Loading...
11-010.00 Consolidated Irrigation District No. 19: Indiana Ave ExtensionMEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF SPOKANE VALLEY AND CONSOLIDATED IRRIGATION DISTRICT NO. 19 FOR MISCELLANEOUS WATERLINE WORK IN CONJUNCTION WITH THE INDIANA AVENUE EXTENSION PROJECT (CIP 0114) WHEREAS, as a part of its 2010 Transportation Improvement Program, the CITY OF SPOKANE VALLEY (the CITY) intends to construct the Indiana Avenue Extension Project (the ROAD PROJECT); and WHEREAS, Consolidated Irrigation District 19 (DISTRICT 19) has installed and is operating existing waterlines adjacent to and within the project; and WHEREAS, DISTRICT 19 has prepared estimates for the miscellaneous waterline work (WATER WORK), based on the ROAD PROJECT grades furnished by the CITY; and WHEREAS, the CITY and DISTRICT 19 agree that completing the water work prior to the completion of the ROAD PROJECT would benefit the ratepayers, taxpayers and the traveling public; NOW, THEREFORE, the CITY and DISTRICT 19 do hereby agree as follows: ARTICLE 1— RESPONSIBILITIES OF THE CITY 1. Grading plans for the ROAD PROJECT have been prepared by the CITY, and the CITY intends to begin constructing the ROAD PROJECT in late March 2011. The CITY has elected to accept the attached time and materials quote prepared by DISTRICT 19 for the WATER WORK not to exceed $11,550. 2. The CITY shall be responsible for construction staking showing the final grades of the ROAD PROJECT. 3. The CITY shall be responsible for compaction testing of trench backfill. The CITY will be responsible for asphalt replacement within the boundaries of the ROAD PROJECT. ARTICLE 2 — RESPONSIBILITIES OF CONSOLIDATED IRRIGATION DISTRICT 19 1. The plans and specifications for the construction of the WATER WORK have been prepared by District 19. District 19 will coordinate with the CITY and take reasonable measures to ensure that the WATER WORK plans are compatible with the scope of work contemplated under the ROAD PROJECT. 2. DISTRICT 19 shall have full control over the resultant construction contract and shall be the administrator for the WATER WORK. DISTRICT 19 shall designate a "responsible person" who shall represent DISTRICT 19's interest during the construction of the WATER WORK, and shall coordinate any modifications or changes needed by DISTRICT 19 in conjunction with the work. 0;01 k -01 D Cons. Irr Dist 19 MOU 3. DISTRICT 19 shall be responsible for the inspection and testing of all work and materials which are solely related to the construction of the WATER WORK, excluding compaction testing and soils testing.. DISTRICT 19 shall provide a representative to perform inspection duties relative to the construction of the WATER WORK, as discussed above. DISTRICT 19's representative shall provide tabulations of material quantities, equipment and labor hours to the CITY upon 48 hours notice to facilitate the preparation of pay estimates by the CITY. 4. Any modifications or changes to the WATER WORK shall be coordinated by DISTRICT 19 and shall be coordinated with and approved by the CITY prior to implementation. ARTICLE 3 — ALLOCATION OF COSTS 1. This Memorandum of Understanding, once fully executed, shall establish a commitment by the CITY to reimburse DISTRICT 19 for those construction costs associated with the WATER WORK on a time and materials basis, not to exceed $11,550. If unknown or unexpected costs are discovered during the work, the Engineer may approve in writing the use of a ten percent management reserve fund (MRF) equaling $1,155. 2. DISTRICT 19 shall prepare a pay estimate for the WATER WORK based upon the tabulations of material quantities, equipment and labor hours for work done. 3. Upon the signing of the pay estimate by the CITY, DISTRICT 19 shall send an invoice to the CITY for work on the WATER WORK. The City shall pay DISTRICT 19, within 30 days of the receipt of the invoice, for all construction costs approved by the ENGINEER for the WATER WORK. 4. DISTRICT 19 shall obtain a permit from the CITY to perform work within the CITY'S right -of -way for the WATER WORK. DISTRICT 19 shall obtain any necessary permits from Spokane County to perform work on County property. CITY O S O ALLEY: r y: ik Jackson, City anager APPROVED AS FORM: By: C � . e.�22�z — Office of e City Attorney Date: /' ZS -/ Date: 1 CONSOLIDATED IRRIGATION DISTRICT 19 By: Date: Bob Ashcraft, Consolidated Irrigation District 19 Mgr. Page 2 of 2