Loading...
PE-1092-77 (2)AGENDA, APRIL 15, 1977 SPOKANE COUNTY PLANNING COMMISSION Time: (PLEASE NOTE DATE CHANCE) Place: PRETTMINARY SURDTVTSTON ANT) ZONE CLASSIFICATION UPGRADING 4. PE 1092 - 77 Mission Ridge Addition ZE— 59 -77. Ag i . ultural to Single Family Residential and /or Two — Family Residential a. Location: b. Sponsor: c. Engineers: d. e. f. g. h. Site Size: Number of Lots: Land use proposed by sponsor: Existing Zoning: Advertised Zone Upgrading: i. Water Source: j. School District: k. Environmental Impact: whether or not this proposal will Friday, April 15, 1977, 9:30 A.M. Conference Room A, County Court House Annex (Use Mallon Avenue entrance) Section 9, Township 25 N., Range 44,E.W.M. The South 1/2 of the SW 1/4 of the SW 1/4 of the SW 1/4 of Section 9, except Fauser's Addition, also except the East 25 feet of the South 165.23 feet. Mrs. Roy Heggem East 11318 — 25th Avenue Spokane, WA 99206 Clarence E. Simpson Engineers, Inc. North 909 Argonne Road Spokane, WA 99206 2.5 Acres 6 Duplexes Agricultural, established April 24, 1942 Single Family Residential and /or Two — Family Residential Modern Electric Water Company East Valley School District A topic of discussion at this hearing may be have a significant adverse environmental impact. .LEPHONE NO.: 456 -2274 rJ 1 ScaL : ec y1 mitt. As- ta l'eSr µ 9 l " OFFICE OF COUNTY ENGINEER FsR AAk J ea_ ;At% From / R Inter- office Communication Ta, � To .n.. ,�, T Subject Al y SPOKANE COUNTY, WASHINGTON DatP r • \ s s F � � R A 6 t _ ! E 1A i s s; oh T pi c al ass ; o „ ` R 0\ c 10L k`K \-.) ' es. / /o hro 0 / Form 327 —C.R. N S e r f 4tA \ �- L .� S J 19 1st U X . 5"41 b cb ti slno-.)3 a 4 of cwrL 4' \e. * t y�•� :s r t �.._ R; A I Trk 4 BEFORE THE BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON /o 7 RESOLUTION NO. 85 0493 IN THE MATTER OF ) VACATION OF STREETS AND PLAT IN ) I SULLIVAN ADDITION ) COUNTY ENGINEER'S FILE NO. 352 RESOLUTION PLAT AND ROADS VACATION e CAI Ace Mi$Sta,v /Zile. This being the day set for the hearing on Spokane County Engineer's Report on the proposed vacation of SULLIVAN ADDITION and adjacent roads, proceedings for which were initiated by PRELIMINARY RESOLUTION NO. 85- , and it appearing to the Board on proof duly made that Notice of Hearing was published and posted in the manner and for the time required by law, and the Board after examining all claims and all maps and papers on file and after hearing all other evidence adduced at the hearing and it appearing that the hereinafter described SULLIVAN ADDITION and adjacent roads are useless and the same are no longer needed and that the public will be benefited by such vacation. THEREFORE, BE IT RESOLVED By the Board of County Commissioners of Spokane County, Washington, that the hereinafter described: BY BLOCKS 5 and 6 of Sullivan Addition, together with: GLENN ROAD - 60 feet wide, North line of NORA AVENUE - 30 feet wide, the East line from the South line of Nora Avenue. from the Northeasterly of Pierce Road. Baldwin Avenue, South to the line of Glenn Court, East to PIERCE ROAD - 30 feet wide, from the South line of I -90 South to the North line of Nora Avenue. ALLEYWAYS - between Lots 1 -40, Blocks 5 and 6 of Sullivan Addition. Located in the Southwest Quarter (SW 1/4) of Section 9, Township 25 North, Range 44 E.W.M. be and the same hereby are vacated in accordance with the provisions of Chapter 58.11.050 R.C.W. Subject to the filing of the final plat of Mission Ridge 2nd Addition and the dedication of 30 feet of Right -of -way along University Avenue. PASSED AND ADOPTED By the Board of County Commissioners of Spokane County, Washington, this 28th day of May, 1985. ATTEST: WILLIAM E. DONAHUE ERK OF THE BOARD D E P U T Y BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON aAKII A -A -Er I•LK.1 ,: % #:1'- I -�/ I 3 ' 1 h Z Z 3 l I I.1 Y 9 O � 1 1 I I 'O ,F0N ��.'- 0 r" rLOV! HI ON. - C.R.F. /369 I't I I I In it. J'.t it Li l 'l ` � 1 I:6/6 I ' - .1.1.1. r .1 . LI I •. � I II :1.• 1 ' 11 . I ; I l.: i I l`I LL:, =z 11 k . ..,,-.- It I 1'I� . _ 1 I c_1.11. Lam_. F"_ ` _ -tea �• T I • MI5514� 1 1� A'L -,%;),,,,: ;� a�•t°�_ S: J -1.r_4 L • r 6o � 0 1 0I- Mr r if • H � : H o : , I0 • 11 11 I ' 2 )03 NDIANA 6 AVE 6 30 ' QQ 1 hil I j 1E,D cc � G •••ss K. LI rz10GEf z f 1 I 3 11 2 I go 2-411 S�> <wc.l N ° 35z II �s -. 3 ff �1e } 11 D l I I ,i l� ijrli !ilI!I 0 z r t. I 4' e � r w . • :/g - 1'J1 B �CHICT� /V = RR 14 t. 1 1_ 1 2.02- n !i .1 ,^ Ii )PL 1 iv i • io t� I" P I CRSON zo' q' • E 71 l0,2bt5 — -K+1t ?- lili-XVA' 140•:\ t o 1 2 � J I '� och 1 O 1 d 7� 16 I " c n U1 tO h m T JA • SP ".LPJNG 99 _ 30• i ,00 • 104 1 0 s 90 9 i 94 „If I r lln;.1 r i n E I \ Iii 2_ o v1 r- - 0' - 3 •- \ i hl I b .. i _ 0 S m 4 � 1 _ b MONibUMEftY ^ � y Tir.er " d- o \ o 14 .. •' o L, 4 L'. :C. _ •,` !__Tf; - ,r'- !CYO : 2.L1 L ?T';":^ .4 a BEFORE THE BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON RESOLUTION NO. 78 425 IN THE MATTER OF ESTABLISHMENT OF AUGUSTA AVENUE COUNTY ENGINEER'S ROAD FILE NO. This being the day set for the hearing on Spokane County Engineer's Report on the proposed establishment of AUGUSTA AVENUE ,proceedings for which were initiated by Preliminary Resolution No. 78 -296 , and it appearing to the Board on proof duly made that Notice of Hearing was published and posted in the manner and for the time required by law, and the Board after examining the report and maps of the Spokane County Engineer and all claims and papers on file and after hearing all other evidence adduced at the hearing; and IT FURTHER APPEARING That the right_ of way has been dedicated as a public road_, 49 feet wide and that said i ,a public necessity and the same should be opened and established as a County road . THEREFORE, BE IT RESOLVED By the Board of County Commissioners of Spokane Cour *.y, Washington, that the hereinafter described road_ as reported by the'Spokane County -ngineer on the 6th day of April , 1978, being more particularly described as fol ows: AUGUSTA AVENUE - from University Avenue to Glenn Road as shown on the plat of Mission Ridge Addition. Located in the Southwest Quarter (SW 1/4) of Section 9, Township 25 North, Range 44 E.W.M. 9Y and as shown by the records and maps on file in the office of the Spokane County Engines- be and the same hereby is established as a County road_ and the same shall be know- as AIOSTA AAVCNUE No. 357 The road supervisor of the road district in which'the said road_ is ocated is hereby directed to open and maintain the same for public use and travel. PASSED AND ADOPTED By the Board of County Commissioners of Spokane County, Washington, this 6th day of April 1978. BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY WASHINGTON A" EST: VERN . OHLAND C'_ OF THE E PUT Y 352 G 6 RESOLUTION - ESTABLISHMENT HARRY M. IARNEO, CHM. RAY W CHRISTENSEN JERRY C. KOPET SUBJECT TO: A TCOR COMPANY Pioneer National Title Insurance Company Refer To: C- 114971 WEST 521 FIRST AVENUE • SPOKANE. WASHINGTON 99210 • TELEPHONE (509) 833.5201 CHARLES U ANDERSON VICE PRESIDENT AND COUNTY MANAGER Spokane County Planning Commission North 811 Jefferson Spokane, Washington 99201 REPORT FOR PLAT CERTIFICATE Proposed Plat Of: Mission Ridge Addition EXCEPT Fauser's Addition, and EXCEPT the East 25 feet of the South 165.23 feet. CC: Clarence Simpson Engineers North 909 Argonne Road This is a report as of July 21, 1977, at 8:00 A.M., covering the following property: The South half of the Southwest quarter of the Southwest quarter of Section 9, Township 25 North, Range 44 East, W.M., in Spokane County, Washington, Record title is vested in P. R. Heggem and Eris Heggem, his wife as to the East 135 feet of the South half of the Southwest quarter of the Southwest quarter of the Southwest quarter, except the South 165.23 feet, and except the North 50 feet; and Eva J. McGee, as her sole and separate property, as to the remainder. 1. Contract of Sale Vendor : Eva J. McGee as her sole and separate property Vendee : P. R. Heggem and Eris Heggem, his wife Dated : June 1, 1977 Recorded : June 8, 1977 Auditor's No. : 7706080303 Receipt No. : 157771 2. For easements, restrictions and other exceptions, see Schedule "B -1" attached. continued Report for Plat Cer,ficate Page 2 c- 114971 NOTES: 1. General and weed taxes for 1977, in the respective.sums of $74.78 and $0.10, are paid in full. (Assessor's Parcel No. 0 95 4 3 -9038) 2. Inquiry should be made as to any unpaid charges by Modern Electric Water Company. This report shall have no force or effect except as a basis for the certificate applied for. RCP /dm PIONEER NATIONAL TITLE INSURANCE COMPAN) Spokane County Office C i Authorized Signatory v v r SCHEDULE "B -1" 1. RIGHTS OF WAY FOR DITCHES AND PIPELINES, PROVIDED FOR IN CONTRACT DATED NOVEMBER 4, 1905, WITH MODERN ELECTRIC WATER COMPANY, RECORDED IN VOLUME "E" OF CONTRACTS, PAGE 267. RECEIVE AUG 241977 SPOKANE COUNTY PLANNING DEPARTMENT / S SP// S14/76t Sec. 9 Teo. 25 30 w 30 /70 /30 /70 x . ee- 4.+Tveu • "" "�'�i is LYA /causes's A0 o/TION Yo/ 4 Pa9c r The Company has not surveyed the premises sketched. The sk=;ch Pelee, is furm:hed without charge solely for the purpose of a. ;'h : ❑ Icca!mg seed premises and the Company assumes no L:.Ltd ty ter u,e:cma. taaent It dos not pu: p.;.1 to show ALL highways. road, and c...ements adj„ming or'attecting said premises. M /S / ON rv,74 s` • .02.1 A S S I G N M E N T For security purcosas only, P. R. Heggem and Eris A. Heggem hereby assigns to Spokane Ccunty, a municipal corporation, ther Savings M Number 13 - 584199'2 in the face amount of • $4,600.00 and held in and by the Pacific First Federal Savings-_& loan . Association Rada of Opportunity Washington Spokane Valley Office Branch: This assignment is made as security for the full and faithful perfortance by P: R Heggem and Eris A. Heggem , of the construdtion of certain • roads and sewers in Mission Ridge Addition , as. specified in the typical section and roadway improvement specifications for said subdivision, dated , and on file in the Office of the County Engineer.- account - Any interest benefits accruing under said savings niot 1X5dexxitg shall remain the property of . P.' R: Heggem or Eris A. Heggem Said savings NiMityaci is to be released to P• R. Heggem or Eris A..Heggem' . or any other party only with the prior written consent and agreement of Spokane County. Dated this 18th day of August . . .19 77 P.. R. He gem & Eris A. Heggem • SPOKANE VALLEY WILL FIRST FEDERAL SAVINGS & LOA A E. 12005 Sprague Avenue Opportunity, Washington- 99214 By By: Jea I. Landa Vice President- Manager �.__NUTES APRIL 15, 1977 PRELIMINARY SUBDIVISION AND ZONE CLASSIFICATION UPGRADING PE- 1092 -77 - MISSION RIDGE ADDITION: HEGGEM ZE- 59 -77 - AGRICULTURAL TO SINGLE FAMILY RESIDENTIAL AND /OR TWO FAMILY RESIDENTIAL Planning Commission Decision: Approve. sublect to the findings and conditions as listed below: (Vote was unanimous.) A. FINDINGS: 1. The proposed subdivision is located within the Spokane Metropolitan Area. Specifically, the proposal is located in the Spokane Valley and north of Mission Avenue and east of University Road. 2. Mission Ridge Addition is situated within an area designated as suitable for residential development by the approved map of the Park and Recrea- tion Element of the Spokane County Comprehensive Plan and its accomp- anying text. The Comprehensive Plan for the Spokane Metropolitan Area, as approved by the Spokane Regional Planning Conference, also desig- nates the area as a residential neighborhood. Boundaries of said neigh- borhood are University to the west, Sprague to the south, Pines to the east, and Interstate 90 to the north. 3. The applicant requests preliminary approval for the subdivision of appro- ximately 2.5 acres into six (6) lots for duplexes; thereby creating a gross density of about five (5) units per acres. 4. The lots in the proposed subdivision have been designed to accommodate either single family dwellings or duplexes with a typical lot size of 11,500 square feet and a typical lot frontage of 100 feet. 5. The proposed subdivision appears to be a compatible extension of exist- ing development in the area. Development to the south of the proposal i includes Fauser's Addition, Fields Addition, Maxwell Subdivision and Marion Addition.; while development to the west includes Jenney's sub- division and Valley Vista Subdivision. Located to the east of the pro- posal is the Spokane County Valley Mission Park. 6. The site in question is currently vacant and the USDA has classified its cropland potential as fair. 7. Public facilities and utilities are available within the area to serve the proposed subdivision to the following extent: A. Water and Power: Modern Electric Water Company states that "upon completion of satisfactory arrangement with the Modern Electric Water Company, the utility is capable of providing water for domestic use and fire protection, and electricity for residential consumption." -1n- PE- 1052 -77 - MISSION RIDGE ADDITION (Cont'd) B. Sewage Disposal: The site in , cuestion is located over the aquifer that serves both the City of Spokane and Spokane Valley. The Spo- :areCbunty Health District has approved the proposed subdiv- sion for on site sewage disposal. The District states "the topography and soils in the plat are suitable for installation of individual on -site sewage disposal systems. Such systems will have negligible immediate impact on the environment in the area but continued urbanization in the area at this density historically pollutes groundwater under the development at some time in the future." C. Schools: The proposed subdivision lies within the bounderies of the East Valley School District. The District's facilities are cur- rently at capacity levels and any increase in student enroll- ment will have to be absorbed by present facilities until their current building program is completed in two or three years. D. Parks: The Spokane County Valley Mission Park is located to the east of the proposed. The County Parks department has no present plans for future site acquidtion or major improvements in the area. E. Police Protection: The Spokane County Sheriff's Department has been contacted and no comment has been received regarding this proposal. F. • Fire Protection: Spokane County Fire Protection District 4'1 has been contacted and the District states hydrants need to be installed to provide for adequate fire protection. G. Roads: Adequate county roads appear to be available at the site to handle the increased traffic if the proposal is approved. The Spokane Regional Planning Conference's adopted transportation plan has designated both University Road and Mission Avenue as principal arterials. ?. The staff of the Planning Department has reviewed the environmental check- list as submitted by the applicant, and the staff recommends that a declar- ation of non- sianificence be issued. If the Planning Commission feels approval of this proposal would be appropriate, the department staff recommends the fol owing conditions: 1. That the plat be designed as indicated on the revised preliminary plat of record and /or attached sheets as rioted. 2. That a statement be placed in the dedication to the effect that no more than one dwelling structure be placed on any one lot, nor shall any lot be further subdivided for the purposes of creating additional lots or building sites without filing a replat. That the plat provide for right of way width for streets as indicated on the preliminary plat of record. That appropriate provision be made that the following described property be held in trust until the continuation of the streets be dedicated or deeded: A 1' strip at the ends or edges of all streets that terminate or border the plat boundary. (Temporary cul de sacs are required when streets terminate at the plat boundaries.) 5. That appropriate street names be indicated. 6. That appropriate utility easements be indicated on copies of the approved preliminary plat for distribution to the Planning Department and the utility companies. Written approval of the easements by the utility company must be received prior to the submittal of the final plat. 7. That a plan for water facilities adequate for fire protection be approved by the water supplier and fire protection district. Said water plan must also have been approved by the appropriate health authorities. The health authorities, water supplier (purveyor), and fire protection district will certify, prior to the filing of the final plat, on the face of said water plan that the plan is in conformance with their requirements and will adequately satisfy their respective needs. Said water plan and certification will be drafted on a transparency suitable for reproduction. The purveyor will also certify prior to the filing of the final plat on a copy of said water plan that appropriate contractual arrangements have been made with the plat sponsor for construction of the water system, in accordance with the approved plan, and in accordance w.th a time schedule. The time schedule will provide, in any case, for completion of the water system and inspection by the appropriate health authorities prior to application for building permits within the plat. The contrctu1 arrangements will include a provision holding Spokane County and the purveyor harmless from claims by any lot purchaser refused a building permit due to the failure of the plat sponsor to satisfactorily complete the approved water system. The plat dedication will contain a statement to the effect that the public water system as approved. by County and State Health authorities and the local fire district and purveyor will be installed within this plat, and the subdivider will provide for individual domestic water service as well as fire protection to each lot prior to sale of each lot. 8. That a certificate of title be furnished the Planning Department prior to the filing of the final plat. 9. That the preliminary plat be given conditional approval to May 1, 1978. —/2 — PE- 1092 -77 - MISSION ,uDGE ADDITION (Cont'd) 10. That a declaration of Non - Significance be issued, in accordance with Section 11.15.340 of the Spokane County Environmental Ordinance (SCEO) prior to approval of this recommendation by the Board of County Commissioners, or that any approving action of the Board be conditioned upon issuance of Final Declaration of Non - Significance in accordance with SCEO 11.15.340. 11. That a name be indicated before the final plat is filed; such name to be approv - ed by the County Assessor and the Planning staff. 12. The Spokane County Health District has determined that the soil conditions in the plat are suitable for on -site sewage disposal systems on each lot. 13. No more than two dwelling units per lot shall be permitted; an on -site manage- ment system shall be approved by the Health District. 14. That conditional approval of the plat is given subject to dedication of right of way to the public and approval of the road system in the plat by the County Engineer. 15. That plans, profiles, and cross sections showing proposed street centerline and curb grades be submitted to the County Engineer for approval prior to construction and the filing of a final plat. 16. That drainage plans and design calculations showing the grades and align- ment of drainage facilities be submitted to the County Engineer for approval prior to construction and the filing of a final plat. 17. Construction within the proposed public streets and easements shall be per- formed under the direct supervision of a licensed land surveyor, who shall be responsible for perpetuating all evidence of the location of survey monuments which may be disturbed during construction and who shall furnish the County Engineer with "As Built" plans and a certificate in writing that all improve- ments were installed to the lines and grades shown on the approved construc- tion plans and that all disturbed monuments have been replaced. 18. No construction work is to be performed with the public right of way until a permit has been issued by the County Engineer. All work is subject to inspec- tion and approval by the County Engineer. 19. All construction with in the public right of way is to be completed prior to filing the final plat or a bond in the amount estimated by the County Engineer to cover the cost of construction of improvements, construction certification, "As Built" plans, and monumenting the street centerlines shall be filed with the County Engineer. 20. Upon the filing of the final plat, upgrad Mission Ridge Addition to the Two Family (R -2) Residential Zone classification. - 13 - (Cont'd) PE- 1092 -77 - MISSION RIDGE ADDITON (Cont' d) C. GENERAL DATA: 1. Location: Section 9, Township 25 N., Range 44, E.W.M. S 1/2 of SW 1/4 of SW 1/4 of SW 1/4 of Sect 9, except Fauser's Addition, also except the E 25 ft of S 165.22 ft. 2. Sponsor: Mrs. Roy Heggem E. 11218 25th Avenue Spokane, WA 99206 Engineers: Clarence E. Simpson Engineers, Inc. N. 909 Argonne Road Spokane, WA 99206 4. Site Size: 2.5 acres 5. Number of Lots 6 6. Land use proposed by sponsor: Duplexes 7. Existing Zoning: Agricultural, established April 24, 1942 8. Advertised Zone Upgrading: Single Family Residential and /or Two Family Residential 9. Water Source: Modern Electric Water Company 10. School ristrict: East Valley School District 11. Environmental Impact: A topic of discussion at this hearing may be whether or not this proposal will have a significant adverse environment- al impact. - 14 - Inter - office Communication OFFICE OF COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Da +a 'T„ 'LANNING GO`nrISSION q From GARY KENNALY, PLANNING 6, TRAFFIC DIVISION ENGINEER r`1w a-7 041// • PC 1092 -77. 2-E- 59 -77 NMsstonl RI Dee 4DD1 Sub** April 11 15 77 that conditional approval of the plat is given subject to dedication of Right of Way to the public and approval of the road system in the plat by the County Engineer; that plans, profiles, and cross sections showing proposed street centerline and curb grades be submitted to the County Engineer for approval prior to construction and the filing of a final plat; • that drainage plans and design calculations showing the grades and alignment of drain- age facilities be submitted to the County Engineer for approval prior to construction and the filing of a final plat; construction within the proposed public streets and easements shall be performed under the direct supervision of a licensed land surveyor, who shall be responsible for perpetuating all evidence of the location of survey monuments which may be . disturbed during construction and who shall furnish the County Engineer with "As Built" plans and a certificate in writing that all improvements were installed to the lines and grades shown on the approved construction plans and that all disturbed monuments have been replaced; no construction work is to be performed within the Public Right of Way until a permit has been issued by the County Engineer. All work is subject to inspection and approval by the County Engineer; • all construction within the Public Right of Way is to be completed prior to filing the final plat or a bond in the amount estimated by the County Engineer to cover the. cost of construction of improvements, construction certification, "As Built" plans, and - .on_;.enting the street centerlines shall be filed with the County Engineer_ that the Sponsor shall prepare and submit to the County Engineer a design proposal accept - abl€ to the State Highway Department of the proposed State Highway - County Road intersectio State Highway Department approval of the proposed design must be received prior to the filing of the final plat. Improvements to the State Highway are to be the responsibility of the Sponsor and may either be constructed or a bond to cover the cost of such improve- ments furnished to the County Engineer in the amount as determined by the County Engineer and the State Highway Department. DeDtcc1 Tip..t Id AODITlO■Ift 2/1 Ao•JG ON've,zs/r1 Avevver Da lcATro.4 25 ADDITio44L. Ani/ 4La./5 EAST "La w n/ GwEr. AaAf: FuTu2E EXTErisio' -/ of Gt-En/n/ 2oao. 1 2 3 4 5 6 Diary Section Comments:i0 ,;; <r.: , r,: ;r +, .,: , • ` ,. DAILY-INSPECTION I Equipment List A OFFICE OF THE SPOKANE COUNTY ENGINEER NORTH 811 JEFFERSON • WASHINGTON 99260 ./(0.12. 91 509 - 456 - 3600 i Date ,r--,C4__ F 1 Project Name 41„ Inspector ! -• Project No. CRP /RID . Weather Report No. Time Charged Contractor this Day -1/2 or 1 Contractor and /or Sub(s) Other County Personnel Hrs. Used Standby Contractor Personnel Classification Number 1 2 3 4 5 6 INSPECTOR'S SIGNATURE " „% ..: M)Knn[ �a uiJi i�U n� nJU aL Lyle Anderson Inland Asphalt Company P.O. Box 11036 Spokane, Wa. 99211 TEY:gg `c;400 December 5, 1980 Ul'l ^.Ut: (IV COUNTY ENGINEER ROBERT S. TURNER COUNTY ENGINEER Sl'oaaavE t Wana iN(Yron 99260 RE: Mission Ridge #1092 Mission Ridge 1st Add. #1202 Pondra Pines 1st Add. #1178 Dear Lyle, The rough grading, drainage, curb, and top course at the above mentioned plats have been completed to a degree so as to allow a 90% bond reduction for these items. I have conveyed this to our bonding person - Jerry Sims. If you have any questions please contact Jerry or me at 456 -3600. Yours very truly, Robert S. Turner, P.E. Spokane County Engineer Thomas E. Yaa e, P.E. Construction Engineer Public Works Building North 811 Jefferson Street Spokane, Washington 99260 (509) 456 -3600 N• �2q�✓�r GESSO- & 0214 GAS r g/er_ra S r. by gl.U4 Loa. LtA N. / 736 a o w. L, c. M4ae S od -Sz9 -/4-3 44 RS toy G BlC <e t! Jt= N April 28, 1978 ROBERT S. TURNER, P.E. SPOKANE COUNTY ENGINEER VE RRI OFFI ns SPOFANt LOUr.ly COLJRr HOUSE SMALE ENGINEER Pacific First Federal Savings & Loan Opportunity Office East 12005 Sprague Avenue Spokane, WA 99206 RE: PE- 1092 -77 - MISSION RIDGE ADDITION The Savings Account Number 13- 584199 -2 in the amount of $4,800.00 securing the completion of the required road improvement work in Mission Ridge Addition may now be released to P. R. Heggem and Eris A. Heggem. cc: P.R. Heggem and Eris A. Heggem ( sap c::U7 •?; ; «(D TH: `rirr OFl ^I (:L OF COUNTY ENGINEER ROBERT S. TURNER COUNTY ENGINEER SIDOICASM , «ySfIN OTON 991111 For security purposes only, P. R. Heggem and Eris A. Heqqem hereby assigns to Spokane County, a municipal corporation, the following: Savings c outt Number 13- 584199 -2 This assignment is made as security for the full and faithful performance by P. R. Heggem and Eris A. Heaaem roads and sewers in Mission Ridge Addition the typical section and roadway improvement specifications for said subdivision, dated , and on file in the Office of the County Engineer. account Any interest benefits accruing under said savings gjuk.Ata shall remain the property of • P. R. Heggem or Eris A. Heaaem Said savings giiiiiicate is to be released to P. R. Heggem or Eris A. Heqqem • or any other party only with the prior written consent and agreement of Spokane County. Dated this A S S I G N K E N T in the face amount of $4.800.00 and held in and by the Pacific First Federal Savings. & Roan Association alt of Opportunity , Washipatnn Spokane Valley Office Branch: 18th day of , of the construction of certain By: ._as specified in • August 19 77 . P. R. Heggem & Eris A. / Heggem By 2f4.-44;,i 9 ° �fC 2-12 44 SPOKANE VALLEY OFFICE PACIFIC FIRST FEDERAL SAVINGS Re LO E.12005 Sprague Avenue Opportunity, Washington 99214 Je&n I. Landa Vice President - Manager OFFP OF SPOKANE COUNTY ENGII"tER 5. JKANE COUNTY, WASHINGTO. TO PERFORM WORK ON COUNTY ROAD RIGHT -OF-WAYS . PERMIT NO r. NAME OF APPLICANT Inland Asphalt Company DATE 4/14/R1 ,ADDRFcs E. 6614 Main - Sok.. WA PHONE NO 514 - 2697 JOB Nn STATE CONTR'S LICENSE NO n079109 —R2 The undersigned hereby applies for permission to Install 1 drywell, concrete curb, grading, crushed rock, and asphalt paving at Mission Ridge - Augusta St. - Job for Roy Heggem. 9 - aS -44- Pursuant to frenchis. rated Date Work to Start 4/1 5/81 The estimated time required for completion of the above work is 30 days which the petitioner agrees to prosecute with all diligence and speed with due regard for the rights, interests and conveniences of the public. Petitioner further agrees to perform the work in strict compliance with the provisions enumerated below and states that he has read and will adhere to the general provisions applicable to permits contained on the reverse side of this form. The undersigned guarantees that if the backfill, street surfacing or improvement fails within one year from the date of final inspection by Spokane County, he shall pay the cost of the County for making repairs or restoration of the roadway and improvements. In consideration of the granting of this permit it is agreed by the applicant that the County of Spokane and any officer or employee thereof shall be saved harmless by the applicant from any liability of responsibility for any accident, loss or damage to persons or property, happening or occurring as the proximate result of any of the work undertaken under the terms of this application and the permit or permits which may be granted in response thereto, and that all of said liabilities are hereby assumed by the applicant. It is further agreed that if any part of this installation interferes with the future use of the highway by the general public, it must be removed or relocated, as designed, by the engineer at expense of t e permitee or his successor in interest. SIGNGn TITLE CoNsTR, PERMIT Subject to all the terms, conditio s, and provisions written or printed below or on any part of this form. PERMISSION IS HEREBY GRANTED the above 1//t applicant to: _..t`_p ! BY V a G TOTAL 3a • C) INSPECTION FFF .is required to insure compliance with the above conditions, said bond to be kept in full . __years following completion of work authorized by this permit. PERMIT FFF A bond in the amount of force and effect for a period of INSPECTION REQUIRED — 24 HOUR NOTICE REQUIRED Call Permit Office 456-3600 to notify when work begins and schedule inspection This permit shall be void unless the work herein comtemplated shall have been completed before COUNTY ENGINEER n.t,.10 -45 4 . DATE UTILITY DAMAGE IS COSTLY. CALL BEFORE YOU DIG. 19 a � It is the responsibility of the applicant to notify all utilities and private property owners when such property is liable to injury or damage through the performance of the above work and the applicant shall make all necessary arrangements relative to the protection of such property and /or Utilities. TRAVERSE ANALYSIS OF MISSION RIDVE ADO 0/ SURVEYOR: SIMPSON ENGINEERS N909 ARGONNE SPOKANE MASH 99206 926 -1322 CHECKED BY: SPOKANE COUNTY ENGRS CATE: 08/10/77 I - - -- LATITUDES -- - -1 I - -- DEPARTURES ----I RICK LOT BEARING DISTANCE N 0 R T H S O U T H E A S T W E S T- PLAT BDRY N 0 0 7W 165.199 165.190 0.006 PLAT BDRY N 89 40 20E 664.121; 3.799 664:109 PLAT BDRY 5 0 1 8W 164.930 164.930 0.054 PLAT BDRY S 89 39 OW 664.060 4.057 664.048 168.989 166.987 r 664.109 664:108 AREA = 109612. 50 FT 1 2.52 ACRES) 1 CL N 0 0 7W 140.190 140.190 1 CL N 89 40 20E 664.110 3.799 664.099 1 CL S 0 1 8W 139.930 139.930 1 CL S 89 39 OW 664.060 4.057 0.005 0.046 664.048 143.989 143.987 664.099 664.098 AREA = 93009. 50 FT ( 2.14 ACRES) 1 SL N 0 .0 7W 95.290 95.290 .. 0.003 1 SL N 89 59 53E 20.000 0.001 20.000 -- 1 SL N 0.19 40W 20.000 20.000 0.114 +CURVE: DELIA = 89 40 27 RADIUS = 20.000 LENGTH = 31.302 TANGENT = 19.887 1 SL N 89 40 20E 569.090 3.256 569.081 1 SL S 0 -19 40E 20.000 20.000 0.114 1 SL S 89 58 52E 20.000 0.007 20.000 +CURVE: DELTA = SO 20 48 RADIUS = 20.000 LENGTH = 31.537 TANGENT = 20.121 1 SL S 0 1 8W 94.820 94.820 0.031 1 SL $ 89 39 OW 609.060 3.721 609.049 118.546 118.547 609.195 609.198 AREA .= 69907. 50 FT ( 1.60 ACRES) 1 1 N 0 0 7W 95.290 95.290 0.003 1 1 N 89 59 53E 20.000 0.001 20.000 1 1 N 0 19 40W 20.000 20.000- 0.114 +CURVE: DELTA = 89 40 27 RADIUS = 20.000 LENGTH = 31.302 TANGENT = 19.687 1 1 N 89 40 20E 80.110 0.458 80.109 1 1 S 0 0 7E 115.140 115.140 0.004 1 1 S 89 39 OW 100.000 0.611 99.998 115.749 115.751 100.113 100.116 AREA = 11431. 50 FT t 0.26'ACRESI 1 2 N 0 0 7W 115.140 115.140 0.004 1 2 N 89 40.20E 100.000 0.572 99.S98 1 2 S 0 0 7E 115.10C 115.100 C.004 1 2 S 89 39 OW 100.000 0.611 59.598 115.712 115.711 100.002 100.002 AREA = 11512. 50 FT ( 0.26 ACRES) 1 3 N 0 0 7W .115.100 115.100 0.004 1 3 N 89 40 100.000 0.572 99.998 1 3 S 0 0 7E 115.060 115.060 0.004 1 3 5 89 39 OW 100.000 0.611 99.598 115.672 115.671 100.002 100.002 AREA = 11508. 50 FT ( 0.26 ACRES) 1 4 N 0 0 7W 115.060 115.060 0.004 1 4 N 89 40 20E 100.000 0.572 99.598 1 4 S 0 0 7E 115.020 115.020 0.004 1 4 S 89 39 OW 100.000 0.611 59.598 115.632 115.631 100.002 100.002• AREA = 11504. SO FT ( 0.26 ACRES) 1 5 N 0 .0 7W 115.020 115.020 0.004 1 5 N 89 40 20E 100.000 0.572 95.598 1 5 S 0 0 7E 114.580 114.980 0.004 1 5 S 89 39 OW 100.000 0.611 99.598 115.592 115.591 100.002 100.002 AREA = 11500. S0 FT ( 0.26 ACRES) 1 6 N 0 0 7W 114.980 114.980 0.004 1 6 N 89 40 -20E 88.980 0.509 88.979 1 6 S 0 19 40E 20.000 20.000 • 0.114 1 6 S 89 58 52E 20.000 0.007 20.000 +CURVE= DELTA = 90 20 48 RADIUS = 20.000 LENGTH = 31.537 TANGENT = 20.121 1 h S 0 1 8W 94.82C 94.820 0.031 1 6 S 89 39 OW 109.060 0.66E 109.058 _ 115.489 115.492 105.093 109.093 AREA = 12453. 50 FT ( 0.29 ACRES) LOT ARFA STATISTICS FOR: MISSION RIDGE ADD 08/10/77 BLOCK 1 AREA = ACCUM AREA = DIFFERENCE = GROSS DENSITY: NET DENSITY: LARGEST LOT: SMALLEST 1 OT: AVERAGE LOT: # OF LOTS: 2 LOTS /ACRE 4 LOTS /ACRE 12453. SO FT 11431. SO FT 11E51. SO FT 6 69907. S0 FT ( 1.60 ACRES) 69907. S0 FT ( 1.6C ACRES) 1. 50 FT KNOW :ALL`MEN BY THESE. PRESENTS,' that ":Wolfland 'Inc. , corporation organized under the laws of the State of Washington, and H. Brandt .Gessel Jr., -an individual, = .have caued to be platted into lots, . blocks and streets the lend shown' hereon as "MISSION RIDGE FIBST ADDITION" and described as: .follows : That portlon of the Southwest.quarter?ofSection T. 25.1 . ,: :R. '44 "E. W. M. in Spokane County, Washington described'.: as follows: " The South half of the Southwest quarter of. the quarter except the platted portion, also except; the :West .:200:feet, Also except the South 10, feetof the East - 112 feet of the West 112 feet of the Southeast,quarter,of the Southwest: quarter ..o of the Southwest' quarter, : except, the West 20 feet thereof;:. Also except the East 162 feet of the South 330' feet - of the Southeast quarter of the Southwest quarter of .the Southwest quarter.. No more than one detached dwelling :. structure shall be placed on any one lot nor shall, any lot be further "subdivide, for the purpose of creating . additional lots or building sites without filing replat. ;. A public water system as approved by. County and State Health- Authorities, `the local fire district, and the water supplier. (purveyor) Will be installed within this plat, . and the .subdivider will provide for. indiv .. domestic Water service as well as fire protection to each lot .prior "to.sale of each lot. X� 1979. H. Brandt Gessel, Jr. Wolfland, Inc, /■ The plattor does hereby dedicate forever the streets shown hereon for public rood purposes: Each_ lot is authorized for the use of individual on - site sewage disposal systems. 'Lots ` 1. - trim .13, : Block _1. and Lots 1 thru 7; Block 2 are duplex lots. 14 and `,. Block 2 shall have a 30 foot setback • f the front property line to the . building ine. The owner,. his Grantees and Assigns 'agree to participote in and. not oppose or protest 'a Road Improvement District on Mission . Avenue. . The ownership of each lot shall be a member of the 'Mission. Ridge First Addition Homeowners Association until dissolution of said .Association. IN WITNESS WHEREOF, we have hereunto set our.hand and affixed our seal this 7"' day of r• Vice ! President ACKNOWLEDGEMENT STATE OF WASHINGTON )SS COUNTY OF SPOKANE )SS this •q 7 day of Z/ ;- 1979, before me personally 'appeared F.V. Seipp and. A.J. Wolff, Jr. , known to be president and vice president of Wolfland, Inc. and H. Brandt Gessel_ , Jr., an individual, ;. who executed the within and foregoing instrument and acknowledged the sarne to be. their free and voluntary act and deed for the uses and purposes herein mentioned. The .officers of Wolfland, Inc. each on. oath stated that they were authorized to eizecute said instrument and the seal affixed is the corporate seal of said corporation. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written: 0 8 O 9 t W 1/4 CORNER FOUND . COPPER WIRE IN 2" PIPE • ACCEPTED AS . PER MISSION RIDGE ADDITION . 21 I 22 1 23 i . 2 4' .,.I 25 1: 26 J .__. _ porgy Lt')//)),, j)i i( 8' 9 =. 17 X 16 I I 30 I SW SECTION CORNER FOUND MONUMENT WITH COPPER WIRE ACCEPTED AS PER • MISSION RIDGE ADDITION Notary public 3. and for the State of. Washington residing at 7 T , Washington commission expires (99.87 S 89 °41'41" 170.00 " 39'27'28" R 167.1o76 T 60, 00 L 115.22 . Exam i ned and approved this Examined and approved this Examined and approved this Examined and approved. this .+Examined and approved this / Examined and approved this ;/t`. / day of- day of',. day of day of, day of day of 13 CURVE DATA "B" "c" 39° 4 '2 " 411° o8138" 276. 0545 172.632 1.00, 00 70. 00 191. 133.01 r' t I Cs. I 1 n . tv ) , t..)t . ►� AVENUE 1 . 90 - , 16:98 • sf , cr, O 0 O 0 0 8 2 1979 6° 22'33" 897.712 5o. 00 99.90 1979 , 1979 • 90.00 90.00 . 90.00 5.,89,4Qi Q .. AUGUSTA AVENUE T 1 1 t t. i t r . t ? 1. 8 3.52 ENGINEERS CERTIFICATE - The bearing of S 89° W along Augusta Avenue, as.per Mission. Ridge Addition, was used as the basis of bearing -for this plat. I, Clarence E. Simpson, a licensed Civil Engineer and Land Surveyor, hereby certify•that this plat represents a true copy of the official record and survey made by me, and that the lot corners and monuments have been set. Clarence E. Simpson Professional Engineer and Land.'Surveyor COUNTY OFFICIALS o' 0 0 0 z ADDITION I hereby certify that the required taxes on the herein platted land have been paid this 310:98 1183 46" W • MON. 8t CORNERS FOUND (AS NOTED) 0 CORNERS SET 1/2" REBAR CAP NO. 706 0 SPOKANE COUNTY STANDARD MONUMENT --- SUBDIVISION BOUNDARY Spokane County Treasurer Spokane County Assessor Spokane County Engineer 1979 Spokane County Utilities Director pokane County' Plan 0 90.00 N 89 °40'20 "E N 89 °40'20 "E LEGEND By By r 0 . 90.00 8 0 '. Z 9 O. 51 90.00 10 0 tn' 90.00 M 0 0 e 90.0o N 89 °40'20 "E --*2659.837 101.43 0 0 Z. 4 6.4 5 7. 0. 00 ✓0 LL .1 r r ) J 664.00-- r= i r _ -1 rocs A INt \t r - ''JtJI. 1 1 \lt L_ 90 :00 -75.88 -- N 89°40 N 93.70 93.85 16. 4 , , ' N 89 °4114111 E \y J, 194.97 0 t y 4 B ee . . 1 _ 94.55 90:00 : r Ii�w 132.00 5' CC 01 !1 :;NF-1.A TIED 1 zit w J 1 0 I 132.00 0 2 M/\ r4 A r -, tr , nt l�t \li A l'"N r l T t r. I\ r-% t....)1.11 t r ■lt c� �Y 25 11 . 26 27 I 28 I 29 I 30 I 31 1 32 1 33 1 34 1 35 1 36 1 ' 37 1 38 1 39 1 40 1 1. 1 1 . 1 t.•�P R.4 teilh 1,1'5 GAP 9 . 56 6 L'O X 0- 0 _ 0_ 15 9 .... 0 . _ h r tP N 83 035 w R) N�\ r o. 0 '0 p M 0 92.50 17 14 68 0 O M w co 0 0 0 0 z MISSION N 89 °39 E f 1979 am t.. g Department Director Spokane ,ounty:Commissioners,Chairman 1' . + Spokane County Health District Health Officer. 1128.47-- cv 39.71 199.21 'N 89° 3 92.50 \ \ 92.50 BLOCK w 00 18 1 0 19 - z 4) 7 � ..., 2 ...... i 0 ..._.... 92.50 S 89°39'00" W °- 370.41 T 1111001• MINIM A r jf \I i I On1 MARCH 1979 SCALE " =50 j4 E OR) 1 0 0 L0 ro 122.52 115. 12 AVENUE 664.00 - -- 2656.00 -- - 4 1 3 BUILDING SETBACK LINE. 0 81.72 55.00 w ct N M °O N 89 °39'00 E 13.00 50.00 92.56 16. 0 20 M FINAL PLAT 1 60.00 S 89 °57'36 "E 16.7d es (11 cf CL 105.00 75.00 S 89° 39 IN 162.00 130.00 ' SCALE 1." = 50' 92.51 : 162.00 C i/4 CORNER. FOUND t" PIPE ACCEPTED AS PER MISSION RIDGE ADDITION� 2 0 r) A PLAT IN A PORTION OF THE SW 1/4 OF THE SW 1/4 OF SECTION 9, T.25 N., R. 44 E.W.M. SPOKANE COUNTY, WASHINGTON 0 MISSION RIDGE FIRST ADDITION SF'OKANE, WASHINGTON st II i to oi 0 0 S 1/4 CORNER FOUND MONUMENT I WITH COPPER WIRE ACCEPTE6 AS PER! MISSION RIDGE , ADDI'l co 0 o 0 L .1 1AQr, es :.. TYp. c.A.V t...o-r s tz_tz. (!, Soa TYetc, -4c .t:Wiz' tsr? x tbc) T701144,. Ae.w. r ` 1 . , •� r - Nekt G. 1 Way & Cou�?c'C C'*3-.(14 1 I C L. E Vale +1 -(69 weers- M MAR 341977 SPOKANE .COUNTY . PLAtfN1110 DEPARTMENT Jc /Neo. 2 /50 .S0 MONTGOMERY I ' Q. 0 514 " 0 42 41 40 ' 112.7 132.7 $32.7 jl 1 1 ,t) Z o t}/ -7 '1 1 > ,C;le 32.7 132.7 8 6 ' N 6s 4F AIRVIE.. 39 38 37 GRA-10E If N8 9 MONTGOMERY DR. - C.R.P. /389 11 II! II 1 ! 1777" -- 27 Ii : 111:11 , 111/ . . I II f ' (I II ! I I I I NI " / / t • 1 ;, 1 / V , / ' c1.0),54. A • ••••• 1-Z- 7 • s•zo . . , • 1 [2 9 tn . k ; 10 T 11 gr 12. 13 14- I 15 17 N N i37 132 7 " _ . FAIRVIEW-0 No. l'3G7 - 40% - c• 36 35 34 33 32 31 30 29 28 27 20 25 .24 P N it36 7-4D' :21 0 N 1 D rE 1 6 - / 5 - 72 4. rO JACIZ SON , 75 / A , 8 } 84 I :9 93 sEc,o, SEC.9 T.25N.R 4 4 E 14 r- s • 6 S' /9 IT F g @ 0 41, . t l'i N ft M ••,).>, 2■7.5 l.1 s2 ,, 744 . :13 FREDERICK 40" - - t..1›.. 1 .. : I I:; 1 3 r : 1 1 0 ' 1 <9 1 1 c f . ° • .// ■ -- . 18 19 20 21 22 I 0 k -. :7•,....}: 4-0' ' ••-:7- , - I', s; kc€1 I ...- • •. 132 74i 11 1,,, • /t/O., /8/ 3z. • •3.11 ..3 9Y I I I . . -4 ; .„-_,,,,, , /2 /3 I.5 I I /c I / 1 T ' 7 1. '-',L G R Ai. C It. -.a.. , 23 6!1• ii 9 8 • 1 c 0 91 4 1 49 50 51 SZ 55 5* 55 56 57 ••D .,.i. .•••" - z- 1 17 ..t. -r, P. -4- Sc a I e - 400 • 5 ., rn ui g 7 ZO A E k A 2.o' Not Cons/co ;tea by 4 3 BUC <EYE 32.7 30 1 2 7 02.9 ro' 4; c- 1 1• fT , [ 1 1, x sl• k Et ! 4 ; • /14.9 T6 9 ; 9 12.145 tee 41'0 F F 7 1.4 10• 1 1 2 /3 , , 15 • BLI CKErY •tl- 'c • t-' \ • a) , 1 0 + 1 ,,,:t fR5 la ..0.7-: !: °.-4 ) ‘-• 64- 5 4.1 ,k): 1404\ _ - - 2,}.....- -1 F? T.33+87.9 No. / a .. . . „ 1 21 1 4 j 516 7 6 ' 9 I 19 17 16 15 14 i i -, - 1 ."; 1. i i . (s i 17' • .P V- Ce -ILI N1 ... ce ir 0 to 05 3 INDIANA AVE F " 1 ' 1 ; 1 II 108 I 12 ./t/ 1/20/ '' .. .. ::::::::: : : .:::::"•:- ....... : ::::: :: : ..................... .. .. ..., r. . • kJ 3S-13 1. 0..r//2 co Riw or<1 R/w or 10 i 3O11 5 . .itt6, ------ -344 / . 3 5' tAAN ;3 14, 15 16 17 1 8 n1 • - 4 . 1 --- 6, 150 ' 8 • 3 - ;40 4 ; I_15 1 7 45 I I VIE A E. • • •• 32.2.5 3 2.1 52 z 21. DESCR1/ IV REPRODUCED FROM IVEN TO 3 : O.' • : • ' • . • • • .............. ........ .. ........ ... .. ..... ... ....... ....... .. . f' • ...................... :,•' ........ ....... ....... • .... .......... •:•:•:•••• : . . : rei5 3 2 / / 7 1 3 2 /4 a, = 89 51' 0: 3 0 ° R T. T=19 L - 299.5' N89 596.5 "r.F39 +7 4- 3 11 274 2)4 a %, c• 24 a6 1\ Y L-A R. /0 , // /2 132. 7 25 "'l c-D a / <4) 20 (>... ,"" 2f 22. a 3 13Z z. esge.,.3it:=6==ft,. N cor Int S..14 C /2 o OFFICIAL County Engine /0 I 7.H -R 4 4 3 2 /2 /3 /4 /5 /6 /7 • ig AVE NLIE 1 /0 I 1 9 11 8.#.' l.t.' 5 4 3 0 71 1 103 9s 27 28 2 20. -too 3e• 31 5 46 .45 4-4 rs 4 3 4-7 48 3 339 4.1. 331.9 ' C.1 I oz, 7 I . k I 0 Ij I 34; .. 34 ••• .................... ... OpP "R17 1 :1) in a 1944- 65,5%7 •J ; IN /.5c 50 0.)17 4 ; 934 8 • 4 Q., 1 At 13..7 tlt. too j 55./0/-1 AR2C)C7a/ G. PaY 71 G 5 4 7 24 PLAT E N T ...SCHOOL 3 1 06 O. 3 A. F? - Sec C". A 0 ° 9O 0 3 i1.... 32 19."' 7 _ - ., ..... ....rd- . 50 ' Se ? 1840-57 . f..? I 6 17 221.7 21.i 222. r I No. 2 J3 13 14J I5• \,1 EC 0 1$Q-2 1 id; ----- 34----- - 3 3 zoi ( III 6 C *. r lark .ci F 4 ....k : 00 . • . loo loo 1 37 1 r ' 41 -3 5" 36 S7 32 39 4-0 4-1 17 ..,., , _1},---r-,_ \ ' 1 ? I \ 1°"-'4. - ..... - A1 7 LTATEL.T 2. =. 2")4 1f:•: - - ` 1 ,., \ 1 13 . 97.G' ..?L2 ; 1 s• 1 1a 4 3 c bti 2 a 3t .„ '-el u .55 49 50 SI S 5^3 54 -----1771 6:: ,,i 4 , - .':•; : ,.. : , : : :. : ............. ::..;5:Cd'..:::,..,4..:;,;,:t...:.:;.:,,:i:it...4.....:...:1 . .... . : .............. :" .. . :• ....... ::::::::7:::: ?:::: ................... :•••••• ..... ........ • . , . ... .......... .... . . .... .. .. . ................................ ... ......... .... . .. ....... . • ha 44 . .. ............. . . ......... ..... . ............ „ ...... ...... ........ . ; ..... ••••••••• • . .. . ... ... •. . •- ........... :•••• • . . .. . • ............ • .. ......... • • 1.91, /1* , '43. / -60 AVE N UE RtrilvED MAR 1 4 1977 SPOKANE COUNTY PLANNING DEPARTMENT ... .. ... ........... 351 352 .413 SG. • 105 55 • IiJ 61. 4 7 :3 C.5 R.. •.A.4.4"/seyc. if_ L- P. CT ftS9 /603 ( " :1 01I 4‘2 / 1.51,onvenorti Co; ecir-s• i670 ,,,,!- .511.1?:Y" TE a„c•+53a, 74. BE4.2 .............. . /.5o7 ......... ....... • ....... .............. . . . ..... • • ................................ ............... • . • . . ................... ................. • ..... • • • • • • • " • • ....... • .......... ........... .• • .:::• • • • • • ....... .. .. ............ . ... ........... ••••• ............ ... ...... .. • . .... .... ..... .... . .................. .%::: . .. .......... ... ............................................................. ............................ .0" 10 3i-O3 AR- Sec. or 15 0°0 744. and `8f: u� i; , UT SW CORNER SEC FOUND MONUMEN7' WITH WIREB as pe County � 17 I6 — Notes on file i LEGEND 8� W. I/4 . CORNER FOIJNO COPPER . IN: 2 PIPE GS per County Notes t on file M 0 -_ Ih vt t0 N I - 3 I _ h- 0 O 3 11 0 0 1 z 0 o 30 0 I N 1 0 z 1 . 80.11 s •MON. 8r CORNERS FOUND (AS NOTED) o. MON.& CORNERS SET I /2 "REBAR TAG 706 ■SUBDIVISION BOUNDARY • 100.00 ENGINEER'S CERTIFICATE I,`Clarence E. Simpson, a licensed Civil Engineer and Land Surveyor, hereby certify that this plat represents a true copy of the official record and survey made by me, and that the lot corners and monuments have been set. o _ 0 — 0 Clarence E. Simpson Professional Engineer and and Surveyor 0 z N 89 100.00 2 100.00 r - . I / r_1 I I 1 r c I '8 c_ N 89° 40' 20 "E -- 664.12 -- AUGUSTA AVENUE 664.11 0 0 1) o 0 0 z M ISSION AUGUST 1977 SCALE . 1 50' N 89° 49'44" E _ 100.00 3 N- o 0 0 0 z 10' UTILITY EAS EMENT ---664.00-- N 89° 39'00" E 100.00 \. oo.00 N 89° 39' 00 I E N 89° 39' 00 E 664.95 r- , 1 IN r - r ( loo.00 ... ...., � ............. loo• 00 — _ 1 ........ ..... � , 664.06 AS PqR FAUSER'S • ADDITION 2659.8 n !t r r 2656.00' 0 ° L 0 0 — z r� -�r r1 11 / -1 r_, I 1 10 r - A • r 1 i � It � 1 -FOOT STRIP L-I 8 -2 AVENUE The bearing of N 89° 3' " E along the veenterline of M :_ssion Avenue, per Fauser's Addition, was used for the -basis of bearing for this plat. FINAL PLAT • ti N MISSION RIDGE ADDITION 1— - - -- ---- 1 -- ------ - - --- A PLAT IN A PORTION OF THE SW 1/4 OF SW 1/4 OF SECTION 9, T.25 N., R.44 E.W. M. SPOKANE COUNTY, WASHINGTON CLARENCE E. SIMPSON ENGINEERS, INC. SPOKANE, WASHINGTON C 1/4 CORNER FOUND 1 " PIPE a per Fair Mobile Home Subdivision ■ SCALE I 50' 1992.00' A N89°39'00" VE 16 FOUND MONUMEN WITH COPPER WIRE S 1/4 CORNER as per County Notes on file N M Acs vt N l 0 0 I (1)