Resolution 05-011 Amending Fee Resolution •
� 1
CITY OF SPOKANE VALLEY
SPOKANE COUNTY, WASHINGTON
RESOLUTION NO. 05-011
A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY,
WASHINGTON, AM}NDLNG RESOLUTION 04-025, AND APPROVING AN
AMENDED MASTER FEE SCHEDULE •
WHEREAS, it is the general policy of the City to establish fees that are reflective of the cost of
services provided by the City; and
WHEREAS, on January 20, 2004, the Spokane Valley City Council adopted Resolution No 04-
001 adopting a fee schedule for 2004; and
WHEREAS, on April 13, 2004, the Spokane Valley City Council adopted Resolution 04-01 !
amending the fee schedule For 2004; and
WHEREAS, on August 24, 2004 the Spokane Valley City Council adopted Resolution 04-021
amending the fee schedule; and
WHEREAS, on November 2, 2004 the Spokane'Valley City Council adopted Resolution 04-025
amending the fe.e schedule.; and
WHEREAS, Council desires to modify Schedule E of the Master Fee Schedule to include
CenterPlace fees; and
WHEREAS, the remainder of the Master Fee Schedule shall remain unchanged_
NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley. Spokane
County, Washington, as follows:
Section 1. Establishment of CeuterF]ace fees in Schedule E of the Master Fee Schedule.
For the purpose of establishing CenterFlace fees in Schedule E of Exhibit A of the Master Fee Schedule.
the City Council hereby adopts the amended Master Fee Schedule, which is attached hereto as Exhibit
"A" as if fully set forth herein.
Section 2. Repeal_ To the extent that previous fee schedules are inconsistent with those set
forth herein, they are repealed. •
Section 3. Effective Date. This Resolution shall be in full Force and effect June 14, 2005.
•
Adopted this 14th clay of June, 2005.
CITY OF SPA.NE VALLEY
j ine Bainbridge, City Cler Diana Wilhite, Mayor
•
Resolution 05-01 l Amending Resolutina 4-025 Master Fee Schedule for 2005
•
Resolution No O -011.: Exhibit A
AMEND.E.D MASTER FEE SCHEDULE
Fee Schedule Page No.
Schedule A: 'Planning
Schedule 1;: Public Works 4
Schedule C: Building 5
Schedule D: Fire Code • • 12
Schedule E: Parks & Recreation 1
Schedule F: Administrative 17
Schedule G: Other :Fees 18
•
•
Exhibit A of Resolutiori 05-011 Aitteri as It£SOIuUOIt 04-025:Master F o Schedule for 2005 Page 1 of 13
MASTER FEE SCHEDULE
Schedule A - PLANNING
AMENDMENTS
Comprehensive Plan amendment $1,500.00
Zoning or other code text amendment $1,500.00
APPEALS
• Appeal of Administrative Decision $1,000.00
Appeal of Hearing Examiner findings $300.00
ENVIRONMENTAL REVIEW
SEPA checklist
Single dwelling(when required) $100.00
All other developments $300.00
Environmental Impact Statement Review $2,000.00
Shoreline
Substantial Development Permit $800.00
Critical Areas $300.00
PERMITS
Home Occupation Permit $80.00
Conditional Use Permit $800.00
Temporary Use Permit . $150.00
PLATS
Subdivisions
Preliminary plat $2,000.00 Plus $25.00 per lot
Final plat $1,000.00 Plus$10.00 per lot
•
Short Plats
Preliminary 2-4 lots $500.00
Final Plat 2-4 Lots $800.00 Plus $10.00 per lot
Preliminary plat 5-9 Lots $1,000.00 Plus $25.00 per lot
Final Plat 5-9 Lots . $800.00 Plus$10.00 per lot
Exhibit A of Resolution 04-025 Master lee Schedule for 2005 Page 2 of 21
•
Ptat Modification
Subdivision plat $650,00
Short plat $265.00
Binding Site Plan $1,500.00
'Binding site plan modification $1,300.00
Change of Conditions $650.00
•
Aggregation/Segregation
Lot Tine adjustment $100,00
Lot line elimination $1 00.00
Zero lot line $100.00 Plus $10.00 per lot
SIGNS
Review of permanent sign $50.00
Review of temporary sign • $50.00
SITE PLAIN REVIEW $250.00
i
STREET VACATION APPLICATION $1,300.00
VARIANCES
Adm i11istrative $3 00.00
Public i-iearings $1,500.00
ZONING
Zoning map amendments (rezone) $1,500.00
•
PhD plan $1,500.00 Plus $25.00 per 101.
PUD modification $500.00
•
1....74.11i bit A of Resolupiors 04-023 MaskrFce Schedule for 2005 Net 3 of21
Schedule B — PUBLIC WORKS
Estimated cost of public works review fees is due upon submittal of application. Any additional
actual costs are due at the time of occupancy permit or final land action, whichever applies.
ENCINFERJNG/PLAN REVIEW —For road design, drainage, erosion and sedimentation
control, right of way improvements, plat maps, etc.
Commercial $250.00 Plus hourly rate after 5
hours
Residential $150.00 Plus hourly rate after 3
hours
HOURLY RATE* $50.00
•
*Examples of aclivitres charged on an hourly rate systern include but are no limited to
•
commercial site.plan reviews and rezone reviews.. •
• INSPECTIONS
Stormwater system review $250.00
Stonnwater system inspections $50.00 Plus hourly rate after
I ' hour
Field monitoring'or inspections of grading sites, Hourly rate
residential or non-residential
Commercial, multifamily, and multi lot sites $200.00 Plus hourly (Four hour
minimum)
Industrial or mineral industrial sites $225,00 Plus hourly
PERMITS
Right-of-way obstruction permit $!6.00 Plus review&
inspection fee at
hourly rate*
Approach permit $25.00 Plus review& •
inspection fee at
hourly rate*
Flooclplrtin permit $50.00 Plus hourly rate after
•
I hour
Conditional Usc permit 5200.00 Plus inspection fee
Shoreline permit • $50 Plus hourly rate after
1 � hour
• Variances Hourly rate
Cash, certified check or bond for right of way cleaning $12000.00
*$25.00 minimum at time of application
STORM WATER UTILITY CHARGE ON DEVELOPED PARCELS
$1.7 For each single-family unit each year
$17 per 3,160 square feet of impervious surface/year for all other properties
TRAFFIC IMPACT ANALYSTS REVIEW $50-00 Plus hourly rate after
hour
•
•
Cxl]ibi[A of Resolution 04-025 MatSlcr Fix Schedule For 2005 Page 4 of 21
•
Schedule C — BUILDING
The building code permit fees are collected at the time of the issuance of the building permit.
Other fees are also to be collected at the time of the issuing of the building permit. Each
department for whom the fee is collected is to advise the permit specialist of fees due.
GRADING
Permit Fees
Cubic Yards FEE
100 or less $20.00
101-to 1,000 $20.00 for the first 100 Cu. Yd., plus $7.00 for
each additional 100 Cu. Yd.
1,001 to 10,000 $83.00 for the first 1,001 Cu. Yd., plus $6.00
for each additional 1,000 Cu. Yd.
10,001 to 100,000 S147.00 for the first 10,000 Cu. Yd. plus
S15.00 for each additional 10,000 Cu. Yd.
100,001 to 200,000 S368.00 for the first 100,000 Cu. Yd. plus
$15.00 for each additional 100.000 Cu. Yd.
200,000 or more S503.00 for the first 200,000 Cu. Yd. plus
$1 5.00 for each additional 200,000 Cu. Yd.
Plans Checking Fees
Cubic yards FEE
50 or less No fee
51 to 100 S12.00
101 to 1,000 $20.00
1,001 to 10,000 $25.00
10,001 to 100,000 $25.00 for the first 10,000 Cu. Yd. plus $7.00
for each additional 10,000 Cu. Yd.
100,001 to 200,000 S98.00 for the first 100,000 Cu. Yd. plus $6.00
for each additional 100,000 Cu. Yd.
200,001 or more $158.00
Land Clearing only (without earth being moved) $65.00
STRUCTURAL CODE
Building permit fees for each project are set by the following fee schedule. The table below is to
be used to determine the building permit fees and plans check. fees based on the value of the
construction work as stated by the applicant or the value calculated by the Building Official using
the latest valuation data published in the Building Safety Journal by the international Code
Council, whichever value is greatest.
Exhibit A of Resolution 04-025 Master Fee Schedule for 2005 Page 5 of 21
Valuation Table
Total Valuation Fee
$1 to $25,000 $69.25 for the first $2,000 plus $14 for each additional
$1,000, or fraction thereof, up to and including $25,000
$25,001 to $50,000 $391.25 for the first $25,000 plus $10.10 for each
additional $1,000, or fraction thereof, up to and
including$50,000
$50,001 to $100,000 $643.75 for the first$50,000 plus $7 for each
additional $1,000, or fraction thereof, up to and
including $100,000
$100,001 to $500,000 $993.75 for the first$100,000 plus $5.60 for each
additional $1,000, or fraction thereof, up to and
including $500,000
$500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each
additional $1,000, or fraction thereof, up to and
including$1,000,000
$1,000,000 and up $5,608.75 for the first $1,000,000 plus $3.15 for each
additional $1,000, or fraction thereof
Valuation Exceptions Fee Per
Square Foot
Private garages (wood frame) $19.00
Private garages (masonry) $22.00
Pole buildings $19.00
Open carport, decks, porches $15.00 •
Plans Review Fees
Fees are to be collected at the time of receiving the application for permit if the plans review fee
is over$50.00. If less than $50.00, it may be collected at the time of permit issuance.
Plans review fee(general) 65% Of bldg permit fee
Plans review fee—Group R-3 occupancies(single family 40% Of bldg permit fee
less than 7,999 sq. ft.)
Plans review fee—Group R-3 occupancies(single family 65% Of bldg permit fee
8,000 sq. ft. or greater)
Plans review fee—U-1 or U-2 occupancies(sheds, barns, 25% Of bldg permit fee
etc.)
Plans review fee—temporary tent or structure 25% Of bldg permit fee
Plans review fees are not refundable once the plan review has been started. This fee is in
addition to the full basic fee. The 1\VSI3CC fee is to be collected at this time.
Initial Plan Review Fees shall be capped at $35,000 maximum with the following exception:
Exhibit A of Resolution 04-025 Master Fee Schedule for 2005 Pace 6 of 21
Exception 41:
if additional professional resources are required for individual project plan review for those
projects that reach the maximum Plan Review Fee, the Building Official shall be authorized to
require the permit applicant to provide those resources to the City of Spokane Valley.
If a set ref plans already checked and approved is resubmitted by the owner or his/her agent, an
hourly rate of$47.00 will be applied for the re-review. •
PLUMBING CODE
The plumbing code fees will be collected when the associated permit is issued. If the plumbing is
included in the Building Permit the unit costs are added, but riot the basic plumbing permit fee,
A. Basic Fees
1) Basic fee for issuing each permit $35.00
2) Basic for each supplemental permit $7-50
B. Unit fees (in addition to the basic fee)
1) For each plumbing Fixture on a trap (including $6.00
garbage.disposals, dish washers, back flow device, -
drainage; hot tubs, built in water softener, water
closets, lavatories, sinks, drains, etc )
• 2) Private sewage.disposal system $20.00
3) eater heater $6.00 Each
4) industrial waste pretreatment interceptor including $15.00
its trap and vertu, except kitchen type grease
interceptors functioning as fixture traps.
5) Repair or alteration or water piping, drainage or $61.00 Each fixture
vent piping
6) Lawn sprinkler system on any' one meter $25.00
7) Atmospheric type vacuum breaker $6.00 Each
8) Backflow protective device other than atmospheric $6.00 Each
type vacuum breakers
9) Medical gas $6.00 Per outlet
10) Interceptors $6.00 Each
MECHANICAL CODE
The mechanical code fees will be collected when the associated permit is issued. if it is included
in the Building.Permit, the unit costs are added, but not the basic mechanical permit fee. -
A. Basic fees
1) Basic fee for issuing each permit $35.00 •
2) Basic for each supplemental permit $7.50
T . Unit fees(in addition to the basic fce)
E\liibit A of Re olutian 04-025 Muster Fee Sehedule for 2005 poae 7 of)l
1) Furnaces &suspended heaters- Installation or
relocation
a. up to and including 100,000 btu $12.00
b. over 100,000 btu $15.00
2) Duct work system $10.00
3) Heat pump&air conditioner
a. 0 to 3 tons $12.00
b. over 3 to 15 tons $20.00
c. over 15 to 30 tons $25.00
d. over 30 to 50 tons $35.00
e. over 50 tons $60.00
4) Gas water heater $10.00
5) Gas piping system $1.00 Per outlet
6) Gas log, fireplace, and gas insert installation $10.00
7) Appliance vents installation; relocation; replacement $10.00 Each
8) Repairs or additions $15.00
9) Boilers, compressors, and absorption systems
a. 0 to 3 hp- 100,000 btu or less $12.00
b. Over 3 to 15 hp- 100,001 to 500,000 btu $20.00
c. Over 15 -30 hp- 500,001 to 1,000,000 btu $25.00
d. over 30 hp- 1,000,001 to 1,750,000 btu $35.00
e. over 50 hp-over 1,750,000 btu $60.00
10) Air Handlers
a. Each unit up to 10,000 elm, including ducts $12.00
b. Each unit over 10,000 cfm $15.00
1 I) Evaporative Coolers (other than portable) $10.00
• 12) Ventilation and exhaust
a. Each fan connected to a single duct $10.00
b. Each ventilation system $12.00
c. Each hood served by mechanical exhaust $12.00
• 13) Incinerators
a. Installation or relocation of residential $19.00
b. Installation or relocation of commercial $22.00.
14) Appliances, each $10.00
15) Unlisted appliances
a. under 400,000 btu $50.00
b. 400,000 btu or over $100.00
16) Hood
a. Type I $50.00
b. Type II $10.00
17) l:, P Storage tank $10.00
18) Wood or Pellet stove insert $10.00
19) Wood stove system-free standing $25.00
•
l">xhibit A of Resolution 04-025 Master Fee Schedule for 2005 Page 8 of 21
•
•
ENERGY CODE
Energy Code Plans check fee is also established to check to meet the requirements of RCW 51-
11 WAC. These are in addition to the Building Code Fees. If City inspectors are assigned to
verify Energy Plans, the following fees apply. If an outside energy inspector is required,
that fee will be determined by the outside agency.
Residential Remodel/Addition $ -0-
New Single Family 5 -0-
Tenant Improvement
A. 0 to 10,000 square feet $35.00
B. ;10,001 square feet and over $45.00
C. Multi-Family $60.00 Per building
D. New Commercial and industrial $90.00
OTHER BUILDING CODE FEES
Annual Permit
Annual Spokane Valley Building Permits used to:
1) maintain equipment or buildings,
2) construct or remodel small areas of assembly occupancies, or
3) install tents or membrane structures
may be available depending upon the determination of the valuation of work made by the
Spokane Valley Building Official. Certain record keeping and inspection responsibilities shall be
established in a site specific Spokane Valley Annual Permit Agreement.
Demolition Permit
Single Family Residence $44.00
Commercial buildings $125.00
Garage or accessory building associated with a.residencc $20.00
or commercial building
Septic tank or underground flammable tank associated with $1 0.00 Each
a residence or commercial building
Early Start Agreements (Foundations) 25% Of bldg permit fee
l:;xhibit A of Resolution 04-025 Master Fee Schedule for 2005 Page 9 of21
Sign Fees
Fees collected for a sign permit and a plans check fee for signs erected in accordance with the
Sign Code. The below fee plus the WSBCC fee of$4.50.
Signs mounted on buildings S45.00
Sign and pole mounting $65.00
Temporary Certificate of Occupancy $50.00
Washington State Building Code Council (W.S.B.C.C.) Surcharge
A flat fee of$4.50 will be collected on each permit for approved plans or any other permit that is
issued in accordance with the Spokane Valley Building Code. EXCEPT: For multi-family
projects, the fee is $4.50 for the first living unit and $2.00 for each additional unit. The City
Finance Department will forward this fee to the WSBCC on a quarterly basis.
OTHER MISCELLANEOUS FEES
A. For City personnel
1) Hourly rate set for City Employees (unless $47.00
otherwise specified)
2) Hourly rate for permit specialist $42.00
3) Overtime charges 1.5 times regular
rate
B. Hourly rate for contracted services Set according to
contract rate
C. Hourly rate for special called inspections $47.00
D. Mobile home location permit and inspection
1) Temporary mobile home $60.00
2) Manufactured home inspection, per section $50.00 *
E. House Moving Fee
1) Class I, 1I, and III—Moving permit $60.00
2) Class I, II, and III—Inspection fee $60.00 **
3) Class 1V (if already permitted by Spokane $ -0-
County or Spokane City)
*Plus basement/crawlspace valuation permit fee
**Plus S47.00 per hour after the 15'hour, and S.50 per mile if the building to he moved into the
City is outside the City limits
behibit A of Resolution 04-025 Master Fee Schedule for 2005 Page 10 of 21
F. Minimum Housing Inspection fee $55.00 Plus$47.00 per hour
after lS' hour
G. Work on any structure or building without a permit if
a Spokane Valley Permit is required:
1) Minimum investigative inspection fee $55.00
2) Total investigative fee to be equal to the permit fee determined for the value of the illegal
work accomplished
H. Special inspections (requested by owner or tenant)
1) Fire, wind, mud slide or flood damage $60.00
2) Day Care $60.00
3) Nursing Homes, hospitals, et al $60.00 Plus$ 47.00 per
hour after I st hour
4) Special Occupancies $60.00
1. Excess inspections for a given project created by the $47.00 Per inspection or re-
developer, owner or contractor inspection
Condominium conversion plans reviewlinspection fee Based on value of
project and bldg
code valuation
K. Temporary tents, canopies, and air supported structures for public use; inclusive of all tents
for a single event. It does not apply to tents less than 200 sq. ft., canopies less than 400 sq
ft, camping tents, or to tents used for private, non commercial events.
I) Plans check fee $13.00
2) Basic permit fee $60.00
L. Enclosing an existing deck or patio
I) Plans check fee 40% Of the basic fee for
plans examination
2) Basic permit fee Based on value.of
project; minimum
$3,000
M. Swimming pools (Over 5,000 gallons) $50.00 Plus plumbing fees
N. Re-roof Permit: Fee based on the value of the project. No plan review fee will be charged unless
plans are submitted for review.
O. Change of Use or Occupancy Classification permit $47.00
P. Towers, elevated tanks, antennas Based on value of
project
BUILDING CODE FE E REFUND POLICY
No Permit Fee refund is allowed once the work has been started. If a refund is requested, the
request shall be addressed to the Building Official in writing, and shall be received at the
Spokane Valley Permit Center within 180 days of the date of issuance of the permit. Any fee
refund request received after 180 days of the date of permit issuance shall be denied. Any refund
approved shall be limited to 80% of the total Permit Fee paid. Refunds shall be limited to
Building, Plumbing and Mechanical Permit fees paid to the City of Spokane Valley.
Exhibit A of Resolution 04-025 Master Fee Schedule for 2005 Page 1 I of 21
Schedule D FIRE CODE
FIRE ALARM, SPRINKLER AND OTHER PROTECTION SYSTEMS
Plans check and review fees, inspections, and permit for installation of separate fire alarm system
or sprinkler system applications, and other fire protection systems.
Fire Alarm System
A. Commercial —permit, plans check and inspection Based on value of
system
B. Residential
1) All zones $40.00
2) Permit fee $35.00
Sprinkler Systems
A. Tenant improvements
1) Less than 10 heads $65.00
2) 11 or more heads $85.00
B. New systems
1) Commercial —permit, plans check and Based on value of
inspection system
2) Residential $60-00 Each riser, plus $I.]0
perpluglhead
Other Protection Systems
A. Fire extinguishing system (other than sprinklers) $50-00 Plus $1.50 per nozzle
B. Standpipe installation
1) Class I and Class II $58.00
2.) Class ii1 $70.00
C. Eire pump installation $5 -00
D. Emergency or standby commercial power generators $55.00
installation
E. Flammable and combustible liquids storage tai1ks
installation •
I) a. Underground, 1st tank $55.00
b. Plus each additional tank on same site $35-50
2) a. Above ground tank 555.00 •
b. Plus each additional tank on same site 35-00
3) Annual permit fee for storage • $30.00
F- Hazardous materials storage tanks installation Per tank
I) Less than 500 gallons $75.00
2) 500 - l ,199 gallons $104.00
3) 1,200 gallons or more $147.00
Exhibit A of Resolution 01-025 Master Fee Schedule for 200 Ptrgc 12 of 21
G. Liquefied petroleum tanks installation Per tank •
1) Less than 500 gallons $84.00
2) 500 - 9,999 gallons - $104.00
3) 10,000 gallons or more $1 47.00
H. Gaseous oxygen systems installation
1) Less than 6,000 cubic feet $78.00
2) 6,000 - 11,999 cubic feet $90.00
3) 12,000 cubic feet or more Si 1 8.00
1. Nitrous systems installation $95.00 Plus $12.00 each
outlet
J. Medical gas systems installation
1) Gaseous system $90.00 Plus $12.00 each
outlet
2) Liquefied system $95.00 Plus $12.00 each
outlet
K. Hazardous material recycling system installation
1) 110 gallons or less per day capacity $95.00
2) More than 110 gallons per day capacity $117.00
L. Vapor recovery system installation Per tank
1) Phase I - tank truck and tank $90.00
2) Phase Ii - vehicle fueled and tank $115.00
M. Cryogenic tank installation
I) First tank $95.00
2) Each additional tank on same site $35.00
N. Removal, abandonment, or any combination thereof,
of flammable or combustible liquid storage tanks
1) First tank (commercial) $84.00
2) Each additional tank on the same site $47.50
(commercial)
3) Contractor's permit for removal or $75.00
abandonment of residential under-ground fuel
tanks
0. Fire Department fee for inspections and follow up. For initial inspection, plans check and follow
up inspections as called for in the Fire Code and performed by the fire department,the fire
department will be paid 65%of the fee collected for the permit. This payment will be paid
quarterly.
Exhibit A of Resolution 04-025 Master Fee Schedule for 2005 Page 13 of 21
•
•
•
FIRE FALSE ALARM..F.EES
The following fees are set for repeated malfunctioning false alarms in a given six month period,
First alarm No charge
Second alarm $30.00
Third alarm $70.00
Fourth alarm $120-00
Fifth and subsequent alarms Regttire a hired fire
watch
FIREWORKS
Public display fee* $100,00 Maximum per RCW
70.77
*A/.so requires a per,fbitna ce bond or cash deposit (0500.00 500.00 f r clean up pw+r poses and a
:crb� it insurance policy of SI,000,000,00.
PLANS CHECK AND REVIEW BY THE BUREAU OF FIRE PREVENTION
A. New commercial plans check and inspection (for projects $40.00
not mentioned •1sewhere)
B. Hire watch service $140,00 3 ho Lit min. plus
hourly thereafter
C. Hourly rate $47.00
D. After hour inspections, plans review, consultations for 1.5 times regular rate
projects that do not require a permit, and other special
services
•
•
•
I '
Exhibit A of Resolution 01-025 Master Fen Schedule for 2005 Page 14 a21
Schedule E — PARKS & RECREATION
ADMINISTRATIVE FEES
Basic fees to be considered when applying rates
Administrative Fee $30.00
Refuse Fee $50.00
AQUATICS
Pool admission (age 5 and under) free
Pool admission (age older than 5) $1.00
Pool punch pass(25 swims) $20.00
Weekend family discount 1 child under 13 free
with paying adult,
Reservation (less than 50 people) $100.00 Per hours
Food fee(if applicable) $25.00
Reservation (50— 100 people) $125.00 Per hour*
Food fee(if applicable) $50.00
Reservation(101 — 150 people) $150.00 Per hour*
Food fee(if applicable) $75.00
•
*Minimum 2 hours
•
ALCOHOLIC BEVERAGE PERMIT
Alcoholic Beverage Permit Fee $10.00
CENTERPLACI_
Conference Center Wing
Auditorium $75.00 Per hour
Auditorium $450.00 Per day
Auditorium $225.00 Per half day
Auditorium\v/Presentation System $50.00 Per hour
Auditorium w/Presentation System $300.00 Per day
Auditorium w/Presentation System $150.00 Per half day
Auditorium Deposit - $50.00
Executive Conference Room $50.00 Per hour
Executive Conference Room Deposit $50.00
Meeting Room (Day& Evening Use) $40.00 Per hour
Meeting Room $250.00 Per clay
Meeting Room • $125.00 Per half clay
Meeting Room Deposit $50.00
•
Exhibit A of Resolution 04-025 Master Fee Schedule for 2005 Page 15 of 21
Great Room
Kitchen w/Dining Room Rental $100.00 Per use
Kitchen—Commercial Use (2 hour min.) $50.00 Per hour
Kitchen Deposit $50.00
Multi-Use/Banquet Hall $100.00 Per hour
Multi-Use/Banquet Hall $800.00 9 hr session
Multi-Use/Banquet Hall $1,500.00 All day(ham-lam)
Small Dining Area $50.00 Per hour
Deposit $200.00
Stage S20.00 Per section per clay
Table Settings(linens &tableware) $2.00 Per place.setting
Senior Center Wing
Lounge with Dance Floor $100.00 Per hour
Lounge with Dance Floor $800.00 Per day
Lounge Deposit $200.00
Meeting Room (Evening Use) $40.00 Per hour
Meeting Room (Evening Use) $125.00 4 hr session
Meeting Room (Weekend Use) $250.00 Per day
Meeting Room (Weekend Use) $125.00 Per half day
Meeting Room Deposit $50.00
Private Dining Room $50.00 Per hour
Private Dining Room Deposit $50.00
Wellness Center $100.00 Per hour
Miscellaneous
Cleanup fee $50-300 Per event
Host/Hostess (after hours) $15.00 Per hour
Presentation System (includes projector/podium/ $250.00 Per day
DVD/VCR/sound system/camera system)
Room Setup $25.00 Per hour
Satellite Video Conferencing $250.00 Per hour
Sound System $40.00 Per day
Technical Support $40.00 Per hour
Television/VCR $75.00 Per day
Touch Pad Voting System $115.00 Base station per day
+$15.00 Per keypad per day
EVENTS— includes Pavilion
Events include but are not limited to activities such as car shows, tournaments and activities
involving 200 or more people. The Director of Parks and Recreation will make the final
determination.
Exhibit A of Resolution 04-025 Master Fee Schedule for 2005 Page 16 of 21
' � E
•
•
General Fee $150.00
Non-profit applications $80.00 Or free with
sponsorship*
*Applications jor joint. sponsorship with The CRT. of Spokane Valley will be considered by the
Spokane Pialley Parks Department.
FIELD RENTAL
Use Fee $25.00 First hour plus $15
each additional hour
•
INDOOR USE
Open gym admission $2.00
Playground program admission (10 entries) $20.00
MI BE U •
irabeau Springs
Small shelter and waterfall $150.00 'Maximum 4 hours
Refundable deposit (less than 200 people) $50-00
M.irnbcau Meadows
Shelter(less than 200 people) $80.00
Shelter(200 or more people) $150.00
Refundable deposit(less than 200 people) $50,00
Refundable deposit(200 or more people) $250.00
PICNIC SHELTERS
Picnic Sheltor(less than 200 people) $30.00
Picnic Shelter(200 or more people) $150.00
Refundable deposit (less than 200 people) $50.00
Refundable deposit (200 or more people) $250.00
•
PROFESSIONAL. PHOTO RA1 Jt
Permit Fee $25.00 Annual
•
RECIEATION
•
Recreation program fees are set to recover costs as specified in the Parks and Recreation revenue
policy.
VALLEY MISSION ARENA
•
•
Exhibit A of]tcsulu[ion 04-025 Maser f'fze Schedule for 2005 Page 17 of 21
•
'
Rental* • • SI00.00 Per weekend
Refundable deposit $50.00
*Renter responsible fr.3.r can-site preparation. Rental requires /rurance.
•
•
•
•
•
•
Exhibit r or k.esoluuoIN 04-025 M7siter Fee,Selleilitle for 2005 Pagc 18 o121
Schedule F - ADMINISTR.ATIVE
•
COPY FEES
Copy or audio tapes, video tapes, photos, maps or other At cost
records needing reproduction
Copy of written records • $0.15 Per page
Copy of annual budget $10.00
Copy of fu!! dociGments At cost
• OTHER ADMINISTRATIVE FEES
NSF Check $25.00
•
•
•
Exhibit A of Resolution 04-025 Miter Fee Schedule For 2005 Page 19 of 21
Schedule G - OTHER FEES
ADULT ENTERTAINMENT FEES
Establishment Licenses
Live Adult Entertainment $1,500.00
Adult Arcade $1,500.00
Other Adult Entertainment Licenses
Adult Arcade Device License $150.00
Manager License • $150.00
Entertainer License $150.00
Late License Fee—Charged in addition to license fee.
Percent of
Past Due Calendar Days License Fee
7—30 25%
31 —60 50%
61 and over 75%
BUSINESS REGISTRATION FEES
Business registration $13 each year
Nonprofit registration ' $ 3 each year
SECURITY FALSE ALARM FEES
Repeated malfunctioning security false alarms in a given six-month period.
First alarm No charge
Second alarm $30.00
Third alarm $70.00
Fourth and subsequent alarms $120.00
TOW OPERATOR ANNUAL REGISTRATION FEE $100.00
I xhihit A of Resolution 04-025 Master Fee Schedule for 2005 Page 20 of 21