10-124.00 WSDOT: Certification Acceptance QualificationVr Washington State
AIF Department of Transportation
Agency City of Spokane Valley
Address 11707 R Spraglle Ave, Suite 106
Certification Acceptance
Qualification Agreement
Agency No.
1223
The agency agrees to comply with the following requirements when developing all Federal Highway
Administration (FHWA) projects under FULL CA status.
1. Adherence to the Local Agency Guidelines and all policies and procedures promulgated by the Washington
State Department of Transportation (WSDOT) which accomplish the policies and objectives set forth in Title 23,
U.S. Code, Highways, and the regulations issued pursuant thereto.
2. The overall approval authorities and conditions will be as follows:
a. The project prospectus will be reviewed and approved by the following official.
Senior Engineer - Capital Projects
Position Title Only
b. The local agency agreement will be reviewed and approved by the following official or officials.
Senior Engineer - Capital Projects
Position Title or Titles Only
c. The designs and environmental documents will be reviewed and approved by the following state of
Washington registered Professional Civil Engineer.
Senior Engineer - Capital Projects
Position Title Only
d. The hearing's findings (if required) will be reviewed and approved by the following official or officials.
Public Works Director
Position Title or Titles Only
e. The contract plans, specifications, and estimate of cost will be reviewed and approved by the following
state of Washington registered Professional Engineer.
Senior Engineer - Capital Projects
Position Title or Titles Only
f. Agreements will be signed by the following responsible local official:
(1) Railroad
City Manager or Designee
Position Title Only
(2) Utility
City Manager or Designee
Position Title Only
(3) Consultant
City Manager or Designee
Position Title Only
(4) Technical Services
City Manager or Designee
Position Title Only
g. The award of contract will
be signed by the following responsible local official.
Senior Engineer - Capital Projects
Position Title Only
h. All projects will be constructed in conformance with the Washington State Department of Transportation/
American Public Works Association (WSDOT /APWA) current Standard Specifications for Road, Bridge, and
Municipal Construction and such specifications that modify these specifications as appropriate. Multimodal
enhancement projects shall be constructed in conformance with applicable state and local codes.
DOT Form 140 -043 EF
Revised 10/2006
Colo - I zy