Loading...
05-014.00 Mooney & Pugh: CenterPlace' .. • . 'r e~-•- GHf~~jG~ Distribution to: Madsen O.~U~R OWNER City of Spokane Valley Mitchel I ARCHITECT b]adsen Mitchell Lvenson Evenson ~ c°nrad &Gonrad CON"1'IZAC'l'OR Mooney &: 17u;h Contractors r,,~ 02.20-01 Architecture Interiors PROJLCI': Centerplace at ~~irabeau Point Park PROJECT NO. 02.20 Construction CNITlAT10N DATE: 2-10-2005 Change Order No.: 13 A4anagement 'f0 (Contractor): Jerry Potter CON"CRAC`l' DA`fE: 04-O1-03 Ivtooney & Pugh Contractors General Contractors 5307 E. Cataldo Spokane, OVA 99212 1'ou arc directed to ineurFtUrtte the fi~llowing changes into this Contrsc.t: .$ee arlachmetx for canplete. lisrin~ of changes• to the tivUrk irsduded in this Change Urder_ Not valid until signed by bosh thz Otivncr and Architect Signature of the Contractor intiict:tes his,tgreement herewith, including an}' adjustments in the Contract Sum or Contract lime. Note: mll costs below include salts tax. The Original Contract Sum was: $7,590,OC2.00 Nct change by previously authorized Change Orders: $642,527.00 The Contact Sum prior to this Change Order was: 58,232,589.00 The Contract Surn will be increased by this change order in the amawu of: $7,536.00 The new Cond•;ret Sutn including this Change Order will be: 53,240,125.00 The Contract 'l'ime ~~~ill be wtchanged. The Date of Substantial Completion as of the date of this Change Order therefore is unchanged. 21G North Honanl Skt•W::Ik I.e,•el ~uthori~,ed: Spokanc,l~rashington 99241 City o ~ ~~ ne Valley i09.624.6800 P}, ` faxS09.624.6262 /J //r~ D~ Date ~~'`- d`' madmitch.com ' Mooney & Y ~3g1~ Contractors By ~i _~-`r -~ I P / Harz ~, ~i1 ~`IG~ ~ Madsen Agitchell Evenson fi Cunrtd, PLLC 21G N. Howarcl, Skywalk Level 99332 5otxk Rawl East SpoS:atte, 1tl+A 90201 P.O. f3ox 11;2 Z-I~OS Fay DFtIC EJwall, Washington 440t}8 549.236.231! fax i49.236.2~.i1 madroitch.coar ids-~y ~~ Madsen Mitchell cHA1vG EVensOn ORDER &Gonrad pllr, Architecture Interioes Construction Management 02.2O-~,~ Attachment PROJECT: Centerplace at Mirabeau Point Park INITlAT1O1\t DATE: 2-10-2005 You are directed to incorporate the following changes into this Contract-. Change Proposal Request Items: I. COR-56 Flo additional cost (corridor wall/insulation change) 2. COR-66 ~b additional cost (soffit Iraming at rooms 237 ~C 159) 3. COR-b0 Additional cost for adding 1'-0" gyp. bd. band to sky bridle 4. COR-47 I~'o additional cost (scuppers) ~. COR-42 Additional cast for sill ~ door 147b 6. COR-~14 Aclclition~tl cost for metal deck supports 7. 0017-58 Additional cast far cupola support b. COIL-74 Additional cost for built-in desk rte room 237 9. COR-78 Additional cost for base cabinet and counter in room 141 l O.COR-68 Additional cost for providing gyp. bd. enclt~surc @ rm. 144 I.COR-72 Additional cost for relocating projection screen 216 ttnrrh liou~ard l2 COR-82 Additional mechanical room work due to boiler change. Slrwalk Level Spolanr,ll'xshinguttt l3.COR-71 No additional cost (RhP-32, Ithl 165 mechanical changes) 99201 $0.00 $0.00 Add 5292.00 $0.00 Add 57b2.00 Add $447.OU Add $~ 13.00 Add $581.00 Add $ 1309.00 Add $613.00 Add $1148.00 Add $ 1871,00 50.00 509.624-6fi~00 Total for Change Order \b. 13 (includes Wa. State sales tax) ($7536.00) fax 109.629-G2G2 madmirch.cnm ^ 49332 SoSc'~ Road East P.O. Bnx 192 Eclw~all, W~t6ingrba 9900S S09.23b•23l! fax i09.23fi-2451 ntadmitch.cum