Loading...
06-059.00 Adams & Clark: Beverly Hills Stormwater StudySo"6Une - - - - 'dal to - - - - -- - - - -- 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921. 1008 ♦ cityhatl @spokanevalley.org Nix. Daniel B. Clark President 1720 `'V 4`h Avenue Spokane, WA 99204 RE: Contract Addendum Beverly Hills Neighborhood Stormwater Study /CO5 -95 A &C Project No. 2005 -01 -168 Dear Mr. Clark: The City of Spokane Valley is authorizing a contract addendum to the Beverly Hills Neighborhood Stormwater Runoff Study contract (CO5 -95). The additional scope of services is the following: Surveying Scone Services 1. Perform a topographic survey with right -of -way data of the area of the intersection of Beverly Drive and Highland Drive. 2. Prepare an in -house topographic base map for design purposes Civil Engineering Scope Services 1. Coordinate with the City and. Budinger and Associates. Budinger and Associates is Adams and Clark subcontractor. 2. Revise existing drawings to incorporate the installation of swales and drywells at the Beverly Drive and Highland Drive intersection I Incorporate results of geotechnical investigation and include geotechnical recommendations in design. 4. Revise the existing drainage report Geotechnical Scone Services 1. Scope of work as outlined in Exhibit G -1 and propose infiiltration rates and outflow rates for drywells. �61� -67-7 Final engineering drawings, drainage report, and specifications are due to the City of Spokane Valley by September 29th, 2006. The City agrees to pay the Contractor on a time and expense basis as set forth on the attached fee and cost schedule provided the total sum does not exceed fourteen thousand, three hundred seventy five dollars. The terms and conditions for the original contract for this project (C05 -95) are in effect for this contract addendum. Please sign below if the terms of this addendum are agreeable to you. IN W ESS OF, the parties have executed this Agreement this �� day of _ 2006. OF POKAN VALLEY: c City Manager A ify Clerk CON CTO : �p M S /)JCI r caner /Authorized_ Agent Tax I.D. No.: REDACTED APPROVED AS TO FORM: O f f ce of the 7 ity Attorney This document contains confidential tax information and has been redacted pursuant to RCW 82.32.330. You may petition for a review of our findings pertaining to any redacted or withheld documents pursuant to Spokane Valley Municipal Code (SVMC) 2.75.080; and obtain judicial review pursuant to RCW 42.56.550. DOCUMENTS EXEMPT FROM PUBLIC DISCLOSURE The page entitled "Appendix A / Fee Schedule" contains confidential cost and rate data and is withheld from public disclosure pursuant to 23 USC 112(2)(F). Prenotification; confidentiality of data. A recipient of funds requesting or using the cost and rate data shall notify any affected firm before such request or use. Such data, shall be confidential and shall not be accessible or provided, in whole or in part, to another firm or to any government agency which is not part of the group of agencies sharing cost data under this paragraph, except by written permission of the audited firm. If prohibited by law, such cost and rate data shall not be disclosed under any circumstances. You may petition for a review of our findings pertaining to any redacted or withheld documents pursuant to Spokane Valley Municipal Code (SVMC) 2.75.080; and obtain judicial review pursuant to RCW 42.56.550. •-F• c _r_..... .. ...a li Exhibit G-I Scope of Work Geoteehnieal Exploration & Analysis Descriptions of Projects: Proposed storm drainage improvements in Beverly Mills neighborhood will include new drywells and storm sewers (layout provided by engineer). 2. Client requested scope involving subsurface exploration and analysis in: a. Areas of proposed infiltration to evaluate feasibility for use of dr}�A,ells and; b. Along routes of proposed sever to evaluate depth to rock and other general conditions for excavation and backfill thickness. Description of Tasks: Log the conditions in up to 2 backhoe test pits and one drilled boring with sampling and testing in areas of proposed iitfikration; depths of excavations to be on the order of 10 feet; depths of boring to be up to 25 feet if sufficient thickness of soil is present to reach sufficiently deep below a typical two barrel -deep dryweil; 2. Drill several probe borings along routes of proposed sewer to depths of no more than 8 feet (a few feet beyond the proposed shallow depth of sewers (5 feet or less); Note: Boring and test pit locations illustrated in attached Prelhninary Exploration Plan. 3. Conduct laboratory testing of index properties of soils if suitable target layer for infiltration is encountered: 4. Conduct geotechnical analysis to prepare appropriate geotecluiical recommendations addressing a. Feasibility of drvwells for infiltration and assessment of potential for impacts down gradient; b. Anticipated excavation difficulties, suitability of excavated soils for reuse as fill, and fill placement; c. Prepare geotechnical report. Budinger &, Associates, Inc. Geotechnical & En%,ironinental Engineers Construction Materials Testing & Inspection DOCUMENTS EXEMPT FROM PUBLIC DISCLOSURE The page entitled "Cost Estimate / Subconsultant Fee Determination Summary Sheet" contains confidential cost and rate data and is withheld from public disclosure pursuant to 23 USC 112(2)(F). Prenotification; confidentiality of data. A recipient of funds requesting or using the cost and rate data shall notify any affected firm before such request or use. Such data shall be confidential and shall not be accessible or provided, in whole or in part, to another firm or to any government agency which is not part of the group of agencies sharing cost data under this paragraph, except by written permission of the audited firm. If prohibited by law, such cost and rate data shall not be disclosed under any circumstances. You may petition for a review of our findings pertaining to any redacted or withheld documents pursuant to Spokane Valley Municipal Code (SVMC) 2.75.080; and obtain judicial review pursuant to RCW 42.56.550. uu Van IEl 0 PI -0je,ct o proposed test excavation (pit) s proposed boring with sampling & testing o proposed probe boring (rock probe, no sampling & testing) PRELIMINARY EXPLORATION PLAN PROPOSAL. # 196S6 I °+ BEVERLY HILLS NEIGHBORHOOD DATE 7/27/06 FIGURE Budinger STORMWATER MANAGEMENT PROJECT & ASSo6aws