10-079.00 Morgen & Oswood: Barker Bridge Replacement�" Waslririg #on State Department of Transportation Change Order Date 6/16 /2010 Page 1 of 3 Pages Contract Number 08 -017 (CIP -0003) Federal Aid Number BRM 4123(004) Contract Title Barker R oad Bridge Replacement Change Order Number 9 Prime Contractor Morgen & Oswood Construction Co., Inc. ® Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ❑ Change proposed by Contractor Endorsed By Surety Consent * Contractor Attorney on Fact ��iL b Date ' Date * Accepted per M &0's attached June 24, 2010 letter Original Contract Amount 9,449,354.75 Current Contract Amount 9,337,985.55 Estimated Net Change This Order 1,955.71 Estimated Contract Total After Change 9,339,941.26 Approval Recommended ❑ Approved Approved Project Eng \1 �,, k, Approving Authority per Agreement - 1 Date Date F XI Approval Recommended a Approved A� Other Approval When Required Signature Date By 4 v1y Date Representing DOT Form 140 -005 EF Revised 4/06 Lvl o- o 9 f CHANGE ORDER Project: Barker Road Bridge Replacement Page 2 of 3 Contract No.: 08 -017 (CIP -0003) Change Order No. 9 Federal Aid Number: BRM 4123 (004) The Contract is revised as follows: Description of Work This change order revises the specified irrigation system controller electrical service to be 110VAC instead of 24VDC. Irrigation Electrical Service Section 8- 03.3(14) is supplemented with the following: The Special Provision on Page 8.8 of the project Special Provisions referring to Section 8- 03.3(14) is deleted, thereby reinstating the requirements in Section 803.3(14) of the Standard Specifications. The Contractor shall locate the electrical service cabinet near the existing power pole at approximate Station 52 +80 RT as directed by the Engineer. Provide 5 -foot minimum clearance between electrical service cabinet and power pole. Provide 2 -inch diameter Schedule 40 grey PVC conduit from base of power pole to base of electrical service cabinet. Provide 24 -inch sweeps at each end of conduit to transition from horizontal to vertical. orientation. Electrical service cabinet shall be post - mounted on minimum 30 -inch square by 6 -inch thick concrete pad. Bottom of cabinet shall be 36- inches above concrete pad. Automatic Controllers Section 9 -15.3 is supplemented with the following: Mount automatic controller enclosure to exterior of electrical service cabinet. Provide GFCI outlet receptacle within automatic controller enclosure. Work to be Performed by Others Avista Utilities will provide and install service riser conduit at power pole, all overhead and underground service conductors between overhead transformer and electrical service cabinet, and meter. Measurement Section 8 -03.4 is supplemented with the following: No unit of measure shall apply to the lump sum price for "AC Irrigation System Controller." n' CHANGE ORDER Project: Barker Road Bridge Replacement Contract No.: 08 -017 (CIE' -0003) Federal Aid Number: BRM 4123 (004) Payment Section 5 -03.5 is supplemented with the following: Page 3 of 3 Change Order No. 9 Payment for "AC Irrigation System Controller" will be made in the lump sum amount of $1,955.71, The lump sum payment shall constitute full compensation for all labor, materials, and equipment to complete the work as specified. Working Days The Contract time is extended by three (3) working days. Attachments None.