Loading...
10-090.00 Morgen & Oswood: Barker Bridge ReplacementVjb~on State Deparbnent of Transportation Change Order Date 6/1/2010 Page 1 of 3 Pages Contract Number 08 -017 (CIP -0003) Federal Aid Number BRM 4123(004) Contract Title Barker Road Bridge Replacement Change Order Number 8 Prime Contractor morgen & USWood Construction Co., Inc. ® Ordered by Engineer under the terms of Section 1 -04.4 of the Standard Specifications ❑ Chanae proposed by Contractor Endorsed By Surety Consent TTRAVFIJERS Ty SS ANY OF AMERICA of Contractor Attorne a JOHN D. LEAF , JULY 20, 2010 Date Date Original Contract Amount Current Contract Amount Estimated Net Change This Order 9,449,354. 9,340,591.55 - 2,606.00 Estimated Contract Total After Change 9,337,985.55 Approval Recommended Approved Approve Project Engine pproving Auth city per C.A. Agreement Date —^ ` Date 7 Approval Recommended ❑Approved Other Approval When Required B Signature Date 26 JUL`/ 21IN6 Date Representing DOT Form 140.005 EF Revised 4106 CHANGE ORDER Project: Barker Road Bridge Replacement Contract No.: 08 -017 (CIP -0003) Federal Aid Number: BRM 4123 (004) The Contract is revised as follows: Description of Work Page 2 of 3 Change Order No. 8 Schedule C - Group 6; City of Spokane Valley The artwork form liner work specified in Section 6-02 of the Special Provisions is deleted from the Contract. the following Section 6 -02 Special Provisions are incorporated into the Contract: Finishing Concrete Surfaces Section 6 -02.3(14) is supplemented with the following: Artwork images shall be etched into the bridge traffic barrier concrete at the locations shown on the Drawings up to 1/4 -inch depth by sandblasting. Use stencil material that will achieve a clean, sharp line between sandblasted and non - sandblasted areas. Prepare concrete and apply stain to etched images per manufacturer's recommendations. Concrete shall be cured 28 days minimum prior to sandblasting. Stain shall be Proline EZ Accent stain, or approved equal. Stain color options shall be submitted to the City for selection_ Apply sealer to stained concrete per manufacturer's recommendations. Sealer shall be Proline EZ Accent sealer, or approved equal. Provide 2 -foot by 4 -foot sample of sandblast and stain finish prior to construction. Measurement No specific unit of measurement will apply to the lump sum item of " "Bridge Traffic Barrier Artwork Sandblasting and Staining." Payment Section 6 -02.5 is supplemented with the following: Payment Item No. 57, "Cl - bridge 'Traffic barrier Artwork," is deleted from the Contract. The associated deduct amount is $28,000.00_ Payment for "Bridge Traffic Barrier Artwork Sandblasting and Staining" will be made in the lump sum amount of $25,394.00. The lump sum payment shall constitute full compensation for all labor, materials, and equipment to complete the work as shown on the plans and as specified. No separate payment will be made for the sample panel. n r CHANGE ORDER Project: Barker Road Bridge Replacement Contract No.: 08 -017 (CIP -0003) Federal Aid Number: BRM 4123 (004) Working Days The Contract time is extended by ten (10) working days. Attachments None. Page 3 of 3 Change Order No. S