11-163.00 Eller Corporation: 2011 Stormwater Small WorksP . 6 S°r'okane p ..;�Vall"+7 CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 11 -022 DEPARTMENT OF PUBLIC WORKS PROJECT; Stormwater Utility 2011 Small Works Projects CONTRACT DATE: 8123/2011 CONTRACTOR: Eller Corporation CHANGE ORDER N0: 2 Public Wbir Projec!# 11.022 BID NO:: 11 -D22, DESCRIPTION OF CHANGES Removalfreplacement of drive approach on Archery (A), adjustment of bill schedule plpe.slzingitype to actual (9,0, E. F), work scope adjustments for Park & 8th (0), additional drain rock on Herald (E), bid Item Correction for asphalt removal (ALL) Item No Description 'Parenthesis Indicates bid schedule Uni Quantity Unit Price Tt1�1 :C0.2 REMOVE P60 SIDEWAMDRIVEWAYAPPROACH (A) SY 4 $10.00 $40,00 CEMENT CONC. DRIVEWAY ENTRANCE TYPE R -110 (A) 5Y 4 589:00. $356.00 SOLID WALL PVC STQ,RM SEWER PIPE, 10 IN. DIAM. (B) LF 40 $33.00_ $1;320.00 SOLID WALL PVC STORM SEWER PIPE, 121N. DIAM. (B) LF 40 $35.00. ($1,400.00) SOLID WALL STORM SEWER PIPE, 101N. DIAM. (C) LF 40 $51.00 $2,040.00 .PVC SOLID WALL PVC STORM SEWER PIPE, 121N, DIAM. (C) LF 40 $53.00 (S2,120.00) CONCRETE INLET TYPE 1 (0) EACH 1 $1,375.00 (51,375.00) DUCTILE IRON STORM SEWER PIPET B IN. DIAM. (D) LF 44 $47.00 ($2,080.00) DUCTILE IRON STORM SEWER PIPE, 12 IN. DIAM. (D) LF 145 $60.00 ($8,700.00) UNUSED MATERIALS RESTOCK (D) LS 1 $100.00 $100.00 REHAB EXISTING DRYWELL TYPE B (D) EACH 1 $1,600.00 $1,500.00 PROTECT & ADJ. EXISTING STRUCTURE TO GRADE (D) EACH 2 $280.00 $580.00. CATCHBASIN TYPE 2, 4844. DIAM_ (E) EACH 1 $2,100.00 $2,1D0.00 GRATE INLET TYPE 2;. WSDOT (E) EACH 1 $1;800.00 $1,900.00 SOLID WALL PVC:STORM SEINER PIPE, 10 IN. DIAM. (E) LF 40 $45.00 $1,800.00 SOLID WALL PVC STORM SEWER PIPE, 12 IN. DIAM. (E) LF 40 $47.00 ($1,880.00) ADDITIONAL DRAIN ROCK (E) LS 1 5700.00 $700:00 DUCTILEIRON STORM SEWER PIPE, 10 IN. DIAM. (F) LF 34 $55.00 $1,670.00 SOLID WALL:PVC STORM SEWER PIPE. 10 IN. DIAM. (F) LF 34. $40.00 (51,360.00) REMOVE ASPHALT ,CONCRETE PAVEMENT (ALL) SY 1170 $?:25 $2,632.50 Total Amount of this Change Order( Incl- Tex); (51,964.50) ESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT _ - -T $ 169,249 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT _ S 17,722 TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE: ORDER S, 186,971 NET THIS CHANGE ORDER -1,984 CONTRACTOR ACCEPTANCE: The contractor hereby accepts this ad)ustment u er the terms of the original contract for all work perfomed. RECOMMENDED BY:�i/ APPROVED BY: DATE: 11-17-11 DATE: 1.) - ?1 - 1/ DATE:������� APPROVED BY: [Azd ----- DATE: Mira Jackson, city Manger ATTACHMENTS: ORIGINALS T0: Contractor, City of Spokane Valley Clerks Office, PW Project File , .. %. SCITY OF p6lene ..;oOValley Memorandum Public Works Department Stormwater Utility 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhatt@spokanevalley.org Date: November 7, 2011 To: Neil Kersten From: Ryan Brodwater Re: Change Order 2 Stormwater Utility 2011 Small Works Projects Project # 11 -022 Budget Account No. 402.402.000.538.36.41.10 Change Order 1 is for the addition of Schedule C. Original Contract amount = Previous Change Order Cost = Change Order #2 Cost = Project Cost including Change Order #1= Max Public Works Director Contract authority = 15% of Original Contract amount Eller Corporation $169,249.50 $17,722.00 -$1,964.50 $185,007.00 $25,387.43 Change Order Cost to date = $15,757.50 Remaining P.W. Director Contract Authority after CO #1 $9,629.93 Public Works Cc: City Manager Finance Dep Project Manager