07-050.00 Inland Asphalt: Broadway Ave Overlay Project Washington State Department of Transportation Change Order Date:July 10, 2007 Contract Number 06-018 Federal Aid Number STPUL-3846(005) Contract Title Broadway Avenue Overlay Project Change Order Number 4 Prime Contractor Inland Asphalt Company 7 Q Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ^ Proposed by Contractor Endons Surety Consent `- ~~_ GOMrfd - Attamey ui Fad I ~ ~ pale ~/ Q3lE Original Contract Amount $ 748.350.00 Current Gontract Amount $ 801,359.18 Estimated Net Change This Change 3 5,207.10 Estimated Contract Total After Change $ 808.566.28 Approval Required X Region ^ Olympia Service Center ^x Local Agency If the amount authorized in the Local Agency Agreement Is exceeded and federal funds are not available for this change, the Local Agency will assume the total cost of this Change Order. /' ~ X 7~// ~D 7 Date ^ A IReco ended oved ey ~/~,~a~ Approving Authority per C.A. Agreement Date Date ~~ ,~ cfi.~~c~: c)k~)F.k Datc: Juh- 10, 2007 Page 2 of 7 Contract No: 05-018 Change Order No. 4 All work, materials, and measurement to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. This Contract is revised as follows: Description of Work The Contractor shall re-stripe 6roadway Avenue east of the Pines intersection. This change will provide a longer taper (merge lane for eastbound traffic) than the original design. This change was requested by the City Traffic Engineer due to field observations of the current striping configuration. The Contractor shall provide all traffic control, signing, and temporary traffic control devices in order to provide a safe work zone. Measurement "Mobilization" will be measured lump sum. "Plastic Line", "Remove Plastic Line", and "Plastic Wide Line" will be measured by the completed linear foot. "Traffic Control Vehicle" will be measured by the day. "Traffic Control Supervisor" and "Traffic Control Labor" will be measured by the hour. "Sequential Arrow Sign" will be measured by the hour for the time that each sign is operating. Payment Payment will be made in accordance with Section 1-04., for each of the following bid items included in the change order. CHANGE ORDER Datc:.luly 10, 2007 Page 3 of 7 Contract No: OS-018 Item No. Item Description Change Order No. 4 Unit Unit Price Est. Qty. Est. Amt_ Measure Change Change 1 MOBlL1ZATION LS S 575.00 LS 5 575.00 2 PLASTIC LINE LF S 1.82 980 51,783.60 3 REMOVE PLASTIC LINE LF S 0.83 640 569720 4 PLASTIC W10E LINE LF S 1.48 80 5118.40 5 TRAFFIC CONTROL VEHICLE DAY S 175.00 1 S 175.00 6 TRAFFIC CONTROL SUPERVISOR HR S 40.00 10 5400.00 7 TRAFFIC CONTROL LABOR HR S 38-00 20 5760 00 8 SEQUENTIAL ARROW SIGN HR $ 7 00 20 S140.00 CONTRACTOR MARKUP (12%) TOTAL 55 .207.1010 Page 4 of 7 .~ .o-: Inland Asphalt Company S~N~,o~, M t~nf C,ppo7tMy fnOb1K Juno 13, ?007 tvlr. Stu-nc Arit Ctity of Spokane Valley Depattrnent of Public Works 11707 E Sprague Avenue, Suitt 106 Spokane Valley, WA 99?06 ltE: Broadway Avaauo Ovally Projep Stripng Change Order 2UU7 Shane: ~anw~cte~ Mretwaner ~ raar~nrs s .' - JUN 1 4 2007 -~. -- Encfoaed wide this lattor is chango order pricing far ttse above-rcfaa~ued change order pa your dewing for revisod striping on Broadway Avenue coat of Pins. "[hose pricx quotes are from Sharp-Line Industries and North Star Ettterpriaes. Please ADU a 12"rL markup to these price far Ialaod Asphalt. I stn olao roquesting additional wonting dayta to Doorplate thv work. Plosao confect me if you have questiafls. Al Hu Inlan h t Company rc: Flle 8pok~a: 6111 E eroatdway, Spokane VaM1ey, WA 98212 • P.O. Box 3368, Spokane, WA 99220 (508} 6342657 • Fax: (609} b36-3061 Rk~land: 955 W, l~t~y • RioWand. WA 99352 • (509) il'13.0874 • Fax: (50~) 94389'79 Page 5 of 7 05/29+':B87 14: A7 ~d35333755 ~rt:y7l~LII.E ItiTVS~I6 Nth 87i 82 ~,~~t~ QUOTATION s~~uiv~. S' ~' P.A. BOX 1197) ~~'' ~' 5POKANE:, WASHINGTON 99211 rHOrr>E: ts~l s3s.~9ds xuc: t~l s3~-3~ss SHwRPI.I0i4C 1 www.~l>larp~ne.oom TO: INLAND ASPHALT COMPANY ATTN: STEVH MiUER DATE: 6J29/07 RE: BROADWAY AVENUE OVERLAY PROJECT BATES ROAD '10 SL)LLIVAN RCWD CMANOE ORDf`R N0. 4, STRIPE TAPIR E{J1aT OF PII~ - I LOC: CITY QF SPOKANE VALLEY, WASHINGTON EiW DATE QUOTt FIRlM fOll >sNiPM£NT FOB TE:R1M8 ~rnn,r 3n SAYS PER 5t=„i~r~t n = JDBSrr~-INSTALL ED PEFe SuBGOFtTRACT AGRSEl~N7 ITtAI D W1ff3 DEBCRIPTIOH TOTAL ADD 1 19 MOBILIZATION 375.00 S37S.00 ADD 9100 LF PLASTIC LINE 1JI2 SI.763.60 ADD , 640 LR REMOVE PLASTIC UNE OJI3 5697.20 ADD 8o IF REMOVE PLASTIC WIDE LINE 1.48 SI18.40 ~ccLUDes: -- ,) soHa 2) TRAFFk: CONTIEOL NFACE p~pAFiAT ON AND / OR SWf I~ING 9 i ~ ,U 7) j~R9ADVAl OF PLA&T1GAIe8lGdOSLYtI INCIIJDEB: 1) ONE ~IQ8t.17AT10N ONLY, EACM AOOIiK~IAL @ i9~0.00 Z) RE#ADVAL Of PIJtdT1C MARfONC~ ON A8P{IALT CONCRETE PAV1ti0 ONLY qOO-mwroxro~sas~,n,rxYOimsn~r-,.na;w~e'rn~.~onraco~Rrx. S UBTOTAL 32,9310 3HARP•LiNE INDUS II~C. SALES TAX IIdGI_L~PF.n .. ~ FREIGHT ~ICLUDED g~ ~~ 5onrcn hi Ad~mt Ybo34aidoot T OTAL S 471+0 Page 6 of 7 ~OI~TH STAR ENTERPRISES , 1 N C Hu-r,~ oo. ca May 30.2007 Inland Asphalt Co. Atm: Al Nughbanka P.Q. Bwc 3366 Spakx~e, WA 99220 Re: Broadway Ava Oreriay Dcar Al: GENERAL l.lBEHTY l.Afdr, WA 9901 B 1~lephono 509-001-0082 FAX 508-'922.3332 As pcr yaur rcqucst, find bclow our unit prixs~ to perform tra>iic contml services duriag the rzstripin~t work nn the above rcfcrerrccd contract Traffic Control Vehicle (c~S 175. WJDay (ter include CI "B" signs dt cones) Traffic Control Strpcvisor aQ340.00/Iir Traffic Corurol Labor (,~538.00/lit per each Qaggrr roquircd Sogwe~ial Armor Boards (a~S7.001Hr per earh board Mubilizetion ~5200.OO/LS Thank you fix allowing ota fum to quote this additional work. Due to tht ouatsirvctioa season being well undo way v-e would request that a erne wock edvancc ooticc apply. Submitted by: NORTH STAR ENTERPRISES. INC. - ~- C.L. Andcrson. Pres. E~a+ oaca~tunar ~~ r . ,. ;~ -° ~ 4 -. ~ ...+ r~ F- L~1 W ~ `- tl'] W:. W _-_. d ~ r PAlNTEE+ Si{IP LANE LINE (Tl'Pj. `~ ~~ ~ ~ e ,~ ~I I . ~ I~ ~~ ~ L~1 ~ . ~E ~ '~ ~ ~+ I ,. jl.'~ .. I ~~ ~ ~ A ~ ' ~~ e, I bd, I,:G" Radhlrn - ~ I I --- 1R i + *,~,, ~_ ~ PAEhd~a Q{h1BLE '!ELL~W ~ i ~ ~E~lrEt~ Llt'~ ~T"r~'). ~. ~ ~ ~' - ?7 GuL ~7 D~ .:-v - U.W. - - Cr~tr~'~ ~. ~ w ~ ,,, .~ _ , ~ s , _ O _,~ J 1~ tl ~_ ?3 ~~ E5 ~I ~~ ~~ I ~C 1~ ,~.~ ~ , ~. "~~-----J~~___ ti____,_~~_-- ~~ ~~ ~~ -'--'~ ~ ~- ~ - °-- - 45 /~~ ~~ ~~r~ I "._' ~`,~,~~JT=i) ,~~ll.) i'LA;~, ,-(iP~,:: L~`dE ~?~`aP,r?;lirv ~~,~i'L~=~!°IS L~~~ AS PEI V~'SG',~ I ~ I f~PJ+~~A~Ll ~Lr~h1 PJ.-~r~-1 ~]-0~- fiTP~TI~ryryI~<fdS.kOFFSEIS, AN[l (~+~ADV~~AY 4YiJThiS ~~1J4~'l~! f+f~E or~wn e;,f i ~~ . o+~Fe City ~f pcslcane V,~91ey ~esl~+ned 5;: ~~ [i~~kr ~~por~:ment ~f f'utxcc Works SCr~,I F i t i F. °~^f~~U~ Avg. Sidlt.~ 1 C~~ H~~dIZOPlTA?: - fF rv;AM ~,'~1_l.F°~`, ti4'b~t. 99eL'6 4'E?TIfiAL: h ,,+~ 1`C~`I u2i-i~~~p p r~,w~- rr___.___~- ~.- - - - p 5T'A 24~+6C~, BNB PLANING +~NB fJUER~AY° ~AT~H E~tI~TIPi~ R~A;JWA!` - - - -- _ -F .. ~ PLA~'sC C~Q~£!L~ Y~l.L9ti~ ~ c~r~TE~ USE { ). ~ ,,_ . ,! !; . ~' -o vr. - BEGIN APER 5~A ~9t~Cf EhyG TAPER STA 3! t 55 ~`,1 i ~. , i 1 ~' ~F.v ~~'. ~~ ~ Fi I ~ ,~~ ~ ~~~ E}fPlf~Ea ~l9~'15/~i~ _ ~.- -- - ,. L~1 ~~ _ ----~ ~~ ~_- - U7 - - -~ J--~.-~~ 1~J _ e_ --~ -- _ - ~ >~~ ~JVE E11"s~1FiG ~II!~ LANE M'V~riPE WiEaT 4F 5TA~ 31 t5':~ I i ;y~-~~ . ~. - ,._. Sfit~KA~E YetiLLE'f PRtJ.JECT N,~, Q5-~JYB -, - - `hr_r BR~A~'~AY A4'~~II~E GATES f~~,ACJ TQ ~lJLLIVAN t~GA~ C ~! 31 CH~~JG~ oRa~B I,aNE STRIPIrIC, REVISlbN~~