11-103.00 Spokane Rock Products: Indiana Ave ExtensionSf'6ne ,; OoValle1 • CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 11.012 DEPARTMENT OF PUBLIC WORKS PROJECT: Indiana Avenue Extension Project CONTRACT DATE: 4/1912011 CONTRACTOR: Spokane Rock Products, Inc CHANGE ORDER NO: 3 CAPITAL IMPROVEMENT PROJECT NO: 0112 BID NO.: 11 -012 DESCRIPTION OF CHANGES This Change Order pays for construction of 10' wide ACC s)dewalk and miscellaneous work with the following pay Items: I tem No Desorlptlon Unit Quantity Unit Price iota CO3 -A1 MOBILIZATION LS 1 $775.00 $775.00 CO3 A2 CONSTRUCTION SURVEYING LS 1 $500.00 $500.00 CO3 -A7 CLEARING AND GRUBBING LS 1 $500.00 $500.00 CO3 -A17 EMBANKMENT COMPACTION METHOD C CY 70 $2.00 $140.00 CO3 -A18 CRUSHED SURFACING TOP COURSE, 2 IN, DEPTH SY 210 $2.00 $420.00 CO3 -A19 CRUSHED SURFACING TOP COURSE, 4 IN, DEPTH SY 400 $2.25 $900.00 CO3 -A57 CEMENT CONCRETE SIDEWALK' SY 307 $28.00 $8,596.00 CO3 -A53 DRIVEWAY APPROACH" SY 89 $35.84 $3,189.76 CO3 -A61 DECTECTABLE WARNING SURFACE IN PCC SF 8 $18.60 $148.80 CO3 -A63 SEEDING, FERTILIZING AND MULCHING SY 250 $0.41 $102.50 SEE ATTACHED DRAWINGS: 2,3,7-10,22 10' SW COST $14,497.06 'Includes cost of Installing contlnuous longitudinal contraction Joint to create --5' square panels. CO3 -82 PERMANENT SIGNING LS 1 $660.80 $660.80 CO3 -94 2 IN. DIAM, WATER SERVICE PIPE LF 404 $8.40 $3,393.60 CO3-95 CONDUIT PIPE 21N., DIAM. LF 753 $11.20 $8A33.60 SEE ATTACHED DRAWINGS :11,19, 24 AND SPECS 8-20 Total Amount of this Change Order( Incl. Tax): $26,985.06 This Change Order Includes approval of 1 /2HMA 64.28 AC (75 Gyration) Mix Design. SUBSTANTIAL COMPLETION Original Date: 7/1212011 Prior to this Change Order. 7114/2011 Including this Change Order: 7/1412011 Original Working Days: 50 Working Days Added by this CO: 0 Working Days Including this CO: 52 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 1,049,282:20 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 26,287.20 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 1,075,569.40 NET THIS CHANGE ORDER _ _ �_:..._ _ $ 26,985.06 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,102,654.46 CONTRACTOR ACCEPTANCE: �4 DATE: 5 The contractor hereby accepts this adjustment under the terms of the original contract for all work perfomed. RECOMMENDED BY: APPROVED BY: APPROVED BY: DATE: —S' Z DATE: �f� DATE: ATTACHMENTS: DlslAbufforr. ORIGINALS T0: Contractor, City of Spokane Valley Clerks Office, PW Project Fite COPIES TO: PW Project File Piva:cwmtet»urcRohg,'C0 M000 rl LIA.-I