08-097.00 Knife River: Appleway Ave ReconstructionWashington State Department of Transportation Daie August 2, 2008 Contract Number TA-2922 Federal Aid Number STPUL-3842 (002) Contract Title Appleway Avenue Reconstruction Project Change Order Number 7 Prime Contractor Knife River v~Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ^ Proposed by Contractor Endorse By Contra or ~ << ~ aat® Surety Consent Attorney of Fad Date Original Contract Amount $ 4,565,859.95 ~-~ 798, 7~'• ?3 Current Contract Amount $ 4,794,330.73 Estimated Net Change This Change S 17,390.00 78f, ~r q-. 73 `~ Estimated Contract Total After Change S 4,776,940.73 Approval Required Region ^ Olympia Service Center [Local Agency If the amount authorized in the Local Agency Agreement is exceeded and federal funds are not available for this change, the Local Agency will assume the total cost of this Change Order. X Appro al Recommen~de/d/ ^Approved `I r Gf Approved Project Engineer ~~~~~ Approving thor' r C.A. Agreement ~ Date Date ^ Approval Recommended Approved Appr~ ~% ~i 6 By proving A ~~ ority per C.A. Agreem Z~/Ofd Date Date Change Order 7 C08-97 CHANGE ORDER Page 2 of 3 Contract No: TA-2922 This Contract is revised as follows: Description of Work Change Order No. 7 Bid Item #58 -Topsoil Type A will be replaced with Bid Item #58A -Topsoil Type B. Native Topsoil (Topsoil Type B) was excavated, hauled, screened and stockpiled off the project site. The contractor and City have negotiated a credit for use of Topsoil Type B in lieu of using topsoil Type A. There are significant quantities of topsoil that have been removed from the project site and can be recycled to provide topsoil for the linear swales along Appleway Avenue. Materials The Materials shall meet the requirements of the 2006 Standard Specifications. Construction Requirements Work shall meet the requirements of the 2006 Standard Specifications. Measurement Topsoil will be measured by the cubic yard in the haul conveyance at the point of delivery. Payment Payment will be made in accordance with Section 1-04.1. "Topsoil Type B", per cubic yard. CHANGE ORDER Page 3 of 3 Contract No: TA-2922 Change Order No. 7 Item No. Item Description Unit Unit Price Est. Qty. Est. Amt. Measure Change Change 58 TOPSOIL TYPE A CY S35.50 1739 {$61,734.50) 58A TOPSOIL TYPE B CY 525.50 1739 $44,344.50 TOTAL $17,390.00