Madsen O.~U~R OWNER City of Spokane Valley
Mitchel I ARCHITECT b]adsen Mitchell Lvenson
Evenson ~ c°nrad
&Gonrad CON"1'IZAC'l'OR Mooney &: 17u;h Contractors
r,,~ 02.20-01
Architecture
Interiors PROJLCI': Centerplace at ~~irabeau Point Park PROJECT NO. 02.20
Construction CNITlAT10N DATE: 2-10-2005 Change Order No.: 13
A4anagement
'f0 (Contractor): Jerry Potter CON"CRAC`l' DA`fE: 04-O1-03
Ivtooney & Pugh Contractors
General Contractors
5307 E. Cataldo
Spokane, OVA 99212
1'ou arc directed to ineurFtUrtte the fi~llowing changes into this Contrsc.t:
.$ee arlachmetx for canplete. lisrin~ of changes• to the tivUrk irsduded in this Change Urder_
Not valid until signed by bosh thz Otivncr and Architect
Signature of the Contractor intiict:tes his,tgreement herewith, including an}' adjustments in the Contract Sum or Contract lime.
Note: mll costs below include salts tax.
The Original Contract Sum was: $7,590,OC2.00
Nct change by previously authorized Change Orders: $642,527.00
The Contact Sum prior to this Change Order was: 58,232,589.00
The Contract Surn will be increased by this change order in the amawu of: $7,536.00
The new Cond•;ret Sutn including this Change Order will be: 53,240,125.00
The Contract 'l'ime ~~~ill be wtchanged.
The Date of Substantial Completion as of the date of this Change Order therefore is unchanged.
21G North Honanl
Skt•W::Ik I.e,•el ~uthori~,ed:
Spokanc,l~rashington
99241 City o ~ ~~ ne Valley
i09.624.6800 P}, `
faxS09.624.6262 /J //r~ D~
Date ~~'`- d`'
madmitch.com '
Mooney & Y ~3g1~ Contractors
By ~i _~-`r
-~ I P /
Harz ~, ~i1 ~`IG~
~ Madsen Agitchell Evenson fi Cunrtd, PLLC
21G N. Howarcl, Skywalk Level
99332 5otxk Rawl East SpoS:atte, 1tl+A 90201
P.O. f3ox 11;2 Z-I~OS
Fay DFtIC
EJwall, Washington
440t}8
549.236.231!
fax i49.236.2~.i1
madroitch.coar
ids-~y
~~
Madsen
Mitchell cHA1vG
EVensOn ORDER
&Gonrad
pllr,
Architecture
Interioes
Construction
Management
02.2O-~,~
Attachment
PROJECT: Centerplace at Mirabeau Point Park
INITlAT1O1\t DATE: 2-10-2005
You are directed to incorporate the following changes into this Contract-.
Change Proposal Request Items:
I. COR-56 Flo additional cost (corridor wall/insulation change)
2. COR-66 ~b additional cost (soffit Iraming at rooms 237 ~C 159)
3. COR-b0 Additional cost for adding 1'-0" gyp. bd. band to sky bridle
4. COR-47 I~'o additional cost (scuppers)
~. COR-42 Additional cast for sill ~ door 147b
6. COR-~14 Aclclition~tl cost for metal deck supports
7. 0017-58 Additional cast far cupola support
b. COIL-74 Additional cost for built-in desk rte room 237
9. COR-78 Additional cost for base cabinet and counter in room 141
l O.COR-68 Additional cost for providing gyp. bd. enclt~surc @ rm. 144
I.COR-72 Additional cost for relocating projection screen
216 ttnrrh liou~ard l2 COR-82 Additional mechanical room work due to boiler change.
Slrwalk Level
Spolanr,ll'xshinguttt l3.COR-71 No additional cost (RhP-32, Ithl 165 mechanical changes)
99201
$0.00
$0.00
Add 5292.00
$0.00
Add 57b2.00
Add $447.OU
Add $~ 13.00
Add $581.00
Add $ 1309.00
Add $613.00
Add $1148.00
Add $ 1871,00
50.00
509.624-6fi~00 Total for Change Order \b. 13 (includes Wa. State sales tax) ($7536.00)