Loading...
05-049.00 CH2M Hill: Barker Rd Boone to Spokane River.. _~ _ . ~~"~ Transportatior;,ti_~~lprovement Board ~..-~ ~~~ Consultant Supplemental Agreement Agency City of Spokane Valley Project Number 8-3-208(001)-1 Project Name Barker Road -Boone Avenue to Spokane River Consulting Firm CH2M HILL, Inc. _, - , Supplement Phase Design Supplement Number 02 The Local Agency of City of Spokane Valley desires to supplement the agreement entered into with CH2M HILL, Inc and executed on November 19, 2004. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section II, SCOPE OF WORK, is hereby amended as follows: Provide additional surveying services necessary for utility agencies to design and relocate utilities as required to accommodate the proposed street widening project. Additional surveying will be as follows: a. Compute and prepare coordinates for the following locations: 1) Back of sidewalk and back of right-of-way at existing power pole locations 2) Back of right-of-way at inter-visible locations in no power poles zones 3) Radius points or angle points of right-of-way at all intersections b. Coordination with design team for design evaluations if required. c. Setting hub and lath at each location with. appropriate designation. 2. Extend completion date, as specified in Section IV, to correspond with bidding process which will occur during Winter 2005-2006. Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the Completion Date SUPPLEMENTAL COMPLETION DATE February 28, 2006 Section V, PAYMENT, shall be amended as follows as set forth in Exhibit A MAXIMUM AMOUNT PAYABLE $321,894.55 (Unchanged) EXHIBIT A Original Agreement Supplement Total Direct Salary Cost $57,173.06 $0.00 $57,173.06 Overhead including Payroll Additives $98,394.85 $0.00 $98,394.85 Direct Non-salary Costs $120,195.35 $2,750.00 $122,945.35 Fixed Fee $18,668.15 $0.00 $18,668.15 Contingency $27,463.14 ($2,750.00) $24,713.14 Total $321,894.55 60.00 6321,894.55 001lSULYANr SUPPlE1dENTAi AGREEN.Eh'T 02.t)oC PAGE t of 2 G'~~ -~9 ~ \ Transportation I.`~ °ovement Board ~~~ Consultant Supplemental Agreement \~~ If you concur with this supplement and agree to the changes as stated above, please sign and date in the appropriate spaces below. A nature Date ~/a~1~ b' Co Rant Signature Date ~f 6~L-~`O~ 7 CONSULTANT SUPPIEAtEh'TAL AGF2EElAE1ri 02000 PAGE z of 2