10-136.00 MJM Grand: Broadway Ave ReconstructionSpokane
,;
CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 90.093
DEPARTMEN I Uh PUBLIC; VVVKKS
PROJECT: Broadway Avenue Reconstruction Project CONTRACT DATE: 7/20/2010
CONTRACTOR: MJM Grand, Inc CHANGE ORDER NO: 8
CAPITAL IMPROVEMENT PROJECT NO: 0088
BID NO.: 10 -013
DESCRIPTION OF CHANGES
This Change Order provides payment for installation of fencing sleeves in a widened pedestrian curb behind the sidewalk at the SW
comer of Broadway and Flora. it also provides payment for Installation of 110 .LF lawn edging behind sidewalk on the west side
of Flora Road between Sta 10+70 and 11 +80. See revised Plan Sheet Drawing 21, date
Item No Description Unit Quentl Unit Price 12 121
CO 8 -1 10" Wide Pedestrian Curb with Sleeves at 5 Ft O.C. LF 57 $44.80 $2,553.60
C08-2 Lawn Edging LF 110 $17.24 $1,896.40
Total Amount of this Change Order (incl. Tax): $4,450.00
St iRSTANTIAL COMPLETION
Original Date: 10/11/2010
Prior to this Change Order.
10/11/2010
Including this Change Order:
10/11/2010
Original Working Days 50
Working Days Added by this CO:
0
Working Days Including this CO:
55.5
THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE:
ORIGINAL TOTAL CONTRACT AMOUNT 1,298,320.28
TOTAL PRIOR CONTRACT CHANGE ORDER AM OUNT 58,176.39
TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER -� _ - „_._...,_,,,,,,, ,,, 1,354,496.67
NET THIS CHANGE ORDER 4,45000
TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER S 1,358,946.67
CONTRACTOR ACCEPTANCE:
The contractor hereby accepts this adjustment under the terms of the original contract for all work perfomed.
RECOMMENDED BY:
APPROVED BY. —
APPROVED BY:
ATTACHMENTS:
DATE: I V ~ a — 1 a
DATE: le "/ • 1 6
DATE: M f (��/ 1
AJ
City
DATE:
01stffbulion:
ORIGINALS TO: Contractor, City of Spokane Valley Clerrc's Office, PW Project File
COPIES TO: PW Project File Ppubrc Woek -- Pumha'rg/CO (9126
0,0 ►c- k 3 ,
A
R ET AIN ING ING WALL'B'
A
Q) D RET A IN ING ING WALL'C'
(
A
RE WALL 'D'
B . ..... .
AINING WALL E'
0
- - ----- --------- - -- -----------
-- ------- ------- ------------
I AT
I
R
17020 BROADWAY R E V
RETAINING WALL
REVISIONS
C07
"IT
IN-
A . II El—
TT1,11
OTT IIL�
-j
17020 BROADWAY
RETAINING WALL DETAIL
C07
C07
Y ..... ....
III —E —1
--l. 11— 1 T".1
AT
SLEEVE FOR FENCE LAWN EDGING
POST ON TOP OF WALL r FLORA STA 10+70 TO 11+80, LT.
IIT TI 2111
=B5FOREYOUDIG 1.8004245555
aiyaSpokano Valley BROADWAYAVENUE RECONSTRUCTION DETAIL
De partment MOORE TO FLORA
11707EMS-14 5,fte 106 S#616i
NE VALLEY VAT ; TAJ DRAINAGE PLAN 21 OF 29
(509) 921-10b�' ELEV
CULVER HEADWALL
- - ----- --------- - -- -----------
-- ------- ------- ------------
I AT
I
R
17020 BROADWAY R E V
RETAINING WALL
REVISIONS
C07
"IT
IN-
A . II El—
TT1,11
OTT IIL�
-j
17020 BROADWAY
RETAINING WALL DETAIL
C07
C07
Y ..... ....
III —E —1
--l. 11— 1 T".1
AT
SLEEVE FOR FENCE LAWN EDGING
POST ON TOP OF WALL r FLORA STA 10+70 TO 11+80, LT.
IIT TI 2111
=B5FOREYOUDIG 1.8004245555
aiyaSpokano Valley BROADWAYAVENUE RECONSTRUCTION DETAIL
De partment MOORE TO FLORA
11707EMS-14 5,fte 106 S#616i
NE VALLEY VAT ; TAJ DRAINAGE PLAN 21 OF 29
(509) 921-10b�' ELEV
Oldeastlle 1'4"L Tan Concrete Matt IL��
Ed
• Item #: 1.9186
• Model #: 102806211
* ** *I ( 6 Reviews )
$ 1.99
Quantity:
I
Add to Cart Oldcastle 1'4 "L Tan Concrete Matt Log Edging
See more details about this product
,
2t �1 t'� ITT F
G.
�A KT - � q 6 i L- F
MJM Grand, Inc.
PO Box 9277
Spokane, Wa. 99209
Phone (509) 244 -4733 Fax (509) 244 -4725
Send To:
Craig Aldworth
Project Engineer
City of Spokane Valley
Bid Based On Plans Dated 9/17/10
Project quotation
DATE September 22, 2010
Description AMOUNT
Broadway Ave. Recon. - CO #7
Supply 110 LF of Matt Log edging. $215.23
Labor to excavate gravel, install edging. $202.59
(Tax on materials included) Total $417.82