10-141.00 MJM Grand: Broadway Ave Reconstruction'w X. Spokane v Valle - CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 10 -013 , Ez� DEPARTMENT C)F PHRI IC WORKS PROJECT: Broadway Avenue Reconstruction Protect CONTRACT DATE: 712012010 CONTRACTOR: MJh1 Grand, Inc CHANGE ORDER NO: 10 CAPITAL IMPROVEMENT PROJECT NO: 0088 BID NO.: 10 -013 SUBSTANTIAL COMPLETION Original Date: 10/11/2010 Prior to this Change Order: 10/18/2010 Including this Change Order: 10/19/2010 Orginai Working Days: 50 Working Days Added by this CO: 1 Working Days Including this CO: 56.5 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 1,298,320.28 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 65,808,55 •....... •. ..........._..........�.._.._ _W......, -. .• .............._ -.... ... TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 1,364,128.83 ......... ............. ... ............ ................ _... NET THIS CHANGE ORDER S 3,543.40 .......... .................. ............................... _. .......... ........ .. ....._._._...._....._.......... TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER S 1,367,672.23 CONTRACTOR ACCEPTANCE: DATE: v fz la The contractor hereby accepts this adjustment under the terms of the original contract for all work perfomed. RECOMMENDED BY: APPROVED BY: DATE: le '/Z zo DATE: tl') L t 4 k i 1 1 J APPROVED BY: I )f-A DATE: City me eger ATTACHMENTS: V1Su wvuvu. ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office, PW Project File COPIES TO: PW Project File P Pctt:: W'Cki L(& eg , 000S«sr07; L& `p— 1L-:\ UtSriKIN11UN Lit UNANUtA This Change Order provides payment for removing and replacing existing curb and gutter and sidewalk between Broadway Ave. Sta 34 +88.56 and Sia 36 +11.07, RT. The existing curb does not align with the surrounding new curb. See revised Plan Sheet Drawing 5, dated 10- 12 -10. Item No Description Unit _ uantl Unit Price Total CO 10 - 8 Remove PCC Curb LF 122.5 $3.68 $450.80 CO 10 -101 Remove PCC Sidewalk / Driveway Approach SY 81.75 $7.73 $631.93 CO 10 - 56 Cement Concrete Curb and Gutter LF 122.5 $8.43 $1,032.68 CO 10 - 61 Cement Concrete Sidewalk SY 68 $21.00 $1,428.00 Total Amount of this Change Order (incl. Tax): $3,543.40 SUBSTANTIAL COMPLETION Original Date: 10/11/2010 Prior to this Change Order: 10/18/2010 Including this Change Order: 10/19/2010 Orginai Working Days: 50 Working Days Added by this CO: 1 Working Days Including this CO: 56.5 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 1,298,320.28 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 65,808,55 •....... •. ..........._..........�.._.._ _W......, -. .• .............._ -.... ... TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 1,364,128.83 ......... ............. ... ............ ................ _... NET THIS CHANGE ORDER S 3,543.40 .......... .................. ............................... _. .......... ........ .. ....._._._...._....._.......... TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER S 1,367,672.23 CONTRACTOR ACCEPTANCE: DATE: v fz la The contractor hereby accepts this adjustment under the terms of the original contract for all work perfomed. RECOMMENDED BY: APPROVED BY: DATE: le '/Z zo DATE: tl') L t 4 k i 1 1 J APPROVED BY: I )f-A DATE: City me eger ATTACHMENTS: V1Su wvuvu. ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office, PW Project File COPIES TO: PW Project File P Pctt:: W'Cki L(& eg , 000S«sr07; L& `p— 1L-:\ AP NAVD88 DATUM o,ECT IPNUCE ITA s —A .e, z3 LT a aDOE PsaNrER xs a+D va+ 20 sTa O zA� ND Eres O Q ,.:NU =s n.TH N N.c.w. � 20 eo., AT - `� -. _.. .3 20 srA Bo «ce so 19 0 19 a 2 1sax3 e a 20 1B4za ea 20 ro I ig aacwaY All 19 19 64BGBNIAD,vaYA &�; °2b ro = , 0?;4. + O � 1eBNDaD „AYA g' o P w J / 34 a N r O r a 2 B «BU. 6TA S 4 s z r w N G I NA e lO lr ��.UI� s•�rR I J L ° T 1 c,-o s5 .� BROADWAY TA 2 T r 1 F A W L�J �.� , Lij l 6 L �od I 3 b °! e'ar $�. 11 A {j D� 0010 ° iI oo N U 4 d -> F a01s s uRa AND c / P aTCHeacK ad OevAUC _ a w G NEB o,�p aNr 20 6 a ,�, 20 Y`t, N a N. AID ° sO case vc 1zz� �F o M cO na20a+ovaa cuRB AND _ «., _.. "', B s6 sr cE "EN X20 AID I— z a B F E as�DEY Y 12.uB Rr rcaNce X20 ... - Lar sa s - ... .. I 1 19 19 _ e OUr a w 9 e 1g F 4m6 cD 16402/06 BROADWAY AVE 1E416/20 1P. —AY AVE 16asa /26 eN.—I AVE .63°6 BROADWAY AVE 4D, BROADWAY CENTERLINE m ry oo o� ,„ f a o � � G M 1 ti a� as f a N aw � \—INISH I N GRADE OLOc KEY NOTES: LEGEN GENERAL CONSTRUCTION N OTE: '� INSrau TmR 1 wa 1 I—IT ANO R—TID wall. Box. ExIST. " R ®ED 1 m,x G 4 ­ r "N. ARE rD ”" Dr "" O Basrau mE z MAI-BOX sUPPDNr AND RELacaTED was e0x1ES1. oN wD ND - YEGETATIN PAD UNDER —ND AND — 1- HD�E o RD�waY PR,« o o PATH ... IHINI O E�VAPONSEE A- RftnOVPL' R N D�sDU:nms mauDBS NE- GRPDINC i0 FlNIBH P� 11— PINE aVA PATLNBALK 1u AL NWO V�* «3n nnr N f DIA � X— D6EEDIND PATLHBgdt NIF OINSTau TEMPORARY FENCE. � My jl I EAxD6CMINC /BaPK ATCHBACK P 6B s oRP 2D ,I 0 O RENDVE AND RE -IN6T- N — — — — M r O RUC ON WNceE E N ao_INI EAS E N 6 r0A'ALb NCH =30 OFRDTFDT PRDPER LDRNER. CALL 8EFOREYOU010 1-8004245555 ND City of Spokane Valley BROADWAYAVENUE RECONSTRUCTION STREET - -- 0086 101f2/10 l0 - Department ofPubfic Works n,T,A MOORE TO FLORA Ns�, Spokane - 11707East Sprague Avenue, Suite 106 PLAN AND PROFILE (BROADWAY) SPOKANE VALLEY, WA. 99206 `�,'',�' STA 29 +50 TO STA 38 +50 5 OF 29 `''' REVISIONS (509)921.1000 � 1