PROJECT; Stormwater Utility 2011 Small Works Projects CONTRACT DATE: 8123/2011
CONTRACTOR: Eller Corporation CHANGE ORDER N0: 2
Public Wbir Projec!# 11.022
BID NO:: 11 -D22,
DESCRIPTION OF CHANGES
Removalfreplacement of drive approach on Archery (A), adjustment of bill schedule plpe.slzingitype to actual (9,0, E. F),
work scope adjustments for Park & 8th (0), additional drain rock on Herald (E), bid Item Correction for
asphalt removal (ALL)
Item No Description 'Parenthesis Indicates bid schedule
Uni
Quantity
Unit Price
Tt1�1
:C0.2 REMOVE P60 SIDEWAMDRIVEWAYAPPROACH (A)
SY
4
$10.00
$40,00
CEMENT CONC. DRIVEWAY ENTRANCE TYPE R -110 (A)
5Y
4
589:00.
$356.00
SOLID WALL PVC STQ,RM SEWER PIPE, 10 IN. DIAM. (B)
LF
40
$33.00_
$1;320.00
SOLID WALL PVC STORM SEWER PIPE, 121N. DIAM. (B)
LF
40
$35.00.
($1,400.00)
SOLID WALL STORM SEWER PIPE, 101N. DIAM. (C)
LF
40
$51.00
$2,040.00
.PVC
SOLID WALL PVC STORM SEWER PIPE, 121N, DIAM. (C)
LF
40
$53.00
(S2,120.00)
CONCRETE INLET TYPE 1 (0)
EACH
1
$1,375.00
(51,375.00)
DUCTILE IRON STORM SEWER PIPET B IN. DIAM. (D)
LF
44
$47.00
($2,080.00)
DUCTILE IRON STORM SEWER PIPE, 12 IN. DIAM. (D)
LF
145
$60.00
($8,700.00)
UNUSED MATERIALS RESTOCK (D)
LS
1
$100.00
$100.00
REHAB EXISTING DRYWELL TYPE B (D)
EACH
1
$1,600.00
$1,500.00
PROTECT & ADJ. EXISTING STRUCTURE TO GRADE (D)
EACH
2
$280.00
$580.00.
CATCHBASIN TYPE 2, 4844. DIAM_ (E)
EACH
1
$2,100.00
$2,1D0.00
GRATE INLET TYPE 2;. WSDOT (E)
EACH
1
$1;800.00
$1,900.00
SOLID WALL PVC:STORM SEINER PIPE, 10 IN. DIAM. (E)
LF
40
$45.00
$1,800.00
SOLID WALL PVC STORM SEWER PIPE, 12 IN. DIAM. (E)
LF
40
$47.00
($1,880.00)
ADDITIONAL DRAIN ROCK (E)
LS
1
5700.00
$700:00
DUCTILEIRON STORM SEWER PIPE, 10 IN. DIAM. (F)
LF
34
$55.00
$1,670.00
SOLID WALL:PVC STORM SEWER PIPE. 10 IN. DIAM. (F)
LF
34.
$40.00
(51,360.00)
REMOVE ASPHALT ,CONCRETE PAVEMENT (ALL)
SY
1170
$?:25
$2,632.50
Total Amount of this Change Order( Incl- Tex);
(51,964.50)
ESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE:
ORIGINAL TOTAL CONTRACT AMOUNT _ - -T $ 169,249
TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT _ S 17,722
TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE: ORDER S, 186,971
NET THIS CHANGE ORDER -1,984
CONTRACTOR ACCEPTANCE:
The contractor hereby accepts this ad)ustment u er the terms of the original contract for all work perfomed.
RECOMMENDED BY:�i/
APPROVED BY:
DATE: 11-17-11
DATE: 1.) - ?1 - 1/
DATE:�������
APPROVED BY: [Azd ----- DATE:
Mira Jackson, city Manger
ATTACHMENTS:
ORIGINALS T0: Contractor, City of Spokane Valley Clerks Office, PW Project File
, .. %.
SCITY OF
p6lene
..;oOValley
Memorandum
Public Works Department
Stormwater Utility
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhatt@spokanevalley.org
Date: November 7, 2011
To: Neil Kersten
From: Ryan Brodwater
Re: Change Order 2 Stormwater Utility 2011 Small Works Projects
Project # 11 -022
Budget Account No. 402.402.000.538.36.41.10
Change Order 1 is for the addition of Schedule C.
Original Contract amount =
Previous Change Order Cost =
Change Order #2 Cost =
Project Cost including Change Order #1=
Max Public Works Director Contract authority
= 15% of Original Contract amount
Eller Corporation
$169,249.50
$17,722.00
-$1,964.50
$185,007.00
$25,387.43
Change Order Cost to date = $15,757.50
Remaining P.W. Director Contract Authority after CO #1 $9,629.93