Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
11-180.00 Budinger & Assoc: Sullivan Bridge Drain Swale
Washington State Department of Tvansportatlon Sup Agreement pp g Organization and Address Budinger & Associates Number 2 1101 N. Faucher Rd. Spokane Valley, WA 99212 Original Agreement Number 11 -028 Phone: 509 - 535 -8841 Project Number Execution Date Completion Date CIP - 0148 12/12/2011 1 12/31/2012 Project Title New Maximum Amount Payable Sullivan Rd Bridge Drain Retrofit Swale $ 5,035.20 Description of Work Provide cation exchange capacity tests per attached Budinger 12/5/11 Cost Estimate for Geotechnical Stormwater Infiltration Study. The Local Agency of City of Spokane Valley desires to supplement the agreement entered Into with Budinger and Associates and executed on 10/28/2011 and Identified as Agreement No. 11 -028 All provisions in the basic agreement remain In effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, Is hereby changed to read; prnvidea!++ +�..., avnT+en�p�er.eni ` r4ngtq pf - r siM `ehe B udingeL2 /5 /11 ContFetin, ate fur Grantechnical fifnrmwater Infiltration Study Il Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Section V, PAYMENT, shall be amended as follows: as set forth In the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated below and return to this office for final action. , d please sign in the appropriate spaces Consultant Signature DOT Form 140.063 EF Revised 012005 �0 Approving Authority Signature l3 Date 1 •� Project: This proposal is an addendum to Proposal Number H- 11392. The client is requesting additional testing, scope: 1. Client requests cation exchange capacity (CEC) tests for a proposed awale area of 5,500 square feet. 2. Three CEC tests are proposed in accordance with Spokane Regional Stormwater Manual, page 6 -16. 3. Budinger to use a small, rubber- tracked mini- excavator with a small bucket in an attempt to minimize disturbance to the natural area. 4. Prepare addendum reporting CEC tests. Assumptions: 1. Legal and physical access will be provided; 2. Location of utilities: Budinger will mark desired test locations and submit a "call before you dig" request. Budinger will not drill in vicinity of marked utilities; however, BAI will not be responsible for improperly located or un- located services. COST ESTIMATE (Sub consultant Pee Determination Summary Sheet) DIRECT SALARY COST (DSC): H= fie " Geotechnical Engineer * Engineer Technician * Word Processing and Report Production * Draftsman SUBTOTAL * REMMURSABLE * Cation Exchange Capacity Test * Sample Shipping $ Mini Excavator SUBTOTAL 2 x $123.15 = 8 x $60.39 2 x $37.17 = 1 x $59.87 6 each $25.00 6 each $10.00 1 day $300.00 CPA $246.30 $483.12 $74.34 $59.87 $863.63 $150.00 $60.00 $300.00 $510.00 TOTAL THIS ESTIMATE (Not To Exceed) $ 1,373.63 9101 N Fancher Rd Spokane Valley, WA 99292 427 S 13ighline Dr Ste Dl 208 E Sherman Ave T 509.528.8849 E Wenatchee, WA 98802 Coeur d'Alene, ID 83814 F 509.535 -9589 T 509- 888 -3809 T 205. 2924367 B udinger Geotechnlcal Enpineaing Enlronmental Engineering V..� & Associates Construction Materials Testing Subsurface Exploration Special Inspection Cost Estimate for Geoteehnicai Stormwater ration Study To City of Spokane Valley Date: 12/5/11 11707 E. Sprague Avenue Suite 106 Spokane, WA 99206 Proposal Number: H- 11392B Attn: Craig Aldworth, PE Project: Sullivan Bridge Infilitration Swale Spokane Valley, WA Email: caidwor1h0saokanevaliev.grg Subject: Cation Exchange Capacity Testing Project: This proposal is an addendum to Proposal Number H- 11392. The client is requesting additional testing, scope: 1. Client requests cation exchange capacity (CEC) tests for a proposed awale area of 5,500 square feet. 2. Three CEC tests are proposed in accordance with Spokane Regional Stormwater Manual, page 6 -16. 3. Budinger to use a small, rubber- tracked mini- excavator with a small bucket in an attempt to minimize disturbance to the natural area. 4. Prepare addendum reporting CEC tests. Assumptions: 1. Legal and physical access will be provided; 2. Location of utilities: Budinger will mark desired test locations and submit a "call before you dig" request. Budinger will not drill in vicinity of marked utilities; however, BAI will not be responsible for improperly located or un- located services. COST ESTIMATE (Sub consultant Pee Determination Summary Sheet) DIRECT SALARY COST (DSC): H= fie " Geotechnical Engineer * Engineer Technician * Word Processing and Report Production * Draftsman SUBTOTAL * REMMURSABLE * Cation Exchange Capacity Test * Sample Shipping $ Mini Excavator SUBTOTAL 2 x $123.15 = 8 x $60.39 2 x $37.17 = 1 x $59.87 6 each $25.00 6 each $10.00 1 day $300.00 CPA $246.30 $483.12 $74.34 $59.87 $863.63 $150.00 $60.00 $300.00 $510.00 TOTAL THIS ESTIMATE (Not To Exceed) $ 1,373.63 9101 N Fancher Rd Spokane Valley, WA 99292 427 S 13ighline Dr Ste Dl 208 E Sherman Ave T 509.528.8849 E Wenatchee, WA 98802 Coeur d'Alene, ID 83814 F 509.535 -9589 T 509- 888 -3809 T 205. 2924367 Client#: 83101 BUDINGER ACORDTM CERTIFICATE OF LIABILITY INSURANCE DATE 12/ (MM/ DD/YYY1� THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Payne Financial Group Inc. Courtyard Office Center 827 W. First Avenue, Suite 225 Spokane, WA 99201 CONTACT NAME: PHONE A/C No Ext : A/C, No): E -MAIL ADDRESS: INSURER(S) AFFORDING COVERAGE NAIC # INSURER A: Continental Western E INSURED Budinger & Associates, Inc 1101 N Fancher Rd INSURER B: $ INSURER C $1 PERSONAL & ADV INJURY $1,000,000 Spokane Valley, WA 99212 INSURER D: GENERAL AGGREGATE INSURER E GEN'L AGGREGATE LIMIT APPLIES PER: POLICY X PRO LOC JECT INSURER F: $2,000,000 COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR TYPE OF INSURANCE I� RL y VD POLICY NUMBER MM /DDY EFF MM /DDY EXP LIMITS • GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE a OCCUR X CWP277729325 8/06/2011 08/06/2012 E $1, 000,000 PREMISES Ea occu $ MED EXP (Any one person) $1 PERSONAL & ADV INJURY $1,000,000 GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: POLICY X PRO LOC JECT PRODUCTS - COMP /OP AGG $2,000,000 $ • AUTOMOBILE LIABILITY X ANY AUTO ALL OWNED SCHEDULED AUTOS AUTOS X HIRED AUTOS X AUTOS S WNED X CWP277729325 8106/2011 08/06/201 (CEO, accident SINGLE LIMIT $1,000,000 BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ parr. cident AMAGE $ A X UMBRELLA LIAB EXCESS LIAB OCCUR CLAIMS -MADE CU278049225 8/06/2011 08/06/2012 EACH OCCURRENCE $4 000 000 AGGREGATE s4: 000:000 DED I I RETENTION $ $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE Y / N OFFICER/MEMBER EXCLUDED? 7 (Mandatory in NH) If es, describe under DESCRIPTION OF OPERATIONS below N/A CWP277729325 WA Stop Gap 8/06/2011 08/06/201 TO Y LIMIT OTH- IER E.L. EACH ACCIDENT $1, 000,000 E.L. DISEASE - EA EMPLOYEE $1 , 000,000 I E.L. DISEASE - POLICY LIMIT $1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, H more space Is required) Sullivan Bridge Drain Retrofit Swale project, Supplemental Agreement Number 1. City of Spokane Valley, their agents, officers and employees are included in holder. We are unable to amend the cancellation wording. VANI.CLLA City of Spokane Valley 11707 E Sprague Ave Ste 106 Spokane, WA 99206 . SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ACORD 25 (2010/05) 1 of 1 #S710597/M675423 ©1988 -2010 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD KG1