07-052.00 Spokane Rock Products: Argonne Overlay Project;. .'~1 ~'-, ~_ ..% ~.. Washington State Department of Transportation Date: July 12, 2007 rage i or Contract Number OS-017 Contract Title Argonne Road Overlay Project Change Order Number 1 Prime Contractor Spokane Rock Products ,- ~-~~ .~ i ; Change Order 1 Federal Aid Number STPUL-4041(012 ^ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ^X Proposed by Contractor Endorsed By Surety Consent Contractor Attorney of Fact ~~~~~ (~ 7 oato Date Original Contract Amount S 383,833.28 Current Contract Amount S 383,833.28 Estimated Net Change This Change $ 1,008.00 Estimated Contract Total After Change $ 384,841.28 Approval Required Region ^ Olympia Service Center ^X Local Agency If the amount authorized in the Local Agency Agreement is exceeded and federal funds are not available for this change, the Local Agency will assume the total cost of this Change Order. X Ap~pjro al Recommended ^Approved ~/ ~~ Appr Proj~ect/Engineer Approving Au/tho/rity per C.A. Agreement Date Date ^ Approval Recommended Approved Approved By Approving Authority per C.A. Agreement Date Date l'i/7~s~ 5 f - ~ ~ _~ ~ ~ CHANGE ORDER l:)ate: ~Tuly 12, 2Q07 Page 2 of 6 Contract No: 05-017 Change Order No. 1 This Contract is revised as follows: Description of Work The Contractor shall be reimbursed for rental of ten (10) Class "A" Road Work Ahead signs that remained installed onsite awaiting the completion of permanent striping completed in the spring of 2007. The project was carried over due to weather limitations for the placement of plastic striping. The City directed the contractor to reschedule work and complete a higher priority project prior to placing permanent striping on Argonne Road. The Argonne Road Project required all work to be completed between the hours of 8:OOpm and Gam. Due to the time of the year minimum temperature requirements for placement of plastic striping were not able to be met thus requiring the project to carry over until spring of 2007. Measurement "Class °`A" Sign Rental" will be measured per each by the month. Payment Payment will be made in accordance with Section 1-04., for the bid item included in the change order. ~. ~~ ~-~~ ~ J Contract No: 05-017 Item No. Item Description CHANGt~ ()R:U:CR -- ~'~. '~ .. ' _~ Date: ~Iuly 12, 2007 Page 3 of 6 Change Order No. 1 Unit Unit Price Est. Qty. Est. Amt. Measure Change Change 1 CLASS "A" SIGN RENTAL MTH $ 150.00 6 $ 900.00 CONTRACTOR MARKUP (12%) $ 108.00 TOTAL ~ 1008.00 - ~ Page November 10, 2006 Spokane Rock Froducts Attn: Ed Griner P.O. Box 3808 Spoltane, WA 99220 Re: Argonne Road Overlay Prnject -Contr. tr05-017 1Vinter Shut Dotti•n Dear Ed: Please accept this letter as our notification that efftctivc Nov. 1~ we will be charging a rental on 10 Class "A" Road Work Ahead signs that will have. to remain up uuti] striping is complete in the spring of 2007. A monthly price of $15.00 per month per each sign or $150.00!montin will be charged for this change. Any maintenance required to correct lost, stolen, or damaged signs will be charged at Force Account rates for equipment, labor. and materiel. North Star Enterprises, Inc. will not be held responsible for maintaining the temporary su~pe during tltc vrinter shut down or will we be held legally responsible for any traffic incidents that might occur due to loss of striping dtuing this shut dovm period. Respectfully submitted, ~. NORTId S"CA£t E\'TERPRISES, •INC. C.L. Anderson, Pres. 4of6 r . ~~ ,~~ ' - ~ ~~ __. _ - - - Page 5of6 ~ ~IOI~I STAR ENTERPRISES, INC. IJORTNve 794 b5 GENERAL CONTRACTORS March 8, 2006 Spokane Rock Products inc. Attn: Ed Griner PO Bcx 3848 Spokane, VVA Og220-3608 Invoice f~735!f ~ , Job Name: Argonne Road Overlay Project Contract Number: TA-2951 Winter Shut Down BOX 6~7 LIBERTY Id~KE, 1~'A 99019 Telephone 509.88 ~ -0692 FAS SOB-922.3332 Please find below billing sign rental during the winter shutdown for November -February per attached letter. Sign Rental (4 Months) 4.00 mas @ 15t)_00 = 600.00 TOTAL DUE $ 600.00 Thank you for allowing us to perform those services for you. If we can be of any further assistance, please do not hesitate to contact us. There will be a 1.5% interest charge on any account 30 days past due. =_quel Oppartunlry Empbydr ~. ,... ~ ~ ~ - ~ ~ Rage i=NTERPRISES, INC. NORTF4SE Q9y PS April ti6, 2606 Spokane Rock Products Inc. Attn: Ed Grlner - PO Box 3808 Spolsenz, WA 99220-3808 Invoice # 7433 Job Name: Argoririe Road Overlay Project Contract Number: TA-2951 eox soy LJBEI;IY L0.1C~.'A'A 99019 Talcpt+ono 509-r°91-0B9f2 FAX 509~972-3332 1~nter Shut Do~.~n Please find below billing sign rental during the winter shutdown for AJiat~ 3 P.pril per attached letter. Sign Rzntel (2 Months) 2.00 rnos Cia 350.00 = 300.00 TOTAL DUE $ 300.00 Thank you for allowing us to perform these services for you. If tive can be Of any fur:tl£r 2SSi^atnn~e, plaas2 d3 not heslt3te 20 COniSEt US. There wilt be a 1.5°~ Intorest chargo on any accv~mt 30 days past duo. RECEIVED APR 1 8 [001 GENE( L C~NTRACTO~Stnc. 6of6 ~9~ OPPafi~dly Etnp7oym