- -� - - - - -- LEGEND MI SSIO N s 090 :�' 40" E AVENU M g 43 MAt • MON. 8r CORNERS FOUND (AS NOTED) _ _ 345.53 snap _ 533.9 MAl' . " % �Found Carrage Bolt + o MON. a CORNERS SET 1/2" REBAR TAG 706 � 0 _ un _ d 3as. z co AcY VAt " 5/8" Rebar SUBDIVISION BOUNDARY FINAL WILBUR BOUNTY OFFICIALS I hereby certify that the required taxes on the herein platted land have been paid this ay of X9 �. y , Spokane County Treasurer puty — � _ B Y 0= -9 =9 Examined and approved this 1 da y of , �,T , a Cbunt Assess De Examined and approved thi day of e , 1976 Examined and approved this 1 day of =, 1976 iAN..' Examined and approved.this_OC ° day of _ Z_ goa ' 1976 N T Examined and approved this �� day of , 1 97 6 By A P1 O ng D irector A RE PLAT r 59, 60, AND 61 SECTION SPOKANE SEPTEMBER, 1976 SCALE I"= 50' IN A PORTION OF LOTS IN PINECROFT FIRST ADDITION 9 T. 25 N -, R -44 E.W.M. COU WASHINGTON CLA RENCE E. SIMPSON ' ENGINEERS, INC. SPOKANE WASHINGTON -.g-' _ X,J Spokane County Pla ng Commissio h r rman Sp r,a County Commissioners Chairman A , Spokan ounty Health Distr Health Officier :ri' -