CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 11 -013
DEPARTMENT OF PUBLIC WORKS
PROJECT: Indiana /Sullivan PCCP Intersection Project CONTRACT DATE: 7/14/2011
CONTRACTOR: Acme Concrete Paving, Inc y CHANGE ORDER NO: 7
CAPITAL IMPROVEMENT PROJECT NO: 0113
BiD NO.: 11 -013
DESCRIPTION OF CHANGES
This Change Order replaces the Bridge Approach Slab with PCC Pavement and extends Contract Time 1.5 days..
It also pays for Installation of temporary WSDOT Type 2 Concrete Barriers In the Sullivan Road Centerline median north of Indiana Ave.
This will allow the City to easily reroute traffic during future bridge repair projects. See attached CO 7 Specifications.
I tem No
Description
C07-1
CEMENT CONC. PAVEMENT
007-29
CORROSION RESISTANT DOWEL BAR
C07 - 33
BRIDGE APPROACH SLAB
C07-1
TEMPORARY TYPE 2 CONCRETE BARRIER
Unit
guantit
Unit Price
Total
CY
38
$158.00
$5,940.80
EA
28
$14.30
$400.40
Sy
-104
$207.00
($21,528.00)
LF
385
$22.00
$8,470.00
Total Amount of this Change Order(
Incl. Tax):
($6,716.80)
SUBSTANTIAL COMPLETION
Original Dale: 7/12/2011 Prior to this Change Order: 7/12/2011 Including this Change Order: 7/1412011
Original Working Days: 30 Working Days Added by this CO: 1.5 Working Days Including this CO: 31.6
THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE:
ORIGINAL TOTAL CONTRACT AMOUNT $ 1,071,710.55
TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 12,326.13
.»».»...»......» .............».....................»......................... ... ».....- .-- ..................
TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER 1,084,036.68
NET THIS CHANGE ORDER - 6
....................._ ......... ....... .. ...... ....... .»......»......,.............»............ .... »... ».... »,................ '
TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,077 319.88
CONTRACTOR ACCEPTANCE: /
The contractor hereby accepts this adjustment un r the terms of the original contract for all work perfomed.
RECOMMENDED ICY:
APPROVED BY:
Neil Kersten, Publlo o Director
APPROVED BY:
City MbLnager
DATE: — z 2-
DATE: V 12 //
DATE:
DATE:
ATTACHMENTS:
DlsfdhuNon-
ORIGINALS T0: Contractor, City of Spokane Valley Clerk's Office, PW Project File
COPIES TO: PW Project File P:Pub'lo Wo(as)Purcha'nglco (8)2812007)
JE - ICITY OF Public Works Department
pokane Capital Improvement Program
Valley
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhaLt@spokanevalley.org
Memorandum
Date: September 13, 2011
To: Steve Worley, Neil Kersten
From: Craig Aldworth
Re: Change Order 7 for Indiana Sullivan PCCP Intersection Project,
CIP 0113
Budget Account No. 303.303.113.595.30.63.00 Acme Concrete Paving Contract 11 -013
Change Order 7 replaces the Bridge Approach Slab with PCC Pavement. It extends Contract
time by 1.5 days, to compensate for time lost by the Contractor waiting to get the Bridge
Approach Slab steel stamped by a WSDOT inspector. It also pays for temporary installation of
Type 2 Concrete Barriers in the Sullivan Road Centerline median north of Indiana Avenue so
that the City can reroute traffic during future bridge repair projects.
The total estimated cost (incl. tax) for this Change Order work is - $6,716.80 paid for by a 79.5%
Spokane Transit Authority (STA) grant, a $100,000 WSDOT grant and the City of Spokane
Valley. There are sufficient funds in the project budget to cover these costs.
Original Contract amount =
Previous Change Order Cost =
Change Order 97 Cost =
Project Cost including Change Order #7 =
15% of Original Contract amount =
Max Public Works Director Contract authority =
Change Order Cost to date =
Remaining P.W. Director Contract Authority after
Public Works ector
Cc: City Manage
Finance Department
$1,071,710.55
$12,326.13
-$6,716.80
$1,077,319.88
$160,756.58
$75,000.00
$ 5,609.33
$69,390.67
SECTION 1 -10 Temporary Traffic Control
8 -11.3 Construction Requirements
Add the following:
The Contractor shall furnish, install and remove Concrete Barrier Type 2 with two terminal sections in
accordance with WSDOT Standard Plan C -8.
8 -11.4 Measurement
Add the following
"Temporary Type 2 Concrete Barrier" shall be measure per linear feet installed.
8 -11.5 Payment
Add the following:
The linear foot unit price for "Temporary Type 2 Concrete Barrie' shall include all costs for furnishing,
loading, transporting, installing and removing Concrete Barrier Type 2 with two terminal sections conforming
to WSDOT Standard Plan C -8 where directed by the Enginer. The unit price does not include providing
temporary traffic control. The unit price shall hold for a time, not to exceed six months from the date of
instaalation.
Indiana / Sullivan PCCP Intersection Project CO 7 Specifications
Concrete Paving, Inc.
September 12, 2011
City of Spokane Valley
11707 E Sprague Ave Suite 106
Spokane Valley, WA 99206
Attn: Craig Aldworth, P.E.
Re: Indiana/Sullivan PCCP Intersection
Capital Improvement Project No. 0113
Furnish and Install Temporary Barrier
Dear Mr. A dworth
The price to furnish and +/. 385 Lineal Feet of WSDOT Type 2 Concrete Barrier
with 2 each 7' noses is $22.00 per lineal foot. The barrier will be tleliver(A and set one
time, then picked up when no longer required and wil l remain. the property of Frank
Gurney, Inc.
The price does not include the following: Dirt or Asphalt work, and anchoring of the
barrier.
If you have any questions, please contact me at 509 -24
Sincerel
e lark
Project Manager
4124 East Broadway, Spokane, WA 99202 • (509) 2�
An Equal Opportunity Eml
Y - 8" (TYP.)
WIRE ROPE LOOP (TYP.) T#5 -0#5 WIRE ROPE LOOP LENGTH
3
N ---------- - - - - -- ------------------
....................................................................... ............................... _
y b
m - - - - -- "- _ _ _ - =F -- ------ -- - - -- ------ -------------
-- -- -__
° 1 --------------- ------ - - - - -- ------------- ----------------------- - - - - -'
TOP VIEW
WIRE ROPE LOOP (TYP.) 11 65 �t
N
------- _ _________
f 1 )
-------------
- ---- --- ----------------------
N 2" CLR.
m i
(TYP.) I 4
1 12" (TYP.) �+ J 2 (� g 5 t •� ROUND EDGES R
i 11Y - W OR 12' - 8" 3/4" MAX. (TYP.)
I I
PIN (i SIDE VIEW PIN
BARRIER SECTION
I
1 12" R. r
7/8" R.
WIRE ROPE
LOOP (TYP.)
1f2" CHAMFER
(TYP.)
tlI I
i
i
SEE NOTE 2
END VIEW (
S" 1 8"
2 ._ D .
SECTION O
r
NOTES
1. Wire rope loops shall be T - B" long, except for the top loop of the Barrier Terminal, which
shall be 2'- 0" long.
2. Except for the locations of the wire rope loops, the dimensions shown in END VIEW "A"
are typical for both ends of a Barter Section or opposing ends of Barrier Terminals.
3. Connecting and Drift Pin head designs vary among different manufacturers. Pin designs
that are shaped differently than those shown in the detail are acceptable, if the bearing
surface is within the minimum and maximum widths specified.
4. The vertical spacing of the Wire Rope Loops in a Barrier Terminal is determined by the
end of the Barrier Segment to which it is being connected. See BARRIER CONNECTION
DETAIL (Sheet 2).
ISOMETRIC VIEWS
1 12"
1
1
CONNECTING PIN
WIRE ROPE LOOP
I
1
1 3/4" I.D. LOOP ..,......... ................
1/8" FROM BARRIER
FACE OF CONCRETE
PIN
DETAIL C
pp WASy�F.�' 1H
Jill
� S TV
AR'oG���4r 4
SA ONAL
CONCRETE BARRIER
TYPE 2
STANDARD PLAN C-8
SHEET 1 OF 2 SHEETS
APPROVED FOR PUBLICATION
Pasco Bakotich 111 02 -10-09
enure DE-rinEm ogre
w.himfon Stab De W ,W of T, pwftft,
BARRIER SECTION BARRIER TERMINAL
WIRE ROPE LOOP DETAIL
r MIN.
2 1rz" MAX.
PLATE WASHER ^
1/S" THICK
7
C
A
2" R. — BEVEL
OR ROUND EDGES
314" MAX. (TYP.) 1 1/2' (TYP.)
PIN
SEE NOTE 4
BARRIER TERMINAL
2" MIN.
112" MAX.
--
1• DIAM. PIN WITH
ROUNDED BOTTOM EDGES
SEE NOTE 3
CONNECTING PINS
AND DRIFT PINS
BARRIER SECTION
REINFORCING STEEL BENDING DIAGRAM
9' -4 3/4" FOR 10' - D" LONG BARRIER SECTION
11' - 10 314" FOR 12' - S" LONG BARRIER SECTION
1Q M5
g'- 4 3/4" FOR 10' - D" LONG BARRIER SECTION
11' - 10 3/4" FOR 12'- S" LONG BARRIER SECTION
SIDE VIEW
BARRIER TERMINAL
REINFORCING STEEL BENDING DIAGRAM
9 -g
19•
03 N5
1' -T" 2' -3" 2' -10"
® 115
WIRE ROPE LOOPS
HOLE FOR
DRIFT PIN
O
.� ....1 ......................... _ .... ............................. .. _.. .. . ..............
i
i
3' -0"
PIN
TOP VIEW
WIRE ROPE LOOPS — SEE NOTE 1
314 "CHAMFER
Og5 1 S"
O �I
� 2" CLR.
I
..............
.............
m
I .I.
2 ®# 5 '1 1 DIAM.
2" CLR. (B) SIDE VIEW
;P�(IN
BARRIER CONNECTION DETAIL
�L S. p ° a
CH
38777 O QI� g F'3
A60 STEA ♦�
ss �ONAL
CONCRETE BARRIER
TYPE 2
STANDARD PLAN C-8
SHEET 2 OF 2 SHEETS
APPROVED FOR PUBLICATION
Pasco Bakotich ❑I 02 -10-09
Amok
IN STALE DESNSN ENGINEER MTE
WmNnBbn Slab D.por mt of Tl peno0en
SEE NOTE 1
5/B" WIRE ROPE
WIRE SEIZING — SHALL BE EIGHT WRAPS
13/4" I.D. LOOP
OF 16 GAGE WIRE WITH THE ENDS TWISTED
TOGETHER, OR EQUIVALENT FASTENING.
WIRE ROPE LOOP DETAIL
r MIN.
2 1rz" MAX.
PLATE WASHER ^
1/S" THICK
7
C
A
2" R. — BEVEL
OR ROUND EDGES
314" MAX. (TYP.) 1 1/2' (TYP.)
PIN
SEE NOTE 4
BARRIER TERMINAL
2" MIN.
112" MAX.
--
1• DIAM. PIN WITH
ROUNDED BOTTOM EDGES
SEE NOTE 3
CONNECTING PINS
AND DRIFT PINS
BARRIER SECTION
REINFORCING STEEL BENDING DIAGRAM
9' -4 3/4" FOR 10' - D" LONG BARRIER SECTION
11' - 10 314" FOR 12' - S" LONG BARRIER SECTION
1Q M5
g'- 4 3/4" FOR 10' - D" LONG BARRIER SECTION
11' - 10 3/4" FOR 12'- S" LONG BARRIER SECTION
SIDE VIEW
BARRIER TERMINAL
REINFORCING STEEL BENDING DIAGRAM
9 -g
19•
03 N5
1' -T" 2' -3" 2' -10"
® 115
WIRE ROPE LOOPS
HOLE FOR
DRIFT PIN
O
.� ....1 ......................... _ .... ............................. .. _.. .. . ..............
i
i
3' -0"
PIN
TOP VIEW
WIRE ROPE LOOPS — SEE NOTE 1
314 "CHAMFER
Og5 1 S"
O �I
� 2" CLR.
I
..............
.............
m
I .I.
2 ®# 5 '1 1 DIAM.
2" CLR. (B) SIDE VIEW
;P�(IN
BARRIER CONNECTION DETAIL
�L S. p ° a
CH
38777 O QI� g F'3
A60 STEA ♦�
ss �ONAL
CONCRETE BARRIER
TYPE 2
STANDARD PLAN C-8
SHEET 2 OF 2 SHEETS
APPROVED FOR PUBLICATION
Pasco Bakotich ❑I 02 -10-09
Amok
IN STALE DESNSN ENGINEER MTE
WmNnBbn Slab D.por mt of Tl peno0en