10-091.00 Morgen & Oswood: Barker Bridge ReplacementW ol�. y ,� °° nt State ins Trans Change Order Date 7/16/2010 Page 1 of 3 Pages Contract Number 08 -017 (CIP -0003) Federal Aid Number BRM 41.23(004) Contract Title Barker Road Bridge Replacement Change Order Number 11 Prime Contractor Morgen & Oswood Construction Co., Inc. ® Ordered by Engineer under the terms of Section 1 -04.4 of the Standard Specifications ❑ Change proposed by Contractor Endorsed By Surety Consent TRAVEL RS ALTY Affl OF AMERICA Contractor Attom o act JGM D. F O JULY 20, 2010 Date Date Original Contract Amount Current Contract Amount Estimated Net Change This Order Estimated Contract Total /After Change 9,449,354.75 9,3 49,166.56 691.20 9,349,857.76 Approval Recommended ❑ Approved Approve Project Engineer Date A roving A ority per C.A. Agreement Date L A Approval Recommended ❑ Approved 4 &� Other Approval When Required Signature Date By Z6Jy �Id Date Representing DOT Form 140-005 EF Revised 4106 C A 10 -og1 CHANGE ORDER Project: Barker Road Bridge Replacement Page 2 of 3 Contract No.: 08 -017 (CIP -0003) Change Order No. 11 Federal Aid Number: BRM 4123 (004) The Contract is revised as follows: Description of Work Schedule A - Barker Road Bridge The Uplands Fill material specified in Section 9 -03.16 of the Special Provisions is deleted and replaced with the following: Fine Uplands Fill - For placement above Ordinary High Water line Sieve Size Percent Passing by Weight 5/8" 95 -100 1/4" 50 -75 No. 40 8 -24 No. 200 10 max Coarse Uplands Fill - For placement below Ordinary High Water line Sieve Size Percent Passing by Weight 8" 100 4 80 -90 1" 40 -60 3z" 25 min No. 10 10 -15 No. 40 0 The fracture requirement for Uplands Fill shall be at least one fractured face for at least 90% of each sample and shall apply to the combined aggregate retained on the No. 4 Sieve in accordance with FOP for AASI ITO TP 61. Material shall be selected of "granite" or "igneous" to be aesthetically consistent with the surrounding natural river bed and shoreline materials. Section 2- 03.3(14)N is supplemented with the following: Uplands fill material shall be placed and compacted in accordance with Section 2- 03.3(14)C of the Standard Specifications. CHANGE ORDER Project: Barker Road Bridge Replacement Page 3 of 3 Contract No.: 08 -017 (CIP -0003) Change Order No. 11 Federal Aid Number: BRM 4123 (004) Measurement Section 2 -03.4 of the Special Provisions is supplemented with the following: Measurement of "Fine Uplands Fill" and "Coarse Uplands Fill" will be made by the cubic yard in place. The estimated quantities are 48 cubic yards and 17 cubic yards, respectively. Payment Section 2 -03.5 of the Special Provisions is revised as follows: Payment Item No. 18, Uplands Fill, is deleted from the Contract. Deduction (65 CY f) $66.00) ($4,290.00) Payment for "Fine Uplands Fill" will be made at the unit price of $29.40 per cubic yard. Addition (48 CY @ $29.40) $1,411.20 Payment for "Coarse Uplands Fill" will be made at the unit price of $210.00 per cubic yard. Addition (17 CY Q $210.00) Working Days The Contract time is extended by ten (10) working days. Attachments None. $3,570.00