Loading...
11-168.00 Benthin & Assoc: Surveying 24th Ave Sidewalks Adams to SullivanFormal Task Assignment Document Task Number L The general provisions and clauses of Agreement Task Assignment 10 -027 shall be in full force and effect for this Location ofProject: 24th Avenue, Adams Rd to Sullivan Rd Project Title: 24th Avenue Sidewalk -Adams Rd to Sullivan Rd Maximum Amount Payable Per Task Assignment: $12,000.00 _ Completion Date: Ap ri130, 2012 Description of Work: (Note attachments and give brief description) Provide on -call surveying services in accordance with Exhibit A -1 of Contract 10 -027, involving a topographic survey from roadway centerline to north right of way line at 1 -foot contour intervals. Survey shall: - show utilities from above ground evidence - identify and determine boundaries from recorded documents with Spokane County - locate monuments along rights of way - determine north right of way line from research and found monuments - establish 4 vertical ben clunarks for project and horizontal control points along route. Consultant will provide a signed topographic map showing right of way, AutoCAD map, point files, break lines and TIN using City of Spokane Valley drawing standards. Consultant will also provide exhibits and descriptions for new right of way if necessary. Preservation of monuments during construction is not included in this task, but may be added under a separate task order or contract. Agency Project Manager Signature: Date: November 30, 2011 Oral Authorization Datt Consultant Signature: Agency Approving Aut DOT Form 140 -089 E Format Task Assignment Revised 8/05 Dated: Date: Date: C4 - (/r 1 .j