10-137.00 MJM Grand: Broadway Ave ReconstructionS 011 60^�Z� ffo!&ke ./' ey CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 90 -013 DEPARTMENT OF PUBLIC WORKS PROJECT: Broadway Avenue Reconstruction Project CONTRACT DATE: 7120/2010 CONTRACTOR: MJM Grand Inc CHANGE ORDER NO: 9 CAPITAL IMPROVEMENT PROJECT NO: 0088 BID NO.: 10.013 DESCRIPTION OF CHANGES This Change Order provides payment for installation of 55 LF of galvanized railing behind the sidevralk at the SW comer of Broadway and Flora. See revised Plan Sheet Drawing 21, dated 9 -17 -10 and Seatlie Std Plan NO 442. I tem No pescrlotion Unit Quantity Unit Price Total cog 55 LF of Galvanized Railing LS 1 $5,182.16 $5,182.16 Total Amount of this Change Order (Inc]. Tax): $5,182.16 SUBSTANTIAL COMPLETION Original Date: 10/11/2010 Prior to this Change Order: 10/18/2010 including this Change Order. 10/18/2010 Original Working Days: 50 Working Days Added by this CO: 0 Working Days including this CO: 55.5 CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 1,298,320.`-, ................................... ... ... _ ._ ..._.....M ................................ _._. ......... ...... TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 60,626.' TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 1 358,946.E NET THIS CHANGE ORDER $ 5,182.1 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,364,128.8 CONTRACTOR ACCEPTANCE: The contractor hereby accepts this adjustment under the terms of the original contract for all work performed. RECOMMENDED BY: APPROVED BY: DATE: 1 0 — - — / DATE: DATE: 10 t, APPROVED BY: DATE: City Nana T r ATTACHMENTS: ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office, PW Project File COPIES TO: PW Project File _ P:PuV dPureha'rcplCO t8r2 CM07 0—o lo- - 1�7 Broadway Avenue Reconstruction Project CIP 0088 Page 1 Change Order 9 55' Railing with posts at 5 feet o. c. SW Corner of Flora Rd & Broadway Ave Activity Fabrication by Flai Installation Ouantitv Unit Rate Sum STANDARD PLAN NO 442 2'9 EXTRA STRONG REV DATE: 2003 OVER 6' — O'TO 7' - 9'MAX OVER 6' - 0'TO 7' - 9'MAX STEEL PIPE POSTS 2'9 STO STEEL PIPE 6' -0' MAX 6' –O' MAX POSTS F olD 2 S D STEEL PIPE – WELDED JOINTS GRIPPING HANDRAIL (1'9 STD STEEL PIPE) SEE SEED L B NOTE 5 -S lypiCAL AT RAIL ENDS I t z'g S EEL PIPE 1 TYP i CW – CONC CL 6 3 4) a• E TD REF STD SPEC SEC 8 -14 & 8 -18 D ETAIL �l City a# Seattle NOT TO SCALE STEEL PIPE HANDRAIL `71 ! COLD JOINT WHEN NOT COMPACTED CONSTRUCTED INTEGRAL SUBGRADE WITH CW (TYP) g TYP SEE DETAIL A ( 2'9 STO STEEL PIPE POST OR Zo S7 EL PPE POST ONG HANDRAIL (1'9 PIPE SEE TOP OF GRIPPING RAIL NOTES• 1 • RAILING SHALL BE HOT DIP GALVANIZED AFTER FABRICATION � GRIPPING 2. ALL POSTS SHALL BE PLUMB AND ` STD STEEL i RAILS PARALLEL TO THE GROUND NOTE 5 1 _p• i6 3. PIPE MATERIAL SHALL CONFORM b� MIN ((( CW WIDTH AS SPECIFIED_ TO ASTM A 53 3/4'9 STD STEEL PIPE TAIL 9 STD STEEL PIPE 4. REINFORCING STEEL ASTM A 6i5 DE B 1 I 2% GR 60 5. IF THE CONCRETE WALK SLOPE B °" IS 57 OR GREATER A GRIPPING ' U COMPACTED SUBGRADE HANDRAIL IS REQUIRED �pST OR 6. PIPE DIAAL' METERS SHOWN ARE 4' �9 EXTRA STRONG •NOMIN DIAMETERS AS GIVEN EN SL PIPE POST IN AMERICAN INSTITUTE OF STEEL CONSTRUCTION MANUAL R GRIPPING HANDRAIL (1'9 SECTION A —A STD STEEL PIPE) SEE NOTE 5 9 STD STEEL PIPE CTION B —B MOUND FOR DRAINAGE(TYP) 3/4 4 REINFORCING a e 1 SE BAR AT EACH POST e.. e SEE DETAIL BELOW 4 c 2'9 STD STEEL PIPE POST OR STRONG STEEL PIPE POST 4 9 16GA GALV 2'9 EXTRA a. STEEL SLEEVE (TYP 4 ` GRIPPING HANDRAIL a (1'9 STD STEEL PIPE) SEE NOTE 5 NON – SHRINK GROUT a c 4 r e 4 ♦ C DETAI 2'9 STD STEEL PIPE POST OR DETAIL � 2'9 EXTRA STRONG _� STEEL PIPE POST 3' -0' GRIPPING HANDRAIL (1'9 STD STEEL PIPE) SEE NOTE 5 A (9 RETAINING WALL 'B' wart pis --- --- - --- --- -- --- -- --- A I a xe — RETAINING WALLTY ------------ --------------- 17020 BROADWAY RIV RETAINING WALL no, m (�D CULVERT HEADWALL CD9 SLEEVE FOR FENCE POST ON TOP OF W) Y xb lo S8 e om MIX. Al LAWN EDGING FLORA STA 10+70 TO 11+80, LT. um ro scut /0•/• rAUNFULEYOUM I-M4X BROADWAYAVENUE;?ECONSTRUCTION DETAIL MOORETOFLORA 21 OF 29 17020 BROADWAY - RETAINNO WALL DETAIL 7 SECTION 8 -26 RAILINGS SECTION 8 -26 RAILINGS 8 -26.1 DESCRIPTION This work shall consist of constructing. See Standard Plans nos. 442 and 443a. 8 -26.2 MATERIALS Materials shall meet the requirements of the following Sections: Galvanized steel pipe railing shall be fabricated from standard weight steel pipe meeting the requirements of ASTMA 53. After fabrication, the railings shall be hot - dipped galvanized per ASTM A 123. Gripping handrail shall be standard steel pipe meeting the requirements of ASTM A 53 and shall be 1 inch nominal diameter (1.315 inch outside diameter) as specified in the American Institute of Steel Construction Manual. 8 -26.3 CONSTRUCTION REQUIREMENTS 8- 26.3(1) HANDRAIL Handrails shall be of welded steel pipe construction, fabricated and installed as indicated on Standard Plan nos. 440a, 440b, 442, 443a and 443b unless the Contract specifies otherwise. Welds shall be made by certified welders and each weld shall be ground and buffed to a smooth surface. Rails shall be hot dip galvanized according to ASTM A 123 after fabrication. if field welds are required, they shall be coated with a zinc alloy solder to a minimum thickness of 2.0 mils per ASTM A 780. The installed railing shall be in true alignment, on proper grade, and with posts plumb. 8 -26.4 MEASUREMENT Handrail of the type specified will be by the linear foot of actual handrail installed measured along the top of the top rail from end post to end post including the posts. 8 -26.5 PAYMENT "Handrail, (Type)", per linear foot. The bid item price for "Handrail, (Type)' of the type specified shall include the costs for the work required to furnish, fabricate and install the handrail along the stairway or sidewalk. MJM Grand Inc PO Box 9277 Spokane, Wa. 99209 Phone (509) 244 -4733 Fax (509) 244 -4725 Project quotation DATE October 5, 2010 Send To: Craig Aldworth Project Engineer City of Spokane Valley RE: Steel Pipe Railing at Southwest corner of Broadway and Flora Description AMOUNT Broadway Avenue Reconstruction Supply and install approximately 55 LF of (2) line galvanized rail per plan. Guardrail $2,300.00 Tax $200.10 21% MJM Markup $525.02 Installation by Flaig Steel $1,640.00 12% MJM Markup $196.80 MJM Superintendent time for coordination of delivery and install. $200.00 Total $5,061.92 FLAIG STEEL & FABRICATING, INC. 1515 E HOLYOKE SPOKANE, WA 99217 -7524 PHONE 509) 487 0841 " FAX 509) 483 -4854 CONTRACTOR LICENSE NO. FLAIGSFI"JJ BID FAX TRANSMITTAL COMPANY. City of Spokane Valley DATE: 1015110 JOB REF: BROADWAYAVENUE GUARDRAIL ATTENTION: Craig Aldworth FROM: ROBERT HOSSFELD /BROCK RASMUSSEN NO. PAGES INCLUDING THIS SHEET. One (1) NOTE: if you do not receive the correct number of pages please contact our office. DESCRIPTION: APPROXIMATELY 55 LN/FT OF (2) LINE GALVANIZED RAIL PER PLAN BASIC BID: $ 2,300.00 TAX.' SALES TAX NOT INCLUDED F. 0. B.: TRUCK / JOBSITE EXCLUSIONS: NO 12 -GAUGE OR LIGHTER METAL, INSTALLATION, FINISH PAINT REMARKS: HOT DIPPED GALVANIZED TOTAL $ Acceptance of Bid: THE ABOVE PRICES, SPECIFICATIONS AND CONDITIONS ARE HEREBY ACCEPTED. YOU ARE AUTHORIZED TO DO THE WORK AS SPECIFIED. ACCEPTANCE SIGNATURE DATE NOTE: THIS PROPOSAL MAY BE WITHDRAWN IF NOT ACCEPTED WITHIN 15 DAYS. PRICES SUBJECT TO CHANGE AFTER 15 DAYS. PAYMENT TERMS: NET 30 DAYS / NO RETAINAGE