Loading...
11-070.00 Aztech Electric: Sprague Ave ITS Ph 1It 0F11 C �— 3POKane . . . . . . . Valley Public Works Department Capital Improvement Program 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhatt@spokanevalley.org Memorandum Date: June 14, 2011 To: Neil Kersten, Public Works Director Thru: Steve Worley, Senior CIP Engineer From: Ken Knutson, Project Manager Re: CIP #0133 - Sprague Ave ITS Phase 1: CO #1, Extend Fiber to Evergreen Attached for your signature are two copies of Change Order #1, which provides the extension of fiber optic cable from McDonald Rd to Evergreen Rd. Evolution of the Change: Bids were opened on March 25, 2011, with $171,500 announced as available funds immediately prior to bid opening. Aztech Electric was low bidder, and entered into contract with the City for $171,462.45, which included the base bid and Additive #1. Additive #2 was bid at an additional $10,330.30. In April, the City requested and received approval from the Department of Energy to move $20,000 from the Bike /Pedestrian Master Plan Implementation to the Sprague Ave ITS Project, with the intention of using the additional funds to extend fiber to Evergreen Rd. Entitlement: This change results in additional work, and the Contractor is entitled to be reimbursed. Price: The City approached the Contractor about exercising Additive #2 at the unit prices in the original bid. The Contractor agreed to the proposal. Contract Time: Five working days will be added as a result of this change. Please sign both copies and return them to me. I will then coordinate distribution to Aztech Electric, the City of Clerk's office and Finance. Original Contract Amount $171,462.45' I Prevous Change Order Cost $0.00 Change Order #1 Cost $10,330.301 15 % of Original Contract 4 $25,719.37 "Max Public Works Director CO Authority F $25,719.37 ' Order Cost to Date (w/ Cpl l� h $10,330.30 Remaining Public Works Director CO Authority $15,389.07 IS c'�rr r�r•' bMane V alle y , 4; CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 11 -008 DEPARTMENT OF PUBLIC WORKS PROJECT: Sprague Avenue ITS - Phase 1 CONTRACT DATE: 3/31/2011 CONTRACTOR: Aztech Electric, Inc. CHANGE ORDER NO: 1 CAPITAL IMPROVEMENT PROJECT NO: 0133 DESCRIPTION OF CHANGES This Change Order provides for the installation of fiber optic cable and associated equipment between McDonald Rd and Evergreen Rd. See attached Description of Work, Item Breakdown and affected plan sheets. Total Amount of this Chan Order:. $10,330.30 SUBSTANTIAL COMPLETION Original Date: Prior to this Change Order: Including this Change Order: THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF CONTRACT PRICE: ORIGINAL CONTRACT AMOUNT $171,462.45 TOTAL PRIOR CHANGE ORDER AMOUNT $0.00 CONTRACT PRICE PRIOR TO THIS CHANGE ORDER _ _ _ _ _ _ _ _ _ _ _ _ $171,462.45 NET THIS CHANGE ORDER ------------------------ $10,330.30 CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $181,792.75 ANDREW R. MUIM, CONTRACTOR ACCEPTANC CaQ�� DATE: JIM 7, 2011 —� The contractor hereby accepts this adjustment under the terms of the original contract for all work perfomed. RECOMMENDED BY: DATE: /V J ul) 210 APPROVED BY: v DATE: V APPROVED BY: IA2� DATE: Mike Jackson, C y Ma ager ATTACHMENTS: Description of Work, Item Breakout, Special Provision page 190, sheets ITS05, ITS12, ITD01, ITD03, ITD05 DistrihWinn ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office COPIES TO: PW Project File CHANGE ORDER Page 2 of 9 Contract No: 11 -008 Change Order No. 1 This Contract is revised as follows: Description of Work The Contractor shall construct and install items of work described in the Bid Documents under Additive 2 (Schedule D), listed on page 190 of the conformed set of Special Provisions and identified as "ADDITIVE 2" on conformed plan sheets ITS05, ITS12, ITD01, ITD03 and ITD05. Contract Time Five (5) working days are added to Contract Time as a result of this Change Order. Attachments Special Provision page 190, plan sheets ITS05, ITS12, ITD01, ITD03, ITD05. CHANGE ORDER Page 3 of 9 Contract No: 11 -008 Change Order No. 1 Item No. Item Description EA Unit Price Est. Q Est. Amt. Change M C:4.... n..a:.. . Measure Fiber Optic Splice Closure EA $ � � iuci vNu�, ulJII WUL'on Panel k IL c urt) EA $ 991.54 1 $ 991.54 D9 Fiber Optic Splice Closure EA $ 452.09 2 $ 904.18 D11 Ethernet Switch EA $ 1,429.22 1 $ 1,429.22 D13 SFP Module (Gigabit) EA $ 599.18 2 $ 1,198.36 D16 Fiber Optic Cable (48 SMFO) LF $ 2.06 2,700 $ 5,562.00 D18 Preterminated Stub Cable (12 SMFO) LF $ 3.50 70 $ 245.00 TOTAL $ 10,330.30 2. Additive(s) Change Order No. 1 Page 4 of 9 a. Additive 1 Based on installing a new CCTV camera, pole and foundation, ITS cabinet, and service connection on the north side of Sprague Avenue east of Houk Rd. The bid items for Additive 1 are as listed in the bid proposal. c. Additive 2 Based on installing new conduit and 48 SMFO fiber optic cable on the north side of Sprague Ave between Sprague Ave /McDonald Rd and Sprague Ave /Evergreen Rd. This additive also includes installing a new Ethernet switch at the Sprague Ave /Evergreen Rd signal cabinet. The bid items for Additive 2 are as listed in the bid proposal. Bidding Procedures To be considered responsive the bidder shall submit a price on each and every item of work included in the Base Bid and all Additive(s). Award Procedures The successful bidder will be the bidder submitting the lowest responsible bid for the preference, listed in the order below, which is within the amount of Available Funds for the project to be announced at the time of the bid opening. Available Funds will be announced immediately prior to the opening of bids. 1. Preference 1: Lowest total for Base Bid plus Additive 1 plus Additive 2. 2. Preference 2: Lowest total for Base Bid plus Additive 1. 3. Preference 3: Lowest total for Base Bid plus Additive 2. 4. Preference 4: Lowest total for Base Bid. In any case, the award will be subject to the requirements of Section 1- 03.adde °d n' City of Spokane Valley 190 Special Provisions Sprague Ave ITS Project— Phase 1 SVPW Bid No. 11 -008 N MCDONALD RD IC "I III I J:1L a 191400 39220C 200400 S MCDONALD RD Tr r; Q U1 W N w z J F Q N CLINTON RD N MCCABE RD Change Order No. 1 I Page 5 of 9 _ L Lu ji LU -_y. - _ _. _ T _- _ _.- - _ = _u6- -_ - - - - - - z w34 3aa4 Ja54oa J 1400 _ J0211� 0 . _ S F- 19<400 I I� II I I I 11 S BLAKE RD SEE SHEET rrS12 CONSTRUCTION NOTES O ROUTE NEW 48 SMFO CABLE THROUGH EXISTING PULL BOX. O CONTINUE NEW 48 SMFO CABLE ROUTED THROUGH EXISTING PULL BOX, SEE ITS 11. NOTES: 1. SEE SHEET ITNO2 FOR LEGEND AND GENERAL NOTES. 2. SEE SHEET ITDO1 —ITD05 FOR FIBER SCHEMATIC. SPLICE DETAILS. AND FIBER DISTRIBUTION PANEL DETAILS. WIRING SCHEDULE (THIS SHEET ONLY) RUN NO. CONDUIT SIZE' EXISTING CONDUCTOR NEW CON DUCTOR AR REMK A, EX. 2 EMPTY 1 -48 SMFO 2 EX. 2" EMPTY — FOR FUTURE INTERCONNECT 1. ALL CONDUIT SHALL CONTAIN A N0. 8 GREEN GROUND WIRE, UNLESS OTHERWISE SPECIFIED. 2. EXISTING WIRING SHALL BE MAINTAINED AND PROTECTED, UNLESS OTHERWISE SPECIFIED. 1 5, YnOW ore C you allnetOR you dig. ADDITIVE 2 S EVERGREEN RD �G 50 25 0 50 100 SGLE FEET 1141 im �xma gNKUN0. W�9NwGlON 996N IF.V0 a45 NSalY CONSTRUCTION NOTES Is INSTALL ETHERNET SWITCH IN EXISTING TRAFFIC SIGNAL CABINET. O INSTALL 12 -PORT FIBER DISTRIBUTION PANEL IN EXISTING TRAFFIC SIGNAL CABINET. sz TERMINATE 12 SMFO PRETERMINATED SC /UPC PIGTAIL IN 12 -PORT FIBER DISTRIBUTION PANEL. os INSTALL SPLICE CLOSURE IN PULL BOX AND SPLICE 48 SMFO CABLE TO 12 SMFO PRETERMINATED SC /UPC PIGTAILS ACCORDING TO FIBER OPTIC SPLICE DIAGRAMS SHOWN IN ITD DETAILS. 68 COIL 50' OF 48 SMFO CABLE IN EXISTING PULL BOX. INSTALL NEW SPLICE CLOSURE AND SECURE THE END OF THE FIBER IN THE SPLICE CLOSURE FOR FUTURE CONNECTION. WIRING SCHEDULE 2 (THIS SHEET ONLY) RUN NO. CONDUIT SIZE X ESTING CON NEW CONDUCTOR REMARK Qj EX. 2' EMPTY 1 -48 SMFO Q EX. Y EMPTY 1 -12 SMFO EX. Y OCCUPIED 1 -12 SMFO A EX. 3' OCCUPIED S EVERGREEN RD EX. Y OCCUPIE!E–E[FOR NOTES- Q EX. 2 EMPTY 1 SEE SHEET ITNO2 FOR LEGEND AND GENERAL NOTES. �FUTURE wrv1— A NU. tl G LLN GHUUNU WIRE. UNLESS OTHERWISE SPECI FIED. 2. EXISTING WIRING SHALL BE MAINTAINED AND PROTECTED, UNLESS OTHERWISE SPECIFIED. NN EVERGREEN RD 'I•II Ii 5I I ,III 'li 1 V I II ' _'� ••I III ' I I I ✓ I I ! • � I i � I %II I i � I II ><-, < I : I I �j � I::t i 1 E SPRAGUE AVE�'i =" r21 -IL L J ll e Change Order No. 1 Page 6 of 9 u ;rrtranSPOGROUP REU iacneaon. xwxwm. waswrwian eeaw I.+I .a eue.a, � rLy i5l •I �..I.. I I i � P E .. r–,i –I �I tG_.' ADDITIVE :2] S EVERGREEN RD NOTES- 1 SEE SHEET ITNO2 FOR LEGEND AND GENERAL NOTES. Z SEE SHEET ITD01 –IT005 FOR FIBER SCHEMATIC, SPLICE DETAILS, AND 20 to D 20 40 FIBER DISTRIBUTION PANEL DETAILS. -� - -.. I4roW WnacxUelow. har. elow.dig. BLP1E mu m.,;, o, ..� <m „,,, mo,w„ Cify of Spokane Valley Depanmenf afPUOlic Wark � °i SPOKANE VALLEY-SPRAGUE ., 11707 Easl Sprzgue Avenue, Suite 106 Spokane SPRAGUEAVE/EVERGREENRO p••, -P - SPOKANEMEY, WA 99206 �11� .. ..... _..- ..,- ... ... .. ....... .._.- ..-- ..._.._.._..__ REWSIORS .,.,..o (509)921 -1000 ITS PLAN ;rrtranSPOGROUP REU iacneaon. xwxwm. waswrwian eeaw I.+I .a eue.a, emtl Al 332 CABINET AT E SPRAGUE AND I -90 .... (CC . 090 050) APPLEWAY BLVD AND S UNIVERSITY RD APPLEWAY BLVD AND S UNIVERSITY RD I — — — — — — — I ea T� µo ® ®111®11 Bill RE- CONNECT' EXISTING F J I I I I I PATCH CORDS TO NEW CONNECT NEW PATCH CORD GIGAB T SF? MODULES. FROM EXISTING FBER I JJ_J 1 ?,FOPIL j DISTRIBUTION PANEL TO I �' - E%. FOP T NEW CISCO GBIC PORT TO Z — — I E% 2 -4 SMFO ESTABUSH COMMUNICATION I I PRETERMINATED STUB I .144 FOP TO SRTMC. CABLE (TO REMAIN) i I SRTMC L- -- _t.___J L-- ___ — T _J _ —_ —1 _ r - - - -� I ---- - - - - -- CONNECTION TO BLUE, I 11 Ln SWICN EX. FIBER OPTIC CABLE Ex 2_2 suro I ORANGE AND GREEN TUBES ON EX. 72 SMFO CABLE TO I r ® ® ® ___ ry _ � _ n _ n _, I TO CAMERA CABINET I i THE WEST. L =f l � — — — — — - -_ —_ T__ � —\ F — I EX 965M0 E%9&SMFO I I EX72SMFO Ex- FOP I E%72-SMFO E%7L F. / — — _ _ — — _�.- ... -.. -.. -- ._..... _...- ...__.._..._..I LC;_- _:fir - -- - - -r - -- r-- -� - - -Y L_ - -_ —_J I I I L --- - - - - -j IX. GABLE VAULT AT CC 090 050 L-------------- --- --J EZ CABLE VAULT SIGNAL CABINETAT E SPRAGUE AND N PINES RD (SR 27) r - -- -- - - - - -� I I %12 FOP I I 1 -12 SMFO COB FOR FUTURE I I CONNECTION TO SFOIWIE VALLEY _ — cm U 12 SMFO PRETERMINATED STUB CABLE F - -- � I I 46 SMFO I I 4BSMFO I L I --- - - - - - j EX. CABLE VAULT AT S FOX RD. (N SIDE OF ROAD) L__ -_ _J IX. PULL BOX (NE CORNER) NOTES. 1. SEE SHEET ITDO2 - ITDO4 FOR FIBER SPLICE DETAILS. 2. NOT ALL PULL BOXES AND JUNCTION BOXES ARE SHOWN IN THIS SCHEMATIC. ---------- - - - - -, ADDITIVE 1 I , 332175 CABINET AT E SPRAGUE EAST -- N NOUN RD I I I , I I � I I , I , I , I 12 FOP , I , 12 SMFO I PRETERMINATED STUB CAB E 1 4B SMFO I 4B SMFO 4B SMFO (SE CORNER) r ------- ---- - - - - -' ADDITIVE 2 1 SIGNA E , I E SPRAGUE — AND N EVERGREEN RD II I IIFTI°1 I I I . ®® ® I II I II 1 12 FDP'- II I I 12 SMFO IX. PULL BOX I PRETERMINATED STUB CABLE (NE CORNER) i - - -- I II I I I I 4R SMFO I I I U L--- - - - - -� I L - -- - - - -JII I i L-- - - - - -- IX. PULL BOX I IX. PULL B0: (N SIDE OF ROAD) 12 SMFO I (NE CORNER PRETERMINATED STUB CABLE — — — — — — — — — — — — — — — — ........... — — 12 FOP I I . ®an I 7=- I) FT � L1•_• • —!J I SIGNAL CABINETAT E SPRAGUE AND N MCDONALD RD SIGNAL CABINET AT E SPRAGUE AND N BOWDISH RD rFT��1 -- - - - - -- L_ J E ®a® I I 12.FDP':'. I I L Change Order Page 7 of 9 12 SMFO PRETERMINATED STUB CABLE 4e SMFO 49 SMFO NEW PULL BOX NEW PULL BOX (NW CORNER) (NE CORNER) I LEGEND EXISTING NEW y i SIGNAL CONTROLLER I I�I lu (BBB�I I BBB® ETHERNET SWITCH I MUMMIMMMIOM ® ETHERHETIIUBSWITCH — id cm FIBER DISTRIBUTION PANEL XX IS NUMBER OF PORTS I I - - -- SINGLE MODE FIBER OPTIC (SMFO) I REROUTED EXISTING FIBER I I I oo FIBER SPLICES ' ,1` pl, JJJ CORED FIBER (��� I I ®a CCTV CAMERA A/ tranSPOGROUP PEU 74e 4asw4. NIRNANO.WA :N�X.7M „�,a„ IFA.I.,AMS41,. SIGNAL CABINET AT E SPRAGUE AND N UNIVERSITY RD r - � - --- - - - - - -- I � ILL._• • -�� ® ®mN.aR -a 2 I I : 12FDP.' X11 I - I I I I I L J TON TO WHITE I EX. 72 SMFO 12 CONNECTION) PRETERMINATED STUB TO BROWN TUBE ON NEW 48 SMFO Change Order No. 1 Page 8 of 9 *COIL 50' OF 48 SMFO CABLE, EAST OF PROPOSED SPLICE, IN EXISTING PULL BOX FOR FUTURE CONNECTION. �K E. O "^ '% transpoGRouP PULL BOX AT: E SPRAGUE AVE /UNIVERSITY RD INTERSECTION Change Order No. 1 Page 9 of 9 BLANK PLATE ' tw B 3w T sw J 7w a sw "11 zw +4wa.a.": : SIGNAL CABINET AT: E SPRAGUE AND N UNIVERSITY RD ADDITIVE 1 E SPRAGUE AND N BOWDISH RD E SPRAGUE AND N PINES RD �E 6PF2AGUE EAST O_F_N_ H_O_ ADDITIVE 2 E SPRAGUE AND N MCDONALD RD r ------------------- --- AND N EVER GREEN RD �E SPRAGUE AVE , CONNECT TO HUB ETHERNET SWITCH 0.S SHOWN 1. 0001 CONNECT BLUE M OIUING OF WHITE TUBE TO HUB ET —NCH AS SHOWN IN NO01 E HE I BLANK PLATE ' 1W � 3W s SW ] 7W a 9W I1 � 2W + 4W a 6W a 8W m10 to 12 BIUE TUBE EX. ] MFO tE 3E ' SE 7E � 9E n11E I+ 2E I 4E le 6E x BE % %10E 2+12E BLUE TUB N .e SMFO L: max: 17 q m gW so g ORANC TUBE x'19 .0 p®>, E %. JZ s�21 � 2 s BuFO 3 24Y ] >13E sB iSE +'17E + 19E + 21 + 23 se 4E +e 6E +s 1BE OE + 22 + 24 RINCE lU0 NEW 98 SMFO S 3 5 sB 6 s:�s p se 2W se 4 ^ 36 GREEN U EX. SMFO e 27E a 9E a 31E a 33 T' 6 e] 6E e. BE ee OE a 2E > 34 ]] 36 L e'4 pTe eo qe: OWN IUB ]2 SMFO CR EN TUBE NEW MFO 1 N NB NEW 48 SMFD .e pw a 2w B aW Bi7"B B 6 g B g9 f7 M O TUB IX. J2 SMFO 'JL f BLANK PLATE BLANK PLATE 332 CABINET AT: APPLEWAY BLVD AND S UNIVERSITY RD 2 CONNECT BLUE — ORNNGE —ES OF BROWN TUBE TO HUB ETHERNET SWITCH AS SHOWN IN N001. O W E y L (!f tr SPOGROUP 1TBL1 me.wme+ NR,R�NB. AsHRR;rBNRem. 1B,«I+>:us..> —L BEFOREYOUOK. 1600J2�S