11-080.00 WSDOT Sullivan West Bridge Replacementan d ov ° � �e� d o{` C44 po 60 tas c r G t toR p S�` r epL CO 0 6 0 O v<SUa° � { o Jt �a 60C 7 dact p to J\e ort5 is to a C re ar City Clerk's Contract # 1 1- 0 � 0 CITY OF SPOKANE VALLEY A Dee° \t`ork d does � PUBLIC WORKS INFORMATIONAL COVER SHEET va� may p o< ��tr 15 FOR .(o � dac�er\ \ Go ae X25 6. DOCUMENTS REQUIRING CITY MANAGER SIGNATURE t to 905va Date: July 6, 2011 Budget Account No: AGREEMENT TOPIC: Local Agency Federal Aid Project Prospectus for CIP -0155, Sullivan Road W Bridge Replacement Project. The project will replace the current, weight- restricted bridge that carries southbound traffic on Sullivan Road over the Spokane River. BACKGROUND: This project is not yet fully funded through construction, however we are beginning design now in the hopes of shortening the time until the project can be constructed rather than wait until it is fully funded before starting work. The project is funded at 80.0% by the Federal Bridge Replacement Program, and is estimated to cost $19.74 million. To date, $8 million in Federal funds have been secured, and another $2 million from the state Freight Mobility Strategic Investment Board. The Mayor's signature is required to execute the Local Agency Federal Aid Project Prospectus. The Prospectus authorizes the reimbursement of federal funds for work on the project. ., 61 Public Works�Director V /- Leg El al (applicable only for Contract Language Letter of Credit Date Approved: Contract Agreements) Performance & Payment Bond Approval DISTRIBUTION: Original to Vendor Original to City Clerk Copy to Submitting Department Copy to Finance Department Project Manager f✓' ^ - Date Ap proved: Finance (applicable only for Original Contract Agreements) ❑ Selection Process Approval ❑ Funding Source Approval Al ✓v Date Approved: Risk Manager (applicable only for Original Contract Agreements) ❑ Insurance Certificates Approval ATTACHMENTS: Local Agency Federal Aid Project Prospectus for CIP -0155, Sullivan Road W Bridge Replacement P:\Public Works \Capital Projects\Bridge Projects \4508 Sullivan Road W Bridge over Spokane River \0155 - Sullivan Rd W Bridge Replacement Project\Funding \Grant Agreements \0155 Project Prospectus blue sheet.docx w7m Washington State Locak Agency Federal Aid Department of Transportation Project Prospectus DOT Form 140 -101 EF Page 1 of 3 ♦ Previous Editions Obsolete O Revised 11/10 Date 7/1/2011 Prefix Route ( ) Central Contractor Registration Exp.Date 1/20/2012 Federal Aid Project Number Local Agency ! WSDOT Federal Employer Project Number 1 COSV - 0155 Use Only] Tax ID Number Agency Federal Program Title City of Spokane Valley ® 20.205 ❑ Other Hi ay Bridge ograin Project Title Start Latitude 47 40' 17.91" Start Longitude 117 11' 47.25" Sullivan Rd W Bridge Replacement Project End Latitude 47 40' 27.33" End Longitude 11711'47.46"_ Project Termini From -- To Nearest City Name Project Zip Code Spokane River S okane Valley 99037 -9012 From: To: Length of Project Award Type 0.00 0.19 0.19 miles ® Local ❑ Local Forces ❑ State ❑ Railroad Federal Agency City Number County Number County Name WSDOT Region I ® FHWA ❑ Others 1223 32 Spokane Eastern Region Congressional District Legislative Districts Urban Area Number TMA / MPO / RTPO 5 4 2 SRTC Phase Total Estimated Cost Local Agency Funding Federal Funds Phase Start Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P. E. $2 $534 $2 7/2011 R/W $200 $40 $160 10/2012 Const. $16,873500 $3 $13 498 800 5/2014 Total $19,743,500 $1-948.700 $15,794 Description of Existin Facili (Existing Design and Present Condition) Roadway Width Number of Lanes 27 2 The existing 2 -lane bridge was constructed in 1951. The travel lanes are approximately 12 -ft in width and the roadway surface is asphalt pavement The bridge received Sufficiency Rating of 24.14 on a 100 -point scale in 2010 inspection. The bridge has also been classified as "Structurally Deficient" in 2010 Load Rating Analysis and "scour critical". Description of Proposed Work ' Description of Proposed Work (Attach additional sheet(s) if necessary) The proposed project will replace the existing 2 -lane Sullivan Road West Bridge at the Spokane River with a new 4 -lane bridge. This will include demolition and removal of the existing bridge, construction of 4 -lane new bridge, improvements to bridge approaches to accommodate the new bridge, and related appurtenances. The dimensions of the proposed bridge are approximately 437 -ft in length by 63 -ft wide. The widening is necessary to accommodate turning traffic from the adjacent Indiana/Sullivan intersection immediately south of the bridge and future increased traffic volumes. Local Agency Contact Person Title Phone Steve M. Worley P.E. Senior Capital Projects Engineer 509- 720 -5014 Mailing Address I City State Zip Code 11707 E. Sprague Ave Suite 106 o alle WA 99206 By < A�L Project Prospectus Approval Appro ' Authority C �1" " Title "/ (C)R -ljq tToc , PILOSCG - Date DOT Form 140 -101 EF Page 1 of 3 ♦ Previous Editions Obsolete O Revised 11/10 Date Iridge Replacement Project 7/1/2011 Geometric Design Data Preliminary Engineering Will Be Performed By Roadway Width Number of Lanes ❑ 3 -R ❑ 2 -R 52 4 Route ❑ Other Crossroad Geometric Design Data Preliminary Engineering Will Be Performed By Others Agency Consultant Description Through Route Contract Crossroad Federal Functional Classification ® Urban ❑ Rural ® Principal Arterial ❑ Minor Arterial ❑ Collector El Major Collector ❑ Minor Collector ❑ Access Street/Road ❑ Urban ❑ Rural ❑ Principal Arterial ❑ Minor Arterial ❑ Collector El Major Collector ❑ Minor Collector ❑ Access Street/Road Terrain ® Flat ❑ Roll ❑ Mountain ❑ Flat ❑ Roll ❑ Mountain Posted Speed 35 Design Speed 40 Existing ADT 12000 Design Year ADT 51000 Design Year 2060 Design Hourly Volume (DHV) 5100 Performance of Work Preliminary Engineering Will Be Performed By Others Agency Consultant 99 % 1 % Construction Will Be Performed By Contract Agency Contractor 100 % % Environmental Classification ❑ Final ® Preliminary ❑ Class I - Environmental Impact Statement (EIS) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement ® Class II - Categorically Excluded (CE) ® Projects Requiring Documentation (Documented CE) Environmental Considerations The proposed project will occur both over the Spokane River and in the river channel. Permits will be required to minimi impacts to river and wildlife. The Contractor's activities will be restricted to minimize impacts to environment and comply with appropriate permits. DOT Form 140 -101 EF Revised 11/10 Page 2 of 3 Agency City of Spokane Valley Project Title Sullivan Rd W Bridge Replacement Project Date 7/1/2011 Right of Way ❑ No Right of Way Required ® Right of Way Required * All construction required by the contract can be accomplished ® No Relocation ❑ Relocation Required within the existinq right of way. Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project There are water, sewer and other utilities attached to bridge. Temporary measures will need to be taken by the contractor to protect or temporarily re -route utilities during construction. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ® No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency City of Spokane V Date - 7� 2fy By hairperson DOT Form 140 -101 EF Page 3 of 3 ♦ Previous Editions Obsolete Revised 11/10