08-094.00 Knife River: Appleway Ave Reconstructionr ~ Washington State Department of Transportation Change Order 5 Date August 1, 2008 Paae 1 of 4 Paae: Contract Number TA-2922 Federal Aid Number STPUL-3842 (002) Contract Title Appleway Avenue Reconstruction Protect Change Order Number 5 Prime Contractor Knife River ^ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ^ Proposed by Contractor Endorsed By Cont ctor f/ O Date Surety Consent Attorney of FaU Dste Original Contract Amount $ 4,565,859.95 Current Contract Amount S 4,792,418.57 Estimated Net Change This Change $ 4,424.00 Estimated Contract Total After Change $ 4,796,842.57 Approval Required Region ^ Olympia Service Center ^ Local Agency If the amount authorized in the Local Agency Agreement is exceeded and federal funds are not available for this change, the Local Agency will assume the total cost of this Change Order. X Ap al Recommended Approved Ap r v d p OO Pro'e t Engineer / ©S pproving rity per C.A. Agree e t a Dat t Approval Recommended Approved Approved By Approving Authority per C.A. Agreement Date Date CU8-94 . ST ~ CHANGE ORDER Page 2 of 4 Contract No: TA-2922 This Contract is revised as follows: Description of Work Change Order No. 5 Planing of Bituminous Pavement at the western end of the project. Sewer construction removed the asphalt to the north and west of the noted asphalt. The asphalt would be removed to provide a uniform top lift of asphalt to the Corbin intersection. An amount of asphalt equaling 250 feet in length and 42 feet wide will be removed to a depth of .21 feet. Materials Planing Bituminous Pavement shall meet the requirements of section 5-04.3(14) of the Standard Specifications. Construction Requirements Work shall meet the requirements of section 5-04.3(14) of the Standard Specifications. Measurement "Planing Bituminous Pavement, .21 Ft. Depth", Lump Sum. Payment "Planing Bituminous Pavement, .21 Ft. Depth", Lump Sum. .~ r CHANGE ORDER Page 3 of 4 Contract No: TA-2922 Change Order No. 5 Item No. Item Description Unit Unit Price Est.. Qty. Est. Amt. Measure Change Change NIA Planing Bituminous Pavement, .21 Ft. Depth LS $3,950.00 NIA S3,950.00 Contractor Markup (12°'/0) $ 474.00 TOTAL $4,424.00 Page 4 of 4 ,f= m ' ' = t~ I y Im _. , . 1 . I t,, ~ ~„ ~ 0 ~ 1 N ~ o~ `r' ' I ~ ~~ ~ z ~ ~ 1 - ~~ D ~ I~ a ~ I ~ ~~~ ~ ~ ~ i ~~ I ~~ ~t ~ rn ~ i .: i ~ I _~_ --~ . ~ o! i o~T, , ~~ ~, I ~ ~ _ I B IN OJECT ~ s•~t p~a~ ~ c -' ~ S -I-73.59 ~ ~ ~ ~ ~~ . w 1 `~ o i ~ x--~--x`~ x- ~ - ~ ' ~ ~~ 1 I ~ I ~ ~ ~ ~ _ 1MD 24 ~ ~ ~