Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PE-1061-76 (2)
Y TIME: PLACE: a. Location: d. Engineer: AGENDA, December 18, 1979 TELEPHONE: 456 -2205 SPOKANE COUNTY PLANNING SUBDIVISION HEARING EXAMINER COMMITTEE PRELIMINARY SUBDIVISION AND ZONE RECLASSIFICATION - EXTENSION OF TIME PE- 1061 -76, HEATHER PARK FIRST ADDITION ZE- 146 -76, AGRICULTURAL SUBURBAN TO R -I The proposal is located south of 16th Avenue and 1300 ft. east of Carnahan Road The W 660 ft. of the NE 1/4 of the NE 1/4 Radiology Associates of Spokane, P.S. N 5901 Lidgerwood Spokane, WA. 99207 Clarence Simpson Engineers, Inc. N 909 Argonne Road Spokane, WA. 99206 20 acres 42 Single family dwellings Agricultural Suburban R -I Washington Water Power Co. Spokane School District No. 81 Individual on -site disposal systems A topic of discussion at this Hearing may be whether the Hearing Examiner Committee has adequate information to assess the adverse Environmental Impacts of the proposal. The State Environmental Policy Act WAC 197 -10 -530 (2) provides that: " In the event that the further investigations authorized by this section do not provide, information reasonably sufficient to assess any potential adverse environmental impacts of the proposal, an EIS shall be prepared." n. The applicant is requesting an Extension of Time on approval until January 1981. b. Legal Description: c. Sponsor: e. Site Size: f. Number of Lots: g. Land use proposed by sponsor: h. Existing Zoning: i. Proposed Zoning: j. Water Source: k. School District: 1. Method of Sewage Disposal: m. Environmental Impact: 1 Tuesday, December 18, 1979 - 9:00 A.M.(Item A on Morning Agenda) Broadway Centre Building, 2nd Floor N 721 Jefferson, Spokane WE WE v 12TH s.vE -12Th 1 ILV E mar LJL J rn 25T A .W.iiLdhl I LINO z rt cc 5 N4. No. 3503 4 0 E Et 21 ,47, s rti 71_j° PI ® ® 1 1161 ® TWENTY FiRST AVE_ ._- w f11' TNFNT FIFTH AVE o 7 • T WENT T SIXTH AVE • 1TWENTY 5e'eNTH AV!. 29 TH A E +i4 45 4 47 1. 4E% 1 49 •• 50 1 51 r 5, , ` 5 57 L 5T - V 4 11 ,' -- A— ' f 58 O 4 0 tq 59 GO 6 6 Ga v , 0 • ' i 29 T. ar 59 60 61 1 1 " _1000 THIRTY S ECDr 11'. 7 TM ���L`�..0 B. T . • . r .. Ws '� y` 1 ,(I'H I L L _ L As' STAFF ANALYSIS - December 18, 1979 PE- 1061 -76, HEATHER PARK 1ST ADDITION ZE- 146 -76, AGRICULTURAL SUBURBAN TO SINGLE FAMILY RESIDENTIAL PRELIMINARY SUBDIVISION AND ZONE RECLASSIFICATION - EXTENSION OF TIME I. GENERAL INFORMATION A. History The plat was originally heard and approved by the Planning Commission in December of 1976. The preliminary plat received conditional approval to January 1, 1977. In December 1977, the applicant applied for and received an Extension of Time to January 1, 1979. The applicant again asked for an Extension to January 1, 1980. The staff at this time last year reported that the plat was relative close to finalizing the proposal. The plat at this time, appears to be very close to finalizing, although little progress appears to have occurred over the last year. The Sponsor is considering selling the proposal to a knowledgeable developer to bring the issue to a conclusion. Since the cost of the Bond is considerable, the sponsor is reluctant to make this expenditure at this time in view of their selling plan. The sponsor is therefore asking for an Extension of the approval until January 1, 1981. B. Location Between 16th and 21st avenue on the south side of 16th, 1/2 mile east of Carnahan Road. C. Proposal - 20 acres subdivided into 42 lots for single family'residences - Lot frontage = from 50' to 235' - Lot sizes = approximately 12,600 sq.ft. II. SPECIAL INFORMATION A. Circulation D. Water Supply The County Road Engineer has not recommended any new conditions. Only those conditions already attached to the preliminary plat of record. B. Sewage Disposal This proposal has been conditioned for a public sewer system. C. Drainage The County Utilities Engineer reports that final construction plans must be reviewed and approved prior to filing of the final plat. The proposal lies within the boundaries of WWP. -1B- STAFF ANALYSIS - December 18, 1979 HEATHER PARK 1ST ADDITION E. Fire District The proposal is situated within the recorded service area of Fire District N8 F. School District 'The proposal lies within the boundaries of Spokane School District 81. III CONDITIONS: If approval is granted, the following conditions are recommended. 1. Those conditions already attached to the preliminary plat of record. 2. That the project sponsor is responsible for requesting an Extension of Time to review any preliminary plat approval. All extensions applied for may subject the project sponsor to new conditions required by Reviewing Agencies. 3. That a Time Extension be granted to January 1, 1981. / / /i'*e PW //,;p S - S:,777cn AE,aei /4. »r �2 5OyZ -IC- AGENDA, December 18, 1980 TELEPHONE: 456 -2205 SPOKANE COUNTY PLANNING SUBDIVISION HEARING EXAMINER COMMITTEE TIME: Thursday, December 18, 1980 - 9:00 A.M.(Item #1A on Morning Agenda) PLACE: Broadway Centre Building, 2nd Floor N 721 Jefferson, Spokane PRELIMINARY SUBDIVISION AND ZONE RECLASSIFICATION - EXTENSION OF TIME PE- 1061 -76, HEATHER PARK 1ST ADDITION ZE- 146 -76, AGRICULTURAL SUBURBAN TO R -1 a. Location: Located south of 16th Avenue and 1300 feet east of Carnahan Road. b. Legal Description: The West 660 ft. of the NE 1/4 of the NE 1/4 c. Sponsor: Radiology Associates of Spokane, P.S. N 5901 Lidgerwood Spokane, WA. 99207 d. Engineer: Clarence Simpson Engineers, Inc. N 909 Argonne Road Spokane, WA. 99206 e. Site Size: 20 acres f. Number of Lots: 42 g. Proposed Land Use: Single family dwellings h. Existing Zoning: Agricultural Suburban i. Proposed Zoning: R -1 j. Water Source: Washington Water Power Co. k. School District: Spokane School District No.81 1. Method of Sewage Disposal: Individual on -site disposal systems m. Environmental Impact: A proposed declaration of non - significance (a preliminary decision, which may be reversed, that an environmental impact statement, an EIS, is not needed) has been administratively issued. This in- sures the applicant of a timely processing of his /her proposal at the time of the public hearing. BUT, a major purpose of the public hearing is to afford the opportunity to present the decision makers with information as to whether or not a potential SIGNIFICANT ADVERSE impact upon the physical environ- ment will result from implementation of the proposal, thus resulting in the need for an EIS. However, all "extensions of time" and most "change of conditions" are exempt from the pro- visions of SEPA; check with the Planning Department staff if uncertainty exists. n. The sponsor is requesting a Time Extension until January 1, 1982. 1C tvE sr A 25T 1/ Cr 7 u C O 6 h'4 Ho. 35n3 G 29 TH A D EL 21 i3 Q 0 N THFNT FIFTH AVE 0:r 7 + vv ENT T SIXTH W .'TWENTY • E. `• 4 47 4(f. 49 5 >` 5� 57 4 L „ LH .Pry F!RsT..,`A)lE r � IA— 1 513 pis -106 . 76 T WENTY FIRST GVE �4 5EVENTH AVF 4 0 it 29 The a\ 53 60 6i T HIRTY 5 ECQr PjTti 11 r r 1 1 1 "_1000 AGENDA, December 18, 1980 TELEPHONE: 456 -2205 SPOKANE COUNTY PLANNING SUBDIVISION HEARING EXAMINER COMMITTEE TIME: Thursday, December 18, 1980 - 9:00 A.M.(Item #1A on Morning Agenda) PLACE: Broadway Centre Building, 2nd Floor N 721 Jefferson, Spokane PRELIMINARY SUBDIVISION AND ZONE RECLASSIFICATION - EXTENSION OF TIME PE- 1061 -76, HEATHER PARK 1ST ADDITION ZE- 146 -76, AGRICULTURAL SUBURBAN TO R -1 a. Location: Located south of 16th Avenue and 1300 feet east of Carnahan Road. b. Legal Description: The West 660 ft. of the NE 1/4 of the NE 1/4 c. Sponsor: Radiology Associates of Spokane, P.S. N 5901 Lidgerwood Spokane, WA. 99207 d. Engineer: Clarence Simpson Engineers, Inc. N 909 Argonne Road Spokane, WA. 99206 e. Site Size: 20 acres f. Number of Lots: 42 g. Proposed Land Use: Single family dwellings h. Existing Zoning: Agricultural Suburban i. Proposed Zoning: R -1 j. Water Source: Washington Water Power Co. k. School District: Spokane School District No.81 1. Method of Sewage Disposal: Individual on -site disposal systems m. Environmental Impact: A proposed declaration of non - significance (a preliminary decision, which may be reversed, that an environmental impact statement, an EIS, is not needed) has been administratively issued. This in- sures the applicant of a timely processing of his /her proposal at the time of the public hearing. BUT, a major purpose of the public hearing is to afford the opportunity to present the decision makers with information as to whether or not a potential SIGNIFICANT ADVERSE impact upon the physical environ- ment will result from implementation of the proposal, thus resulting in the need for an EIS. However, all "extensions of time" and most "change of conditions" are exempt from the pro- visions of SEPA; check with the Planning Department staff if uncertainty exists. n. The sponsor is requesting a Time Extension until January 1, 1982. 1 4. I 4 0 L ._ L A N N EttJ e9 25 n a W h u 0 aEL 2, 53 ER No 35n3 4 r r. PE-1061:-76 61)°76 TWENTY Fi PST CAVE- — 4 — h • T N NT V F 2 � 7 I' W ENT r SIXTH AV E Ll • TWENTY SEVENTH AVE 29 TN A 44 45 £4 47 1 149 5p 1I 1 1 1 r� '.` 5 J 57 V1 �. r, .1 \5 5 i', ra ...., J T v 5e W 2 2 • 0 55 GO 61 E. 9 %o :.s .. THIRTY SEC_Or 6'N r O • Biti �1 W� l CC 11 r 1 29 r. v 93 60 s. 1":1009 STAFF ANALYSIS - December 18, 1980 PE- 1061 -76, HEATHER PARK 1ST ADDITION ZE- 146 -76, AGRICULTURAL SUBURBAN TO SINGLE FAMILY RESIDENTIAL (R -1) PRELIMINARY SUBDIVISION AND ZONE RECLASSIFICATION - EXTENSION OF TIME I. GENERAL INFORMATION A. History The preliminary plat was approved by the Planning Commission in December, 1976. Two previous time extensions have been approved based on the sponsors statement that the plat was very close to finalization. The sponsor still indicates that virtually all of the requirements have been completed and are waiting for final County inspection and is therefore requesting an Extension of Time until January 1, 1982. B. Location Between 16th and 21st Avenue on the south side of 16th, approximately mile east of Carnahan Road. C. Proposal 20 acres subdivided into 42 lots for single family residential Lot frontage = 50' to 235' Lot sizes = Approximately 12,600 sq. ft. II. SPECIAL INFORMATION A. Circulation The County Road Engineer has not recommended any new conditions. Only those conditions already attached to the preliminary plat of record. B. Drainage The County Engineer reports that the final construction plans must be reviewed and approved prior to the filing of the final plat. C. Water Supply The proposal is located within the recorded service area of WWP Company. D. Fire Protection The proposal is situated within the recorded service area of Fire Protection District #8. -1B- STAFF ANALYSIS - December 18, 1980 HEATHER PARK 1ST ADDITION - continued F. Schools The proposal lies within the boundaries of School District 1181. III. NEW CONDITIONS: PLANNING DEPARTMENT 1. Those conditions already attached to the preliminary plat of record and listed below. 2. That the project sponsor is responsible for requesting a time extension to review any preliminary plat approval. All extensions applied for may subject the project sponsor to new conditions required by Reviewing Agencies. 3. That a time extension be granted to January 1, 1982. UTILITY CONDITIONS 1. The owner, his heirs and successors shall join and participate in any petition or resolution which purpose is the formation of a utility local improvement district (ULID) pursuant to RCW Chapter 36.94, as amended. The owner, his heirs and successors shall further agree not to oppose or protest any legal assessments for any utility local improvement district (ULID) established pursuant to RCW Chapter 36.94, as amended. 2. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County. 3. That provisions for public sewers be required. as ?eeOlouSli acgiAJAH I $ r..4... � Ca nid.�'i:uri tf IV. PREVIOUSLY ATTACHED CONDITIONS 1. That the plat comply with all present day standards and conditions. 2. That the plat be designated as indicated on the preliminary plat of record and /or attached sheets as noted and that the dedicatory language of the final plat shall include the following statement: "No habitable structures shall be permitted on Lots 14 and 15 of Block 2 and Lots 1 and 2 of Block 3 of the preliminary plat of record until the Spokane County Health Officer determines that community drainfields will no longer be required on these lots." Con- struction of other structures on the above lots must be approved by Spokane County Health District, Planning Department and Building Codes. 3. That a statement be placed in the dedication to the effect that no more than one dwelling structure be placed on any one lot, nor shall any lot be further subdivided for the purposes of creating additional lots or building sites without filing a replat. 4. That the plat provide for right -of -way width for streets as indicated on the preliminary plat of record. -1 STAFF ANALYSIS - Decembe_.18, 1980 HEATHER _ARK 1ST ADDITION - continued 5. That appropriate provision be made that the following described property be held in trust until the continuation of the streets be dedicated or deeded: A 1' strip at the ends or edges of all streets that terminate or border the plat boundary. (Temporary cul de sacs are required when streets terminate at the plat boundaries.) 6. That appropriate street names be indicated. 7. That appropriate utility easements be indicated on copies of the approved preliminary plat for distribution to the Planning Department and the utility companies. Written approval of the easements by the utility company must be received prior to the submittal of the final plat. 8. That the plan for water facilities adequate for fire protection be approved by the water supplier and fire protection district. Said water plan must also have been approved by the appropriate health authorities. The health authorities, water supplier (purveyor), and fire protection district will certify, prior to the filing of the final plat, on the face of said water plan that the plan is in conformance with their requirements and will adequately satisfy their respective needs. Said water plan and certification will be drafted on a transparency suitable for reproduction. The water purveyor will also certify prior to the filing of the final plat on a copy of said water plan that appropriate contractual arrangements have been made with the plat sponsor for construction of the water system, in accordance with the approved plan, and in accordance with a time schedule. The time schedule will provide, in any case, for completion of the water system and inspection by the appropriate health authorities prior to application for building permits within the plat. The contractual arrangements will include a provision holding Spokane County and the purveyor harmless from claims by any lot purchaser refused a building permit due to the failure of the plat sponsor to satisfactorily complete the approved water system. The plat dedication will contain a statement to the effect that the public water system as approved by County and State Health authorities and the local fire district and purveyor will be installed within this plat, and the sub- divider will provide for individual domestic water service as well as fire protection to each lot prior to sale of each lot. 9. That conditional approval be given subject to provisions in the plat for a public sewer system. Approval of the design of said systems must be given by County and State Health authorities and the County Utilities Department prior to filing of the final plat. A suitable guarantee will be required to cover the cost of providing said system in the amount as determined by the Public Works Department. NOTE: The topography and soils in Block 1, Lots 4 through 13, Block 2, Lots 5 through 11, and Block 3, Lots 7 through 14 of the preliminary plat are not suitable for installation of individual on -site sewage disposal drain - fields. Each of these lots shall provide its individual sewage treatment facility (i.e., septic tank) which shall be connected to a community (public) effluent collector and drainfield disposal system located on Block 2, Lots 14 and 15 and Block 3, Lots 1 and 2 of said preliminary plat of record. -1D- STAFF ANALYSIS - December 18, 1980 HEATHER PARK 1ST ADDITION - continued Also NOTE: That the remaining lots have been determined to be suitable for on -site sewage disposal systems by the Spokane County Health District. Prior to finalization of the plat, the sponsor shall provide covenants for review by the Spokane County Health District indicating that a Home Owners Association will be incorporated requiring membership and financial support of owners of all lots served by the public sewage disposal system. The Associa- tion shall be responsible for inspections, operation and maintenance of the public effluent collector and disposal system and shall control the lots on which the disposal system is located. WETS ' 0 That a statement be placed in the dedication to the effect that a public sewer system will be made available for the plat and individual service will be provided to each lot prior to sale. Vert 11. That a certificate of title be furnished the Planning Department prior to the filing of the final plat. 12. That the preliminary plat be given conditional approval to January, 1978. 13. That streets be improved to standards established by Spokane County or a bond to cover the cost of such improvements be furnished the County Engineer. The bond may also cover the cost of "as built" plans, engineering costs, and placing of final center line monuments. 14. That profiles of streets, cross sections, proposed grades and drainage plan of the plat be submitted and approved by the County Engineer and by the Planning Director before the final plat is drawn. Prior to acceptance of the improve- ments or release of bonds, a certificate by a registered civil engineer or licensed land surveyor will be required indicating that all improvements have been installed to the lines and grades shown on the approved construction plans. 15. Conditional approval of the plat is given subject to the dedication of the right -of -way to the public and approval of the road system in the plat by the County Engineer. 16. That a name be indicated before the final plat is filed; such name to be approved by the County Assessor and the Planning staff. 1' 2oaNeyC - anonl kJ 5%01 L d.C — $yoke as ReprestvttodcLQ al 5por,scra, Pdd.ress O .vest . on s Gov�ce $ ewerz5 _ Ai Cendir/ov, Nag e fjS8,c! - 1E- PE- 1061 -76 DEPT. FILE REF. ZE- 146 -76 STAFF REVIEW OF ENVIRONMENTAL CHECKLIST I. In accordance with the Spokane County Environmental Ordinance and WAC 197 -10, an Environmental Checklist has been submitted by the applicant or his agent. This checklist and any additional pertinent data has subsequently been reviewed by the Spokane County Planning Department The following data briefly describes the proposal: A. Action Requested: Preliminary plat approval and Zone Chance approval (Heather Park 1st Addition) B. Description of Proposal: 20 acres developed into 42 lots (Residential); Average size lots approximately 12, 600 square feet. 38 dwelling units; 4 lots for community drain field. C. Location of Proposal: South side of East 5500 block. of 16th Avenue II. Review of Checklist: A. Slight adverse impacts are noted under the following questions: II. 1. (Earth); II. 2. (Air); II. 3., (Water); II. 4. (Flora); II. 5. (Fauna); II. 6. (Noise); II. 7. (Light and Glare); II. 8. (Land Use); II. 11. (Population); II. 13 (Housing); II. 14. (Public Services); II. 16. (Utilities). B. Potentially significant adverse impacts are noted under the following questions: None C. Discussion of impacts identified in B above: Surface runoff will have to be thoughtfully handle so as to not create a siltation problem on 16th Avenue both during construction and upon completion. Retention of as many trees as possible and existing ground cover (until conversion to lawns) will aid in controlling runoff. Utilization of a community drain field is very important until such time as hook up to a larger sewerage system occurs. III. Conclusions and Recommendations: Based on II B and C above, the staff Concludes no significant adverse environmental impacts and recommends the issuance of a declaration of non - significance SPOKANE COUNTY COURT MOUSE Murphy Bros Const. Co. Attn. Dick Trimborn Term. Annex 2685 Spokane, flash. 99220 COUNTY ENGINEER ROBERT S. TURNER COUNTY ENGINEER SnoJa r : ,Wasirtiwurom T 99260 C November 25, 1980 Re: Flora Add. # I187 Heather Park Iet. Add. x 1/1061 Dear Dick, The Construction at the above mentioned Additions has been constructed, inspected. and approved as per the approved plans. There will be some asphalt patching and curb patching required in the Spring under the permit warranty at Heather Park Ist Addition. If you have any questions please contact this office at 45 -3 Yours very truly, Robert S. Turner PE County Engineer BYClifllttrta�o Q— Thomas E. C Ya > ke PE Constructiun Engineer. Public Works Building North 811 Jefferson Street Spokane, Washington 99260 (509) 456 -3600 OFFICE OF THE SPOKANE COUNTY ENGINEER NORTH 811 JEFFERSON SPOKANE, WASHINGTON, 99260 509 - 456 -3600 /Z,rc% L , _ 1/21 Frx.-s Alch 101 Date / (- /,Z- Inspector itn &v Weather / Time Charged Contractor this Day -1/2 or 1 Other County Personnel Contractor 1 2 3 4 5 6 1 2 3 4 5 6 Personnel Classification Diary Section Comments lj' Airds- isms tewict bst i t • 4/ I. ;, i infrr, s • w // ' 11 ais � r�/ l r/�// J �_�Ir L � `L r m3 1l 73.7GCJIf !]l' I.2'J ■ ei�7r/-.!�l�r%�/Lilre si�i�����_�Pr i�.7arL• a _ �i� - P 4 7L 4 CU,PGs • e P.v /ntrd , oA1/x )) INSPECTOR'S SIGNATURE . 7,C4 1 7.:{/76„...77 Project NametA 44 /j Project No. CRP RID . Report No. Contractor and /or Sub(s) Equipment List Hrs. Used Standby Number lhh1 i /i y r< 4407 ), f4/ h /1 ' ,u &tarr% c4'g4 1rai tr J C'„ShQ , ) 1/ sit OFFICE OF SPOKANE COUNTY ENGINE ER )KANE COUNTY, WASHINGTO' APPLICATION TO PERFORM WORK ON COUNTY ROAD r NAME OF APPLICANT t 1 4�I c' %S'�• t 1 /' r ADDRFcc N'! P., 1, i_i -? `f The undersigned hereby applies for permission to l r • PHONE NO. Pursuant to franchise mater Date Work to Starr ` The estimated time required for completion of the above work is Cl/ t Cjn tr which the petitioner agrees to prosecute with all diligence and speed with due regard for the rights, interests and conveniences of the public. Petitioner further agrees to perform the work in strict compliance with the provisions enumerated below and states that he has read and will adhere to the general provisions applicable to permits contained on the reverse side of this form. The undersigned guarantees that if the backf ill, street surfacing or improvement fails within one year from the date of final inspection by Spokane County, he shall pay the cost of the County for making repairs or restoration of the roadway and improvements. In consideration of the granting of this permit it is agreed by the applicant that the County of Spokane and any officer or employee thereof shall be saved harmless by the applicant from any liability of responsibility for any accident, loss or damage to persons or property, happening or occurring as the proximate result of any of the work undertaken under the terms of this application and the permit or permits which may be granted in response thereto, and that all of said liabilities are hereby assumed by the applicant. It is further agreed that if any part of this installation interferes with the future use of the highway by the general public, it must be removed or relocated, as designed by the engineer at the expense of the permitee or his successor in interest. PERMIT Subject to all the terms, conditions, and provisions written or printed below or on any part of this form. PERMISSION 15 HEREBY GRANTED the above applicant to: PERMIT FFF A bond in the amount of force and effect for a period of BY INSPECTION FEF PERMIT DATF JOB NO STATE CONTR'S LICENSE NO SIGNED TITL F .DATE This permit shall be void unless the work herein comtemplated shall have been completed before COUNTY ENGINEER UTILITY DAMAGE IS COSTLY. CALL BEFORE YOU DIG. RIGHT -OF -WAY NO I l;')• (r' ' 1 ?n INSPECTION REQUIRED — 24 HOUR NOTICE REQUIRED Call Permit Office 456 -3600 to notify when work begins and schedule inspection TOTAL 71 is required to insure compliance with the above conditions, said bond to be kept in full years following completion of work authorized by this permit. It is the responsibility of the applicant to notify all utilities and private property owners when such property is liable to injury or damage through the performance of the above work and the applicant shall make all necessary arrangements relative to the protection of such property and /or Utilities. SPOAARC COURT COURTHOUSE TO: FROM: SUBJECT: Gentlemen: On December 18, 1979, the Subdivision Hearing Examiner Committee met at 9:00 a.m. to consider four Extensions of Time, seven Preliminary Plats and two Short Plat Appeals. Following are the applications in sequence and the action taken by the Committee. If not appealed, these decisions are final 10 days after Findings. and Order have been signed by the Hearing Examiner Committee. Hearing Examiner Committee Board membere were: Kenneth Kennedy - Chairman, Abby Byrne and John Culler. 1. PE- 1061 -76, Heather Park 1st Addition - Radiology Associates Spokane,P.S. ZE- 146 -76, Agricultural Suburban to R -I - Time Extension Location: Proposal: Action: 2. PN- 1201 -78, ZN- 168 -78, Location: Proposal: Action: 3. PE- 1227 -78 ZE- 202 -78, Location: Proposal: Action: n C) t n*- Ltc PLANNING DEPARTMENT PUBLIC WORKS BUILDING N. 811 JEFFERSON STREET PHONE 468 -2274 SPOKANE. WASHINGTON 99201 December 19, 1979 Board of County Commissioners Wallis D. Hubbard, Plat Administrator Subdivision Hearing Examiner Committee Actions of December 18, 1979 South of 16th Avenue and 1300 ft. east of Carnahan Road 20 acres into 42 lots for single family dwellings Approval - Unanimous Highland Rim Estates - Ponderosa Northwest Inc. - Time Extension Agricultural & Agricultural Suburban to Agricultural suburban or R -I and Multiple Family Suburban north of and adjacent to Valley Springs mile east of the Spokane City Limits single family & multiple family dwellings South slopes of Mt. Baldy, Road and approximately 1/2 and Hillyard area. 88 acres into 179 lots for Approval - Unanimous Homestead - Main - Time Extension Agricultural, Agricultural Suburban and R -2 to R -1, Family Suburban Residgntial Office, Local Business and Restricted Industrial In Sections 10, 11, 14 and 15, Township 25N, Range 45. 984 acres into 1,557 lots for multiple uses Approval - Unanimous R -2, Multiple , Commercial t or representative: SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER A. INTRODUCTION This matter having come before the Examiner Committee on December 18, 1979, and the members of the Committee present being Kenneth Kennedy, Chair- person, Abby Byrne, and John Culler. B. PROPOSAL The sponsor, Radiology Associates of Spokane, P.S., is requesting approval of an Extension of Time and Zone Change, PE- 1061 -76, Heather Park 1st Addition and ZE- 146 -76, Agricultural Suburban to R -1 for subdivision of 20 acres into 42 lots for single family dwellings and there being present, the following applicant MICHAEL PHILLIPS C. FINDINGS OF FACT 1. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with. 2. That the proper legal requirements for advertisement of the Agenda Item have been fulfilled. 3. That the owners of adjacent lands expressed neither approval nor dis- approval of the proposed Extension of Time. 1 Fin_ No. PE-1061 -76 ZE- 146 -76 RECEIVED SPUKANf tUuN11 0410141 DEC311979 4. The following are additional findings of fact considered by the Hearing Examiner Committee: a) That the applicant has made progress toward meeting the conditions of preliminary plat of approval. D. SPECIAL CONDITIONS OR CONTIGENCIES APPLICABLE TO THIS EXTENSION OF TIME APPROVAL: 1. Those conditions already attached to the preliminary plat of record. 2. That the project sponsor is responsible for requesting an Extension of Time to review any preliminary plat approval. All extensions applied for may subject the project sponsor to new conditions required by Reviewing Agencies. 3. That a Time Extension be granted to January 1, 1981. E. ORDER The Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Radiology Associates of Spokane, P.S. for an Extension of Time, Heather Park 1st Addition and Zone Change as described in the application should be approved. Motion by: Culler Seconded by: Byrne Vote: Unanimous 2 Fi,_ No. PE-1061-76 ZE- 146 -76 ATTEST: FRED L. DAYHARSH Planning Director 3 File No. PE- 1061 -76 ZE- 146 -76 HEARING EXAMINER COMMITTEE Chairman Inter- office Communication To sDokane County Planning Department From County Engineer's Department DECF/finE_2 /B OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Dot. DEC FMR5R /0 m Subject PE 10b1 -7(o 14F PittnER "PccRk 1 SjL Adc{ifiio The above referenced plat has been scheduled for an "Extension of Time Hearing" on 19n , 19 79 . The County Engineer's Department has reviewed the plat and finds that the "Conditions for Approval" which were required by the Spokane County Hearing Examiner and /or the Board of County Commissioners are still applicable and should be required as a condition in granting the extension of time. OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON D DCEM/3ER /0 19 7 Inter - office Communication To Spokan = n y Planning Department From County Engineer's Department R m Subject_PF I O 4 >i - 7 (o µEA't-ert Pe � S� A dditi on/ The above referenced plat has been scheduled for an "Extension of Time Nearing" on Dace /h' Efa / 8 , 19 79 . The County Engineer's Department has reviewed the plat and finds that the "Conditions for Approval" which were required by the Spokane County Hearing Examiner and /or the Board of County Commissioners are still applicable and should be required as a condition in granting the extension of time TO: Cpokara..e.. co Jerry S ims SUBJECT: DATE: 'C r rt0. N t .t Tler- P r C_- 0 P 1 es CLAk_,JCE E. SIMPSON ENGINEER, NC. CIVIL ENGINEERS AND LAND SURVEYORS N. 909 Argonne Road Spokane, Washington 99206 Telephone: 926 -1322 l j /2o4/'A,;.t A #a. 1,r- You ireJf 1 W � 0.f coo, e i n� /te Sl r - e_e_" o ro /'_S C t-. 1 p en. a- in Pa�f /� Aar• i ��s� et. e- �ro era/ ✓�/>t 1 a P O O "-Cu./ Ln r' P_G) on_ _s O r r e4 I S/ O r-s are.- a a a a .r 55 r P- r/. P_ c e- Li e- o P -'C. -r 1.(j . l / 6 e- f n n P_CI �/ O �I Y%-.S /1 ,t0 /�0.UP_ / K� �OK e- 47 // V 1 � / 1 7 &CCordf / - 0 4-kas r1a-o_ s . I v / / / P)ea -s: e a_ Iv s e i s Of a. n. a12 ;.. et- / raJrs c.�s V ott. t,nd trac e_S5art /' I 1-0...._k YO K Signed co L Transamenca Title Insurance Services 1' Gentlemen: Transamerica Title Insurance Company North 720 Argonne Road Spokane, Washington 99206 (509) 922 -2222 SECOND CERTIFICATE TO PLAT Spokane County Planning Commission N. 721 Jefferson Spokane, Washington Order No.: 92358 -M Certificate for Filing Proposed Plat of HEATHER PARK FIRST ADDITION In the matter of the plat submitted for your approval, this Company has examined the records of the County Auditor and County Clerk of Spokane County, Washington, and the records of the Clerk of the United States Courts holding terms in said County, and from such examination hereby certifies that the title to the following described land situate in Spokane County, to -wit: The West 660 feet of the Northeast quarter of the Northeast quarter of Section 26, Township 25 North, Range 43 E.W.M.; EXCEPT all roads; AND EXCEPT any portion in HEATHER PARK ADDITION shown on the plat recorded in Volume 11, Page 55 of Plats; Situate in the County of Spokane, State of Washington. EXCEPTIONS: (continued) 1 R- ECEILL_P . RP06ANF. € tfl1fl 6 - AIU 31979 1 VESTED IN: RADIOLOGY ASSOCIATES OF SPOKANE, P. S., EMPLOYEES PROFIT SHARING PLAN AND TRUST. 1. EASEMENT AND THE.TERMS AND CONDITIONS THEREOF: Grantee: The Washington Water Power Company, a corporation Purpose: Electrical distribution line with right to place one anchor on East line of the East 330 feet of the West half of the Northeast quarter of the Northeast quarter of Section 26 Dated: September 25, 1973 Recorded: October 15, 1973 Recording No.: 7310150188 in Official Volume 177, page 958 NOTE 1: General taxes for the year 1979 have been paid in full in the amount of $181.08 including Fire Patrol Tax and Weed District Tax. (Parcel No. 26531 -9041) General taxes for the year 1979 have been paid in full in the amount of $181.26 including Fire Patrol Tax and Weed District Tax. (Parcel No. 26531 -9040) Records examined to August 6, 1979 at 8:00 A.M. TRANSAMERICA TITLE cSURANCE COMPANY By: Robert Myler `d cc: Spokane County Engineers cc: Simpson Engineers, Attn: Tim Brewer SECOND CERTIFICATE TO PLAT Page 2 Order No. 92358 -M SVUn.n♦ LOOM ♦bunt euu31 Dear Sir: Grading Surfacing Drainage Other Al o el u me Ars CCIIILLoot 1i` orrioa or COUNTY ENGINEER ROBERT 5. TURNER COUNTY ENGINEER ya'OBAaf1C ,WASIESIV YrOn 1W2111 Yours very truly, / ST Subdivision Name: h&c& 2lee gar One of the requirements set forth by the Spokane County Planning Commission in connection with the above titled plat involves the filing with this office of a Street Improvement Bond. A preliminary inspection of the plat has been made by this office and the amount of the Street Improvement Bond found to be as follows: AMOUNT OF STREET IMPROVEMENT BOND $ / 2+3, 270 tZ 3 / 3 a° A Street Improvement Bond in the above amount must be filed with this office prior to approval of the final plat. The bond will be released only upon satisfactory completion of the required street improvement. Please contact this office when work on the improvement is ready for inspection, or if you desire additional information or advice concerning the work. Robert S. Turner, P.E. County Engineer By 2<e;frkt- Form 327 —C R OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Date :1 U I v 13 Inter- office Communication To n h / a B. From �T 0. Pl/ 1�1,� � _ II Subject flaa�Ther 70.PP( — nROL;AP t' BID ncl l( 3‘,3• 0 Nofe - Roo cl p la".S x,e o, K, o 1 o,.`4'e s-4- 3 e ± ( d oi- E X C E r — n e e4 tt w& p. &+ e ,a, ' - to A,d . as Show VN rccie /eJ 1.3i LAA - de -so- c Subject /&- 4‘OLF(22' Ic.+d /7 2A-0° 1•- FO'd26'440 3 0 Form 327 —C R OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Date Inter- office Communication ~ //� c From rf y 5 M, 4 �c / 3 o 7-024 1 , 2 / >v / °l / 11 2- 13) S S; D * /9SD rl ) _CLAI NCE E. SIMPSON ENGINEER NC. CIVIL ENGINEERS AND LAND SURVEYORS N.909 Argonne Road Spokane, Washington 99206 Telephone: 926 -1322 �\\ L TO: G0.1r kanr\tii � Jpo l�cin COL; -(r n y � I � c, It E n1 J inC�r � � SUBJECT: ' ccc htr ( Add S +rE_c_ protr IE.. DATE: 11/ 717 8 r; r H 11 II II I/�/'L Pot rc -'ran sm JIM t Gr - these Dro +e 1c q rn fir, n }l H Ea..Ther ot- ( S T ArIA . - Cr y nur 1 9 - 1 7 Wets, r « C4YYJ in: n IS b4 tilr'c_ (✓c. t'• ni c c r� ,,.- I In el i. { 11 I �] O- „ e_ yr% l r he" cl IN /A.1 e per, re) e C � /� _f <T 7 .'l �'hC. r fy . 7CI TE F \ I < � re; C_ I c Y? e e fl r A +0 r„,,, n \ 1 +L l e_X C41 /r ..r A J +mi l` rn r r k1, Igo r�Pd�d �e � _ 1 RInc-7.n any Wnl ro *1ti.. r i 44 I � .. N p rr-,L IP.... PXIc+c 4h T c , 4 (,Cy- N to 2 S.<�,� _ 1 In ?no c� ea 4 r.n 40 -r Inc r r t_._.. ar.,C -e ,_ 1 1 � t1 I 1 /' r j y � . I . .. a In G, e h � o i' I' �hr. c-r.- L ICY.. 4L 1 ,,c_ ore "f'NC_I Y�G C✓I ! h VVff TLC 2SCIc"T\A4 ro _ . r I_ 1 1 1 + I r•I�_ k4L, E- <. .. � r,OC IIp.,.S Gr' 4JI CI. Tc, war /< r � i E ✓ J 1 5t \ Q W C CO.. 1 I A h.e • T Gt v." i m F J J Signed 2 t J __-/Sn y'. rn n r tptive P. SMOXAMC COUNTY COUNT HOUSE Srn December 27. 1978 Co(") . of n•�c.oh �-wiE V (e ms •r tsSA JL PLANNING DEPARTMENT PUBLIC WORKS BUILDING N. 811 JEFFERSON STREET PHONE 058 -2270 SPOKANE. WASHINGTON IMI199260 TO: Board of County Commissioners FROM: Wally Hubbard, Plat Administrator SUBJECT: Plat Hearing Examiner Committee Actions of December 20, 1978 and December 21, 1978, respectively. Gentlemen: On December 20, 1978, the Plat Hearing Examiner Committee met at 8:30 a.m,to consider one Extension of Time and six Preliminary SubdiYisions & Zone Reclassifications. Followin are the applications in sequence and the action taken by. the Committee. tf not appealed, these decisions are final 10 days after each hearing date. 1. (P E- 1061 -76; Heather Park First Addition - Spokane Colonial Realty, Inc. ZE- 146 -66../ Agricultural Suburban to Single-Family Residential Location: South of 16th Avenue and 1300 feet east of Carnahan Road. Proposal: 20 acres into 42 lots for single family dwellings Action: Extension of Time approved - unanimously 2. PE- 1246 -78, Jarvis East - Curry ZE- 166 -78, Agricultural to Single- Family Residential Location: Eastern part of Otis Orchards area adjacent to and west of Canal Road and adjacent to and south of Wellesley Avenue Proposal: 6.1 acres into 17 lots for single family dwellings Action: Dental - unanimous 3. PE-I248 -78, East Farms Addition - Guthrie ZE- 188 -78, Agricultural to Agricultural Suburban Location: East Farms area of Spokane Valley adjacent to and south of Railroad Avenue approximately 250 feet west of Stevenson Street Proposal: 3.55 acres into 8 lots for single family dwellings Action: Denial - unanimous 4. PE- 1251-78, Moen's 2nd Addition - McDougall ZE- 185 -78, Agricultural to Agricultural Suburban or Single - Family Residential Location: Adjacent to and south of Sprague Avenue west of Greenacres Road. Proposal: 3.78 acres into 11 lots for single family dwellings Action: Approval - unanimous with condition that single family dwelling shall not be allowed on Lot 2, Block I, until such time as the fourolex on Lot 3. 3's,c'c. ^.�:, FINDINGS PRELIMINARY SUBDIVISION, EXTENSION OF TIME PE- 1061 -76 - HEATHER PARK FIRST ADDITION, ZE- 146 -76 - AGRICULTURAL SUBURBAN TO SINGLE FAMILY RESIDENTIAL Staff findings regarding PE- 106T -76, Heather Park First Addition: 1. This proposal has received conditional approval to December, 1977 by the Board of County Commissioners. 2. The applicant is desirous of obtaining an extension of time to January, 1979. 3. It would appear that reasonable progress has been made and an extension of time would be appropriate. If the Planning Commission grants approval of this request, the Staff would recommend the following conditions be attached: 1. That the preliminary plat be given an extension of time to January 1, 1979. 2. That the provisions. of SEPA's NOTICE OF ACTION pursuant to 43.21c.080 RCW and Board of Count?Commissioners' Resolution No. 77 -1392 be accomplished by the Project Applicant within thirty (30) days of formal action by the Board of County Commissioners; as Instructed by the Planning Department Staff. -5- STAFF RECOMMENDATION PRELIMINAR"i SUBDIVISION AND ZONE, CLAST_�''C-`.TION UPGRADING 4. PE- 19SI --76 - HEATHER PARK FIRST ADDITION: SPOKANE COLONIAL REALTY ZE- 146 -76 - AGRICULTURAL SUBURBAN TO SINGLE FAMILY RESIDENTIAL Planning Staff Recommendation: Approve for the following reasons and subiect to the following conditions: A. REASONS: 1. This proposed plat is within the Metropolitan area. 2. This proposed plat is a continuation of similar suburban density plats listed: Heather Park Addition, Valley View Hills Addition, Sloan's Addition and the recently approved Riegel Heights. • The lower density ownerships to the south and west are moderately buf- fered by topographic relief and some timber. 4. The proposed plat will have ample dedicated roads, power, water, fire protection, and two - thirds of this plat will have a public sewer system. - 5. There is no agricultural value for this land that is presently vacant with sparse timber and some rock outcroppings. B. CONDIT;ONS: Tnat the plat be designed as indicated on the preliminary plat of record and /or attached sheets as noted and that the dedicatory language of the final plat shall include the following statement: "No habitable structures shall be permitted on Lots 14 & 15 of Block 2 and Lots 1 & 2 of Block 2 of the preliminary plat of record until the Spokane Courity Health Officer determines that community drainfields will no longer be required on these lots." Construction of other structures on the above lots must be approved by Spokane County Health District, Planning Department and Building Codes. That a statement be placed in the dedication to the effect that no more i than one dwelling structure be placed on any one lot, nor shall - any lot be further subdivided for the purposes of creating additional lots or building sites without filing a replat. That the plat provide for right of way width for streets as indicated on the preliminary plat of record. '3. -4- PE- 1061 -76 - HEATHER PARK FIRST ADDITION (Continued) That appropriate provision be made that the following de: cribed property be held in trust until the continuation of the streets be dedicated or deeded: A 1' strip at the ends or edges of all streets that terminate or border the plat boundary. (Temporary cul de sacs are required when streets terminate at the plat boundaries.) That appropriate street names be indicated. That appropriate utility easements be indicated on copies of the ap- proved preliminary plat for distribution to the Planning Department and the utility companies. Written approval of the easements by the utility company must be received prior to the submittal of the final plat. That a plan for water facilities adequate for fire protection be approved by the water supplier and fire protection district. Said water plan must also have been approved by the appropriate health authorities. The health authorities, water supplier (purveyor), and fire protection dis- trict will certify, prior to the filing of the final plat, on the face of said water plan that the plan is in conformance with their requirements and will adequately satisfy their respective needs. Said water plan and certification will be drafted on a transparency suitable for repro- duction. The water purveyor will also certify prior to the filing of the final plat on a copy of said water plan that appropriate contractual arrangements have been made with the plat sponsor for construction of the water system, in accordance with the approved plan, and in accordance with a time schedule. The time schedule will provide, in any case, for completion of the water system and inspection by the appropriate health authorities prior to application for building permits within the plat. The contractual arrangements will include a provision holding Spokane County and the purveyor harmless from claims by any lot pur- chaser refused a building permit due to the failure of the plat sponsor to satisfactorily complete the approved water system. The plat dedication will contain a statement to the effect that the public water system as approved by County and State Health authorities and the local fire district and purveyor will be installed within this plat and the subdivider will prvide for individual domestic water service as • . • �j well as fire protection to each lot prior to sale of each lot. 84 That conditional approval be given subject to provisions in the plat for a public sewer system. Approval of the design of said systems must be given by County and State Health authorities and the County Utilities Department prior to filing of the final plat. A suitable guarantee will be required to cover the cost of providing said system in the amount as determined by the Public Works Department. -4A- PE- 1051 -76 - HEATHER PARK FIRST ADDITION (Continued) NOTE: The'topography and soils in Block 1, Lots 4 thru 13, Block 2, Lots 5 thru 11, and Block 3, Lots 7 thru 14 of the preliminary plat are not suitable for installation of individual on -site sewage disposal drainfields, Each of these lots shall provide its indi- vidual sewage treatment facility (i.e., septic tank) which shall be connected to a community (public) effluent collector and drainfield disposal system located on Block 2, Lots 14 & 15 and Block 3, Lots 1 and 2 of said preliminary plat of record. Also Note: That the remaining lots have been determined to be suitable for on -site sewage disposal systems by the Spokane County Health District. Prior to finalization of the plat, the sponsor shall provide covenants for review by the Spokane County Health district indicating that a Home Owners Association will be incorporated requiring membership and financial support of owners of all lots served by the public sewage disposal system. The Association shall be responsible for inspections, operation and maintenance of the public effluent collector and disposal Hystem and shall control the lots on which the disposal system is located. . That a statement be placed in the dedication to the effect that a public sewer system will be made available for the plat and individual service will be provided to each lot prior to sale. That a certificate of title be furnished the Planning Department prior to the filing of the final plat. fir. \IA. That the preliminary plat be given conditional approval to January, 1978. That streets be improved to standards established by Spokane County or a bond to cover the cost of such improvements be furnished the County Engineer. The bond may also cover the cost of "as built" plans, engineering costs, and placing of final center line monuments. f .(1 That profiles of streets, cross sections, proposed grades and drainage \.� plan of the plat be submitted and approved by the County Engineer end by the Planning Director before the final plat is drawn. Prior to accept- ance of the improvements or release of bonds, a certificate by a regis- tered civil engineer or licensed land surveyor will be required indicat- ing that all improvements have been installed to the lines and grades shown on the approved construction plans. Conditional approval of the plat is given subject to the deciation of i the right of way to the public and approval of the road system in the plat by the County Engineer. -4 B- f PE- 1061 -76 - HEATHER PARK FIRST ADDITION (Continued) That a name be indicated before the final plat is filed; such name to be approved by the County Assessor and the Planning staff. C. ZONING RECOMMENDATION: Planning Commission Recommendation: Approve Heather Park First Addition as indicated on the preliminary plat of record to the Single Family Residential (R -1) Zone classification upon the filina of the final plat. REASONS: . 1. The 42 lots in Heather Park First Addition have been designed to accom- modate single family residences; i.e. , gross density of 2.1 lots per acre 2. The Planning Commission has been upgrading similar residential plats in the area to the Single Family Residential Zone; i.e., Heather Park Addition, Sloan's Addition and Riegel Heights Addition. 3. The Single Family Residential Zone prohibits duplexes, animal keeping other than household pets, mobile homes and home occupations. -4C- , t- SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER A. INTRODUCTION This matter having come before the Examiner Committee on December 20, 1978, and the members of the Committee present being Kenneth Kennedy, Chairman, Abby Byrne and Glenn Quigley. B. PROPOSAL The sponsor, Spokane Colonial Realty, Inc., is requesting approval of a preliminary plat and zone change; Extension of time on PE-1061-76 Heather Park First Addition and ZE- 146 -76, Agricultural Suburban to Single Family Residential for subdivision of 20 acres into 42 lots and there being present, the following applicant or representatives: None C. FINDINGS OF FACT 1. That the existing land use in the area is residential. 2. That the Comprehensive Plan designates this area as residential. 3. That the existing zoning of the property described in the application is Agricultural Suburban. 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with. 5. That the proper legal requirements for advertisement of the Agenda Item have been fulfilled. 1 File No. PE- 1061 -76 ZE- 146 -76 Vote: ,Unanimous 2 1e No. PE- 1061 -76 ZE- 146 -76 6. That the land in this area is suitable for the proposed use, or uses within the proposed Zone Classification. 7. That the proposed use is compatible with existing uses in the area. 8. The Hearing Examiner Committee finds the proposed use is not detrimental to the general purpose or otherwise harmfull to the public health, safety, and welfare. 9. That the owners of adjacent lands expressed neither approval nor disapproval of the proposed use. 10. The following are additional findings of fact considered by the Hearing Examiner Committee: a) That the plat will comply with the current county road standards. D. SPECIAL CONDITIONS OR CONTIGENCIES APPLICABLE TO THIS SUBDIVISION APPROVAL: 1. Conditions as presented in Staff Analysis. 2. That the plat comply with all present day standards and conditions. E. ORDER The Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Spokane Colonial Realty, Inc., for an Extension of Time as described in the application should be approved. Motion by: Quigley Seconded by: Byrne TIME: PLACE: d. Engineer: AGENDA, December 20, 1978 SPOKANE COUNTY PLANNING HEARING EXAMINER COMMITTEE PRELIMINARY PLAT, EXTENSION OF TIME Wednesday, December 20, 1978- 8.30 A.M. (Item #1 on Morning Agenda) Broadway Centre Building, 2nd Floor N 721 Jefferson, Spokane PE- 1061 -76, HEATHER PARK FIRST ADDITION ZE- 146 -76, AGRICULTURAL SUBURBAN TO SINGLE - FAMILY RESIDENTIAL a. Location: b. Legal Description: c. Sponsor: The proposal is located south of 16th Avenue and 1300 feet east of Carnahan Road. Section 26, Township 25N, Range 43 E.W.M. The W 660 ft. of the NE 1/4 of the NE 1/4 Spokane Colonial Realty, Inc. N 3019 Argonne Spokane, WA. 99206 Clarence E. Simpson Engineers, Inc. N 909 Argonne Road Spokane, WA. 99206 20 acres 42 Single family dwellings Agricultural Suburban (Established 2/14/67) Single - Family Residential Washington Water Power Co. Spokane School District No. 81 1. Method of Sewage Disposal: Individual on -site disposal systems m. This Preliminary Plat has received approval through January 1, 1979. The applicant is now requesting an Extension of Time to January 1 1980, e. Site Size: f. Number of Lots: g. Land use proposed by sponsor: h. Existing Zoning: i. Proposed Zoning: j. Water Source: k. School District: -1- TELEPHONE: 456 -2205 STAFF ANALYSIS - December 20, 1978 PE- 1061 -76, HEATHER PARK FIRST ADDITION ZE- 146 -76, AGRICULTURAL SUBURBAN TO SINGLE - FAMILY RESIDENTIAL PRELIMINARY SUBDIVISION AND ZONE RECLASSIFICATION - EXTENSION OF TIME 1. Heather Park First Addition is located at the southern edge of the Spokane Valley south of and adjacent to 16th Avenue and approximately 1/4 mile east of Carnahan Road. The proposed plat calls for 42 single family dwellings on 20 acres. 2. The plat was originally heard and approved by the Planning Commission in December of 1976. The preliminary plat received conditional approval to January 1, 1978. In December 1977, the applicant applied for and received an Extension of Time to January 1, 1979. The sponsor is now requesting an additional Extension of Time to January 1, 1980. 3. The staff has received a copy of the final plat of Heather Park First Addition for checking. It appears that the sponsor is relatively close to filing and finalizing this proposal. An Extension of Time should allow him the time to receive final approval, - 1A - .Transamk..dear. Title Insurance Services Spokane County Planning Commission N. 811 Jefferson Spokane, Washington Gentlemen: EXCEPTIONS: Transamerica Title Insurance Cori North 720 Argonne Road Spokane, Washington 99206 (509) 922-2222 CERTIFICATE TO PLAT Situate in the County of Spokane, State of Washington. (continued) Order No. 92358 -M Certificate for Filing Proposed Plat of HEATHER PARK FIRST ADDITION RECEIVED pct 091978 SPOKANE COUNTY PLANNING DEPARTMENT In the matter of the plat submitted for your approval, this Company has examined the records of the County Auditor and County Clerk of Spokane County, Washington, and the records of the Clerk of the United States Courts holding terms in said County, and from such examination hereby certifies that the title to the following described land situate in Spokane County, to -wit: The West 660 feet of the Northeast quarter of the Northeast quarter of Section 26, Township 25 North, Range 43 E. W. M.; EXCEPT all roads; AND EXCEPT any portion in HEATHER PARK ADDITION shown on the plat recorded in Volume 11, Page 55 of Plats; VESTED IN: RADIOLOGY ASSOCIATES OF SPOKANE, P. S., EMPLOYEES PROFIT SHARING PLAN AND TRUST. 1. General taxes for the last half of 1978 in the amount of $91.61, including Weed District Tax and Fire Patrol Tax. (Parcel No. 26531- 9041). Affects a portion of said property. General taxes for the last half of 1978 in the amount of $91.70, including Weed District Tax and Fire Patrol Tax. (Parcel No. 26531 - 9040). Affects a portion of said property. t 2 EASEMENT, AND THE TERMS AND CONDITIONS THEREOF: Grantor: Russell C. Smith and Berniece Smith, husband and wife Grantee: The Washington Water Power Company, a corporation Purpose: Electrical distribution line with right to Location: place one anchor on East line of the East 330 feet of the West half of the Northeast quarter of the Northeast quarter of Section 26 Dated: September 25, 1973 Recorded: October 15, 1973 Recording No.: 7310150188 in Official Volume 177, page 958 cc: Simpson Engineers Jw Robert Myler y Page 2 Order No. 92358 -M Records examined to October 2, 1978 at 8:00 A.M. TRANSAMERICA INSURANCE COMPANY By: ,. U� A/C /1 GF Jgc 26 T,Z A74%iS" (41 4/2/.73 C . I � '/ /(Ili B / ooZ / r' C; C)0 2g �Ir • c , IJRANSAMERICA HIITE:TARANNCE COMPAN'I NORTH 720 ARGOtNNE ROAD . SPOKANE, WA. 99206 E PBS print is mate :ably tut um nulV"r n1 ,- ,tsltnr, In hulling r. 4 mrmkr% and the enman :; : , •n..; f10 liability Inc Val .11 S of mr, n1 drowns m.rs and location xr. ena,nW by ac 11.41 S.II 4:? wo 4 H EATHER PJ Rti HUD 1 :7181.01; II 'Pmear I it 9.3 3nr 0.4 AGENDA, DECEMBER 16, 1977 SPOKANE COUNTY PLANNING COMMISSION Time: Place: PRELIMINARY PLAT, EXTENSION OF TIME 1. PE- 1061 -76, Heather Park First Addition ZE- 146 -76. Agricultural Suburban to Single Family Residential a. b. c. d. e. f. 9a h. 1. J. k. 1. Location: Spohsor: Engineer: TELEPHONE NO.: 456 -2274 Friday, December 16, 1977, approx. 9:30 a.m. Conference Room A, County Court House Annex (Use Mallon Avenue entrance) Section 26, Township 25, Range 43, E.W.M. The W 660 feet of the NE 1/4 of the NE 1/4. Spokane Colonial Realty, Inc. North 3019 Argonne Spokane, WA 99206 Clarence E. Simpson Engineers, Inc. North 909 Argonne Road Spokane, WA 99206 Site Size: 20 acres Number of Lots: 42 Land use proposed by sponsor: Single family dwellings Existing Zoning: Agricultural Suburban, established February 14,'67 Advertised Zone Upgrading: Single Family Residential School District: Spokane School District No, 81 Method of Sewage Disposal: Individual on -site disposal systems Water Source: Washington Water Power Company Environmental Impact: A topic of discussion at this hearing may be whether of not this proposal will have a significant adverse environmental impact. No RTH a" = I MILE SCALE A TOPIC OF IDSCUSSL XT 3 HEARING MAY BE WHETHER NO HIS PROPOSAL WILL HAVE A SIGNIFICANT ADVERSE "ENVIRONMENTAL IMPACT. AGENDA, DECEMBER 10, 1976 TELEPHONE NO.: 456 -2274 SPOKANE COUNTY PLANNING COMMISSION Time: Place: PRELIMINARY SUBDIVISION AND ZONE CLASSIFICATION UPGRADING 4. PE- 1061 -76, Heather Park First Addition ZE- 146 -76, Agricultural Suburban to Single Family Residential (R -1) a. Location: Section 26, Township 25 N., Range 43, E.W.M. The West 660 feet of the NE 1/4 of the NE 1/4. b. Sponsor: Spokane Colonial Realty, Inc. North 3019 Argonne Road Spokane, Washington 99206 c. Engineer: Clarence E. Simpson Engineers, Inc. North 909 Argonne Road Spokane, Washington 99206 d. Site Size: 20 acres e. Number of Lots: 42 f. Land use proposed by sponsor: Single family dwellings g. Existing Zoning: Agricultural Suburban, established February 14, 1967 h. Advertised Zone Upgrading: Single Family Residential (R -1) i. Water Source: Washington Water Power Company j. School District: Spokane School District No. 81 mgt. ' - mc Iv atir c0. ,y Z; MAtt lE t Fl br. 5IZ 1 AVE it Friday, December 10, 1976, 9:30 A.M. Conference Rooin A, County Court House Annex (Use Mallon Avenue entrance) '%U iiGT'rW�Gi 'IH"JlRYICl1fE - MAGvn -4- .+ eo a . e,.• e• ea 1 Stall /"t yzfiiu PRELIMINARY SUBDIVISION AND ZONE CLASSIFICATION UPGRADING PE- 1061 -76 - HEATHER PARK FIRST ADDITION: SPOKANE COLONIAL REALTY ZE- 146 -76 - AGRICULTURAL SUBURBAN TO SINGLE FAMILY RESIDENTIAL Planning Commission Recommendation: Approve for the following reasons and subiect to the following conditions: (Vote was unanimous.) A. REASONS: 1. This proposed plat is within the Metropolitan area. 2. This proposed plat is a continuation of similar suburban density plats listed: Heather Park Addition, Valley View Hills Addition, Sload's . Addition and the recently approved Riegel Heights. 3. The lower density ownerships to the south and west are moderately buf- fered by topographic relief and some timber. 4. The proposed plat will have ample dedicated roads, power, water, fire protection, and two- thirds of this plat will have a public sewer system. 5. There is no agricultural value for this land that is presently vacant with sparse timber and some rock outcroppings. B. CONDITIONS: MINUTES DECEMBER 10, 1976 1. That the plat be designed as indicated on the preliminary plat of record and /or attached sheets as noted and that the dedicatory language of the final plat shall include the following statement: "No habitable structures shall be permitted on Lots 14 & 15 of Block 2 and Lots 1 & 2 of Block 3 of the preliminary plat of record until the Spokane County Health officer determines that community drainfields will no longer be required on these lots." Construction of other structures on the above lots must be approved by Spokane County Health District, Planning Department and Building Codes. 2. That a statement be placed in the dedication to the effect that no more than one dwelling structure be placed on any one lot, nor shall any lot be further subdivided for the purposes of creating additional lots or building sites without filing a replat. 3. That the plat provide for right of way width for streets as indicated on the preliminary plat of record. -4- PE- 1061 -76 - HEATHER PARK FIRST ADDITION (Continued) 4. That appropriate provision be made that the following described property be held in trust until the continuation of the streets be dedicated or deeded: A 1' strip at the ends or edges of all streets that terminate or border the plat boundary. (Temporary cul de sacs are required when streets terminate at the plat boundaries.) 5. That appropriate street names be indicated. 6.. That appropriate utility easements be indicated on copies of the ap- proved preliminary plat for distribution to the Planning Department and the utility companies. Written approval of the easements by the utility company must be received prior to the submittal of the final plat. 7. That a plan for water facilities adequate for fire protection be approved by the water supplier and fire protection district. Said water plan must also have been approved by the appropriate health authorities. The health authorities, water supplier (purveyor), and fire protection dis- trict will certify, prior to the filing of the final plat, on the face of said water plan that the plan is in conformance with their requirements and will adequately satisfy their respective needs. Said water plan and certification will be drafted on a transparency suitable for repro- duction. The water purveyor will also certify prior to the filing of the final plat on a copy of said water plan that appropriate contractual arrangements have been made with the plat sponsor for construction of the water system, in accordance with the approved plan, and in accordance with a time schedule. The time schedule will provide, in any case, for completion of the water system and inspection by the appropriate health authorities prior to application for building permits within the plat. The contractual arrangements will include a provision holding Spokane County and the purveyor harmless from claims by any lot pur- chaser refused a building permit due to the failure of the plat sponsor to satisfactorily complete the approved water system. The plat dedication will contain a statement to the effect that the public water system as approved by County and State Health authorities and the local fire district and purveyor will be installed within this plat and the subdivider will prvide for individual domestic water service as well as fire protection to each lot prior to sale of each lot. 8. That conditional approval be given subject to provisions in the plat for a public sewer system. Approval of the design of said systems must be glen by County and State Health authorities and the County Utilities Department prior to filing of the final plat. A suitable guarantee will be required to cover the cost of providing said system in the amount as determined by the Public Works Department. -4A- PE- 1061 -76 - HEATHER PARK FIRST ADDITION (Continued) NOTE: The topography and soils in Block 1, Lots 4 thru 13, Block 2, Lots 5 thru 11, and Block 2, Lots 7 thru 14 of the,preliminary plat are not suitable for installation of individual on -site sewage disposal drainfields, Each of these lots shall provide its indi- vidual sewage treatment facility (i.e., septic tank) which shall be connected to a community (public) effluent collector and drainfield disposal system located on Block 2, Lots 14 6 and Block 3, Lots 1 and 2 of said preliminary plat of record. Also Note: That the remaining lots have been determined to be suitable for on -site sewage disposal systems by the Spokane County Health District. Prior to finalization of the plat, the sponsor shall provide covenants for review by the Spokane County Health district indicating that a Horne Owners Association will be incorporated requiring membership and financial support of owners of all lots served by the public sewage disposal system. The Association shall be responsible for inspections, operation and maintenance of the public effluent collector and disposal system and shall control the lots on which the disposal system is located. 9. That a statement be placed in the dedication to the effect that a public sewer system will be made available for the plat and individual service will be provided to each lot prior to sale. 10. That a certificate of title be furnished the Planning Department prior to the filing of the final plat. 11. That the preliminary plat be given conditional approval to January, 1978. 12. That streets be improved to standards established by Spokane County or a bond to cover the•cost of such improvements be furnished the County Engineer. The bond may also cover the cost of "as built" plans, engineering costs, and placing of final center line monuments. 13. That profiles of streets, cross sections, proposed grades and drainage plan of the plat be submitted and approved by the County Engineer and by the Planning Director before the final plat is drawn. Prior to accept- ance of the improvements or release of bonds, a certificate by a regis- tered civil engineer or licensed land surveyor will be required indicat- ing that all improvements have been installed to the lines and grades shown on the approved construction plans. 14. Conditional approval of the plat is given subject to the deciation of the right of way to the public and approval of the road system in the plat by the County Engineer. -4B- PE- 1061 -76 - HEATHER PARK FIRST ADDITION (Continued) 15.. That a name be indicated before the final plat is filed; such name to be approved by the County Assessor and the Planning staff. C. THRESP_DLD DETERMINATION: Planning Commission Recommendation: That a Final Declaration of Non- Siani- ficance be issued. D. ZONING RECOMMENDATION: Planning Commission Recommendation: Approve Heather Park First Addition as indicated on the preliminary plat of record to '.the Sinale Family Residential (R -1) Zone classification upon the filing of the final plat. REASONS: 1. The 42 lots in the Heather Park First Addition have been designed to ac- commodate single family residences; i.e., gross density of 2.1 lots per acre. 2. The Planning Commission has been upgrading similar residential plats in the area to the Single Family Residential Zone; i.e., Heather Park Addition, Sloan's Addition and Riegel Heights Addition. 3. The Single Family Residential Zone prohibits duplexes, animal keeping other than household pets, mobile homes and home occupations. E. GENERAT. DATA: 1. Location: 2. Sponsor: 3. Engineer: 4. Site Size: 5. Number of Lots: 6. Land use proposed 7. Existing Zoning: 8. Advertised zone upgrading: 9. Water Source: 10. School District: Section 26, Township 25 N., Range 43, E.W.M. The W 660 ft of NE 1/4 of NE 1/4 Spokane Colonial Realty, Inc. N. 3019 Argonne Rd. Spokane, WA 99206 Clarence E. Simpson Engineers, Inc. N. 909 Argonne Road Spokane, WA 99206 20 acres 42 by sponsor: Single family dwellings Agricultural Suburban, established February 14, 1967 Single Family Residential (R -1) Washington Water Power Company Spokane School District No. 81 - 4 C - SPOKANE COUNTY ENGINEER ROAD DEPARTMENT SUBDIVISION SECTION TO: .TnSP llroia. nirertnr of Plannina- PROM: Robert S. Turner, County Engineer SUBJECT: Standard Plat Conditions DATE: December 7i 1976 We recommend approval of the plat of HEATHER PARK FIRST ADDITION PE 1061 - 76 subject to the following conditions: - that conditional approval of the plat is given subject to dedication of Right of Way to the public and approval of the road system in the plat by_the County Engineer; that plans, profiles, and cross sections showing proposed street centerline and curb grades be submitted to the County Engineer for approval prior to construction and the filing of a final plat; that drainage plans and design calculations showing the grades and alignment of drain- • age facilities be submitted to the County Engineer for approval prior to construction and the filing of a final plat; construction within the proposed public streets and easements shall be performed under the direct supervision of a licensed land surveyor, who shall be responsible - for perpetuating all evidence of the .location of survey monuments which may be . disturbed during construction and who shall furnish the County Engineer with "As Built" plans and a certificate in writing that all improvements were installed to the lines and grades shown on the approved construction plans and that all disturbed monuments have been replaced; no construction work is to be performed within the Public Right of Way until a permit _has been issued by the County Engineer. All work is subject to inspection and approval by the County Engineer; all construction within the Public Right of Way is to be completed prior to filing the final plat or a bond in the amount estimated by the County Engineer to cover the cost of construction of improvements, construction certification, "As Built" plans, and monumenting the street centerlines shall be filed with the County Engineer. . frid t 2 of ( -zr qq Inter- office Com uni atio To ^ g I 4lt-.1 From LA (lace — Subject Form 327 —C R. GMC OFF!E OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Date // - )_-¢- g 0 19 kJit-}QA'Y ts � ilD 5POnANE county COURT nOus[. Radiology and Associates of Spokane PS N. 5901 Lidgerwood Spokane, Washington 99207 Gentlemen: RST /JS /tr cc: Simpson Engineers N. 909 Argonne Road Spokane, Wa. 99206 Orr1UE or COUNTY ENGINEER ROBERT S. TURNER COUNTY ENGINEER SUOnAXXE , «'a31EtnG'roN 99260 December 16th, 1980 Attention: Rod Gannon RE: Heather Park 1st Addition The procedure for establishing the streets for maintenance in the above mentioned plat has been initiated. This process, however, cannot proceed until the final plat is filed and the rights - of-way are dedicated to Spokane County for public road purposes. We recommend that the final plat be filed so that this process can proceed. If you have any questions, please feel free to call me. Very truly yours, Robert S. Turner, P.E. County Engineer .Terry Sims Plat Inspector Public Works Building North 811 Jefferson Street Spokane, Washington 99260 (509) 456 -3600 OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Dote DEC En/6 6 Inter- olfice Communication To Synkane Gounty Planntnt (h kil[futsil� from County Engineer's Department Subjer iota /F/e.oTheze Pakv / A.Iaitiok) The above referenced plat has been scheduled for an "Extension of Time Hearing" on DECEpa6E2 /B Form J27 -C R 4 Jag- , , 19 90 The County Engineer's Department has rovigwed the plat and finds that the "Conditions for Approval" which were required by the Spokane County Hearing Examiner and /or the Board of County Commissioners are still applicable and should be required as a condition in granting the extension of time. Intor- offico Communication To Smaune County Planning IJcpartuisnl_ from County Engineer's Department Subject PE /044 NewihE2 PARk / 5 - 1 The above referenced plat has been scheduled for an "Extension of Time Rearing" on /X can 6E2 /8 , 1990 . The County Engineer's Department has reviewed the plat and finds that the "Conditions fur Approval" which were required by the Spokane County Hearing Examiner and /or the Board of County Commissioners are still applicable and should be required as a condition in granting the extension of time. Form 377 —C k OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Dote DEC En /b6 R 19 80 NEW CONDITIONS PLANNING DEPARTMENT UTILITY CONDITIONS SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER A. INTRODUCTION This matter having come before the Examiner Committee on December 18, 1980, and the members of the Committee present being Eldon Thomas, Chairperson, Jane Myers and John Culler. B. PROPOSAL The sponsor, Radiology Associates of Spokane, P.S., is requesting approval of an Extension of Time and Zone Change, PE- 1061 -76, Heather Park 1st Addition and ZE- 146 -76, Agricultural Suburban to Single Family Residential (R -1) for subdivision of 20 acres into 42 lots for single family dwellings and there being present, the following applicant or representative: RODNEY GANNON C. FINDINGS OF FACT 1. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with. 2. That the proper legal requirements for advertisement of the Agenda Item have been fulfilled. 3. That the owners of adjacent lands expressed neither approval nor dis- approval of the proposed Extension of Time. D. SPECIAL CONDITIONS OR CONTIGENCIES APPLICABLE TO THIS EXTENSION OF TIME APPROVAL: 1. Those conditions already attached to the preliminary plat of record and listed below. 2. That the project sponsor is responsible for requesting a time extension to review any preliminary plat approval. All extensions applied for may subject the project sponsor to new conditions required by Reviewing Agencies. 3. That a time extension be granted to January 1, 1982. The owner, his heirs and successors shall join and participate in any petition or resolution which purpose is the formation of a utility local improvement district (ULID) pursuant to RCW Chapter 36.94, as amended. The owner, his heirs and successors shall further agree not to oppose or protest any legal assessments for any utility local improvement district (ULID) established pursuant to RCW Chapter 36.94, as amended. 1 No. PE- 1061 -76 ZE- 146 -76 w No. PE- 1061 -76 ZE- 146 -76 2. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County. PREVIOUSLY ATTACHED CONDITIONS 1. That the plat comply with all present day standards and conditions. 2. That the plat be designated as indicated on the preliminary plat of record and /or attached sheets as noted and that the dedicatory language of the final plat shall include the following statement: "No habitable structures . shall be permitted on Lots 14 and 15 of Block 2 and Lots 1 and 2 of Block 3 of the preliminary plat of record until the Spokane County Health Officer determines that community drainfields will no longer be required on these lots." Construction of other structures on the above lots must be approved by Spokane County Health District, Planning Department and Building Codes. 3. That a statement be placed in the dedication to the effect that no more than one dwelling structure be placed on any one lot, nor shall any lot be further subdivided for the purposes of creating additional lots or building sites without filing a replat. 4. That the plat provide for right -of -way width for streets as indicated on the preliminary plat of record. 5. That appropriate provision be made that the following described property be held in trust until the continuation of the streets be dedicated or deeded: A I' strip at the ends or edges of all streets that terminate or border the plat boundary. (Temporary cul de sacs are required when streets terminate at the plat boundaries.) 6. That appropriate street names be indicated. 7. That appropriate utility easements be indicated on copies of the approved preliminary plat for distribution to the Planning Department and the utility companies. Written approval of the easements by the utility company must be received prior to the submittal of the final plat. 8. That the plan for water facilities adequate for fire protection be approved by the water supplier and fire protection district. Said water plan must also have been approved by the appropriate health authorities. The health authorities, water supplier (purveyor), and fire protection district will certify, prior to the filing of the final plat, on the face of said water plan that the plan is in conformance with their requirements and will adequately satisfy their respective needs. Said water plan and certification will be drafted on a transparency suitable for reproduction. The water purveyor will also certify prior to the filing of the final plat on a copy of said water plan that appropriate contractual arrangements have been made with the plat sponsor for construction of the water system, in accordance with the approved plan, and in accordance with a time schedule. The time schedule will provide, in any case, for completion of the water system and inspection by the appropriate health authorities prior to appli- cation for building permits within the plat. The contractual arrangements 2 t 3 No. PE- 1061 -76 ZE- 146 -76 will include a provision holding Spokane County and the purveyor harmless from claims by any lot purchaser refused a building permit due to the failure of the plat sponsor to satisfactorily complete the approved water system. The plat dedication will contain a statement to the effect that the public water system as approved by County and State Health authorities and the local fire district and purveyor will be installed within this plat, and the subdivider will provide for individual domestic water service as well as fire protection to each lot prior to sale of each lot. 9. That conditional approval be given subject to provisions in the plat for a public sewer system. Approval of the design of said systems must be given by County and State Health authorities and the County Utilities Department prior to filing of the final plat. A suitable guarantee will be required to cover the cost of providing said system in the amount as determined by the Public Works Department. NOTE: The topography and soils in Block 1, Lots 4 through 13, Block 2, Lots 5 through 11, and Block 3, Lots 7 through 14 of the preliminary plat are not suitable for installation of individual on -site sewage disposal drainfields. Each of these lots shall provide its individual sewage treat- ment facility (i.e., septic tank) which shall be connected to a community (public) effluent collector and drainfield disposal system located on Block 2, Lots 14 and 15 and Block 3, Lots 1 and 2 of said preliminary plat of record. Also NOTE: That the remaining lots have been determined to be suitable for on -site sewage disposal systems by the Spokane County Health District. Prior to finalization of the plat, the sponsor shall provide covenants for review by the Spokane County Health District indicating that a Home Owners Association will be incorporated requiring membership and financial support of owners of all lots served by the public sewage disposal system. The Association shall be responsible for inspections, operation and main- tenance of the public effluent collector and disposal system and shall control the lots on which the disposal system is located. 10. That a certificate of title be furnished the Planning Department prior to the filing of the final plat. 11. That the preliminary plat be given conditional approval to January, 1978. 12. That streets be improved to standards established by Spokane County or a bond to cover the cost of such improvements be furnished the County Engineer. The bond may also cover the cost of "as built" plans, engineer- ing costs, and placing of final center line monuments. 13. That profiles of streets, cross sections, proposed grades and drainage plan of the plat be submitted and approved by the County Engineer and by the Planning Director before the final plat is drawn. Prior to accept- ance of the improvements or release of bonds, a certificate by a registered civil engineer or licensed land surveyor will be required indicating that all improvements have been installed to the lines and grades shown on the approved construction plans. 14. Conditional approval of the plat is given subject to the dedication of the right -of -way to the public and approval of the road system in the plat by the County Engineer. 15. That a name be indicated before the final plat is filed; such name to be approved by the County Assessor and the Planning staff. E. ORDER The Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Radiology Associates of Spokane, P.S. for an Ex- tension of Time, Heather Park 1st . Addition and Zone Change as described in the application should be approved. Motion by: Culler Seconded by: Myers Vote: Unanimous to Approve (3 -0) 4 HEARING EXAMINER COMMITTEE ATTEST: WALLIS D. HUBBARD Plannin. L•JI ecto By: Date: ;tea ditst 8 ' 080 ' No. PE- 1061-76 ZE- 146 -76 Chairman - - E/ /� De-e- e n E:a -Prj Y' /Va 6 Mr. Robert S. Turner, P.E. Spokane County Engineer Office Spokane, Washington Dear Nr. Turner: Sincerely, /bm enclosure We have negotiated for a pipe line easement through the_edge of subject Addition and have restricted our easement to approximately five (5) feet. Plot attached. No buildings or foundations may be placed in the easement, however, there is no restriction on driveways or fences. We do ask that Yellowstone Pipe Line be notified any time work is performed within the easement proper. a -., Marion P. Mowder Superintendent of Terminals Yellowstone Pipe Line System Continental Pipe Line Operator of YPL cc: Radiology Associates of Spokane, P.S. Simpson Engineering, Inc. Continental Pipe Line Company 338 Highway 87 East Billings. Montana 59101 1406) 252 -3841 P.O. Box 11188 Parkwater Station Spokane, Washington 99211 (509)534 -0686 RE: Heather Park, 1st Addition . RECEIVED- QOjANP CRUPTY 1h6lu4C JAN1 41981 PLAT NAME HESbe /4,#'L `$4Q NO Atyoc TOTAL AREA BLOCK 1 BLOCK 2 BLOCK 3 BLOCK 4 BLOCK 5 BLOCK 6 BLOCK 7 BLOCK 8 BLOCK 9 BLOCK 10 i q.4. r gGlec 4. tA#ts.c 4. 3 s. 9 9 Lots per acre area in streets Z. $G. acres. Z.. 13 Grose NO LOTS 42- NO LOTS /5 NO LOTS Q r NO LOTS / T NO LOTS NO LOTS NO LOTS NO LOTS NO LOTS NO LOTS NO LOTS 4 /o 1'4 sfcei3 7.. irw Net IN THE MATTER OF ESTABLISHMENT OF STREETS IN HEATHER PARK FIRST ADDITION -4 (O(ot COUNTY ENGINEER'S FILE NO. 2466 BEFORE THE BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON RESOLUTION NO. 84 0202 RESOLUTION - ESTABLISHMENT This being the day set for the hearing on Spokane County Engineer's Report on the proposed establishment of streets in HEATHER PARK FIRST ADDITION, ESTABLISHMENT pro- ceedings for which were initiated by PRELIMINARY RESOLUTION NO. 84 -0127, and it appearing to the Board on proof duly made that Notice of Hearing was published and posted in the manner and for the time required by law, and the Board after examining the report and maps of the Spokane County Engineer and all claims and papers on file and after hearing all other evidence adduced at the hearing; and IT FURTHER APPEARING That the rights -of -way have been dedicated as public roads, 60 feet wide and that said roads are a public necessity and the same should be opened and - established as County roads. THEREFORE, BE IT RESOLVED By the Board of County Commissioners of Spokane County, Washington, that the hereinafter described roads as reported by the Spokane County Engi- neer on the 13th day of March, 1984, being more particularly described as follows: KOREN STREET - 60 feet wide, from the South right -of -way line of 16th Avenue, Southeasterly to the West right -of -way line of Rocky Ridge Drive. ROCKY RIDGE DRIVE - 60 feet wide, from the South right -of -way line of 16th Avenue, South to the South line of Heather Park First Addition. 19TH COURT - 60 feet wide, from the East right -of -way line of Rocky Ridge Drive Southeast to and including the cul -de -sac. Located in the Northeast Quarter (NE 1/4) of Section 26, Township 25 North, Range 43 E.W.M. as shown and dedicated in the Plat of Heather Park First Addi- tion. and as shown by the records and maps on file in the office of the Spokane County Engineer be and the same hereby are established as County roads and the same shall be known as KOREN STREET, ROCKY RIDGE DRIVE, and 19TH COURT, NO. 2466. The road supervisor of the road district in which the said roads are located is hereby directed to open and maintain the same for public use and travel. PASSED AND ADOPTED By the Board of County Commissioners of Spokane County, Washing- ton, this 13th day of March, 1984. ATTEST: WILLIAM E. DONAHUE CLERK / OF THE BOARD BY • n-- */L/ /C /- D E P U T Y BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON 3 t . SIXTEENTH ir• oe, SI 17°05 . 0 • 9.00• Lt. • 9 5-Qoz" l89.1' e ‘36.7 9 , RI. 1.1.2c.o0 6 \ ° 5 + < t, .•0) 1 q (- u N A 2_9 03 C 16R t pill" , N90.3, -13 k T93 - el a‘ LiBL 1 • r.Vci 5 /0. 1 8 TH AV E. 21 51 A 1E. 2 AVE. r s la PIPELINE' 1 No.I885 — co r p ct, •, .! 2 1 1 r' ICIG: 2 172721/45.:::Tt:1 • _ 4 I vi 4. 2 44 • :78.2.: c4; a 76 ••• 'il 4 3 00) Li .1 a ui -- • R.28G.' rt 4 4 0 5 1. 1 sX) i'• ''.. /Ar — '. 4- * ( CI c . 0 -- e 1 i n A- k is :t ptery* 1061 3 7 4. _. 0 r.0. ri - 1. I- -; • .5 -; 0 1 ' SE '4 CI 4 e , Cr 9 9 — ( !N iAV'yr_{ r . SPOtANE CCUNI" COUFT HOUSE Chuck Simpson N. 909 Argonne Rd Spokane, Wa. 99206 TY /tw ri Le-7 SgrAIDTRAN.w.iii.; 1 A: _kw riri O FJ• . ICF Cl COUNTY ENGINEER ROBERT S. TURNER COUNTY ENGINEER Sro nri ,'%Sn rvorroNr 99260 July 28, 1981 Re: Heather Park 1st Addition #1061 Dear Chuck: Construction at the afore mentioned plat has been completed and inspected as per approved plans. If you have any questions ple contact this office at 456 -3600. Sincerely, Robert S. Turner, P.E. County Engineer ByeltAnnfts. Thomas E. Ya . Construction Engr. Public Works Building North 811 Jefferson Street Spokane, Washington 99260 (509) 456 -3600 • 4 NO. 81 0547 W BEFORE THE BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON. pE- 1061 -76 IN THE MATTER OF FILING THE FINAL PLAT OF HEATHER PARK 1ST ADDITION ) R E S O L U T I O N LOCATED IN SECTION 26, TOWNSHIP � 25N, RANGE 43 E.W.M., SPOKANE COUNTY, WASHINGTON BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON, that the Final Plat of HEATHER PARK 1ST ADDITION The west 660 ft. of the NE 1/4 of the NE 1/4 of Section 26, Township 25N, Range 43 E.W.M., Spokane County, Washington more precisely described in the plat dedication, on the recommendation of the Spokane County Hearing Examiner Committee, be, and the same hereby is approved, with the exception that the public rights of way dedicated in this plat will not be established for maintenance purposes until the County Engineer has certified that the roads have been improved to County standards and approved by a separate resolution of the Board of County Commissioners. " PASSED BY THE BOARD THIS DAY OF ATTEST: VERNON W. OIILANO Cler.. of Board By: MAY 0 5 1981 1 9 BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON F. KIWI JitEPARt JOHN R. MC BRIDE JERRYU. KOPET Transamerica ^,i Title Insurance Services 111111 Gentlemen: EXCEPTIONS: FOURTH CERTIFICATE TO PLAT Spokane County Planning Commission N. 721 Jefferson Spokane, Washington In the matter of the plat submitted for your approval, this Company has examined the records of the County Auditor and County Clerk of Spokane County, Washington, and the records of the Clerk of the United States Courts holding terms in said County, and from such examination hereby certifies that the title to the following described land situate in Spokane County, to -wit: The West 660 feet of the Northeast quarter of the Northeast quarter of Section 26, Township 25 North, Range 43 E.W.M.; EXCEPT all roads; AND EXCEPT any portion in HEATHER PARK ADDITION shown on the plat recorded in Volume 11, page 55 of Plats; Situate in the County of Spokane, State of Washington. VESTED IN: RADIOLOGY ASSOCIATES OF SPOKANE, P. S., EMPLOYEES PROFIT SIIARING PLAN AND TRUST 1. General taxes for the year 1981 in the amount of $396.7,6 including Fire Patrol Tax and Weed District Tax. (Parcel No 26531 -9041) Affects a portion of property herein described, General taxes for the year 1981 in the amount of $396.16 including Fire Patrol Tax and Weed District Tax, (Parcel No 26531 -9040) Affects a portion of property herein described, (continued) Transamerica T IIe Insurance Compar North 720 Argonne Rom_ Spokane, Washington 99206 (509) 922-2222 Order No.: 92358 -M Certificate for Filing Proposed Plat of mw FOURTH ZTIFICATE TO PLAT Page 2 Order No. 92358 -M 2. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: Grantee: The Washington,Water Power Company, a corporation Purpose: Electrical distribution line with right to place 1 anchor on E In of the E 330 ft of the W 1/2 of the NE 1/4 of the NE 1/4 of Sec. 26 Dated: September 25, 1973 Recorded: October 15, 1973 Recording No.: 7310150188 in Official Volume 177 page 953 3. An agreement regarding the construction and maintenance of a sewer system and matters incidental thereto, executed by Radiology Associates of Spokane, P. S., Employees Profit Sharing Plan & Trust and Spokane County, recorded February 21, 1930 as Document No. 8002210202. 4. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: Grantee: Yellowstone Pipe Line Company, a Delaware corporation Purpose: Pipe line for the transportation of oil and gas and products and by- products thereof, tog with rights of ingress and egress; Grantor agrees not to build, create or construct any obstruction, engineering works, or other sturcture over said pipe line or lines nor permit same to be done by others, except for the erection of fences or outbuildings that may be erected by Grantor or Grantor's successors in conjunction with a residential use of the property Location: Begin at the NW corner of Lot 1, Block 1 Heather Park First Addition; th S 88 °54'07" E along Nly In of Lot 1 a distance of 6.6 ft; Th S 01 °24'43" W a distance of 363.65 ft to the W In of sd Block 1; th N 00 °22'16" E a distance of 363.37 ft to pob all being in the NE 1/4 Sec 26, Twp, 25 N., Range 43 E.W.M. Dated: February 20, 1981 Recorded: March 30, 1981 Recording No.: 8103300084 Records examined to April 13, 1981 at 8:00 A.M. TRANSAMERICA TITLE INSi''NCE COMPANY By: Robert Myler cc: Spokane County Engineers cc: Simpson Engineers Attn: Tim Brewer Transamerica Title Insurance Services • ' II J EXCEPTIONS: Transamerica Ttlo Insurance Compan North 720 Argonne Rot. Spokane, Washington 99206 (509) 922-2222 FOURTH CERTIFICATE TO PLAT Spokane County Planning Commission N. 721 Jefferson Spokane, Washington Order No.: 92358 -M Certificate for Filing Proposed Plat of Gentlemen: In the matter of the plat submitted for your approval, this Company has examined the records of the County Auditor and County Clerk of Spokane County, Washington, and the records of the Clerk of the United States Courts holding terms in said County, and from such examination hereby certifies that 'the title to the following described land situate in Spokane County, to -wit: The West 660 feet of the Northeast quarter of the, Northeast quarter of Section 26, Township 25 North, Range 43 E.W.M.; EXCEPT all roads; AND EXCEPT any portion in HEATHER PARK ADDITION shown on the plat recorded in Volume 11, page 55 of Plats; Situate in the County of Spokane, State of Washington. VESTED IN: RADIOLOGY ASSOCIATES OF SPOKANE, P. S., EMPLOYEES PROFIT SHARING PLAN AND TRUST 1. General taxes for the year 1981 in the amount of $396.16 including Fire Patrol Tax and Weed District Tax. (Parcel No 26531 - 9041,) ' Affects a portion of property herein described, General taxes for the year 1981 in the amount of $396.16 including Fire Patrol Tax and Weed District Tax. (Parcel No. 26531 -9040) Affects a portion of property herein described, (continued) 2. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: Grantee: The Washington.Water Power Comnany, a corporation Electrical distribution line with right to place 1 anchor on E In of the E 330 ft of `the W 1/2 of the NE 1/4 of the NE 1/4 of Sec. 26 Dated: September 25, 1973 Recorded: October 15, 1973 Recording No.: 7310150133 in Official Volume 177 page 953 3. An agreement regarding the construction and maintenance of a sewer system and matters incidental thereto, executed by Radiology Associates of Spokane, P. S., Employees Profit Sharing Plan & Trust and Spokane County, recorded February 21, 1930 as Document No. 8002210202. Purpose: 4. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: Grantee: Yellowstone Pipe Line Company, a Delaware corporation Purpose: Pipe line for the transportation of oil and gas and products and by- products thereof, tog with rights of ingress and egress; Grantor agrees not to build, create or construct any obstruction, engineering works, or other sturcture over said pipe line or lines nor permit same to be done by others, except for the erection of fences or outbuildings that may be erected by Grantor or Grantor's successors in conjunction with a residential use of the property Location: Begin at the NW corner of Lot 1, Block 1 . Heather Park First Addition; th 'S 88 °5.4'07" E along Nly 1n of Lot 1 a di_stance'of 6.6 ft; Th S 01 ° 24'43" W a distance of 363.65 ft to the W in of sd Block 1; th N 00 ° 22'16" E a distance of 363.37 ft to pob all being in the NE 1(4 Sec, 26, Twp, 25 N., Range 43 E.W.M. Dated: February 20, 1981 Recorded: March 30, 1981 Recording No.: 8103300084 Records examined to April 13, 1981 at 8:00 A,M, TRANSAMERICA TITLE INS By: C Robert Myler cc: Spokane County Engineers cc: Simpson Engineers Attn: Tim Brewer FOURTH 2TIFICATE TO PLAT Page 2 Order No. 92358 -M NCE COMPANY Transamerica - Title Insurance Service: Gentlemen: EXCEPTIONS: Transamerica Title Insurance Compa' North 720 Argonne Flo.., Spokane. Washington 99206 (509) 922 -2222 THIRD CERTIFICATE•TO PLAT Spokane County Planning Commission N. 721 Jefferson Spokane, Washington Order No.: 92358 -M !RECEIVED: SPOHANP MINrI IN6INEEQ JAN 3O1981 1 . Certificate for Filing Proposed Plat of HEATHER PARK FIRST ADDITION In the matter of the plat submitted for your approval, this Company has examined the records of the County Auditor and County Clerk of Spokane County, Washington, and the records of the Clerk of the United States Courts holding terms in said County, and from such examination hereby certifies that the title to the following described land situate in Spokane County, to -wit: The West 660 feet of the Northeast quarter of the Northeast quarter of Section 26, Township 25 North, Range 43 E.W.M.; . EXCEPT all roads; AND EXCEPT any portion in HEATHER PARK ADDITION shown on the plat recorded in Volume 11, page 55 of Plats; Situate in the County of Spokane, State of Washington. VESTED IN: RADIOLOGY ASSOCIATES OF SPOKANE, P. S., EMPLOYEES PROFIT SHARING PLAN AND TRUST 1. General taxes for the year 1981 in the amount of $396.16 including Fire Patrol Tax and Weed District Tax, payable February 15, 1981. (Parcel No. 26531 -9041) 2. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: Grantee: The Washington,Water Power Company, a corporation Purpose: Electrical distribution line with right to place 1 anchor on E In of the E 330 ft of the W 1/2 of the NE 1/4 of the NE 1/4 of Sec. 26 (continued) 1 Dated: September 25, 1973 Recorded: October 15, 1973 Recording No.: 7310150183 in Official Volume 177 page 953 3. An agreement regarding the construction and maintenance of a sewer system and matters incidental thereto, executed by Radiology Associates of Spokane, P. S., Employees Profit Sharing Plan & Trust and Spokane County, recorded February 21, 1980 as Document No. 8002210202. cc: Spokane County Engineers cc: Simpson Engineers, Attn: Tim Brewer THIRD CERTIFICATE TO PLAT Page 2 Order No. 92353 -M Records examined to January ,1931 at 3:00 A.M. TI�ANSAMERICA TI LE I URANCE COMPANY By: G Robert Myler :_. 2., r2 S 7 2.3 1 /1 fr 5 E / 0 0 2 g1, 1/4I■ • t 1-1 ( 3) /oo - /a 1afr1fv' -'1 ,G.- .r 2•lg9,C - _ (0 . .43-.1— ...e a., .w..a.{. S.;tee.a,s m.b l (1-IIa • I l3_1 ''— e� ,; ri F: ' b■ . % H E ATH E ii i f s , /oo).-n c.; 1` HUD F /ti. ('( .I An.)1 11 IPA GE .11 li «1 l '1 I l' 2/.93 9 v1f.73 ,. .. i RANSAMERICA TITLE liRAIICE CQMPAtit NORTH 720 AI;GOt It if ROAD SPOKANE, \7A. 99206 • r1 n1 ti� -E :Ellis pr nI iS Pyr ton l'r 101 11111 I ,J ..: 1]111± In lo/ Muir, si uIr Cnd Ih** rn•npr; no lia LJil. Inr varub 11 .r?. u1 thriwrs.oas And location escenjd1N a'. it u.,F r -n nry, .1 o 1 , ,U0•f , : 1 r � t .r fs 4,. Jb f> ..e f. r r Inter - office Communication To —,, r , ' LC From Subject I Form 327 -C R t f,a' ears 1 � et J 45 OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Date 19.f c i ion & — �� Inter-office / Communication tti�i To 0 /'�- 1 t. From en? S Subject 70/ea 7tV /rot/rid L. Form 327 -C.R OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON �f Data 1 �"l 19_8J / d 3 t7 r; . c L .. a04 2 31 t %��'fs6. 80 CLARENCE E. SIMPSON ENGINEER, INC. CIVIL ENGINEERS AND LAND SURVEYORS N. 909 Argonne Road Spokane, Washington 99206 Telephone: 926 -1322 TO: &a-r /VeJson- - 5 P /tea —G Co . t' Vi SUBJECT: II„ il ex• ad_ L l pi-e/ DATE: 7h- 3/2 R/fct Jai {or Vnwt• its E'- cue- *ke- oc -�� -nom/ SAe_e �-s J crt tL 5 f 2e,-F Jro 'r %.s , C.oy∎F c 5IQ�o� o * kg_ 1 ravIsI' .r o Y�S W .. e/ ,( _,/ - on-4.)e_ t o _/ e_ SA e-'t -/ pre) - CC„i 1 F. o 1-i , nM / o I / iP w cc/e r- rn o. 7 ( r k 4 -S P, t. 1 — /),t1:1„...-,, / / • ( At, , n r_ iw_c/2d / ,'5 „c_ Co o T fhe Pr000sac.! Y-i nct-/ •n /rte+ S L0 LAJ,..4 tie. e_ ioF r%/ r.. P.-nb! ln.ic I , J / /1 A c WA LcreL A.o LLS 1 vL9 s J 7'r°�P_7 Dro e_i . Signed '% L Form 327 -C R OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Date Inter- office Communication To /Otfl Yezdee CL.. From %lent, s Subjec• : a� "�4-- 71 Ye--- s Ire 3. co-x-L-s &c,& -c}c€ C--1/citc. tc/ ozN -.,UAL ea-Stm- '-& o t/La{N , SCE far F i- c hA, } CLARENCE E. SIMPSON ENGINEER, INC. CIVIL ENGINEERS AND LAND SURVEYORS N. 909 Argonne Road Spokane, Washington 99206 Telephone: 926 -1322 J rLrr" SIvnc Sre-5ka..E Cr, L .Ty t vv� SUBJECT: H 2T e.V,e.- Por1L ( EX NA ,.�,e� ! A TO: DATE: I I zs j 53,1 r1T [Y.�r 1,„4. IS 4kC, - f'o r.r shca ' c�� HPalrie� Park l S /� T proCIC< �„� ( 1 'D..y�a<, e� t�la.,� r..,h�c.� = f tckcd u -�Y»r., �, ,•- I/ 222_/ .. w2 Iha ..,1 cIc eL +4c Ia fJs ac- 0 3 , ..a 1 c. Signed r t CHECK IKt PRINT c..0 -1/4 FINf�I Fs _ PLAT out PLAT CLo5utt.E R oAD NAME _C NECK ADTACEAT _ AQ-E A Ti _ leg port PLAT peA1N ASE PLAT SEWER CHECK IN PRINT �chLtfl FIN/i. i u DRAW IMGS out u� D R At K IkG E 0 - Er1GIMEEk Ca 114.6 FeCTIO4 QQ eviGIKE.E R. 044 PEYEt.Q?elk (ZO t4P RoRb DR AIM AGE Boa Coo niTY EMeo@, stGN Pt.. Kr To P t_ Art tit % N G MOMU MEKT (3o Rt. RE MAR KS elf HetctME& `Roam Vert CC .?), I 9 1,1 0 Sim p S o At _ 7f/ 11)/_/.6r_23 t 5-7,4/.6 sta fiatE/ TRAVERSE ANALYSIS OF HEATHER PARK 1ST ADD SURVEYOR: CLARENCE E SIMPSON fl N 909 ARGONNE ROAD SPOKANE WASH 99206 928 4416 t CHECKED BY: TVS - MATEY - 06/27/79 BLCK LOT BEARING PLAT PLAT PLAT PLAT FILE: 1061 EDRY GORY BDRY EDRY N 0 22 16E 1327.410. 1327.382 S . 88 54 7E 660.000 S 0 22 16W 1327.200 N 88 55 12W . 660.000 1 CL N 0 22 16E 1327.410 1 CL S 88 54 7E 165.000 1 CL 5 0 22 16W 573.050 1 CL S 89 37 44E 147.814 1 CL S 29 53 47W 147.814 - CURVE: DELTA = 60 28 29 RADIUS = 147.814 1 CL S 60 6 13E 233.910 1 CL 5 29 53 47W 196.170 I - - -- LATITUDES - - - -1 -- WIT N 0 R T H S 0 U T H 1327.382 1 CL S 60 6 13E 298.788 148.926 1 CL N 79 6 13W 298.788 56.481 - CURVE: DELTA = 19 0 0 RADIUS = 298.788 LENGTH = 99.082 1 CL N 79 6 13W 525.951 99.422 1 CL 5 68 14 33E 525.951 194.959 +CURVE: DELTA = 10 51 40 RADIUS = 525.951 LENGTH = 99.700 1 CL S 21 45 27W 59.900. 55.633 1 CL S 68 14 33E 274.078 101.595 1 CL N 88 55 12W 274.078 5.166 - CURVE: DELTA = 20 40 39 RADIUS = 274.078 LENGTH = 98.912 1 SL N 0 22 16E 1297.410 1 SL S 88 54 7E 120.250 1 SL S 1 5 53W 20.000. 1 SL S 89 37 44E 20.000 +CURVE: DELTA = 89 16 23 RADIUS = 20.000 1 SL S 0 22 16W 523.620. 1 SL S 89 37 44E 172.814 1 SL S 29 53 47W 172.814 - CURVE: DELTA = 60 28 29 RADIUS = 172.814 1 SL S 60 6 13E 188.910 1 SL S 29 53 47W 20.000 1 SL S 60 6 13E 20.000 12.440. 1339.822 1339.820 668.477 668.479 AREA = 875950. SQ FT t 20.11 ACRES) 12 97 .3 83 8.598 12.648 659.879 1327.172 3.162 573.038 0.957 128.144 LENGTH = 156.015 116.589 170.065 2.304 19.996 0.130 LENGTH = 31.162 523.609 1.119 149.817 LENGTH = 182.402 94.159 17.339 9.969 I - -- ,DEPARTURES - - - -I E A S T W E S T 8.598 164.970 147.811 TANGENT = 202.783 259.028 TANGENT = 488.483 TANGENT = 254.553 TANGENT = 1 CL N 88 55 12W 245.000 4.618 244.956 1493.070 1493.068 1526.225 1526.224 AREA = 323916. SQ FT l 7.44 ACRES) 8.403 120.228 20.000. TANGENT = 172.810 TANGENT = 163.771 17.339 8.596 659.8E3 3.712 73.675 86.159 97..778 293.401 .50.000 516.468 50.000 22.204 2 74.02 9 50.000 0:383 19.748 3.392 86.136 100.731 9.969 --'d L . - i. v - E o 0 F t ir- LOTS 2 THRU 6 ARE IDENTICAL +CURVE: DELTA = 90 0 0 RADIUS = 20.000 LENGTH = 31.416 1 SL S 29 53 47W 151.170. 131.054 1 SL S 60 6 13E 323.788 161.387 1 SL N 79 6 13W 323.788 61.207 - CURVE: DELTA = 19 0 0 RADIUS = 323.788 LENGTH = 107.372 1 SL N 79 6 13W 500.951 94.697 1 SL S 68 14 33E 500.951 185.692 +CURVE: DELTA = 10 51 40 RADIUS = 500.951 LENGTH = 94.961 1 SL S 21 45 27W 59.900. 55.633 1 SL S 68 14 33E 299.078 110.862 1 SL N 88 55 12W 299.078 5.637 - CURVE: DELTA = 20 40 39 R ADIUS = 29 LENGTH __ = 107.934 220.600 1 SL N 88 55 12w 1 1 N 0 22 16E 93.370 93.368 1 1 S 88 54 7E 120.250 1 1 5 1 5 53W 20.000. 1 1 S 89 37 44E 20.000 +CURVE: DELTA = 89 16 23 RADIUS = 20.000 1 1 S 0 22 16W 73.620. 1 1 N 88 54 7W 140.000 2.683 1 7 N 0 22 16E 135.900 1 7 S 88 54 7E 140.000. 1 7 S 89 37 44E 172.814 1 7 S 67 9 46W 172.814 - CURVE: DELTA = 23 1230 RADIUS = 172.814 1 7 S 67 9 46W 167.530 1 1 1 1 - CURVE: 1 1 2 N 0 22 16E 1 2 S 88 54 7E 1 2 S 0 22 16W 1 2 N 88 54 7W 90.000 140.000 90.000. 140.000 1463.070 1463.069 1526.2 1526..287 _ AREA = 281763. SQ FT ( 6.47 89.998 2.683 135.897 2.304 19.996 0.130 LENGTH = 31.162 73.618 96.051 96.049 140.832 140.834 AREA = 12987. SQ FT 1 0.30 ACRES) 2.683 89.998 2.683 1.119 67.072 LENGTH = 70.000 65.021 8 N 41 55 17W 134.470. 100.054 8 N 67 9 4bE 167.530 65.021 8 N 67 9 46E 172.814 67.072 8 S 43 57 16W 172.814 124.407 DELTA = 23 12 30 RADIUS = 172.814 LENGTH = 70.000 8 S 43 57 16W 149.660 107.739 TANGENT = 20.000 75.348 280.701 317.950' TANGENT = 54.184 49 465.264 TANGENT = 47.623 22.204 277.772 299.025 TANGENT = 54.561 - - -- 0.605 120.228 20.000 _ _ TANGENT = 19.748 0.477 139.974 0.583 139.974 92.681 92.681 140.557 140.557 AREA = 12599. SQ FT ( 0.29 ACRES)' 0.880 139.974 172.810 135.897 135.895 313.665 313.665 AREA = 15053. SQ FT ( 0.35 ACRES) 154.398 159.267 232.146 232.146 313.665 0.383 0.583 139.974 159.267 TANGENT,= 35.487 154.398 89.841 119.948 TANGENT = 35.487 103.877 313.666 1 9 N 60 1 9 N 43 1 9 N 43 1 9 S 29 - CURVE: DELTA = 14 1 9 S 60 1 9 S 29 1 10 N 60 6 13W 1 10 N 29 53 47E 1 10 S 60 6 13E 1 10 S 29 53 47W 1 1 1 1 11 11 11 11 1 11 +CURVE: DELTA 1 11 1 12 12 1 12 1 12 1 12 1 12 - CURVE: DELTA 1 12 1 12 +CURVE: DELTA 1 12 N 0 22 16E S 41 55 17E S 60 6 13E S 29 53 47W N 60 6 13E N 79 6 13W = 19 0 0 N 79 6 13W S 68 14 33E = 10 51 40 N 59 31 48W 1 13 N 0 22 16E 1 13 S 59 31 48E 1 13 S 21 45 27W 1 13 S 68 14 33E 6 13W 107.240 53.452 57 16E 149.660 107.739 57 16E 172.814- 124.407 53 47W 172.814 3 29 RADIUS = 172.814 LENGTH 6 13E '28.910 53 47W 140.000 90.000 140.000 90.000. 140.000 N 60 6 13W 90.000. N 29 53 47E 140.000. S 60 6 13E 70.000 S 29 53 47W 20.000. S 60 6 13E 20.000 = 90 0 0 RADIUS = 20:000. S 29 53 47W 120.000 310.510 303.290 59.900 299.080 44.859 44.859 121.370 307.630 307.624 134.470 287.240 31.170' 323.788 323.788 61.207 RADIUS = 323.788 LENGTH 500.951 94.697 500.951 RADIUS = 500.951 LENGTH 303.290 153.794 310.503 AKtA = 1)711. SW FI ( U.56 AI.KtZI 100.054 143.170 27.022 161.387 149.817 = - 42.402 14.410 121.370 34.890. 17.339 9.969 LENGTH = 31.416 104.031 107.372 185.692 = 94.961 153.794 55.633 110.863 103.877 119.948 TANGENT = 25.063 69.781 285.598 285.597 248.888 248.886 AREA =. 12635: SQ FT ( 0.29 ACRES) 121.370 69.781 _ 44.859 . 78.024 121.370 69.781 166.229 '166.229 - 147.804 147.804 AREA = 12600. SQ FT ( 0.29 ACRES) 69.781 60.685 17.339 TANGENT = 166.229 166.229 147.804 AREA = 12514. SQ FT 1.993 89.841 249.016 280.701 2.011 261.404 277.774 92.969 86. 136 21.308 78.024 78.024 9.969 20.000 59.812 147.804 0.29 ACRES) 15.536 317.950 TANGENT = 54.184 491.919 465.264 TANGENT = 47.623 261.404 617.3 6 1086.814 1086.810• AREA = 79809. SQ FT 1. 1.83 ACRES) 22.204 2 CL N 60 6 13W 233.910 116.589 2 CL N 29 53 47E 147.814 128.144 2 CL N 89 37 44W 147.814 0.957 +CURVE: DELTA = 60 28 29 RADIUS = 147.814 LENGTH = 156.015 2 CL N 0 22 16E 573.050. 573.038" 2 CL S 88 54 7E 330.000 6.324 2 CL S 0 22 16W 662.420 662.406 2 CL N 89 37 44W 225.607 1.461 2 CL S 60 6 13E 225.607 112.450 - +CURVE: DELTA = 29 31 31 RADIUS = 225.607 LENGTH = 116.258 2 CL S 29 53 47W 45.000 39.012 1 13 N 88 55 12W 299.080 5.6JI - CURVE: DELTA = 20 40 39 RADIUS = 299.080 LENGTH = 107.935 1 13 N 88 55 12W 220.000 4.147 2 SL N 60 6 13h 188.910 94.159 2 SL N 29 53 47E 122.814 106.471 2 SL N 89 37 44W 122.814 0.795 +CURVE: DELTA = 60 28 29 RADIUS = 122.814 LENGTH = 129.628 2 SL N 0 22 16E 522.480 522.469 2 SL S 89 37 44E 20.000 0.130. 2 SL N 1 5 53E 20.000 19.996 +CURVE: DELTA = 90 43 37 RADIUS = 20.000 LENGTH = 31.670 2 SL S 88 54 7E 239.990 ' 320.287 320.290 541.189 541.191 AREA = 57595. SQ FT ( 1.32 ACRES) • 820.189 820.192 602.912 602.916 AREA = 243072. SQ FT ( 5.58 ACRES) 4.599 2 SL S 1 5 53W 20.000 19.996 2 SL S 89 37 44E 20.000: 0.130 +CURVE: DELTA = "89 16 23 RADIUS = 20.000 LENGTH = 31.162 2 51 S 0 22 16W 612.990. 612.977 2 SL N 89 37 44W 200.607 1.299 2 SL S 60 6 13E 200.607 99.989 +CURVE: DELTA = 29 31 31 RADIUS = 200.607 LENGTH = 103.375 2 SL N 60 6 13W 20.000 9.969 2 SL S 29 53 47W 20.000 17.339 +CURVE: DELTA = 90 0 0 RADIUS = 20.000. LENGTH = 31.416 [ Ulf TANGENT = 54.561 219.961 202.783 73.675 147.811 TANGENT = 86.159 3.712 329.939 4.291 225.602 - 195.585 --- TANGENT .= 163.771 61.215 122.811 TANGENT = 71.587 3.384 20.000 0.383 TANGENT = 20.255 239.946 20.000 TANGENT = 173.912 TANGENT = TANGENT = 59.451. 22.429 0:383 19.748 3.970 200.603 52.863 17.339 9.969 20.000 755.159 755.159 518.839 518.846 AREA = 190863. SQ FT (. 4.38 ACRES/ 2 1 N 0 22 16E 72.480 72.478 0.469 2 1 S 89 37 44E 20.000: 1 0.130 20.000 2 1 N 1 5 53E 20.00 19.996 0.383 +CURVE: DELTA = 90'43 37 RADIUS = 20.000" LENGTH = 31.670 TANGENT = 20.255 2 1 5 88 54 7E 119.740 2.295 119.718 1 S 0 22 16W 92.730 92.728 0.601 1 N 88 54 7W 140.000 2.683 139.974 95.158 95.152 140.570 140.575 AREA = 12892. SQ FT ( 0.30 ACRES)" -y �i 2 2 N 0 22 16E 90.000 89.998 2 2 S 88 54 7E 140.000 2 2 5 0 22 16W 90.000 2 2 N 88 54 7W 140.000 2.683 92.681 92.681 140.557 140.557 AREA = 12599. SQ FT ( 0.29 ACRES). 2 7 N 60 6 13W 58.910 29.363 2 7 N 29 53 47E -- 122.814 - - 106.471 61.215 2 7 N 89 37 44W 122.814 0.795 122.811 ---. +CURVE: DELTA = 60 28 29 RADIUS = 122.814 LENGTH = 129.628 TANGENT = 71.587 2 7 S 88'54 7E 140.000 2.683 139.974 2 7 5 0 22 16W 90.000 89.998 0.583 2 7 S 31 18 23W 51.430 43.942 26.724 2 2 2 2 2 8 N 60 6 13W 130.000 8 N 31 18 23E 51.430 8 S 88 54 7E 140.000 8 N 89 37 44W 200.607 136.629 136.623 201.189 201.189 AREA = t 13833. SQ FT ( 0.32 ACRES). 64.796 43.942 1.299 2 9 N -0 22 16E 90.000 89.998 2 9 S 8 54 7E 140.000 2 9 S 0 22 16W 90.000 2 9 N 88 54 7W 140.000 2.683 2 15 N 0 22 16E 92.730. 92.728 2 15 S 88'54 7E 120.250 2 15 S 1 5 53W 20.000 2 15 S 89 37 44E 20.000 +CURVE: DELTA = 89 16 23 RADIUS = 20.000 2 15 S 0 22 16W 72.990. 2 15 N 88 54 7W 140.000 2.683 2.683 89.998 2.683 8 S 60 6 13E 200.607 99.989 +CURVE: DELTA = 29 31 31 RADIUS = 200.607 LENGTH = 103.375 2 8 N 60 6 13W 20.000 9.969 2 8 5 29 53 47W 20.000. 17.339 +CURVE: DELTA = 90 0 0 RADIUS = 20.000. LENGTH = 31.416 2 .6 83 89.998 0.583 139.974 26.724 139.974 173.912 TANGENT = TANGENT = 120.006 120.011 340.610. 340:611 AREA = 12653. SQ FT ( 0.29 ACRES) 0.583 139.974 0.583 139.974 51.071 112.701. 200.603 52.863 17.339 9.969 20.000 0.583 139.974 92.681 92.681 140.557 140.557 AREA = 12599. SQ FT ( 0.29 ACRES) 2.304 19.996 0.130 LENGTH = 31.162 72.988 0.601 120.228 0.383 20.000. TANGENT = 19.748 0.473 139.974 95.411 95.419 140.828 140.830 AREA = 12899. SQ FT ( 0.30 ACRES). 3 CL S 88 55 12E 274.078 3 CL N 68 14 33W 274.078 101.595 +CURVE: DELTA = 20 40 39 RADIUS = 274.078 LENGTH = 3 CL N 21 45 27E 59.900 55.633 3 CL N 68 14 33W 525.951 194.959 3 CL S 79 6 13E 525.951 99.422 - CURVE: DELTA = 10 51 40 RADIUS = 525.951 LENGTH = 99.70 3 CL S 79 6 13E 298.788 56.481 3 CL N 60 6 13W 298.788 148.926 +CURVE: DELTA = 19 0 0 RADIUS = 298.788 LENGTH = 99.08 3 CL N 29 53 47E 241.170 209.077 3 CL N 60 6 13W 225.607 112.450 3 CL S 89 37 44E - 225.607 1.461 - CURVE: DELTA = 29 31 31 RADIUS = 225.607 LENGTH = 116.258 3 CL N 0 22 16E 662.420. 662.406 3 CL S 88 54 7E 165.000 3.162 3• CL S 0 22 16W 1327.200 1327.172 3 CL N 88 55 12W 415.000 7.822 5.166 98.912 3 SL S 88 55 12E 249.078 4.695 3 SL N 68 14 33W 249.078 92.328 +CURVE: DELTA = 20 40 39 RADIUS = 249.078 LENGTH = 89.890 3 SL N 21 45 27E 59.900 55.633 3 SL N 68 14 33W 550.951 204.226 3 SL S 79 6 13E 550.951 104.148 - CURVE: DELTA = 10 51 40 RADIUS = 550.951 LENGTH = 104.439 3 SL S 79 6 13E 273.788 51.755 3 SL N 60 6 13W 273.788 136.465 +CURVE: DELTA = 19 0 0 RADIUS = 273.788 LENGTH = 90.792 3 SL S 60 6 13E 20.000 9.969 3 SL N 29 53 47E 20.000 17.339 +CURVE: DELTA = 90 0- 0 RADIUS = 20.000. LENGTH = 31.416 3 SL S 60 6 13E 41.380. 20.625 3 SL S 29 53 47W 20.000 17.339 3 SL N 79 53 27E 20.000 3.510 +CURVE: DELTA = 49 59 40 RADIUS = 20.000 LENGTH = • 17.451 3 SL N 79 53 27 50.000 8.776 3 SL N 20 5 54W 50.000 46.955 - CURVE: DELTA = 279 59 21 RADIUS = 50.000 LENGTH = 244.337 3 SL N 20 5 54W 20.000 18.782 3 SL S 29 53 47W 20.000 17.339 +CURVE: DELTA = 49 59 41 RADIUS = 20.000 LENGTH = 17.451 3 / SL _N 60 6 13W 41.380 20.625 3 SL N 29 53 47E 20.000. 17.339 3 SL N 60 6 13W 20.000 9.969 +CURVE: DELTA = 90 0. 0 RADIUS = 20.000 LENGTH = 31.416 3 SL N 29 53 47E 151.170 , 131.054 3 SL N 60 6 13W 250.607 124.911 3 SL S 89 37 44E 250.607 1.623 - CURVE: DELTA = 29 31 31 RADIUS = 250.607 LENGTH = 129.141 3 SL N 0 22 16E 611.840 611.827 .3 SL S 89 37 44E 20.000 0.130 3 SL N 1 5 53E 20.000. 19.996 +CURVE: DELTA = 90 43 37 RADIUS = 20.000 LENGTH = 31.670 3 SL S 88 54 7E 119.740. 2.295 3 SL S 0 22 16W 1297.200 1297.173 274.029 254.553 TANGENT. =. 50.000 22.204 488.483 516.468 .TANGENT = 50.000: 293.401 TANGENT = 120.207. 225.602 TANGENT = 4.291 164.970 249.034 TANGENT = 22.204 541.018 TANGENT = 268.852 TANGENT = 9.969 TANGENT = 75.348 250.602 TANGENT= 3.963 20.000. 0.383 TANGENT = 119.718 259.028 50.000 195.585 59.451 1492.868 1492.865 1621.172 1621.171 AREA = 308965. SQ FT I 7.09 ACRES/ 231:334 45.439 511.702 52.377 9.969 19.690 TANGENT:= 9.325 49.224 17.182 TANGENT = - 41.963 6.873 9.969 9.325 35.873 17.339 20.000 217.258 66.038 20.255 8..402 3 SL N 88 55 12W 390.000 7.351 389.931 8.596 414.926 237.355 TANGENT = 45.816 17.339 9.969 TANGENT = 20.000' 35.873 LOTS 2 THRU 7 ARE IDENTICAL 3 1 N 0 22 16E 71.840. 3 1 S 89 37 44E 20.000 3 1 N 1 5 53E 20.000 +CURVE: DELTA = 90 43 37 RADIUS = 3 1 5 88 54 7E 119.740 3 1 5 0 22 16t 92.100. 3 J 1 N 88 54 7W 140.000 3 2 3' 2 3 2 3 2 N 0 22 16E S 88 54 7E S 022 16W N 88 54 7W • 3 9 N 29 53 47E 3 9 N 60 6 13W 3 9 S 70 11 44E - CURVE: DELTA = 10 5 31 90.000 140.000. 90.000 140.000 41.170 3 250.607 12 250.607 RADIUS = 250.607 3 S 5 82 49 41E 155.360,. 3 9 S 0 22 16W 100.000 3 9 N 77 12 44W 197.440 4 94.518 AREA = 89.998 204.304 3 10 N 29 53 47E 110.000 95.362 '3 . 10 . S 77 12 44E 120.330' 3 10 S 53 47W 140.400 3 10 S 29 53 47W 50.000 3 10. N 20_. 5 54W 50:000. 46.955 - CURVE: DELTA= 49 59 41 RADIUS .= 50.000. LENGTH = 3 10 N 20 5 54W 20.000 18.782 '3 10 S 29 53 47W 20.000. 1527.086' 1527.089 1693.183 1693.185 AREA = 258826. SQ FT ( 5.94 ACRES) 71.838 0.465 0.130 20.000 19.996 0.383 0.000. LENGTH = 31.670 TANGENT = 20.255 2.295 119.718 92.098 0.597 2.683 139.974 94.522 14 140.571 . 12804. SQ FT ( 0.29 ACRES) - 2.683 89.998 26.634 121.717' 43.346 0.583 139.974 54.828 117.345 0.583 2.683 139.974 92.681 92.681 140.557 140.551 AREA = 12599. SQ FT ( 0.29 ACRES) 3 8 N 70 11 44W 250.607 84.908 235.7E5 3 8 5 89 37 44E 250.607 1.623 2 - CURVE: DELTA = 19 26 0. RADIUS = 250.607 LENGTH = 85.000 TANGENT = 42.912 3 8 S 88 54 7E 140.000 2.683 139.974 3 8 S 0 22 16W 100.000 99.998 0.648 3 8 N 82 49 41W 155.360. 19.396 154.144 104.305 104.304 390.576 390.577 , AREA = 13359. SQ FT ( 0.31 ACRES). 5.691 20.520 4.911 217.258 -- 84,903 235.785 LENGTH = 44.141 TANGENT = 22.128 19.396 154.144 99.998 0.648 3.701 192.543 204.303 410.450. 410.449 AREA = 15745. SQ FT ( 0.36 ACRES)'. 69.980 24.922 _ 17.182 43.629 TANGENT = 23.313' 6.873 17.339 9.969 U _ ti +CURVE: DELTA = 3 10 3 10 3 10 +CURVE: DELTA = 3 11 N 29 53 47E 3 11 S 77 12 44E 3 - 11 S 0 22 16W 3 11 • N 56 41 12W 3 11 N 56 41 12W 3 11 .N 29 53 47E - CURVE: DELTA = 93 25 1 3 12 N 2 16 26E 135.550 3 12 N 8 47 15E 130.000 3 12 N 8 47 15E 50.000 3 12 S 56 41 12E 50.000 CURVE: DELTA = 65 28 27 RADIUS = 50.000 3 12 S 56 41 12E 151.540 3 12 S 0 22 16W 206.410 3 12 N 88 55 12W 200.000. 3 - CURVE: 3 3 +CURVE: 3 3 +CURVE: 3 3- 3 +CURVE: 3 3 - CURVE: 3 3 13 13 DELTA 13 13 DELTA 13 13 DELTA 13 13 13 DELTA 13 13 DELTA 13 13 49 59 41 RADIUS = N 60 6 13W 41.380 N 29 53 47E 20.000 N 60 6 13W 20.000 90. 0. 0 RADIUS = N 72 5 17W N 79 6 13E = 7 0 56 S 79 6 13E N 60 6 13W = 19 0 0 S 60 6 13E N 29 53 47E = 90 0 0 S 60 6 13E S 29 53 47W N 79 53 27E 20.000 LENGTH = Ll.451 20.625 17.339 9.969 20.000 LENGTH = 31.416 209.032 209.036 182.142 182.137 AREA = 16118. SQ FT ( 0.37 ACRES) 140.400 77.110 17.068 258.690 258.685 151.540 83.228 50.000 27.461 50.000. 43.346 RADIUS = 50.000. LENGTH = 81.522 121.717 69.980 275.752 275.752 AREA = 26855. 135.443 128.474 49.413 3.770 27.461 LENGTH = 57.137 83.228 206.406 5.50.951 169.448 550.951 104.148 RADIUS = 550.951 LENGTH = 67.461 273.788 51.755 273.788 136.465 RADIUS = 273.788 LENGTH = 90.792 20.000 __ 9.969 20.000. 17.339 RADIUS = 20.000' LENGTH = 31.416 41.380 20.625 20.000 17.339 20.000 3.510. = 49 59 40 RADIUS = 20.000 LENGTH = 17.451 N 79 53 27E 50.000 8.776 S 8 47 15W 50.000 49.413 = 71 6 12 RADIUS = 50.000 LENGTH = 62.049 5 8 47 15W 130.000 128.474 N 72 5 17W 150.170 46.186 IANGtNI = 9.969 TANGENT = 9.315 35.873 17.339 20.000 75.197 1.676 126.639 41.784 24.922 TANGENT= 53.074 170.099 170.098 SQ FT ( 0.62 ACRES) 5.378 19.860 7.639 41.784 TANGENT = 126.639 541.018 TANGENT = 268.852 1.337 199.964 317.100 317.095 201.300 201.301 _ AREA = 48800. SQ FT ( 1.12 ACRES) 524.247 33.773 237.355 45.816 TANGENT = 17.339 9.969 TANGENT = 20.000 35.873 9.969 19.690 TANGENT = 9.325 49.224 TANGENT = 7.639 35.733 19.860 142.891 381.724 381.723 941.963 941.960 AREA = 21828. SQ FT ( 0.50.ACRES) 32.145 - - - - -• j F 1 j 14 S 58 55s 12E 249.078 4.b y5 [4/.0 w 3 14 N 68 14 33W 249.078 92.328 231.334 +CURVE: DELTA = 20 40 39 RADIUS = 249.0 LENGTH = 89.8 TANGENT = 45_.439_ 3 14 N 21 45 27E 59.900 55.633 22.204 3 14 N 68 14 33W 550.751 204.152 511.516 3 14 S 72 5 17E 550.75 169.386 5 _ — CURVE: DELTA = 3 50 44 RADIUS = 550.751 LENGTH = 36.965 TANGENT = 18.489 —- — 3 14 S 72 5 17E 150.170. 46.186 142.891 3 14 S 2 16 26W 135.550 135.443 5.378 3 14 N 88 55 12W 190.000 3.581 189.966 355.694 355.710 938.185 938.194 AREA = 27725. S9 FT ( 0.64 ACRES) --- 11 H El LOT AREA STATISTICS FOR: HEATHER PARK 1ST ADD FILE: 1061 06/27/79 BLOCK 1 AREA ACCUM AREA DIFFERENCE BLOCK 2 AREA ACCUM AREA DIFFERENCE BLOCK AREA ACCUM AREA DIFFERENCE GROSS DENSITY: 2 LOTS /ACRE NET DENSITY: 3 LOTS /ACRE LARGEST LOT: 79809. SQ FT SMALLEST LOT: 12514. SQ FT h,- AVERAGE LOT: 17416. SQ FT IE OF LOTS: 42 281763. SQ 281764. SQ 1. SQ 190863. SQ 190866. SQ 3. SQ = 258826. SQ = 258829. SQ 2. SQ FT FT'( FT FT 1 FT ( FT FT ( FT ( FT 6.47 ACRESI 6.47 ACRES) 4.38 4.38 5.94 5.94 ACRES) ACRES) ACRES) ACRES) LOT AREA STATISTICS FOR: HEATHER PARK 1ST ADD BLOCK 1 AREA = 281763. SQ FT ( 6.47 ACRES) _ ACCUM AREA = 281764. SQ FT ( 6.47 ACRES) DIFFERENCE = 1. SQ FT BLOCK 2 AREA = 190863. SQ FT ( 4.38 ACRES) ACCUM AREA = 190866. SQ FT ( 4.38 ACRES) DIFFERENCE = 3. SQ FT B LOCK 3 AREA = 258826. SQ FT ( 5.94 ACRES) ACCUM AREA = 258829. SQ FT ( 5.94 ACRES) DIFFERENCE = 2. SQ FT GROSS DENSITY: 2 LOTS /ACRE NET DENSITY: 3 LOTS /ACRE - LARGEST LOT: 79809. SQ FT SMALLEST LOT: 12514. SQ FT AVERAGE LOT: 17416. SQ FT 21. OF LOTS: 42 8 J ! FILE: 1061 06/27/79 0 7 /6 rd i9 VENUE T 5 88 °5-4'07 "E ' 0' N 3 ^ 27 1 _ 4.9© /43 1 1 Logy 2 N n1 Rj BioCx /O o Lor - 0 _ L7 ETA\ l— " A�� SCALE: NHS : 450 SLALE %E ew:/ "- 5� Lo7 _ For: w s -one or -/ t6S.00' "9" S88* 54'077E 330.00' 0 1 1213.25' c 9 ` 1 A ;•� 119.74' Z 120.25' t'o.li ! • 1 + ` 4 e‘, �iqr I A ;,. + °, • 14 : 15 1 0 25' 23 a i'c 4,90 r • ti Si � _ . 14 I ., _ _ t 4o•od ..._— So le 83 , o ass° 5.4•o7"E Itl iI 2 8 8 2 8 /} w I Stw 1 ,, .. 140.00' PAR � o.od th 5,88 No. r f# ' g � h R3 1 4r /(v3 140.00 I 4 ' 586°54'07"E ;oi of 4 , 0 1 " 1 r_ _LALII i c40. 1"= /poi S 85°54'07"E J 1 1 0 ; x I wi 2 1 2 4, tri lo'8I (STATE of WASNItJGT614) SURVEYOR CERTIFICATE (Coo1.1TY OF SPok. /:04E%) SS CI- +o)-1e% E. Simpson o.- r Spok -cnc , Wosh -on \nere\oy cerit:ty 4-14-1r J vnaF+ \h/CIS t+•tccle . •ra nok-es 4-okcerl clurin5 cn ac --uot Survey mode under w,y dt'recA -ion or, Uece r ei' c. oteurn 10 rod uc Iine t!• I , S$8 ° 54' 07 "E •6 AVENUE 140.00' 08 - 0 0 0 IT O A ID 0 0 Z O W O Cc 0 • q 5 88 °5407 E 3 c • 8 l,TAL l Y to SEP -140.00'---- - - - -- _ - - S 88 ° 54 07 8 0 4 c m 1 4000' N S 88° 5-4 t0 777 5 o O g 0 • 140 00 PETROLEUM PROCDLC.TS E.ASEt4ENT Begin ak 41•,e 1.1• \i.r Co - reY - \ FS\oc\c \ 1- 4 - ker Park \ ST _ , Coun4 -y V- /as\rtinon ; +fence S E38 54 O't "e. alor►g Yior4- \lef1y lint 0' LOA- l n d■slronce ex. co, co cee4; +hene S 0 1 (, ° Z.4 � 4'3 c d iS�'cnce osr 3Zo3.35 c'ee' r +1-ie we $4- line o} 5-e*4d B\oG 1 ; #1•erzee. 11 00 Z' ' \Go E n di5,i-ar,ce e• 3co3. 37 . ee) 4 - 0 •\ -1-,e PoinA- 0.4- r bGtirn■n9. 1'7 tS , ar,cd 1 -1-1a4- 14' coho•s --1•,e koccrI-icn og c5 \oca-k -ed ‘4v, ietd b Yel\owS4 -0r,e P;peli•le / 1 � •,,,- I ,,� err,ptoye.eS aril 15 Shc i n \how '44- FnliiJ; i v .. I rata-It-es •l•o 'pre perk ers__.0 I 44 eo-k-\-ier Pork 1 SI I aLARENCEE MVO MINERS Mt ROAD SPOKANE, fi � ry .� CNN SPOKANE, 4MASK PHONE 926 -1322 STATE OF WASHINGTON) DEDICATION KNOW ALL MEN BY THESE PRESENTS, that Radiology Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust, has caused to be platted into lots, blocks and streets the land shown hereon as "HEATHER PARK 1ST ADDITION" and described as follows: The West 660 feet of the Northeast quarter of the Northeast quarter of Section 26, T. 25 N., R. 43 E.W.M.; Except all roads; And Except any portion in Heather Park Addition shown on the plat recorded in Volume 11, Page 55 of Plats; Situate in the County of Spokane, State of Washington. No more than one detached dwelling structure shall be placed on any one lot, nor shall any lot be further subdivided for the purpose of creating additional lots or building sites without filing a replat. A public water system as approved by County and State Health Authorities, the local fire district, and the water supplier (purveyor) will be installed within this plat, and the subdivider will provide for individual domestic water to each lot prior to sale of each lot. The plattor does hereby dedicate forever the streets shown hereon for public road purposes. The plattor does hereby dedicate to the public the temporary Cul-de-sac easements, as shown hereon, over and across Lot 13, Block 1 and Lot 14, Block 3. These temporary Cul-de-sac easements are granted for road purposes until such time as the road is continued as a full width right of way, at which time they will be vacated. 8 and 20 foot wide easements are hereby provided on the lots as shown and shall be used for utility purposes. Lot 14, Block 1, as shown hereon, is hereby dedicated to Spokane County to be deeded for road purposes forever at such time as adjacent property is platted. No habitable structures shall be permitted on Lots 1, 2, and 3, Block 3 until the Spokane County Health Officer determines that community 0.rainfields will no longer be required on these lots. LOTS 4 TMR 13, Block 1, Lots 4,thru 12, Block 2, and Lots 4, thru 14, Block 3, shall be connected to a community SEWAGE drainfield system Located on Lots 1, 2, and 3, Block 3. Said sewer system will be made available and individual service will be provided to each of the aforementioned lots prior to sale of each lot. The ownership of each lot served by the public sewage disposal system shall PROVIDE INDIVIDUAL SEPTIC TANK TREATMENT prior to discharge of effluent into the community collection. and drainfield system. Lots 1,2 ohd 3. Block 1. Lots 1,2,3, 13,14 and 15, Block 2 and Lots 1,2, AND 3, for the use of individual on-site sewage disposal systenns, A 20 foot wide easement is hereby provided on Lot I, Block 3 as shown hereon to be used for drainage purposes. A petroleum products easement for Yellowstone Pipe Line Company is across the west end of Lots 1,2,3, and 4 in Block 1 as shown. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal this day of c44k1u.. Radiology Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust Assiseatit Secretary-Treasurer ACKNOWLEDGEMENT COUNTY OF SPOKANE ) SS On this day of AL: , 1979, before me personally appeared Rodney E. Gannon, known to be assistant secretary-treasure of Radiology Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust, who executed the within and foregoing instrument and acknowledged the same to be his free and voluntary act and deed for the uses and purposes herein mentioned. The officer of Radiology Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust on oath stated that he was authorized to execute said instrument. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. My commission expires Examined and approved this day of Exanined and approved this day of Examined and :Improved this day of Eylr'.ined and approved ti day or " Exa-iined and arpr thir day of Exali anprovee thr day of COUNTY OFFICIALS .1981 ,1981 ,1981 , 1581 ,1981 (71JZ"" Ael,.. (5:7 , -( if Notary Public in and for the ‘State of Washington residing at Sr..., , Washington pokane County Utilities Director I hereby certify that the renuired taxes on the herein platted land have been paid this day of By Spokan. County Treasurer Deputy ,1981 By Spokane County Assessor Deputy Spokane County Engineer . Spokane County Planning Department Director Spovane County Co-Tdssioners Chairnan ne County Health DirTr Health Officier Block 3, are authorized , 197'). ,1981 LOT BLOCK 2 3 4 3 6 7 8 9 10 11 12 13 service as well as fire protection 12,987 12,600 12,600 12,600 12,600 12,600 15,053 15,577 12,635 '12,600 12,51 4 79,809 , 57,594 0 W m Z I :51 AREA LOT BLOCK AREA FT 2 1 2 12,892 FT: FT 2 2 12,€00 FT FT 3 2 12,600 FT 2 2 FT 4 2 12,600 FT , FT 5 2 12,600 FT 2 FT 6 2 12,600 FT 2 FT 7 2 13,833 FT FT 8 2 12,654 FT: FT 9 2 12,600 FT FT 10 2 12,600 FT: FT 11 2 12,600 FT FT 12 2 12,600 FT FT 2 13 2 12,600 FT: 14 2 12,600 FT 15 2 12,900 FT 2 ISTH AVENUE S 88 07E 0 3.2.71w (./) in t Jii 1st • w IN 0 st o -.... 0 a 0 o . o s m i 3 _1 a::/ 0 z Q- 0 1 Z z I.6 3 II 0 6 0 4/ cri /-.. f0 4 Q 1 . 17 0) '.. 25 z 25' N 88 55 W DETAIL "B" LOT AREAS SCALE N.8IS.: r=100 SCALE E.aW.:1“:: 10 c. CURVE DATA LOT 13 BLOCK TEMPORARY CUL DE SAC "A" "c" A 29P 31 '31" 60P 28 '29" 19 00 '00" 10 R 225.607 147.814 298.788 525.95 T 59.45 86.16 156. 02 50. 00 50.00 L 116.26 99.08 99.70 The bearing of S 88 E along 16th Avenue as per Heather Park Addition was used as the basis of bearing for this plat. LEGEND • MON. a CORNERS FOUND (AS NOTED) O CORNERS SET I/2" REBAR CAP NO. 706 © SPOKANE COUNTY STANDARD MONUMENT ••■•■• SUBDIVISION BOUNDARY LOT BLOCK 2 3 4 5 6 7 8 9 10 11 12 13 14 NI 0 DETAIL 3 3 3 3 3 3 3 3 3 3 3 3 3 3 ENGINEER'S CERTIFICATE 20 274.078 50.00 98.91 I, Clarence E. Simpson, a licensed Civil Engineer and Land Surveyor, hereby certify that this plat represents a true copy of the official record and Clarence E. Simpson Professional Engineer and fiend Surveyor _et AREA 12,804 FT 12,600 FT 2 1 12 :6 6 0 00 F FT: 12,600 T 12,600 FT 2 1 532 2 ::736 6 450 0 590 0F FFF T TTT2 ; 16,118 FT 2 4 2 8 6 :8 85 0 5 0 F 21,828 FT 27,725 FT survey made by me, and that the lot corners and monuments have been set. f LTEMPORARY CUL BLOCK 3 23 1312.40' FOUND 1/2" PIN ACCEPTED AS CORNER R PS N 45 38.29 NAIL WITH TAG 706 IN POWER POLE. S60 54.14 CROSS IN CURB RADIUS. 30 55.34 NAIL WITH TAG 706 IN POWER POLE. 9( A s 88°54' 07" E To 0 3 1,5 SEE DETAIL '13' 1 1 SCALE: 1 50 PETROLEUM PRODUCTS LINE EASEMENT 0 0 1.1_1 2 ‹, 1-1 ( (.J to_ 165.00' _ c. tz lid 25 4 - 6 • 4 140.00 I S 88 54'07"E rg _im 140.00' 0 , S 88°5407"E 1 b • 1 1 w F SW CORNER O * NE 1/4 OF NE 1/4 FOUND 3/4" PIPE 2 ' 140.00' 1 140.00 1 S88° 5407"E =0 -9 4 0 140.0d S 88 54'07"E 8 6 0 0 ACCEPTED AS CORN ER ' 1 10 RECORDED ,..._- S 8 8 54' 07"E AVENUE. - 2 --- - gso.00 ' ---- S 88 -- ,S 88 5 4 E 330.00' - 0 0.) 6 ‘ 6 4._ 9 .;,A .71 Li tr....4 \ — •-•- 654.07- — - 6 5.00' - 1 57.03 - ' F -- _ 1 ',.bN N . • ..5 . 1 0 , . 2 5 N N t cc! ‘ / 1 . 1 9.74 to itt -% 4 4'4' f": 120.25' 2 . .c,1 0 51.1 0 25' 2 ) ,1/4. 1/4 5 cr • 3.. 1 - . \ FOUND 14/2" A v PIPE I) 25 _ ‘ .1r..c.8 i 'col in ; <v 61 , _ t... t... P 2 0' DRAINAGE N I 3 2 4181 -. r• 1 ln - L 4 i U 14. 11 I 40.00' 0 L 140.00 1 EASEMENT 0 0 —4 ‘. 0 C! 0 q 200 14 - . S88 54.070E 8 - 0 "0 O 0 ci Q 006 S88 07 • qo oc.; ........ i 89fTc: E .0: 1: 0 2 CS 0 Cil Ch M 0 I a% :3 2 :9' 0 t 140.00' .: 140.00' 0 4 .--— L. — — -0 I- I40.0d 14 b S 88 07 .6 0 q taw q 3 S 88 E 13 * q 3 6 `1, . 1 ki,, . • 0 8 0 o cr 0 0 0 6 (Ni at 0 ca al 0 co co (1 , 1— 0/ 1 ..fri ,. UTILITY EASEMENT 140.0d__: 13) W in c - -if- - 140.00 11 , -0 O z -.:- -----; 6 s 88°5 q 0;t.C) o 12 - b x 8 • w m - IN, . cv Z 0 i 40.0d w 0 . 140001 N N 14 0 0 . d 2 • 0. 5 S 88 - 607"E 0 5 ..8 ' 0 0 m 11 m m 6 (I) „ 0 d 25 25 140.00' S 88 ‘6. 7 13 J_ _1 60o 0 1. ditS 1■11 :31_0A1`,1 13.1_;;C:1/. '. / 140.0D t) • S 88 07 7 - 8 - 0 0 m g 12 - _ 117 _ 9 ° 0 6 . 13"w( R) NOTE: _ OF TEMP.' CUL" DE SHOWN IN DETAIL "A" 0) 0) 1, 0 TEMPORARY m - 14 1 /,:- a): : f:TEMPORARY in CUL DE - SAC t o m 2 m / CUL-DE-SAC to .\ m thi 1 N 25 I 25 / 220.00 190.00 N 88°55 12"W -- - 660.00 1' STRIP LOT 14, BLOCK 1 140.00' 140.00' S88 407"E 6 0 0 I 140.00' ' S88° 54 07 "E Al)01T 1 N 1 _ 13 I0• 0 140.00' 'SO, I? • • b q I. b o - Q . 4 0 w o 4 0/ ' O 140.00' 0 0& w 0 S 8,8°54' 07"E >u) "o o ca rej • e 8 1 ") /3 0' - ° ••• A r , " ‘1 "' /4 e, 0 0 o '1 • c " I . .;\ 6se -V .0 ‘11." 7 0 0 at - 'e? 9 s7 7 0 12 , 44up FINAL PLAT 140.00' S 88°5407 " E 0) ea 12 20000 CO 4 . 1 ! 01 ,1r 20' UTILI4 s';/ Z:7 FOUND 3/4" PIN 1 974 4 uJ FOUND P K NAIL 0 PER SLOANS REPLAT N0.1 01 4 b ® c c:1 c. 0 0 5 5 0 0 ti - tO 0. Et c.) Y . 0 S 88 . ,c1.554.. ..;;.s at,...t;)\ 0 - 0 ' Q 6 o - m ( 5 0 to m c\I :•••• t•••• SI. • 01 ,..- . IP 0 UJI 0 et S 88 0 7 " E -"" :7 - 7. cc ....-1.; *A - ... t 44 ''''' o N b 8 1 1 1,- .,...e. 9 , 0 , • o 7 ' - d v 7.. d m 2 1 5 25 g , 01 . / 'k; ■ ,., •‘,....,■ .." ...., • 4 140.00' io ‘ .1:f.., A 11/6/ , to f-. ■ / co .• - tr. ■ S88 54 07 E - \ ■ / + :0 / 0 co , / 8 1*/ S . 9 -. \ ■ 1.. .',' / , -\ ..f. 6 % . = A) (., ' i i.:: N.44, C-1) :..41/ .. 0 o \c-• • 0 4 o 0 A.- a*/ " 4, 0 ‘-' 10 ■ zr / =t .x., ■ - ‘ ./ v ■ N , \V, Cs 7 te• ‘, CP 0 do 0 155.36 Cj 1 ° 49 41"E 0 1.1 ACCEPTED AS CORNER r. N 31 It'. r. HEATHER PARK Isr ADDITION 'PLAT IN A PORTION • OF. THE NE 1/4 OF. THE NE 1/4 OF SECTION 26, T. 25 N., R. 43 E.W.M. 1. SPOKANE COUNTY, WASHINGTON 2 Io 0 0 co 1- w w .3 0 1 13 2 30 - - 4 al 13 2. 4V 4 ol I cci; g -0 c.1 0 I I z 32. 51' tz„, S 89 40 1 S r 1 6 305.49 R F' S N 35 45'55 TACK IN POWER POLE N 15 36.0.0 NAIL WITH TAG 706 IN POWER POLE N 55 50.03 TACK IN POWER POLE • 11 t!,700 1 0 ca •-•• 0 1'4 16 "Zo \ ..111 "MI - kr "f 0 e *•. 6 2:1 —1- W CO ■ • I. .FOUND 3/4" PIPE ACCEPTED AS CORNER e JANUARY 1981 CLARENCE E. SIMPSON ENGINEERS, INC. SCALE: 1' SPOKANE, WASHINGTON SCALE: 1"•=100' Nvt3t �c.C�'. 'TYPic (. .t..AZ 'S17 -E Lcc. .i�rrA.S��. 1)y. Lam_ ► �`�4�:?"C G h:� Sa. ` ,1\1.E l4- . t...1 4 T �.. Cet+kil.tKki %TY DPA�tJ�t t-a! , ..Lrsts_ . _ C. s:'7 _ $ aS lo , 4"2., 1 "3 . & ‘4- 4"f As fi.,. G1�T�Ri F • 8 � � S A 0 A. o,25 25 ; 3 2:.Q? o1 14 o. r cri \\O 1Di 4 P ` {1 V o Neck:: .. 7`tPic44.. 'Liz P.S CO AhM UN, j \b \ \ . S. \Z. Zo )1)191 + IVF NOV 1 5 1976 3rwr i E. vUU1l !4 ; PLANNING aOMMISSSON 0 . 1 al. • GI.. o • o • o gca le:i " =1oo -rhe T. ... i„,C0 CV , ate ;O. -4; . rn a _ N.. E_ `74- _. o .„ o ! Cc► rCavc _S. N i rFt s I`a r c . < � - o S _ Z C.o T New ,o "EO 5 ;3 '. ' E . o A o \ \ S \ ( DJ \-1, 8 octt ` 7 Ate£ Tc+ Strt'r-V ,. %Ts.1 �P_ A IJ� Zl Fates.. Les 4, S, (0, '7 a a �. \ L6 CS S_ .Co ` 7 T 3 \O ' t t 3 Z,3 Z A 3 . ; t,A t)-,a " uw zz 66 8 6 0 z z g 2 e 0 2 a a 0 7 /z a 2 5 /(D .:77o0 0„c V 55 58 S4 o 7 E - 1/9.74 1 Avg:C/0(5 a 0 4 2 0 /s z5 25* e() /;L T // 11,,,„ PLATE 1, PLAN-PROFILE n"rc KEUFFEL & ESSER CO. 48 7004 _Cc E'," I: SO 2 . / /6 CZ° Aee eetee,e,6) ,fa cnt/ a32.<_ 14e76 /4 ei..4,-.) ■ M =M 1, EM =EOM = M MMMOMEM= MM M M■■ OMENEMME MEMEMMEMMMEEMM MEMAUMMEM MENEM ME EMMIT"M MIME = I=ME= MMIIVMMEMEM, MMEMMEMM VEM EMEMMEMEME MMIMMM EI! =M MEMEMEMEMEmmizmEmm M MEMEMEMEMEMEm WM.= M EM ===M === . _ MEMMEMEm-mmEmm==mmmmil ==EMEMEMEMEMEMEMEM=MmEm 11111,11,1 ■■NROM■MOME, adii111111 =hi= WIWI ilONSMI■ NIENENEDIMA alti■ MillraW■ 18311M■ =MIMI OMEN" INAII ■IfidatMER■lNIIMIUMWANINUSIIIIVAWIalbl■■1 . PiT2IPAWAZI2wILVIMINZUO ■ MIT w 0 tO u- 5e 0 c be c 8 Z X .8 , a - , z 4 17, g 6 # R 2 Zap 5 1 1 1 1 1 1 00 AI 1111111M11 MIMI 1111111=1111 NM= _ ^ WM= czwinammiram." _ , t.,-, .D1, 4- ,s1 4. 1\1 ki 1 ■ f9N *-1A 1-.1 ".1 na › ; 0 Ci r 1 . 1 t 1 -- 1 (A -) tkt 7 1. 00 8-Fe0 ' 5" 3 ' "c • "' 1 94 • 7 3 / 48 7004 MADE IN U. S. A.* H41. FE .E p LATE 1 E P U L F AN L 8. R c -PR ; ' 14 *00 15.too ' /2 4 ' .4/ : /7 - t -. 0 0 163-1 C.2) D ' .J.1 • 1 1 J. 11 CLARENCE E, SIMPSON ENGINEERS,' INC, N. 909 ARGONNE ROAD PH 926-1322 SPOKANE, WASHINGTON 99206 72'./c . 7 7 - 17 I lo '1 / • 41\ • V *. 2:61 ) DRAWN BY 1 • I BOOK NO. DRAWING NO, CHECKED BY • 1 1 :1 111117AfilINNIM1111111Vili :1111•0 < 0 CL. E. > 2 ' 0 ••••S 1) 0. X z 0 2 . 1 0 .,..\ . \ . 4 t' l '• , ,..„1,C ' .---- rj 'ft 4 kD . H 0 0 4' I Z flo 48 7004 MADE IN U.S.A.* Le PLATE 1, PLAN-PROFILE KEUFFEL & ESSER CO F )3-00 /el-t00 6 .,154 5 h. /6+00 R 4 cy _23; 4 / 7 0 oo. ore DRAWN BY CHECKED BY • • , „, ,., tIZ 6 • er• t.51 73 6'4. :OP .4 1j?• .".. ' „st t, tt„ • - CLARENCE E. SIMPSON ENGINEERS, INC. N. 909 ARGONNE ROAD PH: 926-1322 SPOKANE, WASHINGTON 99206 %Mt I !L". 111211111111111 I, I. tin MINI" .ffirtNeseilmii Um= Mum • =1E6 1111111110 CI <3 1111111311Mil 1 BOOK NO. I DRAWING NO. 19+Q at)+ 2-170 246,0 't s 7 KNOW ALL MEN BY THESE PRESENTS, that Radiology Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust, has caused to be platted into lots, blocks and streets the land shown hereon as "HEATHER PARK 1ST ADDITION" and described as follows: The West 660 feet of the Northeast quarter of the Northeast quarter of Section 26, T. 25 N., R. 43 E.W.M.; Except all roads; And Except any portion in Heather Park Addition shown on the plat recorded in Volume 11, Page 55 of Plats; Situate in the County of Spokane, State of Washington. � to more than one detached dwelling structure shall be placed on any one lot, nor shall any lot be further subdivided for the purpose of creating additional lots or building sites without filing a replat. A public water system as approved by County and State Health Authorities, the local fire district, and supplier (purveyor) will be installed within this plat, and the subdivider will provide for individual ---moo each lot prior to sale of each lot. gOtThe plattor does hereby dedicate forever the streets shown hereon for public road purposes. The plattor does hereby dedicate to the public the temporary Cul -de -sac easements, as shown p eacross Lot 13, Block 1 and Lot 14, Block 3. These temporary Cul -de -sac easements are granted for road purposes -r D� until such time as the road is continued as a full width right of way, at which time they will be vacated. $.` and 20 foot wide easements are hereby provided on the lots as shown and shall be used for utility purposes. A. Lot 14, Block 1, as shown hereon, is hereby dedicated to Spokane County to be deeded for road purposes forever at ,.._such time as adjacent property is platted. 7 No habitable structures shall be permitted on Lots 1, 2, and 3, Block 3 until the Spokane County Health Officer . eter'that community drainfields will no longer be required on these lots. Lots 4 thru 13, Block 1, Lots 5 thru 11, Block 2, and Lots 7 thru 14, Block 3 shall 1 0-treatment and drainfield disposal system located on Lots 1, 2, and 3, Block 3. Said sewer system will be made available and individual service will be provided to each of the aforementioned lots prior to sale of each lot. The ownership of each lot served by the public sewage disposal system shall be a member of the Heather Park 1ST Addition Homeowners Association until dissolution of said Association. Lots 1,2 and 3, Block I, Lots 1,2,3,4,12,13,14 and 15, Block .2 and Lots 1,2,3,4,5 and 6, Block 3 are authorized for the use of individual on -site sewage disposal systems. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal this W -" day of Radiology Associates of Spbkany, P.S., Employees Profit Sharing Plan and Trust d My commission expires a -b - Bl Examined and approved this Examined and approved this Examined and approved this day of DEDI CATION L4 Ass ist Secretary- Treasurer ACKNOWLEDGEMENT COUNTY OFFICIALS day of , 1979 I hereby certify that the required taxes on the herein platted land have been paid this day of Examined and approved this day of ,1979 Examined and approved this day of ,1979 Examined and approved this day of ,1979 day of ,1979 1 me a Notary Public in and for the r tate of Washington residing at 'p 0 k.o.rs e- , Washington Spokane County Utilities Director By Spokan; County Treasurer Deputy By Spokane County Assessor Deputy Spokane County Engineer . Spokane County Planning Department Director SD ane County Commissioners Chairman Spokane County Health District Health Officier hereon, over and the water service-5 (4 ( c be- connected to a community sewage , 1979. STATE OF WASHINGTON) COUNTY OF SPOKANE ) SS On this 6 + h day of Iloilo S • ; 1979, before me personally appeared Rodney E. Gannon, known to be assistant secretary- treasur of Radiology Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust, who executed the within and foregoing instrument and acknowledged the same to be his free and voluntary act and deed for the uses and purposes herein mentioned. The officer of Radiology Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust on oath stated that he was authorized to execute said instrument. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. ,1Q79 7 . • A T L q. CURVE DATA LOT 13 BLOCK 1 TEMPORARY CUL - DE t U " 29'31'31" 60° 28' 29" 19' 00' oo" lo° 31'40" 20 °40 225.607 147. 814 298.788 52.5.951 274.078 59. 86 .16 50.00 50.00 50.00 116.26 156.02 99.08 99.70 98.91 The bearing of S 88 E along 16th Avenue as per Heather Park Addition was used as the basis of bearing for this plat. r LEGEND • MON. & CORNERS FOUND (AS NOTED) o CORNERS SET 1/2" RE BAR CAP NO. 706 © SPOKANE COUNTY STANDARD MONUMENT • SUBDIVISION BOUNDARY • w •).- WI '0 N1 0 25' Z 25 N 88 °5512 "W DETAIL ENGINEER'S CERTIFICATE I, Clarence E. Simpson, a licensed Civil Engineer and Land Surveyor, hereby certify that this plat represents a true copy of the official record and survey made by me, and that the lot corners and monuments have been set. Clarence E. Simpson Professional Engineer and Land Surveyor ♦\ LOT 14 ,TEMPORARY / CUL • SCALE: I "= 50' BLOCK 3 • 0 0 cr } 1 W I 1 J 1 Z ' • 23 1312.40 r - - --� -- 1 ®or 165.00' FOUND 1/2" PIN 17 ACCEPTED AS CORNER I 0 8 SW CORNER OF • NE 1/4 OF NE 1/4 FOUND 3/4" PIPE ACCEPTED AS CORNER • I . 120.25' ti' �y- . . 1 11' N N. 40 ti 25' 140.00' S 88° 54'07 "E 2 0 0 o► 140.00' s 88 °5407 'E 0 3 d 0t 140.00' u S88° 54'07 "E 0 0 4 0 140.00' S 88° 54'07 "E 5 140.00' S 88 ° 54'07 "E 6 O o Os 140.00' S 88 °54'07 "E - 7 p- 4, r =c% 5 90 3/ , . 2 9 . :NOTE: q. OF TEMP. 13 C UL DE S SHOWN IN DETAIL "A' ' I-- // • TEMPORAR / 0 . ) m CUL DE - SAC I n m \ 0 \ 25125 220.00' S LOAN'S rLi'..l\ 8 T 12 , S 88° 54' 07 "E 16TH AVENUE S88° 54'07HE 330.00' Q %, 1I9.74' s ee' m ' 25' 140.0d t'+ 140.00' S88° 54'07 "E 2 0 14 0► a 140.0d o 140.00' S 88 5 4'07 E 3 0 13 8' UTILITY EASEMENT n p -140.00 - --- 14Q00 - - -- 0 --- - --- S 88 ° 54 07 (.3 0 0 0 at 0 I- W O O 1-ai 0 0 0 3 o°) m N N 0 0 Z O w0 r at Y 0 u ti 0 0 O 0 25'25'0 w d 0) 600 0 c - ___417_9°06 ' 13, W (R) • A .1) I 1 1 1 9 1 p 1 o 4 0 u, 12 140.00' c 1400d S 88 °54 0 07 "E n 5 8 II 01 140.00' k , 140.00' S88 5 4 07 "E 6 8 10 0 0) 140.00' 140.00' S 88°51407E 7 6 O 0 o 1 n m1 / 0i 0 / ti 0) ' 1 1 ' m M 0) h 14 TE MPORARY CUL- DE- SAC _190.00' - 4660.00' ---- - ,_,,L�__ S 88 °54'07'E ro 6 6 . 00' 165 - �lJ-- 157.03' 120.25' 2 0 1 / / 9, 119 .74' \ i ?._ l X 2 0 0. \ 1 25' 2 d � � s� ° 1 O • _ N a! N m I.- 0 M 140.00' S88° 54'07 "E 0 Q 0 at 4, /50 12 oO ,?1...0?) 41 88 °55'12 "W -- - 60.00 - -- 1' STRIP LOT 14, BLOCK I 0 0 xa Q 0 0 (/) r 7 i -- - - -'/ _ u w 0 o o 'n o Izt 0 03 0 FINAL PLAT rt a o 9 O 2 q 0 d 0+ o0 0 at 0 0 140.00' s88 54' 07" E 140.00' S 88 °54'07 "E o - 3 o o 140.00' ti S 88 ° 5407 "E 140.00' I S 88 ° 54 07 "E O 0 0r S 7 70 F 0 0) >N4:- 2d UTILITY 113 o \ 5� \ � us i2, 12 200.00 0 0 4 0 0) FOUND 3/4" PIN 5 0 O o 11 • 0) 0 m . 0 6 o ' O of m u S 88 °54'07 "E - 8 8 0 0 O O 155.36 or: �\S? 082 °49'4 " .2 , 9 , E /R D O ACCEPTED AS CORNER 4', .7. :1r .28' ■ 1 �I tie "i 5 8g °4C E _ I 2 U ui I 1 -0 0 1 _ 2_ __.1 f' • m W d' -1W 0 ce 3 (-:I 1 - 0 2 I N m N 132.4 , A 'PLAT IN A ` PORTION , OF • THE . NE 1/4 OF THE NE 1/4 OF SECTION 26, T. 25 N., R. 43 E.W.M. 5 140.00' :32.51' q S 88°5407"E a - � - S 89° 40'E 1 m 0 0-) 6 > - r_J_ v 140.00 0 0 0 SJ - q N � •1} g �� /`.3 \ n S 88 - 0 Q O » ° , 7 :1 • 9 �25' 0 3 7 140.00' �D ' A45/, et' / / 4 / W • 0 , w o d o 16 m O - w _co cr 014 r HEATHER PARK I ADDITION 4 Y ft, / : 6 c0 0 rd sa \ / / v W : 0 15 0 °s 0 • W 2 3 0 Z 0 ° CO 0 0 0 co CC 1 • 654.07 _ l 305.49 / • • FOUND 3/4" PIPE ACCEPTED AS CORNER RECEIVED ; ►m own itittOitt' AUG- 61979 SPOKANE COUNTY, WASHINGTON JANUARY 1979 . CLARENCE E. SIMPSON ENGINEERS s INC. SCALE: I" =100'. SPOKANE, WASHINGTON I • SCALE: Irr =100' KNOW ALL MEN BY THESE PRESENTS, that Radio' logy Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust, has caused to be platted into lots, blocks and streets the land shown hereon as "HEATHER PARK 1ST ADDITION" and described as follows: The West 660 feet of the Northeast quarter of the Northeast quarter of Section 26, T. 25 N., R. 43 E.W.M.; Except all roads; And Except any portion in Heather Park Addition shown on the plat recorded in Volume 11, Page 55 of Plats; Situate in the County of Spokane, State of Washington. \-NaTmore than one detached dwelling structure shall be placed on any one lot, nor shall any lot be further subdivided for the purpose of creating additional lots or building sites without filing a replat. water system as approved by County and State Health Authorities, the local fire district, and the water . supplier (purveyor) will be installed within this plat, and the subdivider will provide for individual domestic water to_each lot prior to sale of each lot. ;Theprettor does hereby dedicate forever the streets shown hereon for public road purposes. ._,....,.... lhei0Iattor does hereby dedicate to the public the temporary Cul-de-sac easements, as shown hereon, over and across Lot 13, Block 1 and Lot 14, Block 3. Thesetemporary Cul-de-sac easements are granted for road purposes untiIisuch time as the road is continued as a full width right of way, at which time they will be vacated. '8 , ;and - 20 foot wide easements are hereby provided on the lots as shown and shaltbe used for utility purposes. A.OtA4, Block 1, as shown hereon, is hereby dedicated to Spokane County to be deeded for road purposes forever at such time as adjacent property is platted. No habitable structures shall be permitted on Lots 1, 2, and 3, Block 3 until the Spokane County Health Officer determines that community Orainfields will no longer be required on these lots. 0 H44 loOk-A Lat•5 1.TS - 4:7 7 TR-3 r , 7 , , , B,, 12 0( ‘ B10 and Lots 4, thru 14, Block 3 shall b e- connected to a community SEWAGE drainfield system t / will be made available and individual service will be rovided to each of the aforementioned lots prior to sale of each lot. The ownership of each lot served by the public sewage disposal system shall PROVIDE INDIVIDUAL SEPTIC TANK prior to discharge of effluent into the community collection_ and drainfield system. Lots 1,2 and 3. Block 1, Lots 1,2,3, 13,14 and 15, Block 2 and Lots 1,2, AND or the use of individual on sewage disposal systems. A , 20 foot wide easement is hereby provided on Lot I, Block 3 as shown hereon to be used for drainage purposes. A petroleum products easement for Yellowstone Pipe Line Company is across the west end of Lots 1,2,3, and 4 in Block STATE OF WASHINGTON) COUNTY OF SPOKANE )SS 7 0ca-lined and approved this DEDICATION IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal this Radiology Associates of Spokane, P.S.,,Employees Profit Sharing Plan and Trust Examined and approved this day of day of and approved this day of - roved thi day or 1 il F day of ,1981 496 ' Assist:slit Secretary-Treasurer ACKNOWLEDGEMENT On this day of Po,)9t,. , 1979, before me personally appeared Rodney E. Gannon, known to ,= s' be assistant secretary-treasurdi of Radiology Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust, who executed the within and foregoing instrument and acknowledged the same to be his free and voluntary act and deed for the uses and purposes herein mentioned. The officer of Radiology Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust on oath stated that he was authorized to execute said instrument. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. C .......kit.A.1.. , C..... . My commission expires e) -1 . - at Notary Public in and for thetState of Washington residing at St , Washington i COUNTY OFFICIALS , 1981 ',..;pokane Cadrity Utilitios Director I hereby certify that the reouired taxes on the herein platted land have been paid this day of By Spokan, County Treasurer Deputy ,1981, By '.• Spo%ane County Ass-orsar Deputy • Spokane County Engineer day of ,1981' . Spokane County Planning' Spo County Comylissioners Chairnan day of ,198F . . _ _ Snoane County Health: Health Officier TREATMENT Block 3, are authorized I as shown, , 1979. ,1981 LOT BLOCK 2 3 4 5 6 7 8 9 10 11 12 13 AREA 2,987 2,600 2,600 2,600 2,600 2,600 5,053 5,577 2,635 2,600 2,51 4 79,809 157,594 service as well as. fire protection z•1 0 0 -1 - • w 0 0 -N it/ ta. o 0 Z 5 L 0 tri a 14/ FT 2 FT FT FT FT FT FT FT FT FT FT FT FT 2 16 TH AVENUE S88°54 07"E '1 6.6' 1 4.90' , - 0 ' 2 o 3.27,w _ ic■ 0- io 1 DETAIL 4 0 0 m LOT AREAS LOT BLOCK 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 2 10 2 11 2 12 2 13 2 14 2 15 • 2 SCALE N.EIS SCALE EaW.:1' I 0 12,892 FT 12,600 FT 12,600 FT 2 12,600 FT 12,600 FT 12,600 FT 13,833 FT 12,654 FT: 12,600 FT 12,600 FT 12,600 FT 12,600 FT 12,600 FT: 12,600 FT 12,900 FT 2 BLOCK TEMPORARY , CUL DE c. CURVE DATA "A" "B" "c" • 29° 31'31" 60° 28'29" 19) oo '00" R 225.607 147.814 298.788 T 59.45 86.16 50.00 L 116.26 156.02 99.08 LEGEND AREA LOT BLOCK , - LOT 13 2 3 4 5 6 7 8 9 10 11 12 13 14 The bearing of S 88° 5 1 'O7" E along 16th Avenue as per Heather Park Addition was used as the basis of bearing for this plat. • MON. & CORNERS FOUND (AS NOTED) o CORNERS SET 1/2" REBAR CAP NO. 706 © SPOKANE COUNTY STANDARD MONUMENT • SUBDIVISION BOUNDARY 25' :Zee- () ' Clarence E. Simpson-'" 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 1/: tel.', la WI '0 co 0 Z 25 N 88° 55'12" W DETAIL "A " "D" 10°5140" 20°40'39" 525.951 274.078 50.00 50.00 99.70 98.91 ENGINEER'S CERTIFICATE I, Clarence E. Simpson, a licensed Civil Engineer and Land Surveyor, hereby certify that this plat represents a true copy of the official record and survey made by me, and that the lot corners and monuments have been set. 8 A 0 REA FT2 12, 4 12,600 FT 1 12 :6 6 0 00 F FT: 12,600 T 12,600 FT 111532:,736450590 FT2 12,600 FT 16,1 18 FT 26,855 FT 2 48,800 FT 21,828 FT 27,725 FT , \ , ..... LOT 14 \ ,,,. i , I ■ ■ BLOCK 3 / > LTFMPORARY CUL Professional Engineer and Land Surveyor N 45 38.29 NAIL WITH TAG 706 IN POWER POLE. S60 54.14 CROSS IN CURB RADIUS. w 211 IC) 7 • 1 0 .>"" ... 1312 . 4 0 ' 2.-\. -- ...„,-I tn ict - rHG ---4"-- T'' zi leek/ S e8 54' 07"E 16T11 AV 00 --- - 660 ----- ro , _S:18 . - = .7.1. . RECORDED 23 - - - 165.00' ... SEIB ° 54 4 ,„., 1 - A - N - -157.03'- - ( FOUND 1/2" PIN ACCEPTED AS ( 119.74' o • • _ CORNER t. i 4.-..bv 4 , ... « . • . i r co ,',* , 4 ° i r- re) 6 .17 : — - 654.07-- f. I. cu 120 2 s.z 25 , 25 ..4. .6,)6, . R P s 1 4 ,... ■ 6.6 ,1 20.25 . c,1.:46 )) no I at! .20 C pi 25 25 4 140.00' 1 C EASEMENT M \ . i4 1 1 S 88 5407"E 1 •0 18 2 ' q q o o as co 10 S 30 55.34 NAIL WI TH TAG I " 140.00' 706 IN POWER POLE. S 88 1 PETROLEUM PRODUCTS ro 1 0 3 LINE EASEMENT la SEE DETAIL 1 8 1 10 1 140.00 SCALE: 1 t 50' I 1 I 1 1 1 0 I . 1 1 SLOAN'S ADD:TIC: ' ;31_0C K • 1; 1 1 >- w t 1111 Ci to SW CORNER OF • NE V4 OF NE V4 FOUND 3/4" PIPE ACCEPTED AS CORNER 140.00' 11 t4 S 88°54'07"E b '0 6 C I g 25' 25' at co /dr ;It' It JANUARY 1981 SCALE: 1 140.00 7 - - fcs •.% • 1.44 • 2 • 14 -0 ci 4 en o 1 at 1 140.00' 140.00' t, C 140.0d , t 'a 1 - S 88° 5 407" E ' q La, 'o o Li, In q 3 q 13 o o t-1 8 - . UTILITY 0 , n EA SEMENT CC`).. ° ° u) .. - . I - - I40.00 . - - -- - i4 0.00-- - - Ct S 88 3/ 220.00' 12 .01 1111,1 I" I 600 0 s p - -117_9006 NOTE: OF TEM 13 CUL DE : SHOWN IN tstkETAIL "A"i /-"" TEMP o CUL DE STRIP 140.0d 140.00' S813° 54'07"E 140.00' S88° 407"E 6 0 0 140.0d 140.00' S 88 , 07 , E • 7 0 co cy) LOT 14, BLOCK 1 0) (0 0 i4 ,d4z TEMPORARY a) op I CUL- DE=. SAC _190.00' ; c" • /.3 • ift 0° 0 b ,,,. 4 . M F 0 ` < 6 • SMININL N8 55'12"W - 660.00 0 0? m d 0 z FINAL PLAT HEATHER PARK Isl • 140.00 13244 14 or 1,4_ _ — - --I S88 54' 07" E S 89,40 " 1 - 0 ' . ' 0 0 . o I 2 c? . ut o C 2 a gr 1 01 . di I 0 . ch m U) > Q 0 -a 5 06 . 5 • at / S • is5.36 co iti• tv .1' 0) Cd . • , 2 CO • • S 8 P 0 --- 7" .. "*" - ••■•4 ■ •S 8 • S7 0' 44 E 12 11 ---. \ _\\ FOUND 11/2" - ._ e2 PIPE N (4 61- M M I 97.4 77 0 e.1 o N 2 N 0 173: FOU 4' PIN 7 ACCE ED AS CORNER f t .1 r 1 s *IP \--r* IN • ADDITION PLAT IN A PORTION -. OF. THE NE 1/4 OF THE NE 1/4 OF SECTION 26, T 25 N., R. 43 E.W.M. 2 FOUND P K NAIL PER SLOANS REPLAT tg10.1 ? '17 / /7g - f - to 140.00' - - - :3 .1 q. l' - - --I, o (9 1 0 - 8 , 0 S 88 i S 89 4Ci‘E i 6 0 "e 01 d >-. 1 cn 0 6 srn a cn 0,1 ;.z 0 - 4 .... -: 1° 14-: E . 0 140.00' 01 . ,-- cc . IN '1 l.'"1-‘ ' 0 S 8$°54'07'E 4/ - ..., -- 'sr 3 ;• , 5'25 1 g 25 g 7 ....1.- 9, 0 0 ..., ." SI 2 ty, , f. 7 .Z. 2..1, A...■ 44, 140.00' 140.00' ,:toNN-1-t/cc, . /,./.. 11 •s .. "lir A be" ' It". ''' S 88° 54 0 0 88° 54'0 7 E " . 800 " - tio ‘ v. : '6 : 142 - 8 0 / ,.... : / 8 c 9 / - - • l!Niz' • v p, • 1. "o‘ • .0 to r.f /V 10 4c- ‘. V 0.40 A- •■■• t- C1- 4js 11 '01 4).\ • 16 . \1 `L3v, \ 0 N 5F 04 0 at ., ID 0 tv co ‘■ele 2d UtILITY • ss. - ; m o ASEmENT n • .5' • it I tt • 1 •-■ * *?.:/c 4% . • 4) 7■.. ■ ■ 4 \ ■ 96 tr co or S.' 1 "•• .-N •.‹ .... • --- -•.• •-f- ./ .. • \ - ■ . / • ■ ...-----M..... ... . .. " ... 1 • - - - - -%- - - "•• .... — 305.49' 15 • )// FOUND. - 3/4" PIPE ACCEPTED AS CORNER SPOKANE COUNTY, WASHINGTON CLARENC.E E. SIMPSON ENGINEERS, INC. SPOKANE, WASHINGTON POWER POLE SCALE: l"00' • 7 w 0 W f] m owl LL v� a X • " za z • � O O 0 0 o z z N ram MINN MINIM 111111111.1 INNEN O�- Ste_ o■ s IMMO 1111111111111 amr ■ NNE= r•sININNI■ ] 1 .31_INIaCNIENN ra L1l� 1�'�� llRi SiI AIMS= RIMid�`IS � MINN PEW MINNS MUNN ONE= 111111111111 MINS =111111111111111 . • - V W• rm.- —■11101N11111ILMINM11112 " cr1 ���MUNSON IMIws MINIM RIM % rty 1 `tii110EiGZIIIIIII11 ∎C ='ZVINSINi _ MINN Ir1AMUiiiil!_, MEM NEI L__ _ 11Ii• WeIRRIPM IMP ______ 11111110311311111 I MEIN MINIM MINN MIIIINZ &MINN M1 MINN MINIM SEMI - - -- Waal MINIM IIIMINNINININNI MINIMUM= MIMI MINS 111•1111111111 .111111111ell MINN 11111111111111M11 12111111111111MINNIE 414411111111111111011111111111111111111 -"_ h. ® Wm° mosaliammumimmomm mina MONNE MINN =NM WISMn , INININIII imposowas ma= INNEN MINIM MINN MONNE \'� ` " `ICS --- •...- --.. -� . el M CI 11111111111 1=111111111111111111111111111111111111111111m 1111111111111 111111111111111111•111= 111111111111111 MINNIE M EM NNE= r • 1111111111111111 IMMO . KIIIIIIIIIININI1111911111111..m. MI= MINN 111111111111 MINN 11111111111110111111111111 omoMmEEE 4j EN i; 511111 'itltli E MI El= . M ME M EM ENNIO MINNS — IIIIIt411111•11111•1 MINIM 11.1 ilai n.MM I MINNS mm" 1 Ma MINNS 1111111111111111•111111111111111111111111 MINIM MINIM moo moo• MINN MINN MINIM MINN 11111111111111111111•1111 MINNS 1111111111111 _ 1111111111•11 NM= MEM =111111111111111111=1 Man 111111111111111111111111110 11111111111111 MOM NEN= L E1111111111111111MINIIIIIININII MINN MINN MINN M MM II SEM= M EMONI =I M MIME M M III IMMINIIIII= 1 1 1 . =MINIM MINN MINE MINNS MIMEO 1111111111•1 Mom e SE MEM M ill =11111111111111111 =611= MINS MINIM INNEN =s N■1111- 111111MT.MIM_I n _ �_ MINN ` MI MI i N a = MONNE MINN imuulie MI M���. IPSIIIIM NIPAINI O URN= - wl�I -11 �I■.i.MIME �.[<IITLI t -i - .. NI A MINIM ttiMISIS lllI , Z _ MOM MINN MIRE MINN MIMI IN MINI Iiii WWI: VICENIal l'I", A II 11 win MINI MINN INNINISIMOIM =MINI ..P MIll MINN -- ��•••]ivi` /ae1• I� UT ar. .r .r 1 •.� MINIM s_I�I rr_rf r MEN ME EM _ INIIIIININNIIIIIiil ������_ - - -_ � NM =.m6- 0 =MIMI ,... o IMM311111=1 TH Mi= mom =WA =MKS= Milli ■11111111=1111111111 ENNIS MIEN MINN MEIN IMMO mut �I'!1"�rt��� I�d l�J��►ll� .1 12 1�1:.t> •.1.1141: %'I��mmon orail /. /J * -t %111 11111111111111110111111 MEM MINN MEIN • r�c'�s>I111111111s I■— 11111■sI111 MINIM =MEM MENU MIN =NM MINION i WM' sr•111 ® -- t` l to h 4I) K s ad u t. TM • tta • —1/ ers . 1 1 1 N • I y MOM MINN mar mom mi=imm I' K (r l . n IA . � �,1 'III If % a L lair 2. 16 0 2.16o N. i 1 /pt- ' 166'":oo Inlet N v-c)t f3 a=zn• 19•73 L- 31.1(, • 0 u1JB Barr e Dry weft 7 .e2-0. 0 $" c•M 1 14 2$ ! zs � t Z. )1'" 2.0 T 11+ ao 1 aarre.l .5 s5 - - 3. - - /19.74 R zo' T= aO.zs' L= 30.67 Dry wed 1 -C 1 3 +00 /2 T= 19. L= 31., Inlet u0.61e a�� Prywe s . Z5 25 `<, u r. 6' 651 0 B arre + c •7 ie 1/ / / 6+0 0 PLATE 1, PLAN - PROFILE KEUFFEL & ESSER CO. 48 7004 MADE IN U. S. A." E 0 41 Fi p p�D 1.9+00 N SCALE, / SO 2. it 2a° W:4 tk for (see: ►��, if 2 a . r- •.r ao° 1r A5 pkaf t Cont. P / C / cz. Q s .s ( Cor, cleo i-tr, TYP IC/14L r SECTtoI) �o Scl9L S lacks or s 1,e. l 1 b e. NOTES II 1111 I 1 Ih fec-�or sI ee* ) l6TN A ue road Zo * 2.2- . 0-0( - br■ti<- used in dry el) Vnor' -u.re J Ih ?I L e . plat' 1. p e. r-ess a P 9 '`a.te Z ��U �.. u li c - g r0_d e. . Tr•an Slflc*ai fe r depressivA 51-+x11 b 2," rn 3 ° - 3• D vo ELM S pJ4c !n l'ul SP c: SLlrnp Are rer� OIrE. Cu rb E qu fter- iriIe �" S Pa h+1 Q. Co std "l, -a."). All otl<ers ' r'ec�vit"G rt .5 /07.9 98: 9, t t• Ei t p = 29 ° R = Z 4.6db0 T= 59.4.E L h/ v Gt3rVe Dc.'tO- It G " 19 ° oD r CO " 2 9 8.7892. SO .00 99;08 " D u 10 S1 ' Szs 75 54 , c)o 9 9. 70 .9 t N 1 3- :C. 0 re 74 20 4 3/. , ev. E m NOTE: peto-As , �c J L] G c K "i-i 1 / r i'oY D ra.:r\c� s ee shee.+ 4 of 4• . 7 Cu (LB L /Nc Coke LINE f 4 Pr D.ry,1 iI Co. S},. „0-1,4 7 +e Gr�7 = 179,4:22 L t Top Groste. E/e '.: Z /'1.9 --± PoQblt B Spoka.Ae 1 t S: L. II 4- w HEATHER PARK IST ADDITION CLARENCE E SIMPSON ENGINEERS, INC. N. 909 ARGONNE ROAD PK: 926 -1322 SPOKANE, WASHINGTON 99206 - DRAWN BY T. J. E3 r E a e t CHECKED BY pv ub.le: Bo.rreI DY.yw po;k6.ne Co, SfA -i S to l$ 7 7 ZZ- G . )-9 1 Topr G r.�f (Ie.; = Zt43 ` ' STREET PROFILE Do.u6(e , i - re -I Dry - /I Curb Eac...t:er- 1r►lef S� - lore Co. Ste. + 19 +s$?� . t Gra.�e. =19 Tr Gr o t e E 1:11:234 e v.: 214a•�fS Rz24 T Z i9 7 C =31• 1 ,1/79 BOOK NO.1 DRAWING NO. 1 1 -9.11 ±- 30 R"Z�S T .o i L = 3( •c�'7 S to le Bsa.r Dry/wall, Spoko.na Ca. S +4. "b -l St:• 19 +5 7 A: : Grw•I1 • 19 = Rat• top Grote glac• z:40•46 ,7004 MADE U. PLATE ,t, PLAN= PRO1=x IOEI FFa tt i ESSER CO ry to - . 0 -- - _...a.. &t. CA. ,, :; Kt -- - • rn .4i • . .57 , rk It ro 4.rt J Le. Cu 6. tE3t -C1C w a m • ca• Pc5 z z 1 z z 0 < i k ! C it' 1 tMC z 'n 2. (2:m Lit 2 . • ; LeS"' L. I • 1 • I 3 'TX 14-oo `.7 (.) P•:s. re ri E NoTC.: ad.: ex,* °f4. , 1 10+ 00 1-, en •■• 4.;$0 • 'N / 9 0 ' /11 V . 1 - ,1) 4 2 V ER PI 7 8 7 7 0(.3, . PLATE 1, Fit..ANPF,OFIL,E • KEUFFEL & ESSER Cip " 413 7004 VAI* IN U.S. ' 8 • I • 1 1 )`' 400 7:2 ColzB LiAir CURB Lit.) LT CurV fcA, 7-; 1+7.8138 T: / • F. 1 i • /q-ro 154 , 4- Bektre.i ,D. 5 pJ6.Q _ .5+.. / .} 17 192- R.E. Top Gro-•+e_ E./ev. Z)/36 4 S , "•••^. / 7 0 •,2 c„ 0 e + 4,1 N N v.c1 P. P. -- PooLie. Bo..t eel Dry well G- 0.* I t. e„÷ 5 oko,,e„ co. std "D-'" 1-e.. 18 + 6 9 Gra. Fe., = Tor. r. 2-163 .70 G/ a9/7 9 E.,1 s 5- 1 3 1 173 12_ r- e4. e. ,91 164 HEATHER PARK I' ADDITION e .1 E - AM= NMI IMIIMMIM r jatui 11111 1M....= ENO= IN1111110 IIMMIEn ° —m•"•.... *l... .—,'"amtim•P c--.TZ%." INIMINSIIIMMNI OEMS = MMINIIN ow moms smonems munimmEnt iitr im ammo assme ammo mem =M ammearmoso MIMI O = MN= UM= MI Gail Mlb.lirlIMININNI .11111111INIIN IMO= MII =NMI MINNIF31=1111311M1111•111 MEIN im.711. AM IIII01 0MEW M ram. amme mo M 11111111111111111111 MN= 11111111111111 = Fall= MIMI= FM= =UMW! = = W M = MOM 11111111111115111 11111111111111111 1 • Sin Ell IMMO ME Ili "1111."M*2-4111.11 .-46 au MR ME= - Om [-IX) Ze C u r 0 1%. tel e4 t Er " IIII t2,0. MOM= cr. )10111111111 IMMO =MEM 1111 117:11111111111 EWAN= • 4.0 2 , 1111111111111111111110111 jam 4 r0I,S^C • . 11111111111110141: - 1 111111111111111 IMMIMP2,91”1111111 MEN 111111111111 ,riqs 1 /2 O. 6S" 00- P*. - . ' . . . . +Ni • 41 , '4! 9 t is, e11.90- tv, 4 I • o 1, P* 0 kr ".• -•• 4 I 40 I .1 1 1 1- " •I4 1 eV , so 9 .. . NO - 161 E t SS° 4 111 Ex J Act G ro Ar.... 4 - 112111111M 1311 a. 0 r. s pJ - "",:■ 11.:4111 '" " L E : ■11111111111 gs 0 1 DRAWN BY r e e CHECKED BY o 4A3 ie. go.1-re-i Pry well G. Curb f 19 -t sP E S 6 re. i ie Te p Cs-r.<4e T:)9.?1" 3) Rzto' .= 1 L.,- 3 / STREET PROFILE CLARENCE E. SIMPSON ENGINEERS, N. 909 ARG ROAD PH: 926-1322 SPOKANE, WASHINGTON 99206 1 4:1 N i eI-Ot roL.e.a to NI •1111011111 1111 EMI= MOM REIM krOw. 11.1.1.111511.1.11 libikr0 - " • cs. \4 03 1 -171 fit -.4 . , 0•• I. • 1 i , 79 1 BOOK NO. DRAWING NO. 1 L - 9-ia 20 4 of a 1 I 1111111111 r 0 W O a c' u Y V z 0 G ~ 4 Q W t om, Z c 1.) a 'u : a}ep ' v a a re. t0 eu SC 0 0 H O o Z Z 4 • ..4. rit 4 . v 0 • Elev. . r.+c f '�G�r - r3 • �' 4}403! F cc -Ire and 6 - c• - te z'-s1/4.... F r w 1 axe; IF r-10 I/2 "_,I (, -1 "off Conc,re4 e. Gt GA'r: t 1';reS1N 1—;"t'& N - 1 No Sc.p le- u qt ! i L J L Mr► * i ;1 .u�Air H ` If 7 t-0 "" m --- min 1 . 7 2 7= 1 IIKUMMEMILIMILIMUMEME wimmeran mr.m= INEMEMOM'mErsEibliMrdilEmia.= ranam Fi„ c1, Cfr MEE= ■ ,1f i, 11 t r.4 AND-, -.._ P tOFILE_ 1 L7�J7�j, j _.. _ E GIN l ) NO. Mcr*e.r" Frll r'otnct CO. S+ b1 s. Co. 54' C ; A ryS v• o • t 1 G /2. �� 0 cr 1 11 TY P,CRL M Af;` {OLC CC W . G • • ( Pre.c.a;* M'1 N RIngllcover - -L; rra e ef P.P. f ). r .1 " 1 i - ,:i. y f__ f t 4 Co r. Se DETAIL x' N meet S - {' . 63 r'ecvi rc v e n�S t(- ,1 1, d = Z9 ° 31 1 3/ JS'000•,. -_... R - zas• 606.8 2.98.7832. T = S9. 5L 5 - so • L : 116 . Lam, 9 5) r 14- C" D �.. l3 - ac 9B 4'- ° C /0 ° SI • �D" 25, 75 8 sia 59. 7a A 1 5 v3 p Lo ° co' 3 9 27 07e-i1- So �c 9 .'. / a / k; 0 _ t7 Q' . Q Q/ & q_ ti K. 0 v x a (./ f x ' /r (X, / V C. ri . (:, I-1 / w •w. t` t L, . 0. 11 $LOc.k, 1 1 G -71 3 i t" / T G. /43 S 4 V 4 p o , Z` 8 ! c' O- O, ! o ti IG ' to :c • 11 1V „+i' ALNWWib' vJ • \ c' y (.5" J W F� L \ �a. ti \� . - C n L � 0 ' 8 .SP kv \ 4. 1 . ":-.71/ ? :": 3e, '---.-..s..1)---9 -7_.___ ::;4 ' ' ''• •-• I 7 ' R. 1 1 r • tEr 48 7004 MADE: IN U. S. A. • 1 212` t PLATE 1, PLAN - PROFILE KEUFFEL & ESSER CO 4 Sid[ SBL :er LtPP 7 C / Lc t f3 T J -. Z - f - 13 l , X o r N J -ifG __Ij7�tlt'C� -_--_ . 5' .6_- -_.- "CT"- s. I •' C. M .P. 15 c L apS 1 Y, 1 s 2 7 19° Lt \.9 I o. 6 r to Ele _•.' 7 1 I 6 rFL o 1 \ = 2170,30 T F N' 1 u\ '11 \s t t1ti s G r • 66 y1' 1' { Tvi"c= Sfx /6 Grn% 19 'tit G Ele: = 21fo`t FL out= Z16Z.90 S - -- - - -- - -, — 1 Sar1. s c.M• P• S e C:� D� _1E i;,srrel Dr / ..:t(1 C p �k�. f Si- yx• 17187 f GrotE i9 Ct 7"..F.) G' " Eie.v. = a 49 3 4 G -t 1 f \•• t of ac ' 1 1/ ti ' —� 7 ,. -4- 7_3E C7 I ON: A-- A . 1^ Mu t 1 '" Doot1 * - LE GEAJ - — 4 " 0ra•,n F ci u C •�E s - ieco L•F --- ¢ 5e.wEr T,' C es ERiSTt.: P•,-E Tr€•. 1' 1.,, i ., . ., • u t (7 o.:61e Bo-. rC.I �rf....; Cil� 5 ,..t k- e : „. : ....:::, ): ... -- i -; s :-- ,:::.i . ‘ . 0 ; ,} -. :,,,,,-,:,- C -ti � � G..*t�r /..let �: sp�k.., -L Cc. 5tc1. ? Sfn I +S9 Z ^` Lc c_k ,r, L, J.s. Ti? : " GrU i"_ Dr ainf• Eld +Z_ %' FL 3;7 n= 2.1•°° -c— 1 — — - -- X` / / / /�. i ' /r ;:;43/1:7:evy. • . _,_ _ _________2. j c.‘,.. . ,4//c 1 - , ... , ./ fi, .:;„ , ': 1 jG / C � , �• t y i / J' (3/ I ' r X x / / / j r 90 4 ' - - - - "Zi: : ::: . . ..z. : 7 : - 5 -- - -; : 4 ; 7 1: ::: :::-; :::: ::-. , - , 1 7 ,. . ''(/ . . j i 1 7 1 ::' I. : (. - . 1 -/ 4 : 4 " . . ::::\: bl > :'-'3'/ ,/ /::. /' :///: / i — ( Use S Ca • Sf °l. "D-I" tit Fro 4 V1 e ,srs� 1 3.7 7 - 4- • • 1. 2 (-)'• r E - -1 9 Z !c - T , C�.4_ a • • • f . _. .... -.. `.. JGfn.Y._ Cr, ,} i 7 _ r Lhl • . j +" r 7 nJ 4 ' { �4 �•' ,.� . 0 di . -2, -I-. =3 . .-i, *� } +� I Dr ci fit , t tes- 7ftr z « -. .�� = its,• �;� P sr. • ) .. .. . -_ j . ,"i,,1 t, Fiji By HEATHER PARK I ADDITION C .AREN E E 5IMPS Y -4 . E 3INFERS, INC. N. 909 AR.CO NE ROAD PH: . 926 -J322 'SPOKANE,, WASHING ON 99206 T��e... t. . if S r v- Dr 5t , ,■•• •: 7 _..._ Top i, r - lk 00K NO • 4 2 - _ i � t J i '41_ 1' F: . V T.' A, 1 y pra i i + 7S . 7- 7 Z1 _`0.30 Ji 44 STREET PRQF1iLE ;.=4 `' .. ROCKY • RIDGE DRIVE 7------J2: ,1 > _ __..,._ ______ -- .... . CLAR NCE E, C } NG RS, . N 909 ARCONNE f A.D P , 926-1322 ,x; ca. a, v. •. # SPQK.A# E, WA*INCTON 99206 - i.K. yi. +"i-• DRAWN BY r, .t 'r n rzi co ; L z c.`. 4 CHECKED BY . ( r. .(" .0 S.4 °r - ly Li 4 ,, J4 CurbGk?t 1.0,1E=r • n •iw,.: ::..: v a.•. .....r. .,.rte -•.- .. w ..,. .: , i ..r ., w.. ..., . .. - ,.. - al V Examined and approved this 3xar, i ner? and anrroved Ex. xn:inecf` aiti,. aPProti ed - b xaY 4 rpr - '� P 1 , tgy�R STATE OF WASHINGTON) )SS COUNTY OF SPOKANE ) On this ' 25 +k day of th I �iY' rya. or , arpro' :er' ±; s t;r • day o- KNOW ALL MEN BY THESE PRESENTS tNat RAd. .. )`,' :'t iii.._ i _ .11 ...� ._ - ?- �O f' i� t"ub r,. .s S }i '! J i)_ ,, P - 1 :: ..i. Sharing Plan end , has caused to be platted iar-n l ets, i and s sel,?t: th. lEind siiw,:n he as I EATi R PARK ISI ADDITION" and . described ss Iol1nws: The West 660 fee.. • i t the .cr t i ess ::i_i tf': f the I'•fi Ln ast quat tc :: of S ct ion 2r , T. !- .'1 , R. 43 E,',;.i`: Y Except all roads; And Except any portion in Heather Park Addition shown on the plat recorded in Volume 11, Page 55 of Plats; Situate in the County of Spokane, State of Washington. No more than one dwelling structure shall be placed on any one lot, nor shall any lot be further subdivided for the purpose of creating addi�ional lots or building sites without filing a replat. A public water system as approved by County and State Health Authorities, the local fire district, and the water supplier (purveyor) will be installed within this plat, and the subdivider will provide for individual domestic water service to each lot prior to sale of each lot. The plattor does hereby dedicate forever the streets shown hereon for public road purposes. The plattor does hereby dedicate to the public the temporary Cul -de -sac easements, as shown hereon, over and across Lot 13, Block 1 and Lot 14, Block 3. These temporary Cul -de -sac easements are granted for road purposes until such time as the road .is continued as a full width right of way, -at which time they will be vacated. 8 and 20 foot wide easements are hereby provided on the lots as shown and shall be used for utility purposes. Lot 14, Block 1, as shown hereon, is hereby dedicated to Spokane County to be deeded for road purposes forever at such time as adjacent property is platted. No habitable structures shall be permitted on Lots 1, 2, and 3, Block 3 until the Spokane County Health Officer determines that community c'rainfields will no longer be required on these lots. LOTS 4 THRU 13, Block 1, Lots 4, thrt 12 Block 2, and Lots 4, thru 14, Block 3, shall be connected to a community SEWAGE drainfield system located on Lots 1, 2, and 3, Block: 3. Said sewer system will be made provided to each of the aforementioned lots prior to sale of each lot. The - wnershir of each lot si rved by the public sewage disposal system shall PROVIDE INDI prior to discharge of effluent into the community collection and drainfield system. Lots 1,2 chd 3, Block I, Lots 1, 2,3, 13,14 and 15, B Ioc k .2 are authorized for the use of individual on -site sewage disposal systems. A 20 foot wide easement is hereby provided on Lot I, Block 3 as shown' hereon to be used for drainage A petroleum products easement for Yellowstone Pipe Line Company is across the west end of Lots 1,2,3, and 4 in Block 1 Lots 1,2 and 3, Block 3 are authorized for the use of individual on -site sewage disposal systems after the community drainfield The owner , his heirs and successors shall join and participate in any petition or resolution which purpose is the formation of a utility I improvement district (ULID) pursuant to RCW Chapter 36.94, as amended.. The owner , his heirs and successors shall further agree not to oppose or protest any legal assessments for any utility local improvement district (ULID) established pursuant to RCW Chapter 36.94, as amended. Any water service for this project shall be provided in accordance with the Coordinated IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal this Radiology Associates of Spokane, P,S., Employees Profit Sharing Plan and Trust /approved F 4, 72 day of /1AY J. S e l r',ry of e.1, F >'V? < x: 4: x. e• l:. t{:.:. Tt' F.,:..•::: L'} e .IP ^3`.'.'^. :t:�S:2xR^A:F'^'.: g Lim Assistant Se etary- Treasurer ACKNOWLEDGEMENT March , 1981, before me personally appeared Rodney E. Gannon, known to be assistant secretary - treasurer of Radiology Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust, who executed the within and foregoing instrument and acknowledged the same to be his free and voluntary act and deed for the uses and purposes herein mentioned. The officer of Radiology Associates of Spokane, P.S., Employees Profit Sharing Plan and Trust on oath stated that he was authorized to execute said instrument. . IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. My commission expires B! Notary Public in and for the tate of Washington residing at g , , Washington ;�;,� ;. ,t.'•, � °. COUNTY OFFICIALS day of .1981 :.:pokane County Utilities Director I hereby certify that the rersiired taxes on the herein putted and have been paid this \ yy yl —.S_ Jl e1 --- ,1:,81 1981 ,1981 • po :one Co-)nty Engineer .. available and i..iv '7uai service will be County Treasurer e - By Cozen y Assessor_ VtDUAL SEPTIC TANK TREATMENT Water System Pion for Spokane County. By � . �`' Deputy 2 Deput purposes. day of ,1981 . , r • . .. �,.,.. , r'-) -arm Co P1 anninq` Department Director cpn" -reb °Co )nty Co ". iFFio ;era Chairr..n { r Health n;f tri(t Hea..lth Off i.rier as day of ��' ✓. , 1951. ,1 981 1_')'I E3 L_O t_; K shown; and 12,9R -7 FT I 12,60(? FT' 1 2.ErC 0 FT' 4.. 1 12,600 FT` 5 12,600 FT 6 12,Et00 FT 7 15,053 FT 8 15,577 FT 9 12,635 FT 10 12 FT 11 12,514 FT 12 79,809 FT 13 x57,594 FT as well as fire protection ai recorded under auditors file no. is abandoned 8103301084 local 16 TH AVENUE S88°54 07'E tit � /,h 2 r O � r 3.27,Lu 1_ M () W I.v 0 cfl /N ° o M/o a� O l z z 1.63 J L 5' 1 O t / l0 4 DETAIL 0 R T L 0 3 0 .T 29° 31'31" 225. 607 116. 26 iN.W.'A1S•T.va�sSYJF..:I.^: SRZY!18GdTi:J.�V?.IPB?T 2 ?� LOT BLOCK 1 2 12,892 FT ''' 2 2 2 12,E00 FT 3 2 12_,60:7 F 2 4 2 12,600 FT 5 2 12,600FT 6 2 ,600 2 2 7 2 13,833 FT 8 2 1 2 FT FT 2 9 2 12,600 FT 10 2 12,600 FT 2 1 I 2 12,600 FT 12 2 12,600 FT h3 2 12,600 FT 2 14 2 12,600 FT 15 2 !2,900 FT 2 SCALE N. &S :I" =100 SCALE Ell W :I " =I0 IIMIIMMINZ001N111111111111101111111P a lie im � ��i iii .n 11.111 ,m in r 28 ' 29- ., 11 914 86. 16 156. 02 LEGEND ARE TEMPORARY CU L D E SAC I � c_ CURVE DATA BLOCK 0'00' P.2 2 9. 788 5c. 00 29. LOT 13 e MON. a CORNERS FOUND (AS NOTED) o CORNERS SET 1/2 REBAR CAP NO. 706 © SPOKANE COUNTY STANDARD MONUMENT • SUBDIVISION BOUNDARY / W , - to 1 - o I N N O 25' Z 25 N 88° 55' 12" W 10 °51'40 525.951 50.00 99.70 The bearing of S 89°5 E along 16th Avenue as per Heather Park Addition was use as the basis of bearinsp, for this plat. LO 1 3 3 3 3 4 ;3 5 3 6 3 7 3 8 3 9 3 10 3 11 3 12 3 13 3 14 3 DETAIL "A ENGINEER'S CERTIFICATE [-11O 11 "E " E 20 °40 ' 39 274.078 50.00 98.91 I, Clarence E. Simpson, a licensed Civil Engineer and Land Surveyor, hereby certify that this plat represents a true copy of the official record and survey made by me, and that the lot corners and monuments have been set. c: Clarence E. Simpson -' Professional Engineer and Land Surveyor 4- 12,804 FT 12,600 FT' 12,600 FT 2 12,600 FT 2 12 FT 2 12,600 FT 2 12,600 FT 13,359 FT2 15,745 FT 706 IN POWER POLE. 16,1 I S FT 26,8 FT2 S60 ° W 54.14 CROSS IN CURB 48,800 FT RADIUS. 21,828 FT 27,725 FT S 30 ° W 55.34 NAIL WITH TAG 706 IN POWER POLE. TEMPORARY CUL BLOCK 3 31240' FOUND 1/2' I'IN ACCEPTED AS CORNER R Ps N45 ° W 38.29 NAIL WJTH TAG SCALE: I = LOT 14 I PETROLEUM PRODUCTS LINE EASEMENT SEA DETAIL 0 rn . /: r 120.25 1 6 \ 1 " 1' g� N M s r9 ° ? 4 4 . 4 � . B w I g M 25 2 ev ti C4 -4 , 8 0 W) tD 0 M SW CORNER OF NE 1/4 OF NE 1/4 FOUND 3/4" PIPE ACCEPTED AS CORNER r._, 140.00' S 88 54'07 "E j 0 IQ 1° 1 S 88 E 10 I t 0 o I - lo+ 1-1 140.00' u ! S88 54'07"E 0 0 4 0 140.0 0' I65.00' 'O 3 0 140.00' S 88 54'07 "E 140.00' S 88 ° 54'07 "E - 7 , ;i'' 1. , .- , ' SLgiflUz un3iO4SP DSZL7IDuRFa'SSV+?dTr.•db"...^.4f p I G o 0 2 0 0 0 a a) O o 0 tO a ch O o t) Z 0 w 0 ' 0 �' 0 0 o Y Of 13 0 a 140.00' S 88 ° 54 07 "E 0 6 c 0 25' 25' m r u 6 0 12 0 3i ' 2 9 ' Fe S ./3' 88 54' 07 "E 163 -s AVENUE 330.00 ° 0 3 0 0 13 0 O 6 \'c 'm •!1-^. 140.00' NOTE: OF TEMP. CUL SHOWN IN DETAIL "A" TEMPORARY ---1 CUL - DE - SAC ; o \ Q) 25125 54 19.74 I40.Od U 140.00' S88° 5407 "E 2 8 14 Of 140.Od u S 88 5 4'07" E o g 8 UTILITY EASEMENT - 14a00 - - -- s 12 1400d s 88 °54' 807 " 5 0 11 140.00' 10 140.00' 9 140.00' 61 'e4 0 N79°0613 W(R) 0 0) h 1' STRIP LOT 14, BLOCK 1 I t !— - -- — ti as S 88 ° 54 07 (.1 S88 5 4' 07 "E 0 6 0 140.00 S 88 7 g o 0 a) o 0 Of 0i m (0 • 14 TEMPORARY CUL- -DE - SAC 120 .25' 119.7 0 - - -- 3 1 !s s 15 25 2� a) , 20 DRAINAGE N EASEMENT p. ti 140.00' kr 140.00' S88° 54'07'E t50 0 rn (Rl 0 Q 0 at 0 0 0 0 0 m N „•, i3 a � ' ° N t 220.00'. 190.00 N 88°55 W - - - 660.00- - - 0 co 9 ■.Y 4j .3 a P9 r ` Q , ) 6 c A. % � O `n 660.00 - - -- —... 165.00 660.00 1 O W 0 M 0 0, O FINAL PLAT N tD cD a 0 O 0 b 140.00' 140.00' S 88 ° 54'07 "E 0 6 0 0 6 0, 140.00' S88 54' 07" E S 88 ° 54'07 "E ti ° 2 0 o ' 0 4 o 140.00' 88 ° 54'07 "E 5 13'2.51' 01 : S, 8y° 4c E 1 6 o 1 l� O o N "' 6 O v 140.00 0) g ' � _ � � � oVb 'S to u-11 l u S 88 ° 54'07 "E 140.00 0 ) 10 0 elt .. D tl 0 o S 88 ° 54'07 "E 00 8 25' 25 g 7 0 N m 140.00' S 88 7"E 1 55.36 `� 582°49' 4 E ) n 9 SRI o O S7701 2, 44 p O 197 44 12 ' 11 200.00' FOUND 3/4" PIN • o m `. 20' UTILIT' ' $ ASEMENT - • i I I. S 89 ° 5407 . E - 157.03 -- -4 — 2 c Q, Os O - 0 0 n u — ACCEPTED AS CORNER \ \ .4 l N 0 a FOUND I I/2" PIPE E 89 m to o HEATHER PARK Isl ADDITION A PLAT IN A PORTION OF THE NE 1/4 OF THE NE 1/4 OF P NAIL 1 100 2 1 5 7 w cn 4 0 0 0 • db le 4 Y . re 2 co 1\/55°E 45:55 TACKIN POWER POLE N I5 36.00 NAIL WITH TAG 706 IN POWER POLE N 55 50.03 TACKIN POWER POLE 4 9 • I0 v tu 7\ . .. S PO KANE COUNTY, WASHINGTON JANUARY 1981 CLARENCE E. SIMPSON ENGINEERS, INC. SCALE: I SPOKANE, WASHINGTON 23 24 FOUND" 3/4" PIPE ACCEPTED AS CORNER SCALE: I".100i