Loading...
08-139.00 GEOEngineers: Sprague Concrete Intersections at Evergreen/Pines/McDonaldAGREEA9L>:i\`T FOR PROFESSIONAL SERVICES Evergreen /Sprague intersections Concrete intersection Pines /Sprague Concrete Intersection N.1cDonald /Sprague Concrete Intersection Geotechnical Exploration and Pavement Design Services GeoEnhincers. Inc COSH' Contract 08 -031 THIS AGREEMENT is made by and between the City of Spokane Valley, a code City of the State of Washington, hereinafter "City' and * hereinafter "Consultant," jointly referred to as "parties." IN CONS1 OUkTIOTT of the terms and conditions contained herein the parties agree as follows: 1. Work to Be Performed. The Consultant will provide all labor, services and material to satisfactorily complete the attached Scope of Services described in the attached 9 -29 -03 GeoLnincers Proposal. A. Administration. The City Manager or designee shall administer and be the primary contact for Consultant.. Prior to commencement of work, Consultant shall contact the City Manager or designee to review the Scope of Work, schedule and date of completion. Upon notice from the City Manager or designee, Consultant shall commence work, perform the requested tasks in the Scope of Work, stop work and promptly cure any failure in perfornlance under this agreement. B. Representations. The City has relied upon the qualifications of the Consultant in entering into this agreement. By execution of this agreement, Consultant represents it possesses the ability, skill and resources necessary to perform the work and is familiar with all current laws, rules and regulations which reasonably relate to the Scope of Work. No substitutions of agreed upon personnel shall be made without the written consent of the City. Consultant shall be responsible for the technical accuracy of its services and documents resulting therefrom, and Cite shall not be responsible for discovering deficiencies therein. Consultant shall correct such deficiencies without additional compensation except to the extent such action is directly attributable to deficiencies in City furnished information. C. Modifications. The City may modify this agreement and order changes in the work whenever necessary or advisable. The Consultant will accept modifications when ordered in writing by the City Manager or designee. Compensation for such modifications or changes shall be as mutually aglFCCd between the parties. The Consultant shall make such revisions in the work as are necessary to correct errors or omissions appearing therein when required to do so by the City without additional compensation. 2. Term of Contract. This agreement shall be in full force and effect upon execution and shrill remain in effect until completion of all contractual requirements have been met. Either party may terminate this agreement by ten days written notice to the other party. In the event of such termination, the City shall pay the Consultant for all work previously authorized and satisfactorily performed prior to the termination date. Agreement t )r Pmfessional Services Nave I d 6 Cob -139 I Compensation. The City agrees to pay the Consultant on a time and materials basis, not to exceed $33,000 for Construction Materials 'Testing Services as described in the attached proposal. The Consultant shall not proceed with work that will exceed this billable cost without obtaining written approval from the City. A Management Reserve Fund in the amount of $3,300 is also hereby established that may be spent on the project, if the City authorizes. A total contract amount of S36,300 is established as the maximum compensation for everything done under this agreement. 4. Payment. The Consultant shall be paid monthly upon presentation of an invoice to the City. Applications for payment shall be sent to the City Clerk at the below stated address. The City reserves the right to withhold payment under this agreement which is determined in the reasonable judgment of the City Manager or designee to be noncompliant with the Scope of Work, City Standards, City ordinances and federal or state standards. Notice. Notice shall be Liven in writing as follows: 'f0 THE CITY: Name: Christine Bainbridge, City Clerk Phone Number: (509)921 A 000 Address: 11707 Past Sprague Ave, Suite 106 Spokane Valley, WA 99206 TO THE CONSULTANT: Name: Jim Harakas, P.L., L,hCi Phone Number: (509) 363 -3125 Address: 523 E. Second Avenue Spokane, WA 99202 6. Applicable Laws and Standards. The parties, in the perfornance of this agreement, agree to comply with all applicable Federal, State, local laws, ordinances, and regulations. 7. Relationship of the Parties. It is understood, agreed and declared that the Consultant shall be an independent Consultant and not the agent or employee of the City, that the City is interested in only the results to be achieved, and that the right to control the particular manner, method and means in which the services are performed is solely within the discretion of the Consultant. 'Any and all employees who provide services to the City under this agreement shall be deemed employees solely of the Consultant. The Consultant shall be solely responsible for the conduct and actions of all its employees under this agreement and any liability that may attach thereto. S. Ownership of 1.)oeurrlents. All drawings, plans, specifications, and other related documents prepared by the Consultaint under this agreement are and shall be the property of the City, and maybe subject to disclosure pursuant to RCW 42.56 or other applicable public record laws. Any modifications to such documents or reuse for purposes outside the scope of this project without prior written permission of Consultant shall be at user's sole risk and without legal liability to Consultant. 9. Records. The City or State Auditor or any of their representatives shall have 11111 access to and the right to examine during normal business hours all of the Consultant's records with respect to all matters covered in this contract. Such representatives shall be permitted t.o audit, examine and make excerpts or transcripts from such records and to make audits of all contracts, invoices, materials, payrolls and record of matters covered by this contract for a period of three years from the date final payment is made hereunder. 10. insurance. The Consultant shall procure and maintain for the duration of the agreement, Agreement for Professional Scn�ccs Pgge 2 of 6 insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, or employees. A0000la Limitation of Remedies: The Consultants aggregate liability responsibility to the City, including that of its f% officers, directors, employees, and agents, as it applies to all lawsuits, claims or actions based on allegations of negligent professional errors or omission, whether identified as arising in tort, contract, or when the alleged errors or omissions arise out of, or are related to, services under this Agreement or any continuation or extension of services, is limited to $1,000,000. c A. Minimum Scope of Insurance. Consultant shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non - owned, hired and Icased vehicles. Coverage shall be written on Insurance Services Office OSO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CO 00 01 and shall cover liability arising fi•om premises, operations, independent contractors and personal injury and advertising injury. 'fhe City shall be named as an insured under the Consultant's Conunercial General Liability insurance policy with respect to the wort: performed for the City. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 4. Professional Liability insurance appropriate to the Consultant's profession. B. Minimum Amounts of Insurance. Consultant shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate. 07 3. Professlonal Liability insurance shall be written with limits no lass than $1,000,000 per intersection and $3,000,000 contract policy aggregate }'unit. Z (� C. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability, , Professional Liability and Commercial General Liability insurance: 1. 'I"he Consultant's insurance coverage shall be primary insurance as respect the City. Any insurance, self - insurance, or insurance pool coverage maintained by the City shall be excess of the Consultant's insurance and shall not contribute with it. Ageemtnt for Professional Services Page 3 of 6 it #yAU�q' �' ,594 $R�ipsi 4 q Cancellation of Consultant's insurance shall be governed by either: a. the policy shall be endorsed to state that coverage shall not be cancelled by either party, except. after thirty days prior written notice by certified mail, return receipt requested, has been given to the City, or b. the Consultant shall provide at least 30 days prior written notice by certified mail, return receipt requested of a cancellation. D. Acceptabi lit:y of insurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:V. E. Evidence of Coverage. As evidence of the insurance coverages required by this contract, the Consultant shall furnish acceptable insurance certificates to the City at the time the Consultant returns the sit-med contract. The certificate shall specify all of the parties who are additional insureds; and will include applicable policy endorsements, and the deduction or retention level. Insuring companies or entities are subject to City acceptance. If requested, complete copies of insurance policies shall be provided to the City. The Consultant shall be Financially responsible for all pertinent deductibles, self-insured retentions, and/or sell- insurance. 11. indemnification and Hold Harmless. The Consultant shall defend, inderrmify and hold the City, its officers, officials; employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, to the extent arising out of or in connection with the negligent acts, error, or omissions of Consultant in the performance of this agreement. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Consultant's waiver of immunity under Industrial Insurance. Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of the agreement. 12. Waiver. No officer, employee, agent or other individual acting on behalf of either party has the power, right or authority to waive any of the conditions or provisions of this agreement. No waiver in one instance shall be held to be waiver of any other subsequent breach or nonperformance. All remedies afforded in this agreement or by law, shall be taken and construed as cumulative, and in addition to every other remedy provided herein or by law. Failure of either party to en force at any time any of the provisions of this agreement or to require at any time performance by the other party of any provision hereof shall in no way be construed to be a waiver of such provisions nor shall it affect the validity of this agreement or any part thereof. 13. Assignment and Delegation. Neither party shall assign, transfer or delegate any or all of the responsibilities of this agreement or the benefits received hereunder without first obtainint, the written consent of the other party. Agi-mment for Professional Services Page 4 of 6 14. Subcontracts. Except as otheiivise provided herein, the Consultant shall not enter into subcontracts for any of the work contemplated under this agreement without obtaining prior written approval of the City. 15. Confidentiality. Consultant may, from time to time, receive information which is deemed by the City to be confidential. Consultant shall not disclose such information without the express written consent of the City or upon order of a Court of competent jurisdiction. 16. .Jurisdiction and Venue. This agreement is entered uito in Spokane County, Washington. Venue shall be in Spokane County, State of Washington. 17. Cost and Attorney's Fees. In the event a lawsuit is brought with respect to this agreement, the prevailing party shall be awarded its costs and attorney's fees in the amount to be determined by the Court as reasonable. Unless provided otherwise by statute, Consultant's attorney fees payable by the City shall not exceed the total sum amount paid under this agreement. 18. :Entire Aftreement. This written agreement constitutes the entire and complete agreement between the parties and supercedes any prior oral or written agreements. `Phis agreement may not be changed, modified or altered except in writing signed by the parties hereto. 19. Anti- kickback. No officer or employee of the City, having the power or duty to perform an official act or action related to this agreement shall have or acquire any interest in this agreement, or have solicited, accepted or granted a present or future gift, favor, service or other thing of value from any person with an interest in this agreement. 20. Business Registration. Prior to commencement of work under this agreement, Consultant shall rebister with the City as a business. 21. SeverabAL. If any section, sentence, clause or phrase of this agreement should be held to be invalid for any reason by a court of competent jurisdiction, such invalidity shall not affect the validity of any other section, sentence, clause or phrase of this agreement. 22. Exhibits. Exhibits attached and incorporated into this agreement are: 1. GeoEngineers 9 -29 -08 Proposal 2. Insurance Certificates Agreement for Professional Services Page 5 of 6 IN W TNES WHEREOF, the parties have executed this agreement this � day of _, ��d� , 2008. CITY OF SPOKANE VALLEY: �j+ Consultant: /�/� 7 /C./ David Mercier City Manager (wner Tax ID No._ REDACTED APPROVED FORM: ie Bainbri ge, City Clerk 0111 ice dthe City Attorney This document contains confidential tax information and has been redacted pursuant to RCW 82.32.330. You may petition for a review of our findings pertaining to any redacted or withheld documents pursuant to Spokane Valley Municipal Code (SVMC) 2.75.080; and obtain judicial review pursuant to RCW 42.56.550. Agreement for Professional Services Page Terra Insurance Company ' (A Risk Retention Group) Vp Two Fifer Avenue, Suite 100 Corte Madera CA 94925 CERTIFICATE OF INSURANCE " DATE ..cu, 1 0/20/08 NAME AND ADDRESS OF INSURED OcoE,ngineers, Inc. 523 East Second Avenue Spokane, NVA 99202 This certifies that the Insurance policy (described below by a policy number) written on forms In use by the Company has been Issued. This certificate Is not a policy or a binder of Insurance and does not alter, amend or extend the coverage afforded by that policy. Notwithstanding any requirement, term or condition of any contract or other document to which this certificate may pertain, the Insurance afforded by the policy Is subject to all of its terms, exclusions and conditions. TYPE OF INSURANCE Proiassional Liability POLICY NUMBER EFFECTIVE DATE EXPIRATION DATE 208019 01101/03 12/31/08 LIMITS OF LIABILITY $1,000,000 EACH CLAIM $1,000,000 ANNUALAGGREGATE PROJECT DESCRIPTION aeotecluilcal Engineering Services, Proposed Intersection Reconstruction Projects at Sprague Avenue/McDonald Road, Spokane Valley, Washington File No.: 11264- 011 -00 CANCELLATION If the described policy is cancelled by the Company before its expiration date, the Company will malt written notice to the certificate holder thirty (30) days In advance, or ten (10) days in advance for non - payment of premium. If the described policy is cancelled by the insured before Its expiration date, the Company will mail written notice to the certificate holder within thirty (30) days of the notice to the Company from the insured. CERTIFICATE HOLDER ISSUING COMPANY: TERRA INSURANCE COMPANY (A Risk Retention Group) City of Spokane Valley -City Hall ON J — Attn: Craig Aldworth, PE -Sr. Engineer/Proj. Mgr. 11707 East Sprague Ave., Suite 106 a4lc Spokane Valley, WA 99206 President Terra Insurance Company rMI&A ` (A Risk Retention Group) Two Fifer Avenue, Suite 100 Corte Madera CA 94925 CERTIFICATE OF INSURANCE ` / /If• /tl/ \110 i[OV1 DATE 10/20/08 NAME AND ADDRESS OF INSURED OeoEngineers, Inc. 523 East Second Avenue Spokane, WA 99202 This certifies that the Insurance policy (described below by a policy number) written on forms In use by the Company has been Issued. This certificate Is not a policy or a binder of insurance and does not alter, amend or extend the coverage afforded by that policy. Notwithstanding any requirement, term or condition of any contract or other document to which this certificate may pertain, the Insurance afforded by the policy Is subject to all of Its terms, exclusions and conditions. TYPE OF INSURANCE Professional Liability POLICY NUMBER EFFECTIVE DATE EXPIRATION DATE 208019 01/01/08 12/31108 LIMITS OF LIABILITY $1,000,000 EACH CLAIM $1,000,000 ANNUALAGGREGATE PROJECT DESCRIPTION Geotechnical Engineering Services, Proposed Intersection Reconstruction Projects at Sprague Aventte/Pines /toad, Spokane Valley, Washington File No.: 11261- 011 -00 CANCELLATION If the described policy is cancelled by the Company before Its expiration date, the Company will mail written notice to the certificate holder thirty (30) days In advance, or ten (10) days In advance for non - payment of premium. If the described policy is cancelled by the Insured before its expiration date, the Company will mail written notice to the certificate holder within thirty (30) days of the notice to the Company from the Insured. CERTIFICATE HOLDER ISSUING COMPANY: TERRA INSURANCE COMPANY (A Risk Retention Group) City of Spokane Valley -City Hall Attn: Craig Aldworth, PF -Sr. Engineer /Proj. Mgr. 11707 East Sprague Ave., Suite 106 Spokane Valley, WA 99206 President Terra Insurance Company (A Risk Retention Group) Two Fifer Avenue, Suite 100 Corte Madera CA 94925 CERTIFICATE OF INSURANCE 6 .1...61..ato. a.er. DATE 10/20/08 NAME AND ADDRESS OF INSURED Geo:Engineers, Inc. 523 East Second Avenue Spokane, WA 99202 This certifies that the insurance policy (described below by a policy number) written on forms in use by the Company has been Issued. This certificate Is not a policy or a binder of Insurance and does not alter, amend or extend the coverage afforded by that policy. Notwithstanding any requirement, term or condition of any contract or other document to which this certificate may pertain, the Insurance afforded by the policy Is subject to all of Its terms, exclusions and conditions. TYPE OF INSURANCE Professional Liability POLICY NUMBER EFFECTIVE DATE EXPIRATION DATE 205019 01/01108 12/31/08 LIMITS OF LIABILITY $1,000,000 EACH CLAIM $1,000,000 ANNUAL AGGREGATE PROJECT DESCRIPTION Geotechnical Engineering Services, Proposed Intersection Reconstruction Projects at Sprague Avenue/Evergreen Road, Spokane Valley, Washington :File No.: 11264-011-00 CANCELLATION If the described policy is cancelled by the Company before its expiration date, the Company will mall written notice to the certificate holder thirty (30) days in advance, or ten (10) days in advance for non - payment of premium. if the described policy is cancelled by the insured before its expiration date, the Company will mail written notice to the certificate holder within thirty (30) days of the notice to the Company from the insured. CERTIFICATE HOLDER City of Spokane Valley -City Hall Attn: Craig Aldworth, PE -Sr. Engineer/Proj. Mgr 11707 East Sprague Ave., Suite 106 Spokane Valley, WA 99206 ISSUING COMPANY: TERRA INSURANCE COMPANY (A Risk Retention Group) President A(IORD,. CERTIFICATE OF LIABILITY INSURANCE page 1 of 3 1 10/14DATE /2008 PRODUCER 877 - 945 -7378 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Willie North America, Inc. 26 Century Blvd. HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. ip CYENFE PUATE MIN TON P. O. Box 305191 Nashville, TN 372305291 INSURERS AFFORDING COVERAGE NAIC#1 INSURED GeoEngincars, 2nc. NSURERA.Travolara Property Casualty Company of Am 25674 -003 LVSURERB:Travelora Property Casualty Company of Am 25674 -002 Debbie Williams 523 East 2nd Avenue X OOMMERCIAL GENERAL LIABILITY I CLAIMS MADE a OCCUR Spokane, WA 99202 W SURER C: LYSURER D: S 300,000 M ED EXP (Arty ana parm) INSURER E: PERSONAL 6 ADV INJURY S 11000,000 rAVFRAr.FR THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TER,',( OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. N ILTR N RD TYPEOPINSURANCE POLICYNUMBER ip CYENFE PUATE MIN TON LINTTS A X GE.VERALLIAWL.ITY 630532D8375TIL07 11/1/2007 11T /El /N2008 EACHOCCURRREENCE $ 1,000,000 X OOMMERCIAL GENERAL LIABILITY I CLAIMS MADE a OCCUR DA PREMISES TED )- PREMISES aoOCarer►x S 300,000 M ED EXP (Arty ana parm) S 5,000 PERSONAL 6 ADV INJURY S 11000,000 X WA Stop Gap GENERAL AGGREGATE S 2,000,000 GENL AGGREGATE LIMIT APPLIES PER! PRODUCTS - CQMPdOP, 5 2, 000 000 POLICY I� LOC H HAUIOPAOBILELIABOMY ANY AUTO 810532D8375TIL07 11/1/2007 11/1/2008 COMBINED SINGLE LIMIT (Ea aaodem) S 1, 000, 000 BODILY INJURY (Per person) S I ALLOWNEDAUTOS SCHEDULED AUTOS BODILY @IJURY (Por aWdcm) S HIREDAUTOS 44014•O'AWED AUTOS PROPERTYDAMAGE (Per a eldenl) S GARAGEUABILITY AUTO ONLY -EA ACCIDENT S OTHER THAN EAACC S LANYAJUTO S ALITOONLY: AGG EXCESSIUMBRELLALIABlL/TY EACHOOCURRGVCE S I OCCUR CLAIMSMADE A�REGATE S S 5 DEDUCTIBLE S RETEA'TION S WORKERS COMPENSATION AND yy ''�� tt T� T6. WI- 1 ER EMPLOYERS' LIABILITY ANY FROPRI9TOWYARTNER.EXECUTIVF. OFFICER MEMBER EXCLUDED? E.L EACH ACCIDEYT 5 I E.L DISEA`E • EA EAIPLOYc -E S M describe under IAIL PROVISIONS below I E.L DISEAtiE - POLICY LIMIT S OTHER DESCRIPTION OF OPERATIONSILOCATIONSNEHICLEVEXCLUSIONS ADDED BY ENDORSEN.ENTtSPECIAL PROVISIONS Pile No. 11264 - 011 -00 Regarding: Geotechnical Engineering Services, Propooed Intersection Reconatruction Projects at Sprague Avenue /Evergreen Road; Sprague Avenue /McDonald Road; and Sprague Avenue /Pines Road ISPokane valley, Wan on UtK I II'IUA1 It rlULLItK L,NIYL,tLL.A I Ivry SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING NSURER WILL B1F6Ti]l=XCCIeAB. 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEF'fF"XIaXQ11S:id(Ct=1IDX1LL City of Spokane Valley Attention: Craig Aldworth 11707 East Sprague Avenue, Suite 106 Spokane Valley, WA 99206 ACORD 25 (2001/08) Coll :2507100 Tpl:827645 Cert:11512357 BACORD CORPORATION 1988 Willis CERTIFICATE OF LIABILITY INSURANCE page 2 of 3 10/14/2008 PROOUGER 877 - 945 -7378 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Willie North America, Inc. 26 century Blvd. HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P. O. Box 305191 Nachville, TIT 372305191 INSURERS AFFORDING COVERAGE NAIC4 INSURED peoEngineers, Inc. INSURERA:Travelers Property Casualty Comp say of J-1 25674-003 Debbie Williams 523 Hest 2nd Avenue INSURERB:Travelers Property Casualty CO=Pany of Am 25674 -002 INSURERC: Spokane, WA 99202 INSURER C: INSURER E: CT" .K. -C. I MMUTA YKVV1JIVNQ It is agreed that City of Spokane Valley is included as an Additional Insured as respects to General Liability. Coll:2507100 Tpl:827645 Cert:11512357 Page 3 of 3 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract behveen the Issuing Insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD25(2001108) Co11:2507100 Tp1:827645 Cert:11512357 September 29, 2005 City of Spokane Valley City Hall 11707 East Sprague Avenue, Suite 106 Spokane Valley, Washington 99206 GEOENGINEER� Attention: Craig Aldworth, PE Senior Engincer/Project Manager Subject: Proposal Geotechnical Engineering Services Proposed Intersection Reconstruction Projects at Sprague Avenue/Evergrrcen Road; Sprague Avcnuc.(?vicDonald Road; and Sprague Avenue /Pines Road Spokane Valley, Washington File No. 11264-011-00 INTRODUCTION GeoEnglneers is pleased to present tills proposal for geotechnlcal engineering services for the city of Spokane Valley (city). We understand that the city plans on completing intersection reconstruction projects at the following locations: Spragme Avenue and Evergreen Road; Spra- c Avenue and McDonald Road; and Sprague Avenue and Pines Road. Plans for the reconstruction of the Sprague/Evergreen and Sprague/McDonald intersections include new portland cement concrete (PCC) pavements within the intersection "box" and approach de- acceleration lanes, and new hot mix asphalt (HiVIA) pavements witl-dn exit acceleration lanes. Plans for the reconstruction of the Sprague/Pines intersection only will encompass Sprague Avenue and include new PCC pavement within approach de- acceleration lanes and new I -IMA pavement within exit acceleration lanes. We further tuiderstand that reconstruction will extend about 200 feet out from the center line of each intersection. We also understand that pavement surfacing at the subject intersections consists of asphalt, and that portions of Sprague Avenue are underlain by PCC pavement. SCOPE OF SERVICES GENERAL The purpose of our services is to provide recommendations for design of PCC and I- MA pavements based on site exploration, laboratory testing and engineering analyses. At your request, we have broken our scope of services into three separate tasks as described below. City of Spokam ley September 29, 2UA Page 2 TASK 1 SPRAGUE /EVERGREEN INTERSECTION RECONSTRUCTION Our specific scope of services will include (lie following: 1. Coordinate clearance of existing utilities by contacting the local One -Call Service before begituling our explorations. 2. 'Traffic control services provided under subcontract to GcoEngineers, Inc. We assume traffic control will include closing one lane of traffic for each exploration we complete, and requiring flaggers and signage during drilling operations. We further assume that traffic control will be limited to one day. 3. Pavement coring services provided under subcontract to GeoEngineers, Inc., as necessary. If proposed boring locations within Sprague Avenue will be located in areas known to be underlain by existing PCC pavement, we will subcontract a pavement coring subcontractor to core the existing PCC pavement so that we can complete our borings. For estimating purposes, we assume that two pavement cores will be required at this site. 4. Exploration of soil and groundwater conditions within the limits of the project site by drilling six borings, each to a depth on the order of about 5 feet below existing pavement grade. Samples of soil encountered in the borings will be obtained at approximate 2%- foot -depth intervals using a 2.4- inch, inside- diameter, split -barrel sampler. After each boring is completed, the hole will be back-filled, and the pavement repaired with quick- setting concrete mix. S. Laboratory analyses of select soil samples obtained from the roadway borings. For estimating purposes, we assume the laboratory testing program will include two gradation analyses and three California Bearing Ratio (CBR) tests. 6. Recommendations for site preparation and fill placement including: an evaluation of the suitability of on -site soil for reuse as structural fill; gradation criteria for imported fill; guidance for preparation of subgrade soil, which will support pavements; and criteria for structural fill placement and compaction. 7. Pavement layer thickness design for PCC and M4A pavements including Base course thickness, gradation and required degree of compaction, thickness and compaction criteria for I -IMA surfacing and thickness criteria for PCC. We assume that Equivalent Single -Axle Loads (ESALs) will be provided by the city. We further assume that the pavement thickness designs will be completed for the following scenarios: • PCC within the intersection box for both center panel and edge loadings. PCC within Sprague Avenue and Evergreen Road de- acceleration lanes for both center panel and edge loadings. • HN4A within Sprague Avenue and Evergreen Road acceleration lanes. 8. Prepare a written report for the project which summarizes our conclusions along with supporting field and laboratory information. We assume that one report will be prepared which will address all three sites. TASK 2 SPRAGUE/ MCDONALD INTERSECTION RECONSTRUCTION Our specific scope of services will include the following: Fite Ma. 11764- 4011 -00 GMENGINEERS� • City of Spokal Illey September 29, 2UO8 Page 3 9. Coordinate clearance of existing utilities by contacting the local One -Call Service before beginning our explorations. 10. Traffic control services provided under subcontract to GcoEngineers, Inc. We assume traffic control will include closing one lane of traffic for each exploration we complete, and requiring flaggers and signage during drilling operations. We further assume that traffic control will be limited to one day. 11. Pavement coring services provided under subcontract to GeoEngineers, Inc., as necessary. If proposed boring locations within Sprague Avenue will be located in areas known to be underlain by existing PCC pavement, we will subcontract a pavement coring subcontractor to core the existing l'CC pavement so that we can complete our borings. For estimating purposes, we assume that two pavement cores will be required at this site. 12. Exploration of soil and groundwater conditions within the limits of the project site by drilling six borings, each to a depth on the order of about 5 feet below existing pavement grade. Samples of soil encountered in the borings will be obtained at approximate 2%z -foot -depth intervals using a 2.4 -inch, inside - diameter, split -barrel sampler. ARcr each boring is completed, the hole will be back[illed, and the pavement repaired with quick - setting concrete mix. 13. Laboratory analyses of select soil samples obtained from the roadway borings. For estimating purposes, we assume the laboratory testing program will include two gradation analyses and three Californua Bearing Ratio (CBR) tests. 14. Recommendations for site preparation and till placement including: an evaluation of the suitability of on -site soil for reuse as structural fill; gradation criteria for imported fill; guidance for preparation of subgrade soil, which will support pavements; and criteria for structural fill placement and compaction. 15. Pavement layer thickness design for PCC and IB4A pavements including base course thickness, gradation and required degree of compaction, thickness and compaction criteria for HMA surfacing and thickness criteria for PCC. We assume that Equivalent Single -Axle Loads (ESAhs) will be provided by the city. We further assume that the pavement thickness designs will be completed for the following scenarios: • ]'CC within the intersection box for both center panel and edge loadings. • PCC within Sprague Avenue and McDonald Road de- acceleration lanes for both center panel and edge loadings. • HNIA within Sprague Avenue and _'McDonald Road acceleration lanes. 16. Prepare a written report for the project wluch summarizes our conclusions along with supporting field and laboratory information. We assume that one report will be prepared which will address all three sites. TASK 3 SPRAGUE/PINES INTERSECTION RECONSTRUCTION Our specific scope of services will include the following: 17. Coordinate clearance of existing utilities by contacting the local One -Call Service before beginning our explorations. 18. 'Traffic control services provided under subcontract to GeoEngineers, Inc. We assume traffic control will include closing one lane of traffic for each exploration we complete, and requiring File NU. 11164 -011 -170 GEOENGINEERS� 4„ City of Spokarn ley September 29, 20US Page 4 flaggers and signage during drilling operations. We further assume that traffic control will be limited to one day. 19. Pavement coring services provided under subcontract to GeoEngineers, Inc,, as necessary. tf proposed boring locations within Sprague Avenue will be located in areas known to be underlain by existing PCC pavement, we will subcontract a pavement coring subcontractor to core the existing PCC pavement so that we can complete our borings. For estimating purposes, we assume that two pavement cores will be required at this site. 20. Exploration of soil and groundwater conditions within the limits of the project site by drilling four borings, each to a depth on the order of about 5 feet below existing pavement grade. Samples of soil encountered in the borings will be obtained at approximate 2%- foot -depth intervals using a 2.4- inch, inside- diameter, split - barrel sampler. After each boring is completed, the hole will be back-filled, and the pavement repaired with quick - setting concrete mix. 21. Laboratory analyses of select soil samples obtained from the roadway borings. For estimating purposes, we assume the laboratory testing program will include two gradation analyses and two California Bearing Ratio (CBR) tests. 22. Recommendations for site preparation and fill placement including: an evaluation of the suitability of on -site soil for reuse as structural fill; gradation criteria for imported fill; guidance for preparation of subgrade soil, which will support pavements; and criteria for structural fill placement and compaction. 23. Pavement layer thickness design for PCC and l-MA pavements including base course thickness, gradation and required degree of compaction, thickness and compaction criteria for HV1A surfacing and thickness criteria for PCC. We assume that Equivalent Single -Axle Loads CESAT.,$) will be provided by the city. We further assume that the pavement thickness designs will be completed for the following scenarios: • PCC within Sprague Avenue de- acceleration lanes for both center panel and edge loadings. • 11MA within Sprague Avenue acceleralion'lanes. 24. Prepare a written report for the project which summarizes our conclusions along with supporting Field and laboratory information. We assume that one report will be prepared which will address all three sites. The actual location of the explorations will vary depending on access and site constraints, including existing utility locations and access to commercial developments. The exploration locations will be marked in advance of the scheduled fieldwork. The explorations will be monitored on a full -time basis by an engineer from our staff, who will obtain representative samples, classify the soils encountered, record groundwater conditions (if observed), and prepare a detailed log of each exploration. The samples obtained from the explorations will be brought to our laboratory for further examination and testing. Selected samples will be tested to define pertinent soil characteristics as described above. The borings will be backfilled in accordance with Washington State Departnnent of Ecology requirements. SCHEDULE We can typically mobilize equipment and personnel to the site within about one week of your notice to proceed to allow time for utility clearances and scheduling. Site exploration should take about one day for cacti site. Laboratory test results should be available within about two to three weeks after completion of field work. Preliminary verbal recommendations should be available within about three to four weeks File AV 11164 -011 -00 GEOENGINEERS� c� City of Spokant ley September 29, 2008 Page 5 following authorization of services. The final report should be complete within about four to five weeks following authorization of our services. We will keep you abreast of our findings during the course of work. If this schedule does not meet your needs please contact its so we can discuss appropriate modifications. TERMS AND FEE ESTIMATE Our services will be completed in accordance with the terms contained in the "Agreement for Professional Services ", which was provided in your letter to us dated September 19, 2005. A copy of the agreement is attached. The fee for our services will be determined on a time and expense basis using the rates contained in our Schedule of Charges, which also is attached and forms a part of this agreement. We estimate that our fee for the services outlined above will be approximately $33,000. This includes about $12,000 for Task 1, $12,000 for Task 2, and about $9,000 for Task 3. We will not exceed our fee estimate without your prior authorization. We will keep you informed of project status and advise you if it appears appropriate to modify the scope and budget. This proposal is valid for a period of 60 days commencing from the first date listed above and subject to renegotiation by GeoEngincers, inc., after the expiration date. Sincerely, jG,ce-oEn ineers, lnc. . Lauder Geotechnical Engineer ?;1 01*9- (;J rtes $. Harakas, P1, LEG nior Principal Disclaimer. Any electronic form, facsimile or hand copy of the original document (email, text, table, and /or figure), if provided, and any attachments are only a copy of the original document. lire original document is stored by GcoEngincers, Inc. and will serve as the official document of record. The scope of services and terms described herein arc accepted and GeoEngineers, Inc. is authorized to proceed. Organization Date 13y 'Signature 'Individual with contracting authority and responsible for payment of GeoEngineers, Inc. services. Name Printcd Proprietary Notice: The contents of this document ate proprietary to GeoEngincers, Inc. and arc intended solely for use by our clients and their design teams to evaluate GenHngineers' capabilities and understanding of project requirements as they relate to performing the service proposed for a specific project. Copies of this document or its contents ntuy not be disclosed to any other panics without the written crosent of GeuEngineers. Copyright® 2005 by GwEngineers, Inc. All rights reserved. rile Alb. 11264 - 011 -00 GEOENGINEERS.0