11-125.00 Acme Concrete Paving: Indiana Sullivan PCCP Intersectioncrrr oe , S.� le a CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 11 -013 DEPARTMENT OF PUBLIC WORKS PROJECT: Indiana /Sullivan PCCP Intersection Project CONTRACT DATE: 7/14/2011 CONTRACTOR: Acme Concrete Paving, Inc y CHANGE ORDER NO: 7 CAPITAL IMPROVEMENT PROJECT NO: 0113 BiD NO.: 11 -013 DESCRIPTION OF CHANGES This Change Order replaces the Bridge Approach Slab with PCC Pavement and extends Contract Time 1.5 days.. It also pays for Installation of temporary WSDOT Type 2 Concrete Barriers In the Sullivan Road Centerline median north of Indiana Ave. This will allow the City to easily reroute traffic during future bridge repair projects. See attached CO 7 Specifications. I tem No Description C07-1 CEMENT CONC. PAVEMENT 007-29 CORROSION RESISTANT DOWEL BAR C07 - 33 BRIDGE APPROACH SLAB C07-1 TEMPORARY TYPE 2 CONCRETE BARRIER Unit guantit Unit Price Total CY 38 $158.00 $5,940.80 EA 28 $14.30 $400.40 Sy -104 $207.00 ($21,528.00) LF 385 $22.00 $8,470.00 Total Amount of this Change Order( Incl. Tax): ($6,716.80) SUBSTANTIAL COMPLETION Original Dale: 7/12/2011 Prior to this Change Order: 7/12/2011 Including this Change Order: 7/1412011 Original Working Days: 30 Working Days Added by this CO: 1.5 Working Days Including this CO: 31.6 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 1,071,710.55 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 12,326.13 .»».»...»......» .............».....................»......................... ... ».....- .-- .................. TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER 1,084,036.68 NET THIS CHANGE ORDER - 6 ....................._ ......... ....... .. ...... ....... .»......»......,.............»............ .... »... ».... »,................ ' TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,077 319.88 CONTRACTOR ACCEPTANCE: / The contractor hereby accepts this adjustment un r the terms of the original contract for all work perfomed. RECOMMENDED ICY: APPROVED BY: Neil Kersten, Publlo o Director APPROVED BY: City MbLnager DATE: — z 2- DATE: V 12 // DATE: DATE: ATTACHMENTS: DlsfdhuNon- ORIGINALS T0: Contractor, City of Spokane Valley Clerk's Office, PW Project File COPIES TO: PW Project File P:Pub'lo Wo(as)Purcha'nglco (8)2812007) JE - ICITY OF Public Works Department pokane Capital Improvement Program Valley 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhaLt@spokanevalley.org Memorandum Date: September 13, 2011 To: Steve Worley, Neil Kersten From: Craig Aldworth Re: Change Order 7 for Indiana Sullivan PCCP Intersection Project, CIP 0113 Budget Account No. 303.303.113.595.30.63.00 Acme Concrete Paving Contract 11 -013 Change Order 7 replaces the Bridge Approach Slab with PCC Pavement. It extends Contract time by 1.5 days, to compensate for time lost by the Contractor waiting to get the Bridge Approach Slab steel stamped by a WSDOT inspector. It also pays for temporary installation of Type 2 Concrete Barriers in the Sullivan Road Centerline median north of Indiana Avenue so that the City can reroute traffic during future bridge repair projects. The total estimated cost (incl. tax) for this Change Order work is - $6,716.80 paid for by a 79.5% Spokane Transit Authority (STA) grant, a $100,000 WSDOT grant and the City of Spokane Valley. There are sufficient funds in the project budget to cover these costs. Original Contract amount = Previous Change Order Cost = Change Order 97 Cost = Project Cost including Change Order #7 = 15% of Original Contract amount = Max Public Works Director Contract authority = Change Order Cost to date = Remaining P.W. Director Contract Authority after Public Works ector Cc: City Manage Finance Department $1,071,710.55 $12,326.13 -$6,716.80 $1,077,319.88 $160,756.58 $75,000.00 $ 5,609.33 $69,390.67 SECTION 1 -10 Temporary Traffic Control 8 -11.3 Construction Requirements Add the following: The Contractor shall furnish, install and remove Concrete Barrier Type 2 with two terminal sections in accordance with WSDOT Standard Plan C -8. 8 -11.4 Measurement Add the following "Temporary Type 2 Concrete Barrier" shall be measure per linear feet installed. 8 -11.5 Payment Add the following: The linear foot unit price for "Temporary Type 2 Concrete Barrie' shall include all costs for furnishing, loading, transporting, installing and removing Concrete Barrier Type 2 with two terminal sections conforming to WSDOT Standard Plan C -8 where directed by the Enginer. The unit price does not include providing temporary traffic control. The unit price shall hold for a time, not to exceed six months from the date of instaalation. Indiana / Sullivan PCCP Intersection Project CO 7 Specifications Concrete Paving, Inc. September 12, 2011 City of Spokane Valley 11707 E Sprague Ave Suite 106 Spokane Valley, WA 99206 Attn: Craig Aldworth, P.E. Re: Indiana/Sullivan PCCP Intersection Capital Improvement Project No. 0113 Furnish and Install Temporary Barrier Dear Mr. A dworth The price to furnish and +/. 385 Lineal Feet of WSDOT Type 2 Concrete Barrier with 2 each 7' noses is $22.00 per lineal foot. The barrier will be tleliver(A and set one time, then picked up when no longer required and wil l remain. the property of Frank Gurney, Inc. The price does not include the following: Dirt or Asphalt work, and anchoring of the barrier. If you have any questions, please contact me at 509 -24 Sincerel e lark Project Manager 4124 East Broadway, Spokane, WA 99202 • (509) 2� An Equal Opportunity Eml Y - 8" (TYP.) WIRE ROPE LOOP (TYP.) T#5 -0#5 WIRE ROPE LOOP LENGTH 3 N ---------- - - - - -- ------------------ ....................................................................... ............................... _ y b m - - - - -- "- _ _ _ - =F -- ------ -- - - -- ------ ------------- -- -- -__ ° 1 --------------- ------ - - - - -- ------------- ----------------------- - - - - -' TOP VIEW WIRE ROPE LOOP (TYP.) 11 65 �t N ------- _ _________ f 1 ) ------------- - ---- --- ---------------------- N 2" CLR. m i (TYP.) I 4 1 12" (TYP.) �+ J 2 (� g 5 t •� ROUND EDGES R i 11Y - W OR 12' - 8" 3/4" MAX. (TYP.) I I PIN (i SIDE VIEW PIN BARRIER SECTION I 1 12" R. r 7/8" R. WIRE ROPE LOOP (TYP.) 1f2" CHAMFER (TYP.) tlI I i i SEE NOTE 2 END VIEW ( S" 1 8" 2 ._ D . SECTION O r NOTES 1. Wire rope loops shall be T - B" long, except for the top loop of the Barrier Terminal, which shall be 2'- 0" long. 2. Except for the locations of the wire rope loops, the dimensions shown in END VIEW "A" are typical for both ends of a Barter Section or opposing ends of Barrier Terminals. 3. Connecting and Drift Pin head designs vary among different manufacturers. Pin designs that are shaped differently than those shown in the detail are acceptable, if the bearing surface is within the minimum and maximum widths specified. 4. The vertical spacing of the Wire Rope Loops in a Barrier Terminal is determined by the end of the Barrier Segment to which it is being connected. See BARRIER CONNECTION DETAIL (Sheet 2). ISOMETRIC VIEWS 1 12" 1 1 CONNECTING PIN WIRE ROPE LOOP I 1 1 3/4" I.D. LOOP ..,......... ................ 1/8" FROM BARRIER FACE OF CONCRETE PIN DETAIL C pp WASy�F.�' 1H Jill � S TV AR'oG���4r 4 SA ONAL CONCRETE BARRIER TYPE 2 STANDARD PLAN C-8 SHEET 1 OF 2 SHEETS APPROVED FOR PUBLICATION Pasco Bakotich 111 02 -10-09 enure DE-rinEm ogre w.himfon Stab De W ,W of T, pwftft, BARRIER SECTION BARRIER TERMINAL WIRE ROPE LOOP DETAIL r MIN. 2 1rz" MAX. PLATE WASHER ^ 1/S" THICK 7 C A 2" R. — BEVEL OR ROUND EDGES 314" MAX. (TYP.) 1 1/2' (TYP.) PIN SEE NOTE 4 BARRIER TERMINAL 2" MIN. 112" MAX. -- 1• DIAM. PIN WITH ROUNDED BOTTOM EDGES SEE NOTE 3 CONNECTING PINS AND DRIFT PINS BARRIER SECTION REINFORCING STEEL BENDING DIAGRAM 9' -4 3/4" FOR 10' - D" LONG BARRIER SECTION 11' - 10 314" FOR 12' - S" LONG BARRIER SECTION 1Q M5 g'- 4 3/4" FOR 10' - D" LONG BARRIER SECTION 11' - 10 3/4" FOR 12'- S" LONG BARRIER SECTION SIDE VIEW BARRIER TERMINAL REINFORCING STEEL BENDING DIAGRAM 9 -g 19• 03 N5 1' -T" 2' -3" 2' -10" ® 115 WIRE ROPE LOOPS HOLE FOR DRIFT PIN O .� ....1 ......................... _ .... ............................. .. _.. .. . .............. i i 3' -0" PIN TOP VIEW WIRE ROPE LOOPS — SEE NOTE 1 314 "CHAMFER Og5 1 S" O �I � 2" CLR. I .............. ............. m I .I. 2 ®# 5 '1 1 DIAM. 2" CLR. (B) SIDE VIEW ;P�(IN BARRIER CONNECTION DETAIL �L S. p ° a CH 38777 O QI� g F'3 A60 STEA ♦� ss �ONAL CONCRETE BARRIER TYPE 2 STANDARD PLAN C-8 SHEET 2 OF 2 SHEETS APPROVED FOR PUBLICATION Pasco Bakotich ❑I 02 -10-09 Amok IN STALE DESNSN ENGINEER MTE WmNnBbn Slab D.por mt of Tl peno0en SEE NOTE 1 5/B" WIRE ROPE WIRE SEIZING — SHALL BE EIGHT WRAPS 13/4" I.D. LOOP OF 16 GAGE WIRE WITH THE ENDS TWISTED TOGETHER, OR EQUIVALENT FASTENING. WIRE ROPE LOOP DETAIL r MIN. 2 1rz" MAX. PLATE WASHER ^ 1/S" THICK 7 C A 2" R. — BEVEL OR ROUND EDGES 314" MAX. (TYP.) 1 1/2' (TYP.) PIN SEE NOTE 4 BARRIER TERMINAL 2" MIN. 112" MAX. -- 1• DIAM. PIN WITH ROUNDED BOTTOM EDGES SEE NOTE 3 CONNECTING PINS AND DRIFT PINS BARRIER SECTION REINFORCING STEEL BENDING DIAGRAM 9' -4 3/4" FOR 10' - D" LONG BARRIER SECTION 11' - 10 314" FOR 12' - S" LONG BARRIER SECTION 1Q M5 g'- 4 3/4" FOR 10' - D" LONG BARRIER SECTION 11' - 10 3/4" FOR 12'- S" LONG BARRIER SECTION SIDE VIEW BARRIER TERMINAL REINFORCING STEEL BENDING DIAGRAM 9 -g 19• 03 N5 1' -T" 2' -3" 2' -10" ® 115 WIRE ROPE LOOPS HOLE FOR DRIFT PIN O .� ....1 ......................... _ .... ............................. .. _.. .. . .............. i i 3' -0" PIN TOP VIEW WIRE ROPE LOOPS — SEE NOTE 1 314 "CHAMFER Og5 1 S" O �I � 2" CLR. I .............. ............. m I .I. 2 ®# 5 '1 1 DIAM. 2" CLR. (B) SIDE VIEW ;P�(IN BARRIER CONNECTION DETAIL �L S. p ° a CH 38777 O QI� g F'3 A60 STEA ♦� ss �ONAL CONCRETE BARRIER TYPE 2 STANDARD PLAN C-8 SHEET 2 OF 2 SHEETS APPROVED FOR PUBLICATION Pasco Bakotich ❑I 02 -10-09 Amok IN STALE DESNSN ENGINEER MTE WmNnBbn Slab D.por mt of Tl peno0en