~h~~g~ ~rd~r
Dale; June 27. ?_OQu
Page 1 0f
Gontract Number OS-018 Federal Aid Number STPUL-3848(oLaS)
Contract T1tlE E-uaduray AvenuR Oveflay I~tvJoct
Chango Omer Number 1
Prime Contractor Inlond Asphalt Company
(~ Ordere6 by Englneer under the terms of Section 1-04.4 o1'the 612ndard Specifications
[} Proposed by Cenfador
End t7
CORSr ~
iJ2Lp +esew
surety consent
Attamoy cf Fact
(~~
Original CantrOCt Amount 743,350
Current Con~aiCt Amount 74g 350
C-gtimat~d Net Change This Change 47,907.18
Es-tlmatrd Gonlract Total AftLr Change 795.697.1$
Approval Requfrtd X Region ~ Olympia Service Center ~ Local Agency
C
If the amount authorized in the Local l~gency A9re~errfent is exceeded an~~cimrall fund~re rrot aveitable for lttii~
chgrtge, ~c LoC~I l~a~ncy will assume the t~ofel co~i of th(s Chango Order ///,Il
XAp r i31 ReGOmmeng?d Apprnv~d Apprav 1
r
Project Englneer p ing - .ho Aon*emen-
~/L S~~O ~ ~ Z
Data Date
Appro.al Recommended Approved AppreveG
r~
By Approving AuNiority per C.A. Agreernen
0
Date Data
C06-81
CM:ANGE ORDER
Contract No: 05-018
Uate:.June 27, 2U()6
Page 2 of 4
Change Order No. 1
All work, materials, and measurement to be in accordance with the provisions of the
Standard Specifications and Special Provisions for the type of construction involved.
This Contract is revised as follows:
Description of Work
The Spokane Valley City Council approved a plan to stripe Broadway Avenue as a
3-lane section between Pines Road (SR 27) and Sullivan Road. The following
changes to the contract support this change:
Add Standard Item: Job Mix Compliance Price Adjustment Calculated
Add Standard Item: Compaction Price Adjustment Calculated
Add Item: Spokane County Type M Curb, Doweled 164 LF
Curb construction shall conform to Spokane County Standard Plan A-3. Curb shall
be doweled into the existing pavement, 4' minimum spacing. Curb shall be installed
on planed asphalt surface.
Add Standard Item: Paint Line
Add Standard Item: Plastic Drop Lane Line
Revise Item 17: Plastic Wide Line
Revise Item 18: Plastic Traffic Arrow
Revise Item 19: Plastic Crosswalk Line
Revise Item 21: Temporary Pavement Marking
LF
6240 LF
172 LF
Increase from 115 to 18,830 LF
Increase from 2 to 70 EA
Increase from 1072 to 1632 SF
Increase from 46,836 to 70,254
Add item Project Temporary Traffic Control 14 DAYS
This item shall cover Project Temporary Traffic Control per day for each working
day over the original contract time of 30 working days.
Add item: Cement Concrete Island with Filler 18 SY
Construction shall consist of 4'° Class 3000 concrete over 4" of compacted crushed
surfacing base course.
Revise Item 32: Induction Loop Vehicle Detector Increase from 8 to 39 EA
Date: Junc 27, 2006
Page 3 of 4
Delete item 33: Optical Vehicle Detection System Delete 1 EA
Add item: Type 2 Junction Box Inc. Repairs 3 EA
Add Item: Catch Basin Frame and Grate 1 EA
Construction shall include removing existing frame and grate at approximate station
55+20 LT and installing new frame and grate per Spokane County Standard Plans
B-11 and B-14. Work shall also include any pavement repair, concrete curb and
gutter repair and sidewalk repair to complete the installation.
14 working days shall be added to the original 30 working days.
Refer to list of items and quantities below.
Payment
Payment will be made according to the Standard Specifications per the unit
specified.
CI~iANCE ORDER
llate: Junc 27, 2QQ6
Page 4 of 4
Contract No: 05-018
Item No. Item Description
Change Order No. 1
Unit Unit Price Est. Qty. Est. Amt.
Measure Change Change
101 Job Mix Compliance Price Adjustment
102 Compaction Price Adjustment
103 Type M Curb
104 Paint Line
105 Plastic Drop Lane Line
106 Plastic Wide Line
107 Plastic Traffic Arrow
108 Plastic Crosswalk Line
109 Temporary Pavement Marking
110 Project Temporary Tragic Control
111 Cement Concrete Island with Filler
112 Induction Loop Vehicle Detector
113 Optical Vehicle Detection System
114 Type 2 J-Box Inc. Repairs
115 Catch Basin Frame and Grate
Calc. $1.00 Calc. $1.00
Calc. $1.00 Calc. $1.00
L.F. $35.50 164 $5,822.00
L.F. $0.20 6240 $1,248.00
L.F. $1.60 172 $275.20
L.F. $2.40 18,715 544,916.00
EA $106.00 68 $7,208.00
S.F. $5.20 560 $2,912.00
L.F. $0.11 23,418 $2,575.98
DAY $440.00 14 $6160.00
S.Y. $71.00 18 S1,278.00
EA $760.00 31 $23,560.00
L.S. $57,350.00 (1) $(57,350.00 )
EA 53,100.00 3 S9,300.00
LS 52,000.00 1 52,000.00
TOTAL $a7,so7.~8
Change Order Cover Ili'lemo
Date: 8/25!06
From: Louis Graf, P.E.
Phone: (509) 688-0225
Contract No: 05-018
Federal Aid No: STPUL-3846(005)
Project Title: Broadway Ave. Overlay Project
To: Keith MartinlBill McCammon
CHANGE ORDER TRANSMITTAL
CHANGE ORDER NO. 1
Requested Action:
Work Start Date: July 26, 2006
^ For Review and Execution
Description of the Change:
This change order is being prepared to compensate the Contractor for additional work
required to:
1. Stripe Broadway as a 3-lane section between Pines and Sullivan.
2. Added Job Mix Compliance Price Adjustment and Compaction Price
Adjustment.
3. Added concrete curb and island at Summit School.
4. Vehicle detection system upgrades to accommodate the 3-lane section.
5. Repair a broken catch basin frame and grate.
The 3-lane striping change was approved by Spokane Valley City Council on June 13,
2006 (after contract award). The items Job Mix Compliance Price Adjustment and
Compaction Price Adjustment should have been included in the original bid documents.
The island at Summit School is a pedestrian safety improvement. The broken frame
was an existing condition. The grate was broken by traffic running on it during
construction.
Evolution of the Change:
Change Order Cover Memo
The 3-lane striping configuration was proposed by City staff and approved by the
City Council after contract award. Therefore the change order is required to
address the construction changes associated with this design.
Per an email from Bill McCammon at H8~LP the items Job Mix Compliance Price
Adjustment and Compaction Price Adjustment were added.
The need for the catch basin frame and grate repair work was discovered during
construction
Entitlement:
This work vas not included in the contract; Therefore, the Contractor could not
have anticipated nor bid this work. The Contractor is entitled to additional
compensation and time to perform this work.
Price:
The estimated total cost of this change is $41,747.18.
Contract Time:
14 additional wor#cing days will be added to the contract.
Grinding is complete. All of the work except for the striping must be completed prior to
paving. The 14 days was arrived at based on vehicle detector loop ordering time and
installation. The Contractor has agreed to this.
Attachments:
Change Order
Verbal Approval Documentation
Supporting Documentation
C~ri~NGE ORDER Price .I)ocumen~rarion
Hate: September 7, 2UU6
Contract No: 05-018
Change Order No. 1
The following is supporting information for the accepted prices for work included in
Change Order No. 1.
Job Mix Compliance Price Adjustment $1.00 Calculated
• No documentation required.
Compaction Price Adjustment $1.00 Calculated
• No documentation required.
Spokane County Type M Curb, Doweled $35.50/LF 164 LF
• City of Spokane Valley Project - FairviewlUniversity Quiet Zone $34.06lLF
82 LF
• City of Spokane Valley Project -Argonne Road Overlay $25.00, $35.00/LF
for Concrete Curb and Gutter.
This is a small quantity and the sub-contractor had to remobilize to complete the
work. Therefore a price of $35.50/LF is appropriate.
Paint Line $0.20/LF 6240 LF
• WSDOT Contract 007192, 8/06 Avg. Bid $0.17/LF 10,220 LF
• WSDOT Contract 007134, 5/06 Avg. Bid $0.121LF 96,200 LF
Overall average of $0.15/LF.
The price of $0.20/LF is acceptable based on this small quantity.
Plastic Drop Lane Line $1.60/LF 172 LF
• WSDOT Contract 007192, 8106 Avg. Bid $1.10lLF 310 LF
• WSDOT Contract 007122, 6106 Avg. Bid $1.33lLF 1971 LF
Overall average of $1.22/LF.
The price of $1.60 is appropriate for this small quantity.
Plastic Wide Line $2.40lLF 18,830 LF
• City of Spokane Valley Project -Barker Road, 3/06 $2.50, 2.31lLF for an
average bid of $2.41/LF.
• City of Spokane Valley Project -Argonne Road, 7/06 $2.39, $2.50/LF for an
average bid of $2.45/LF.
The price of $2.401LF is below the average of the Spokane Valley bids.
Plastic Traffic Arrow $1061EA 70 EA
• WSDOT Contract 007163, 6106 Avg. Bid $103.33/EA 17 EA
• WSDOT Contract 007134, 5106 Avg. Bid $121.67/EA 7 EA
Overall WSDOT average of $112.50/EA.
The price of $106/EA is below the average of these bids.
Plastic Crosswalk Line $5.20/SF 1632 SF
• WSDOT Contract 007122, 6/06 Avg. Bid $3.08/SF 450 SF
• WSDOT Contract 007163, 6/06 Avg. Bid $6.33/SF 1460 SF
Overall WSDOT average of $4.71/SF.
• City of Spokane Valley Project -Barker Road, 3/06 $6.40, 5.86/SF for an
average bid of $6.13/SF.
• City of Spokane Valley Project - Dishman-Mica Road, 2/06
$6.00,5.00,7.10/SF for an average bid of $6.03/SF.
• City of Spokane Valley Project -Argonne Road, 7/06 $4.70,5.00/SF for an
average bid of $4.85/SF.
The price of $5.20/SF is within range of the recent bid history for this item.
Temporary Pavement Marking $0.11lLF 70,254 LF
• WSDOT Contract 007192, 8106 Avg. Bid $0.18/LF 21,000 LF
• WSDOT Contract 007122, 6106 Avg. Bid $0.47/LF 17,756 LF
• WSDOT Contract 007134, 5/06 Avg. Bid $0.20/LF 314,700 LF
Overall WSDOT average of $0.28/LF.
• City of Spokane Valley Project -Barker Road, 3/06 $0.10, 0.10/LF for an
average bid of $0.10/LF.
• City of Spokane Valley Project -Argonne Road, 7106 $0.35, $0.40/LF for an
average bid of $0.38/LF.
• City of Spokane Valley Project -Dishman-Mica Road, 2/06 $1.00, $1.00,
$1.25 /LF for an average bid of $1.08/LF.
The price of $0.11/LF is below the average of the WSDOT bids.
Temporary Traffic Control $440/DAY 14 DAYS
• City of Spokane Valley Project -Broadway Ave, $8,000 LS for 30 days
($267/day)
• City of Spokane Valley Project -Argonne Road, $50,000, $52,000 LS for 25
days ($2000/day and $2080/day)
The price of $440/DAY is within the range of the recent bid history for this item.
Cement Concrete Island with Filler $71/SY 18 SY
• City of Spokane Valley Project -Barker Road, Stamped sidewalk $62/SY
• City of Spokane Valley Project -Argonne Road, sidewalk, $45, $76/SY for
an average bid of $60.50.
Starting with an average bid of $60.50/SY, adding a small quantity of rock at
$45/CY for $4.95/SY, adding additional effort for paving around an island at
$5/SY comes to a final estimated cost of $70.45/SY. Also, considering the re-
mobilization for the sub-contractor supports the $71/SY as an appropriate price.
fl
Induction Loop Vehicle Detector 7~~lEA 39 E
^ pity of Spokane 1lalley Project - Argonne F~oar#, ~~,791~, ~7,~I~0 L for 48
Poops (average price of 95~_1bllaop~
The pride of 7~0lEA is below the average of tY~e l~rgonne bids,
~p#ical ll~hicle Detection ystern delete 'I E
* fro docurr}entatior~ required
Type ~ Junction Box Inc. Repairs 'IU~fE~4 ~ EA
This item carer's the electrical sub-contractor°~ bid per eaci~ of 1,~1~0 knot
including rcpair~, curb and sidewalk repair of "I,~QO per each and ~5~ per each
for asphalt repaif and Inland Asphalt mark~p_
a#ch Basin Frame and Crate 0001EA 1 EA
~`he Icvel of effort involved with campJeting the removal and replacer~nent of the
frame, grate and the assaciated concre#e repair for tF~is work is sirtilar to installing a
new catch basin. For the pity of Spokane Malley project -Barker Road, e
received bids of Q013, 75Q, and 1Q~ for a quantity of 19. Therefore the price of
~~0 is appropriate fcr this small quantity.
'l~ working days shall be added to tl~e original ~D working da~rs.