Loading...
10-152.00 Morgen & Oswood: Barker Bridge ReplacementAillifth, w7 Washington State A WDepartment of Transportation Date 7/16/2010 Page of Z Pages Contract Number 08-017 (CIP-0003) Federal Aid Number BRM 4123(004 Contract Title Barker Road )ridge Replacement Change Order Number 12 Prime Contractor Morgen & Oswood Construction Co., Inc. M Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications 0 Change proposed by Contractor Surety Consent TRA May 7 w "M S 'COMPANY OF AMERICA Attorney' act JOHN D. LEAF NOVIMBER 5, 2010 Date Original Contract Amount Current Contract Amount Estimated Net Change This Order Estimated Contract Total After Change 9,449,354.75 9,349,857.76 34,907.75 9,384,765,51 Approval Recommended FApproved Approved N Approving Authority per C.A. greement Project Engi'n6 F Date veto Approval Recommended ❑ Approved Other Approval When Required Signature Date 6 - Y 6 gate Representing DOT Form 140-005 EF Revised 4106 *U Project: Barker Road Bridge Replacement Page 2 of 2 Contract No.: 08-017 (CIP-0003) Change Order No. 12 Federal Aid Number: BRM 4123 (004) The Contract is revised as follows: Description of Work Schedule A — Barker Road Bridge The Contractor shall perform core drilling of the Pier 3 Left and Pier 4 Right Exterior shafts and testing as directed by the City and as specified in Section 6-19.3(9)H of the Special Provisions. Measurement Section 6-19.4 of the Special Provisions is supplemented with the following: No unit of measure shall apply to the lump sum price for "Drilled Shaft Coring and Testing." Payment Section 6-19.5 of the Special Provisions is revised as follows: Payment for "Drilled Shaft Coring and Testing" will be made in the lump sum ,amount of $34,907.75. The lump sum payment shall constitute full compensation for all labor, materials, and equipment to complete the work as specified. Working Days The Contract time is unchanged. Attachments None. Page 1 of 1 Anna Hewitt From: Jim Harpole Dim.mando @embargmail.com] Sent: Thursday, November 04, 2010 9:49 AM To: anna.mando @bresnan.net Subject: FW: Barker Road Bridge Replacment - Change Order No. 12 Attachments: Chang eOrder_12.pdf From: Jim.Dingfield @CH2M.com [mailto:Jim.Dingfield @CH2M.com] Sent: Friday, October 29, 2010 3:56 PM To: jim.mando @embarqmail.com Cc: KKnutson @spokanevalley.org Subject: Barker Road Bridge Replacment - Change Order No. 12 Jim, I've prepared the change order document for the Pier 3 Left and Pier 4 Right- Exterior drilled shaft coring and testing work. Please review the attached document and return two signed copies if it is acceptable to you. Otherwise, please let me know if you have any comments or concerns. M &O was directed to perform the Pier 3 Left and Pier 4 Right- Exterior coring and testing work by our March 24, 2009 and April 29, 2009 letters, respectively. According to Special Provision 6- 19.3(9)H, the City is responsible to pay for the coring costs if no defect is found. Both shafts were found to be acceptable based on the test results. M &O submitted a cost summary for the coring work along with backup documentation in a letter to CH2M HILL dated July 6, 2010. The City has reviewed this information and found it to be acceptable. Regards, Jim Dingfieici, P.E. Senior Project Manager CH2M HILL Spokane Office 717 West Sprague Avenue, Suite 800 Spokane, WA 99201 -3911 (509) 464 -7241 (Direct) (509) 475 -6272 (Cell) (509) 252 -1507 (Fax) �im_ .dingfieid(a7eh 2m.corr M L. No virus found in this incoming message. Checked by AVG - www.avg.com Version: 9.0.864 /Virus Database: 271.1.1/3225 - Release Date: 10/28/10 11:34:00 No virus found in this message. Checked by AVG - wwvv. .corn Version: 10.0. 1153 / Virus Database: 424/3237 - Release Date: 11/04/10 11/4/2010