Resolution 04-011 Amending Master Fee Schedule •
CITY OF SPOKANE VALLEY
SPOKANE COUNTY, WASITINGTON
RESOLUTION NO. 04-011
A RESOLUTION OF THE, CITY OF SPOKANE VALLEY, SPOKANE COUNTY,
WASHINGTON,AMENDING RESOLUTION 04-001,AND APPROVING AN AMENDED
MASTER FEE SCHEDULE FOR 2004
WHEREAS, it is the general policy of the City to establish fees that are reflective of the cost of
services provided by the City; and
WHEREAS, the Spokane Valley City Council adopted Resolution No. 03-053 on November 25,
2003 to adopt a City fee schedule for 2004; and
WHEREAS, the Spokane Valley City Council adopted Resolution No. 04-001 on January 20,
2004 to adopt a fee schedule for 2004.
ALCOHOLIC BEVERAGE PERMIT REGISTRATION FEE ESTABLISHMENT:
WHEREAS, Ordinance No. 03-065, Section 9(C) states that the City shall adopt by resolution
the fee for an Alcoholic Beverage Permit; and
WHEREAS, the City Council directed staff to determine an appropriate cost for such a permit;
and
WHEREAS, staff has determined that the appropriate fee for the permit is$10.00 per event; and
WHEREAS, it is necessary to modify the current Master Fee Schedule for 2004 specific to the
establishment of an Alcoholic Beverage Permit Registration Fee.
NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane
County, Washington, as follows:
Section 1. Establishment of an Alcoholic Beverage Permit Registration Fee in Schedule E
(Parks & Recreation) of Exhibit A of the Master Fee Schedule. For the purpose of establishing an
Alcoholic Beverage Permit Registration Fee in Schedule E (Parks & Recreation) of Exhibit A of the
Master Fee Schedule, the City Council hereby adopts the amended Master Fee Schedule for 2004, which
is attached hereto as Exhibit"A" as if fully set forth herein.
Section 2. Repeal. To the extent that previous fee schedules are inconsistent with those set
forth herein, they are repealed.
Section 3. Effective Date. This Resolution shall be in full force and effect April 13, 2004.
Resolution 04-01 I: Amended 2004 Master Fee Schedule 1
Adopted this 13t day of April, 2004.
CITY OF SPOKANE VALLEY
I I
./
Michael DeVle ' g, Mayor
ATTES .
Chri tine Bainbridge, City Clerk
Approved as to Form: -4../---il
aryriskell, De City Attorney
Resolution 04-011: Amended 2004 Master Fee Schedule 2
r
Resolution No. 04-011: Exhibit A
AMENDED MASTER FEE SCHEDULE
Fee Schedule Page No.
Schedule A: Planning 2
Schedule B: Public Works 4
Schedule C: Building 5
Schedule D: Fire Code 12
Schedule E: Parks & Recreation 15
Schedule F: Administrative 17
Schedule G: Other Fees 18
Exhibit A of Resolution 04-01 I:Amended Master Pee Schedule for 2004 Page I of 18
MASTER FEE SCHEDULE
Schedule A - PLANNING
AMENDMENTS
Comprehensive Plan amendment $1,500.00
Zoning or other code text amendment $1,500.00
APPEALS
Appeal of Administrative Decision $1,000.00
Appeal of Hearing Examiner findings $300.00
ENVIRONMENTAL REVIEW
SEPA checklist
Single dwelling(when required) S 100.00
All other developments $300.00
Environmental Impact Statement Review $2,000.00
Shoreline
Substantial Development Permit $800.00
Critical Areas $300.00
PERMITS
Home Occupation Permit $80.00
Conditional Use Permit $800.00
Temporary Use Permit $150.00
PLATS
Subdivisions
Preliminary plat $2,000.00 Plus $25.00 per lot
Final plat $1,000.00 Plus$10.00 per lot
Short Plats
Preliminary 2-4 lots $500.00
Final Plat 2-4 Lots $800.00 Plus $10.00 per lot
Preliminary plat 5-9 Lots $1,000.00 Plus $25.00 per lot
Final Plat 5-9 Lots $800.00 Plus$10.00 per lot
Exhibit A of Resolution 04-011:Amended Mastcr Fcc Schedule for 2004 Page 2 of 18
Plat Modification
Subdivision plat $650.00
Short plat $265.00
Binding Site Plan $1,500.00
Binding site plan modification $1,300.00
Change of Conditions $650.00
Aggregation/Segregation
Lot line adjustment $100.00
Lot line elimination $100.00
Zero lot line $100.00 Plus$10.00 per lot
SIGNS
Review of permanent sign $50.00
Review of temporary sign $50.00
SITE PLAN REVIEW $250.00
STREET VACATION .APPLICATION $1,300.00
VARIANCES
Administrative $300.00
Public Hearings $1,500.00
ZONING
Zoning map amendments(rezone) $1,500.00
PUD plan $1,500.00 Plus $25.00 per lot
PUD modification $500.00
Exhibit A of Resolution 04-011:Amended Master Fee Schedule for 2004 Page 3 of 18
Schedule B — PUBLIC WORKS
Estimated cost of public works review fees is due upon submittal of application. Any additional
actual costs are due at the time of occupancy permit or final land action, whichever applies.
ENGINEERING/PLAN REVIEW—For road design, drainage, erosion and sedimentation
control, right of way improvements, plat maps, etc.
Commercial $250.00 Plus hourly rate after 5
hours
Residential $150.00 Plus hourly rate after 3
hours
HOURLY RATE* $50.00
*Examples of activities charged on an hourly rate system include but are not limited to
commercial site plan reviews and rezone reviews.
INSPECTIONS
Stormwater system review $250.00
Stormwatcr system inspections $50.00 Plus hourly rate after
151 hour
Field monitoring or inspections of grading sites, Hourly rate
residential or non-residential
Commercial, multifamily, and multi lot sites $200.00 Plus hourly(four hour
minimum)
Industrial or mineral industrial sites $225.00 Plus hourly
PERMITS
Right-of-way obstruction permit $16.00 Plus review&
inspection fee at
hourly rate*
Approach permit $25.00 Plus review&
inspection fee at
hourly rate*
Floodplain permit $50.00 Plus hourly rate after
1'hour
Conditional Use permit $200.00 Plus inspection fee
Shoreline permit $50 Plus hourly rate after
15' hour
Variances Hourly rate
Cash, certified check or bond for right of way cleaning $1,000.00
*$25.00 minimum at time of application
TRAFFIC IMPACT ANALYSIS REVIEW $50.00 Plus hourly rate after
10 hour
Exhibit A of Resolution 04-011:Amended Master Fee Scheclule for 2004 Page 4 of 18
Schedule C — BUILDING
The building code permit fees are collected at the time of the issuance of the building permit.
Other fees are also to be collected at the time of the issuing of the building permit. Each
department for whom the fee is collected is to advise the permit specialist of fees due.
GRADING
Permit Fees
Cubic Yards FEE
100 or less $20.00
101 to 1,000 $20.00 for the first 100 Cu. Yd., plus $7.00 for
each additional 100 Cu. Yd.
1,001 to 10,000 $83.00 for the first 1,001 Cu. Yd., plus $6.00
for each additional 1,000 Cu. Yd.
10,001 to 100,000 $147.00 for the first 10,000 Cu. Yd. plus
$15.00 for each additional 10,000 Cu. Yd.
100,001 to 200,000 $368.00 for the first 100,000 Cu. Yd. plus
$1 5.00 for each additional 100,000 Cu. Yd.
200,000 or more $503.00 for the first 200,000 Cu. Yd. plus
$15.00 for each additional 200,000 Cu. Yd.
Plans Checking Fees
Cubic Yards FEE
50 or less No fee
51 to 100 $12.00
101 to 1,000 $20.00
1,001 to 10,000 $25.00
10,001 to 100,000 $25.00 for the first 10,000 Cu. Yd. plus$7.00
for each additional 10,000 Cu. Yd.
100,001 to 200,000 $98.00 for the first 100,000 Cu. Yd. plus$6.00
for each additional 100,000 Cu. Yd.
200,001 or more $158.00
Land Clearing only (without earth being moved) $65.00
STRUCTURAL CODE
Building permit fees for each project are set by the following fee schedule. The table below is to
be used to determine the building permit fees and plans check fees based on the value of the
construction work as stated by the applicant or the value calculated by the Building Official using
the latest valuation data published in the Building Safety Journal by the International Code
Council, whichever value is greatest.
Exhibit A of Resolution 04-011:Amended Master Fee Schedule for 2004 Page 5 of 18
Valuation Table
Total Valuation Fee
$1 to $25,000 $69.25 for the first $2,000 plus $14 for each additional
$1,000, or fraction thereof, up to and including $25,000
$25,001 to $50,000 $391.25 for the first $25,000 plus $10.10 for each
additional $1,000; or fraction thereof, up to and
including$50,000
$50,001 to$100,000 $643.75 for the first $50,000 plus $7 for each
additional $1,000, or fraction thereof, up to and
including$100,000
$100,001 to $500,000 $993.75 for the first$100,000 plus $5.60 for each
additional $1,000, or fraction thereof, up to and
including $500,000
$500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each
additional $1,000, or fraction thereof, up to and
including $1,000,000
$1,000,000 and up $5,608.75 for the first$1,000,000 plus $3.15 for each
additional $1,000, or fraction thereof
Valuation Exceptions Fee Per
Square Foot
Private garages (wood frame) $19.00
Private garages (masonry) $22.00
Pole buildings $19.00
Open carport, decks, porches $15.00
Plans Review Fees
Fees are to be collected at the time of receiving the application for permit if the plans review fee
is over$50.00. If less than $50.00, it may be collected at the time of permit issuance.
Plans review fee (general) 65% Of bldg permit fee
Plans review fee—Group R-3 occupancies(single family 40% Of bldg permit fee
less than 7,999 sq. ft.)
Plans review fee—Group R-3 occupancies(single family 65% Of bldg permit fee
8,000 sq. ft. or greater)
Plans review fee—U-1 or U-2 occupancies(sheds, barns, 25% Of bldg permit fee
etc.)
Plans review fee—temporary tent or structure 25% Of bldg permit fee
Plans review fees are not refundable once the plan review has been started. This fee is in
addition to the full basic fee. The WSBCC fee is to be collected at this time.
If a set of plans already checked and approved is resubmitted by the owner or his/her agent, an
hourly rate of$47.00 will be applied for the re-review.
Exhibit A of Resolution 04-011:Amended Master Fcc Schedule for 2004 Page 6 of 18
PLUMBING CODE
The plumbing code fees will be collected when the associated permit is issued. If the plumbing is
included in the Building Permit the unit costs are added, but not the basic plumbing permit fee.
A. Basic fees
1) Basic fee for issuing each permit $35.00
2) Basic for each supplemental permit $7.50
13. Unit fees(in addition to the basic fee)
1) For each_plumbing fixture on a trap (including $6.00
garbage disposals, dish washers, back flow device,
drainage, hot tubs, built in water softener, water
closets, lavatories, sinks, drains, etc)
2) Private sewage disposal system $20.00
3) Water heater $6.00 Each
4) Industrial waste pretreatment interceptor including $15.00
its trap and vent, except kitchen type grease
interceptors functioning as fixture traps.
5) Repair or alteration of water piping, drainage or $6.00 Each fixture
vent piping
6) Lawn sprinkler system on any one meter $25.00
7) Atmospheric type vacuum breaker $6.00 Each
8) Backflow protective device other than atmospheric $6.00 Each
type vacuum breakers
9) Medical gas $6.00 Per outlet
10) Interceptors $6.00 Each
MECHANICAL CODE
The mechanical code fees will be collected when the associated permit is issued. If it is included
in the Building Permit, the unit costs are added, but not the basic mechanical permit fee.
A. Basic fees
1) Basic fee for issuing each permit $35.00
2) Basic for each supplemental permit $7.50
13. Unit fees(in addition to the basic fee)
1) Furnaces &suspended heaters- Installation or
relocation
a. up to and including 100,000 btu $12.00
b. over 100,000 btu $15.00
2) Duct work system $10.00
Exhibit A of Resolution 04-011: Amended Master Fee Schedule for 2004 Page 7 of 18
. r
3) Heat pump & air conditioner
a. 0 to 3 tons $12.00
b. over 3 to 15 tons $20.00
c. over 15 to 30 tons $25.00
d. over 30 to 50 tons $35.00
e. over 50 tons $60.00
4) Gas water heater $10.00
5) Gas piping system $1.00 Per outlet.
6) Gas log, fireplace, and gas insert installation $10.00
7) Appliance vents installation; relocation; replacement $10.00 Each
8) Repairs or additions $15.00
9) Boilers, compressors, and absorption systems
a. 0 to 3 hp- 100,000 btu or less $12.00
b. Over 3 to 15 hp- 100,001 to 500,000 btu $20.00
c. Over 15- 30 hp-500,001 to 1,000,000 btu $25.00
d. over 30 hp- 1,000,001 to 1,750,000 btu $35.00
e. over 50 hp-over 1,750,000 btu $60.00
10) Air Handlers
a. Each unit up to 10,000 cfm, including ducts $12.00
b. Each unit over 10,000 cfin $15.00
1 I) Evaporative Coolers (other than portable) $10.00
12) Ventilation and exhaust
a. Each fan connected to a single duct $10.00
b. Each ventilation system $12.00
c. Each hood served by mechanical exhaust $12.00
13) Incinerators
a. Installation or relocation of residential $19.00
b. Installation or relocation of commercial $22.00
14) Appliances, each $10.00
15) Unlisted appliances
a. under 400,000 btu $50.00
b. 400,000 btu or over $100.00
16) Hood
a. Type I $50.00
b. Type II $10.00
17) 1_,P Storage tank $10.00
18) Wood or Pellet stove insert $10.00
19) Wood stove system-free standing $25.00
Exhibit A of Resolution 04-011:Amended Master Fee Schedule for 2004 Page 8 of 18
ENERGY CODE
Energy Code Plans check fee is also established to check to meet the requirements of RCW 51-
11 VAC. These are in addition to the Building Code Fees. if City inspectors are assigned to
verify Energy Plans, the following fees apply. if an outside energy inspector is required,
that fee will be determined by the outside agency.
Residential Remodel/Addition $-0-
New Single Family $-0-
Tenant Improvement
A. 0 to 10,000 square feet $35.00
B. 10,001 square feet and over $45.00
C. Multi-Family $60.00 Per building
D. New Commercial and industrial $90.00
OTHER BUILDING CODE FEES
Annual Permit
Annual Spokane Valley Building Permits used to:
1) maintain equipment or buildings,
2) construct or remodel small areas of assembly occupancies, or
3) install tents or membrane structures
may be available depending upon the determination of the valuation of work made by the
Spokane Valley Building Official. Certain record keeping and inspection responsibilities shall be
established in a site specific Spokane Valley Annual Permit Agreement.
Demolition Permit
Single Family Residence $44.00
Commercial buildings $125.00
Garage or accessory building associated with a residence $20.00
or commercial building
Septic tank or underground flammable tank associated with $10.00 Each
a residence or commercial building
Early Start Agreements (Foundations) 25% Of bldg permit fee
Exhibit A of Resolution 04-01 I:Amended Master ree Schedule for 2004 Page 9 01 18
•
Sign Fees
Fees collected for a sign permit and a plans check fee for signs erected in accordance with the
Sign Code. The below fee plus the WSBCC fee of$4.50.
Signs mounted on buildings $45.00
Sign and pole mounting $65.00
Temporary Certificate of Occupancy $50.00
Washington State Building Code Council (W.S.B.C.C.) Surcharge
A flat fee of$4.50 will be collected on each permit for approved plans or any other permit that is
issued in accordance with the Spokane Valley Building Code. EXCEPT: For multi-family
projects, the fee is$4.50 for the first living unit and $2.00 for each additional unit. The City
Finance Department will forward this fee to the WSBCC on a quarterly basis.
OTHER MISCELLANEOUS FEES
A. For City personnel
I) Hourly rate set for City Employees (unless $47.00
otherwise specified)
2) Hourly rate for permit specialist $42.00
3) Overtime charges 1.5 times regular
rate
13. Hourly rate for contracted services Set according to
contract rate
C. Hourly rate for special called inspections $47.00
D. Mobile home location permit and inspection
1) Temporary mobile home $60.00
2) Manufactured home inspection, per section $50.00 *
E. House Moving Fee
1) Class I, II, and III—Moving permit $60.00
2) Class I, II, and III—Inspection fee $60.00 **
3) Class IV (if already permitted by Spokane $ -0-
County or Spokane City)
*Plus basement/crawlspace valuation permit fee
**Plus$47.00 per hour after the 1s`hour, and S.50 per mile if the building to be moved into the
City is outside the City limits
I�xhibit A of Resolution 04-011:Amended Master Fee Schedule for 2004 Page 10 of 18
F. Minimuin Housing Inspection fee $55,00 Plus $47,00 per hour
after I ` hour
G. Work an any structure or building without a permit if
a Spokane Valley Permit is required:
1) Minimum investigative inspection fee $5 5.00
2) Total investigative fee to be equal to the permit fee determined for the value of the illegal
work accomplished
H. Special inspections (requested by owner or tenant)
I) Fire, wind, mud slide or flood damage $60.00
2) Day Care $60,00
3) Nursing Homes, hospitals, et al $60-00 Plus 47.00 per
hour after 1st hour
4) Special Occupancies $60,00
1. lxcess inspections for a given project created by the $47.00 Per inspection or re-
developer. owner or contractor inspection
J. Condominium conversion plans reviewlinspection fee Based on value of
project and bldg
code valuation
K. Temporary tents, canopies, and air supported structures for public use; inclusive or all tents
for a single event. It does not apply to tents less than 200 sq, ft., canopies less than 400 sq
ft, camping tents, or to tents used E'or private, non commercial events.
1) Plans check fee $13.00
2) Basic permit fee $60.00
L. Enclosing an existing deck or patio
1) Plans check fee 40% (Vibe basic fee for
plans examination
2) Basic permit fee Based on value of
project; minimum
$3,040
M- Swimming pools (Over 5,000 gallons) $50.00 Plus plumbing fees
N. Re-roof Permit: Fee based on the value of the project. No plan review Fee will be charged unless
plans are submitted for review.
O. Change of Use or Occupancy Classification permit $47.00
I'. Towers, elevated tanks, antennas Based on value of
project
BUILDING CODE FEE REFUND POLICY
No Permit Fee refund is allowed once the work has been started, if a refund is requested, the
request shall be addressed to the Building Official in writing, and shall be received at the
Spokane Valley'Permit Center within 180 days of the date of issuance of the permit, Any fee
refund request received after 180 days of the date of permit issuance shall be denied. Any refund
approved shall be limited to 80% of the total Permit Fee paid. Refunds shall be limited to
Building, Plumbing and Mechanical Permit fees paid to the City of Spokane Valley-
Exhibi[A of Resolution 04-011;Amended Master Fcc Schedule for 2004 Page 11 of 18
Schedule D - FIRE CODE
FIRE ALARM, SPRINKLER AND OTHER PROTECTION SYSTEMS
Plans check and review fees, inspections, and permit for installation of separate fire alarm system
or sprinkler system applications, and other fire protection systems.
Fire Alarm System
A. Commercial—permit, plans check and inspection Based on value of
system
B. Residential
1) All zones $40.00
2) Permit fee $35.00
Sprinkler Systems
A. Tenant improvements
1) Less than 10 heads $65.00
2) 11 or more heads $85.00
B. New systems
l) Commercial—permit, plans check and Based on value of
inspection system
2) Residential $60.00 Each riser, plus$1.10
per plug/head
Other Protection Systems
A. Fire extinguishing system (other than sprinklers) $50.00 Plus$1.50 per nozzle
B. Standpipe installation
1) Class 1 and Class Il $58.00
2) Class ITT $70.00
C. Fire pump installation $55.00
1-1 Emergency or standby commercial power generators $55.00
installation
E. Flammable and combustible liquids storage tanks
installation
I) a. Underground, 1st tank $55.00
b. Plus each additional tank on same site $35.50
2) a. Above ground tank $55.00
b. Plus each additional tank on same site $35.00
3) Annual permit fee for storage $30.00
F. Hazardous materials storage tanks installation Per tank
1) Less than 500 gallons $75.00
2) 500 - 1,199 gallons $104.00
3) 1,200 gallons or more $147.00
Exhibit A of Resolution 04-01 I:Amended Master Fee Schedule for 2004 Page 12 of 18
•
G. Liquefied petroleum tanks installation Per tank
I) Less than 500 gallons $84.00
2) 500 - 9,999 gallons $104-00
3) 10,040 gallons or more $147.00
H. Gaseous oxygen systems installation
1) Less than 6.000 cubic feet $78.00
2) 6,000 - 11 ,999 cubic feet $90-00
3) !2,000 cubic feet or more $1 18.00
1. Nitrous systems installation $95.00 Plus 512.00 each
outlet
J. Medical gas systems installation
1) Gaseous system $90-00 Plus $12.00 each
outlet
2) Liquefied system $95,00 Plus $12.00 each
outlet
K. Hazardous material recycling system installation
�) 110 gallons or less per day capacity $95.00
2) More than 1 1 0 gallons per day capacity $1 1.7,00
L. Vapor recovery system installation Per tank
L) Phase l - tank truck and tank $90.00
2) Phase II - vehicle fueled and tank $115.00
M- Cryogenic tank installation
1) First tank. $95.00
2) Each additional tank on same site $35.00
N, Removal, abandonment, or any combination thereof,
of flammable or combustible liquid storage tanks
I) First tank (commercial) $84.00
2) Each additional tank on the same site $47.50
(commercial)
3) Contractor's permit for removal or $75.00
abandonment of residential under-ground fuel
tanks
O. Fire Department fee for inspections and follow up. For initial inspection, plans check and follow
up inspections as canted For in the Fire Code and performed by the fire clepartmentjl.hc fire
department will be paid 65% of the fcc collected For the permit This payment will be paid
quarterly.
Exhibit A of Resolution 04-011: Amended Muster Fce Schedule for 2004 Page 13 of 18
FIRE FALSE ALARM FEES
The following fees are set for repeated malfunctioning false alarms in a given six month period.
First alarm No charge
Second alarm $30.00
Third alarm $70.00
Fourth alarm $120.00
Fifth and subsequent alarms Require a hired fire
watch
FIREWORKS
Public display fee* $100.00 Maximum per RCW
70.77
*Also requires a performance bond or cash deposit of$500.00for clean up purposes and a
liabilit��insurance policy of 51,000,000.00.
PLANS CHECK AND REVIEW BY THE BUREAU OF FIRE PREVENTION
A. New commercial plans check and inspection (for projects $40.00
not mentioned elsewhere)
B. Fire watch service $140.00 3 hour min. plus
hourly thereafter
C. Hourly rate $47.00
D. After hour inspections, plans review, consultations for 1.5 times regular rate
projects that do not require a permit, and other special
services
Exhibit A of Resolution 04-01 I:Amended Master Fee Schedule for 2004 Page 14 of I8
•
Schedule E — PARKS & RECREATION
ADMINISTRATIVE FEES
Basic fees to be considered when applying rates
Administrative Fee $30.00
Refuse Fee $50.00
AQUATICS
Pool admission (age 5 and under) free
Pool admission (age older than 5) $1.00
Pool punch pass (25 swims) $20.00
Weekend family discount 1 child under 13 free
with paying adult
Reservation (less than 50 people) $100.00 Per hour*
Food fee(if applicable) $25.00
Reservation (50— 100 people) $125.00 Per hour*
Food fee(if applicable) $50.00
Reservation(101 — 150 people) $150.00 Per hour*
Food fee(if applicable) $75.00
*Minimum 2 hours
EVENTS—includes Pavilion
Events include but are not limited to activities such as car shows, tournaments and activities
involving 200 or more people. The Director of Parks and Recreation will make the final
determination.
General Fee $150.00
Non-profit applications $80.00 Or free with
sponsorship*
*Applications for joint sponsorship with the City of Spokane Valley will be considered by the
Spokane Valley Parks Department.
FIELD RENTAL
Use Fee $25.00 First hour plus$15
each additional hour
INDOOR USE
Open gym admission $2.00
Playground program admission (10 entries) $20.00
Exhibit A of Resolution 04-011:Amended Master Fee Schedule for 2004 Page 15 of 18
MIRABEAU
Mirabcau Springs
Small shelter and waterfall $150.00 Maximum 4 hours
Refundable deposit(less than 200 people) $50.00
Mirabeau Meadows
Shelter(less than 200 people) $80.00
Shelter(200 or more people) $150.00
Refundable deposit(less than 200 people) $50.00
Refundable deposit(200 or more people) $250.00
ALCOHOLIC BEVERAGE PERMIT
Alcoholic Beverage Permit Fee $10.00
PICNIC SHELTERS
Picnic Shelter(less than 200 people) $30.00
Picnic Shelter(200 or more people) $150.00
Refundable deposit(less than 200 people) $50.00
Refundable deposit(200 or more people) $250.00
PROFESSIONAL PHOTOGRAPHY
Permit Fee $25.00 Annual
RECREATION
Recreation program fees are set to recover costs as specified in the Parks and Recreation revenue
policy.
VALLEY MISSION ARENA
Rental* $100.00 Per weekend
Refundable deposit $50.00
*Renter responsible for on-site preparation. Rental requires liability insurance.
Exhibit A of Resolution 04-011:Amended Master Fee Schedule for 2004 Page 16 of 18
•
Schedule F - ADMINISTRATIVE
COPY FEES
Copy of audio tapes, video tapes, photos, maps or other At cost
records needing reproduction
Copy of written records $0.15 Per page
Copy of annual budget $10.00
Copy of full documents At cost
OTHER ADMINISTRATIVE FEES
NSF Check $25.00
Exhibit A of Resolution 04-011:Amended Master Fee Schedule for 2004 Pagc 17 of 18
•
Schedule G - OTHER FEES
ADULT ENTERTAINMENT FEES
Establishment Licenses
Live Adult Entertainment $1,500.00
Adult Arcade $1,500.00
Other Adult Entertainment Licenses
Adult Arcade Device License $150.00
Manager License $150.00
Entertainer License $150.00
Late License Fee—Charged in addition to license fee.
Percent of
Past Due Calendar Days License Fee
7-30 25%
31 —60 50%
61 and over 75%
SECURITY FALSE ALARM FEES
Repeated malfunctioning security false alarms in a given six-month period.
First alarm No charge
Second alarm $30.00
Third alarm $70.00
Fourth and subsequent alarms $120.00
TOW OPERATOR ANNUAL REGISTRATION FEE $100.00
Exhibit A of Resolution 04-011:Amended Master Fee Schedule for 2004 Page 18 of 18