Loading...
10-067.00 Inland Asphalt: Sprague Rehabilitation Ph 1CS ITY OF Public Works Department pol�,ane C apital Improvement Program ,,;oO 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhait@spokanevalley.org Memorandum Date: June 11, 2010 To: Mike Jackson From: Shane Arlt Cc: Neil Kersten, Steve Worley and Finance Department Re: Change Order 8 — ADA Ramps - Sprague Avenue Rehabilitation Project Budget Account No: 307.307.0110.595.30.10.00 Change Order #8 is for removing and replacing (3) three existing ADA ramps that were not noted on the plans and not updated to ADA standards during the 2009 construction. The total cost of this change order is $6,343.68. There are sufficient funds in the project budget to cover these costs. Public Works Director CO Authority Available: $ 75,000.00 Previous Change Order Authority Used: $ 74,078.01 Remaining Change Order Authority: $ 921.99 Original City Manag Change Order Authority Available; $200,000.00 Previous Public Works Director CO Authority used $ 74,078.01 Previous CO Authority used by City Manager $117,921.52 Total $191,999.53 $ 6,343.68 This Change Order Amount: Total Sprague Avenue Change Order Amount $198,343.21 Remaining Change Order Authority: $ 1,656.79 Public Works 4,"&W M- Project Manager c,io -o�,7 Washington State Department of Transportation Change Order 8 Date June 3, 2010 Contract Number 09 -031 Federal Aid Number ARRA -3840 (008) Contract Title Sprague Avenue Rehabilitation Project #1 Change Order Number 8 Prime Contractor Inland Asphalt Co. M Ordered by Engineer under the terms of Section 1 -04.4 of the Standard Specifications ❑ Proposed by Contractor End ed By o r S . Cont J'J C) P. . 2b l0 Date Surety Consent Attorney of Fact Date Original Contract Amount 2,256,393.18 Current Contract Amount $ 2,448,392.71 Estimated Net Change This Change $6,343.68 Estimated Contract Total After Change $ 2,454,736.39 Approval Required Region ❑ Olympia Service Center R(Local Agency If the amount authorized in the Local Agency Agreement is exceeded and federal funds are not available for this change, the Local Agency will assume the total cost of this Change Order. X AP I Recommended ❑Approved 4u4w ATI� Approved 1 4xa , Project Engineer Approving Auth per C.A. Agreement Date Date ❑ Approval Recommended ❑Approved Approved By Approving Authority per C.A. Agreement Date Date CHANGE ORDER Page 2 of 3 Contract No: 09 -031 Change Order No. 8 This Contract is revised as follows: Description of Work This change order will remove and replace three (3) existing ADA ramps that were not noted on the plans and not updated to ADA standards during 2009 construction. The locations are at the NW corner of Skipworth, SW corner of Union and the NW corner of Mayhew. Materials The Materials shall meet the requirements of the 2008 Standard Specifications. Construction Requirements Work shall meet the requirements of the 2008 Standard Specifications and the special provisions. Measurement "CEMENT CONCRETE SIDEWALK RAMP, TYPE 2 ", PER EACH Payment "CEMENT CONCRETE SIDEWALK RAMP, TYPE 2 ", PER EACH CHANGE ORDER Page 3 of 3 Contract No: 09 -031 Change Order No. 8 Item Item Description Unit Unit Price Est. Qty. Est. Amt. No. Measure Change Change CEMENT CONCRETE SW RAMP, TYPE 2 EACH $1,888.00 3 $5,664.00 PRIME CONTRACTOR MARKUP (12 %) 679.68 TOTAL $6,343.68 Five Star Concrete Ind. 6225 N Malvern Rd Otis Orchards, WA 99027 I Name /Address I Inland Asphalt PO BOX 3366 Spokane WA 99212 Estimate Date Estimate # 5/19/2010 1105 Description Units Qty Cost Total Sprague Wheelchair Ramps remove and replace wheelchair ramps 3EA NW- Myrtle,NW- Skipworth,SW -Union LS 1 5,664.00 5,664.00 concrete- $1,232.00 labor- $3,321.00 trucks /equipment $ 414.00 truncated domes $ 375.00 dump fees $ 150.00 Price quoted includes all sawcutting, removal and haul, subgrade excavation and compaction, tactile warning material, concrete, labor and equipment to complete. Excludes cold weather placement/protection and traffic control. Thank you for the opportunity! Subtotal $5,664.00 Sales Tax () $0.00 Total $5,664.00 Signature Phone # Fax # E -mail 509- 226 -1189 509- 226 -1159 www. fivestarconcreteinc@hotmail.com klZ�o b'1G�4'�