11-158.00 Solid Structures: Salt Storage BuildingSPO.Kane
,,;0oWX7a11ey-
DEPARTMENT OF PUBLIC WORKS
CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 11 -027
PROJECT. Salt Storage Building CONTRACT DATE: 1012812011
CONTRACTOR: Solid Structures CHANGE ORDER NO: 2
CAPITAL IMPROVEMENT PROJECT NO:
BID NO.: 11 -027
DESCRIPTION OF CHANGES
This Change Order pays for the additional concrete required for post placement due to the soil ccnditolns and metal debris excavated
per post hole. This includes all additional excavation, concrete and labor
Item No Descriptlon Unit uant! Unit Prico Total
CO2 Post Concrete LS LS $2,246.83 $2,246.83
Total Amount of this Change Order( Incl. Tax): 52,246.83
THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE:
ORIGINAL TOTAL CONTRACT AMOUNT $ 55,784.84
_ .. ...___........ .. ......... .._.,. _,...._,_..._ . ,..._.__ ....._...... --
TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT 3,303.12
TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 59,087.96
NET THIS CHANGE ORDER
2,246.83
TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 61,334.79
CONTRACTOR ACCEPTANCE: DATE: %C
The contractor hereby accepts this adjustment under the teams of the original contract for all work perfomed.
RECOMMENDED BY: -/ &ei 11r, DATE: l% l
APPROVED BY:
Nell Kersten, PumcL
APPROVED BY:
City Manager
ATTACHMENTS:
Distribution:
DATE:
DATE:
ORIGINALS TO: Contractor, City of Spokane Valley Clerk's Office, PW Project File
COPIESTO: PWProjectFile P. Pubt :cWorksrpo-:drrng1CO(Mel20'J7)
(01( - I
Z'd ££ZLLZ£609 63, i-lio iisanos dL0: 60 16 9Z 100
Oct 24 11 10:06a SOLIDSTRUCTURES
5093277233 p.2
Solid Sfructures
CH"GE OZWER AGWEEffNT
To Original Construction Alzreemertt
Each c�� orderto � o �iatiee to Ova
conformance vyw the eta Solid ,men# m>$f be m wry and des a � � and is m
conditions as specked AU tv�$ SbM be under the same tetras and
b weer the Owner and Brander unless otizerwisse stapu]a2ed M
tivr it�a Faah +age Order de�7s all s to the
tfre Cor�truetiot} A p� The � `�' thai r�esnit in a revision of
Price o aim (mm and g��der must 1� is sEa�d bel= r m mete Agreement
additional find at the amo= ofthe er and receive verfi�on that
buildia c=uw a Off, nor available fiomthe 1 r orhave been deposited in the
g bef�e work can. €� started-
--
ar.t
• a ■ - � • � t . • IA t t t . r _i •=+n vti t .ass
t t i tit L. F. lit i. . r - a �� _ , w s.p ••-�:!t i1
concerning the property locate. at: 1 � p o �, E- Eon �� �� ; q of �au�
The Builder and the Owner A.UY agr� as follows:
1-
Changes in the Work OrighlaW Agreed To Are As Fellows:
a
M:
N��0,
4. ao
Grand Tom: ; 5 . R $ roe fete Pro -
B (date)
CHANGE ORDER ,¢
TMJ Propertks -1
Ovgerfsl "Pro-Val
(am)
(am)
SCITY OF
pollne� ,,�oOValleyv
Memorandum
Date: October 28, 2011
To: Neil Kersten
Public Works Department
Capital Improvement Program
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhatt@spokanevalley.org
From: Shane Arlt Q �,
Re: Change Order /1 and 2 for Salt Storage Building
Change Order 1 is for the addition of 7/16" OSB and felt paper located under the roof material to
prevent condensation from dripping from the metal roof. A barrier was not included in the
original scope of work. Materials and installation of the vapor barrier is $3,303.12.
Change Order 2 pays for the additional concrete required for post placement due to the soil
conditions and metal debris excavated per post hole. The design called for .88 yards per post
for a total of 17.6 yards. A total of 40.6 yards were used. The additional yardage with tax
amounted to $2,246.83. This includes all additional excavation, concrete and labor.
Original Contract amount = $55,784.84
Previous Change Order Cost = $0.00
Change Order #1 Cost = $3,303.12
Change OrderJWCost = $2,246.83
'71
Project Cost including Change Orders $61,334.79
Max Public Works Director Contract authority = $75,000.00
Change Order Cost to date = $5,549.95
Remaining P.W. Director Contract Authority after CO #2 $69,450.05
tn _ �� #e
Public Worr ector Project Manager