06-032.00 Spokane County: 2006 Sewer Construction Drainage Improvement Cost Sharing Memorandum of Understanding Between the City of Spokane Valley and Spokane County Pavement Replacement Cost Sharing and Drainage.lmprovement Costs for.the 2006 Sewer Construction Program WHEREAS the City of Spokane Valley (the CITY) and Spokane County (the COUNTY) desire to work collaboratively to construct portions of the COUNTY's 2006 Sewer Construction Program together with CITY paving and drainage improvement projects; and WHEREAS the CITY desires that the roads impacted by the construction of sewers in the 2006 Sewer Construction Program be reconstructed to the.full preconstruction width for an improved roadway surface; and WHEREAS the CITY also desires .that pavement replacement. work be extended in some areas beyond the limits of sewer construction; and WHEREAS the CITY also desires that certain drainage improvements.be constructed in areas that will be impacted by the COUNTY's 2006 Sewer Construction Program; and WHEREAS tfie costs of such full width repaving, .additional length of road reconstruction, and miscellaneous drainage improvements are not funded by the COUNTY's Sewer Construction Program, and said costs will need to be paid by the CITY; and WHEREAS the 2006 Sewer Construction Program includes the Veradale Heights, Vera Terrace, and Electric Railroad Sewer.Projects within the limits of-the CITY, as identified in the COUNTY's adopted Six-Year Sewer Capital Improvement Program 2006-2011. NOW THEREFORE, the CITY and the COUNTY do hereby agree as follows: 1. Prior to the bid of each project, the COUNTY shall provide the CITY with a set of project plans, together with cost estimates indicating the extent of pavement removal and replacement to be paid for by the COUNTY as a part of the sewer project. The CITY shall review the plans and estimate, and shall advise the COUNTY regarding the extent to which the CITY desires to add pavement removal and replacement, as well as the specific drainage improvements.that the CITY would like to make in conjunction with the project. 2. The COUNTY shall prepare bid documents that include the additional work that is requested by the CITY. The CITY may request that the COUNTY include a Base Bid Schedule and an Alternate Bid Schedule in the bid documents to allow for a more accurate determination ~of the -true cost impact-of the additional -work requested by -the CITY. C06-32 3. After the bids for a project are opened, .the COUNTY shall prepare the.bid tabulation and provide a copy to the CITY on the day of the bid, together with a calculation of the CITY's~estimated share of the project cost based upon the unit prices submitted by the low bidder. If the CITY then decides to proceed with the desired improvements, the CITY shall provide a written notice ~to the COUNTY within three days of tfi~e receipt of the bid tabulation. 4. The CITY's maximum cost for the -three projects shall not exceed $725,000 for road improvements and $140,000 for drainage improvements without~written authorization by the CITY. The COUNTY shall not proceed with any work that would increase the CITY's cost to an amount greater. than- the total amount authorized. The estimated CITY costs by project are presented in Table 1 below. The CITY and the COUNTY recognize that This .estimated total .cost .is for planning purposes, and that the actual amount will be based upon final quantities and actual contract prices. 5. If the CITY subsequently elects to -make additions to the scope of the project, .the CITY shall request such additional work in writing. A corresponding adjustment shall then be made to the CITY's share of the cost based upon the resulting increase in pay quantities and .the associated contract bid prices. For work .items requested by .the CITY that are not covered by the contract bid prices, the COUNTY shall prepare a change order for the CITY's .review and acceptance prior to work items being constructed. 6. Upon substantial completion of each project, the COUNTY will send an initial invoice to the CITY for the CITY's portion of the cost of roadway and drainage improvements. Upon execution of the final pay estimate with the contractor, the COUNTY shall prepare and send a final invoice for any additional amounts payable by the CITY. SPOKANE COUNTY: s- By: N. Bruce Rawls, County Utilities Director CITY OF SPOKANE VALLEY: gy. ,~i~!/D~1~/ Dave Mercier, City Manager Date: 2 ~ ~" - °~ Date: o?~~'~°6 MOU -Pavement ReplacemenCCost'Sharing and'Drainage Improvement Costs Page 2 of 3 For the 2006 Sewer Construction Program TABLE 1 City of Spokane Valley Share 2006 Estimated Road 8 Drainage Improvement Costs ro'ect -Estimated Road Improvement Costs Estimated Drainage Improvement Costs Electric Railroad $77,000 $52,000 Vera Terrace $241,000 $41,500 Veradale Heights $357,000 $37,000 Contingency $100,000 $19,500 Estimated Total Costs. $775,000 $150,000 MOU -Pavement Replacement Cost Sharing and Drainage Improvement Costs Page 3 of 3 For the 2006 Sewer Construction Program