Loading...
06-009.00 Spokane County: 2006 Sewer Construction Project Drainage Improvement Costst` •~ Memorandum of Understanding Between the City of Spokane Valley and Spokane County Pavement Replacement Cost Sharing.and Drainage..Improvement.Casts for~the 2006 Sewer Construction Program WHEREAS the .City of Spokane Valley (the CITY) and Spokane County (the COUNTY) desire to wor~C collaboratively to construct portions of the COUNTY's 2006 Sewer Construction Program together with CITY paving and drainage improvement projects; and WHEREAS the CITY desires that~the roads impacted by the construction of~ sewers in the 2006 Sewer Construction..Program be reconstructed-to the.full preconstruction width for an improved roadway surface; and . WHEREAS the. CITY also desires .that pavement replacement. work be extended in some areas bgyond the limits of sewer construction;oand WHEREAS the.CITY also desires that certain drainage improvements-be constructed:in areas that will be impacted by .the COUNTY's 2006 Sewer Construction Program; and WHEREAS th.e costs of such .full width- repaving,. .additional length of .road reconstruction, and miscellaneous drainage improvements are not funded by the COUNTY's Sewer Construction Program, and said costs will need to be paid by the CITY; and WHEREAS the 2006 Sewer-Construction Program includes-the Veradale Heights, Vera Terrace, and Electric Railroad Sewer.Pcojects within the, limits.of.the CITY, .as identified in the COUNTY's adopted Six-Year Sewer Capital Improvement Program 2006-2011. NOW THEREFORE, the CITY and the COUNTY do hereby agree as follows: 1. Prior to the bid of each project; the COUNTY shall~.provide the CITY with a~ set of project plans, together with cost estimates indicating the.extent of pavement removal and replacement to be paid for by the COUNTY as a part of the sewer project. The CITY shall review the plans and estimate, and shall advise the COUNTY regarding the extent to which -the CITY desires to add pavement removal and replacement, as well. as the speck drainage improvements-that the.CITY would like to make in conjunction with the project. 2. The COUf~TY shall prepare bid documents that include the additional work that is requested by the CITY. The CITY may request that the COUNTY include a Base Bid Schedule and an Alternate Bid Schedule in the bid documents to allow for a more accurate determination ~of the-true cost impact-of the additional work requested •by -the CITY. C06-09 j - 3. After the bids for a project are opened, .the COUNTY shall prepare the.bid tabulation and provide a copy to the CITY on the day of the bid, together with a calculation of the CITY's estimated share of the project cost based upon the unit prices submitted by the low bidder. If the CITY then decides to proceed with the desired improvements, the CITY shall provide a written notice ~to the COUNTY within three -days of the receipt ~of the bid tabulation. 4. The CITY's maximum cost for the .three projects shall -not exceed $725,000 .for road improvements and $1~40;000~for drainage improvements without~written authorization. by the CITY. The COUNTY shall not proceed with any work that. would .increase the CITY's cost to an amount. greater. than the total amount authorized. The estimated CITY costs by project are presented in Table 1 below. The CITY and the COUNTY recognize that .this .estimated .total .cost -is for .planning -purposes, and that the actual amount will be based upon final quantities and actual contract prices. 5. If the CITY subsequently elects to .make .additions to the scope of -the project, .the CITY shall request such additional. work in writing. A~ corresponding adjustment shall then be made to the CITY's share of the cost based upon the resulting increase in pay quantities and .the .associated contract .bid .prices. For work .items requested . by -the CITY that are not covered by the contract bid prices, the COUNTY shall prepare a change order for the CITY's review and acceptance prior to work items being constructed. ' 6. Upon substantial completion of each~.pcoject, the COUNTY will send an initial invoice to the CITY for the CITY's portion of .the .cost.of roadway and. drainage improvements. Upon execution of the .final- pay- estimate with. the contractor, the COUNTY shall prepare and send a final invoice for any additional amounts payable by the CITY. SPOKANE COUNTY: By: N. Bruce Rawls, County Utilities Director CITY OF SPO¢CANE VALLEY: By: Dave Mercier, City Manager Date: _ .:. ~/~~1~ _ Date: MOU -Pavement Replacement~Cost'Sharing an~'Drainage`Imptovement Costs Page'2 of 3 For the 2006 Sewer Construction Rrogram i S ~ TABLE 1 City•of Spokane Valley Share 2006 Estimated Road & Drainage Improvement Costs ro'ect Estimated Road Improvement Costs Estimated Drainage Improvement Costs Electric Railroad $77,000 $52,000 Vera Terrace $241,000 $41,500 Veradale Heights $357,000 $37,000 Contingency ~ ~ $100,000 $19,500 Estimated Total Costs $775,000 $150,000 MOU -Pavement Replacement Cost Sharing and Drainage Improvement Casts Page 3 of 3 For the 2006 Sewer Construction Program . -- ~ ~ . , • -` ~ _ . Sporkane Valley 1T707-E'Sprague Ave Suite-106 •-Spokane Va~tey~VVA'9920b 509.921.1000 • Fax: 509.921.1008 • cityhall@spokanevalley.org Kevin Cooke, P;F. Public Works Buildi.n~, 4`t' Floor 1026 W Broadway Ave Spokane, WA 99212 Re: Memorandum of Understanding Pavement Replacement Cost Sharing and T~rainage-Improvements Costs .for the 2006 Sewer Construction Projects Bear Mr. Cooke, Enclosed you will f nd three (3) three copies of the Memorandum of Understanding for Pavement Replacement Cost Sharing and Drainage lmprovement5 Costs for the 2006 Scwcr Construction Pr~jects..Please.have-Bruce Rawls,-County Utilities~n.irector, review-and sign all three copies. Upon•execution; retairrtwo.copies for your files, and return one copy to our office. Should you have any questions please do not hesitate to contact our office. Sincerely, Steve or ey, ., ent~ Public Works Departmen ro~ec Cc: Neil K.ersten, AIA, Public Works Director