Loading...
12-089.00 Shamrock Paving: Evergreen ReconstructionSC bane ,,;wOValley CHANGE ORDER TO CONSTRUCTION CONTRACT NO: 12-009 DEPARTMENT OF PUBLIC WORKS PROJECT: Evergreen Rd Reconstruction Project CONTRACT DATE: 5/18/2012 CONTRACTOR: Shamrock Paving, Inc CHANGE ORDER NO: B1 CAPITAL IMPROVEMENT PROJECT NO: 0160 BID NO.: 12 -009 DESCRIPTION OF CHANGES This Change Order pays for Schedule B Waterline material revisions to Connection DII 1/3 in the 24th Ave & Evergreen Rd Intersection. The Change Order cost Is based on the attached Revised 1/03 Connection DU plan and Invoice costs. The total costs of this change order ( Including tax) will be paid by Vera Water and Power Company. Item No Description Unit Quantl Unit Price Total CO B1 -1 20" Butterfly Valve FL FL EA 1 $2,786.96 $2,786.96 CO 131 -2 10" Gate Valve MJ x MJ EA 3 $1,331.96 $3,995.88 CO 61 -3 10" Foster Adapter EA 3 $202.60 $607.80 CO B1 -4 10" FL x MJ Adapter EA 3 $123.68 $371.04 CO 131 -5 10" Resilient Seat Gate Valve FLxMJ EA -3 $1,037.00 ($3,111.00) 8.7% Tax $404.61 Total Amount of this Change Order( Incl. Tax): $5,055.29 SUBSTANTIAL COMPLETION Original Date: 8/24/2012 Prior to this Change Order: 8/24/2012 Including this Change Order: 8/24/20121 Orialnal Working Days: 45 Workinq Days Added by this CO: 0 Working Days including this CO: 45 THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT PRICE: ORIGINAL TOTAL CONTRACT AMOUNT $ 1,503,303.67 ............_ ..............._..-..................._...........,............._......,.....,.................... ..- ........,.- ................. TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 0.00 .............. ...... ..... ...._.............................. .........,.....__...... ....,............. .....,....,.. TOTAL CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 1,503,303.67 ....................... .................. .. ........... NET THIS CHANGE ORDER $ 5,055.29 1. TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,508,358.96 CONTRACTOR ACCEPTANCE: The contractor hereby accepts this adjustment under the terms of the original contract for all work perfomed. RECOMMENDED BY: APPROVED BY: Vera Water and Power Co APPROVED BY: ATTACHMENTS: rAldhuBon: DATE: ,� DATE: l�- DATE: -7 S (oZ DATE: ORIGINALS T0: Contractor, City of Spokane Valley Clerk's Office, PW Project File COPIESTO: PW Project File P: Pub'.( c4yorks /PurchainglC0 (912 612 0 07) (�i2 -D8� :3 U Ito �� N 10" CPLG 10 "W (STL) 10 "W N1 X N2 of 'J, U? I N n (10 CPLG N4 II j f w10" TEE, MJxFL /THRUST BLOCK 10" RSGV, FLxMJ a ( 20 "x10" RED. FUR ai0 ti 20" CROSS, ALL FL $ \ „ ADAPTER, FLxMJ. 20"W DI 20 ADAPTER, FLxMJ 20 "x10" RED. FUR . V -V . L./ V /o .t x arT AdA ?TAX I 2100 2090 10" TEE, MJxFL w /THRUST BLOCK N4 10" CPLG '�:I °1 20"W DI 20" BFV, FLxFL La 10" CPLG N4 ow "W 10 »W x �"' !o R'cJi1L� I /o N�i4TE t/si��I �i �° fATr ,u�►y pt3'kaf5' FIRE HYDRANT ASSEMBLY. SEE. DETAIL 02560 -8. PAYMENT FOR. HYDRANT ASSEMBLY WILL BE MADE UNDER SEPARATE BID ITEM Evt�ltw $. P� /L a s- A��'��1►i /o: do AM 7fg /� ot,2 N.T.S. PHASE 1 , I PHASE.2 H.D. FOWLER ..� COMPANY PO Box 160, Bellevue, WA 98009 -0160 Invoice Number 13153102 SPWH 0 138482 Corporate Offices 13440 SE 30th St., Bellevue, WA 98005 PO Box 160, Bellevue, WA 98009 -0160 Phone 425 -746 -8400 * Fax 425 -641 -8885 Spokane Branch 8826 E. Sharp street Spokane. WA 99212 (609) 668 -8404 Fax (609) 668 -8405 To; Ship to: HD Fowler company - Spokane 1/2 1I1f1illiloin, filIlillul��hilirii�li�ili�r�l 'lll'�f IIII�'��I) 6 MURPHY BROS INC Spokane WA 99212 110 N Hayford Rd Spokane WA 99224 -9555 Order# Inv Date: Order Writer: 03912219 06/21/12 JOSHUA MYERS Terms: NET I OTH PROX Due: 07110/12 POIJOB: HOMESTEAD VALVES FOB: H. D. FOWLER Ship Via: WILL CALL EVERGREEN ROAD RECONSTRUCTt Qty Qty Partin Unit. Extended T Line ShIWd BO'd UoM Description Price Price X 1 5 0 EA 20" HOMESTEAD BUTTERFLYVALV=GED RIES ( 2526,$80 12,634.40 Y AWWA 0504, CLASS 1508, WITH . ENDS ON BODY, FUSIO NDED EPDXY ON BODY, DI DISC STAINLESS STEEL EDGE, SS SHAFT, BBUUNA N RUBBER SEAT, WITH BURIED SERVit;`E GEAR OPEREATOR AND 2" NUT 2 1 0 EA ,HOMESTEAD BUTTERFLY VALVE, SERIES 820, 1897.850 1,897,85 Y AWWA C604, CLASS 1506, FUSION BONDED EPDXY ON BODY, DI DISC WITH STAINLESS STEEL EDGE, SS SHAFT, BUNA N RUBBER SEAT, WITH BURIED SERVICE GEAR OCERATOR AND 2" NUT, DUCTILE: IRON FLANGED ENDS ON BODY 0Q7X4 Sub total 14,532.25 TIM Freight Tax Serving the Pacific Northwest since 9811 Grand Total 0.00 1,264.31 15,796.56 www.hdfowlercom JUL -04 -2012 22:29 _ HD FOWLER COMPANY P.001i001 IV, 191+N ORDER CONFIRM&TION Customert Order No MURPHY BROS IN(! Order Date RVERORSEN PD. & 32ND AVR, Due Date Ord Writer SPOICWE VALLEY WA 99216 Warehouse Sale$pexsan ;03942263 :07/03/12 :07/05/12 JOSHUA MYRRS Spokane Warehouse :Greger Larson Project: Carrier :OUR TRUCK EVERGREEN ROAD RECONSTRUC Customer Reference: EVRRl3REEN RdAD Line Order B/O Uom item/ Unit Extended T # qty qty Description Price Price x -------------------------- - - - - -< - - - - - - -- ---------- �------------ - -- -- . -- -- - - -- DI VALVES/FOSTER ADAPTERS 3 BA 1►tEi4067MM44DL 1331.960 3995.88 Y 1011 DUCTXLE IRON MJ X Ma GATE VALVE AVJWA 0515 RRSII.IENT SRATI LESS MJ' ACCE80AIE' S (287 LBS) 2 3 EA IFFA4 202.600 607.00 Y 10" STAR MJ X Ma ADAPTER, SERIES 100, (ADAPTER & ACCESS PACK) 3 3 13A 1PA44MFL 123.680 371.04 Y 10" MJ X FL ADAPTER DI, AWWA C153, C/L LESS ACC (75 I,BS 4 2 2 BA DNBFVKLT9G 120.000 240:00 Y 2011 BFV PLANGE PI.A,TED BOLT & ]RUT KIT, A307 16RA 1 -1/81' X 5" SOLT WITH NDT; 4HA 1 -1/8" X 4� P.C- 77v'"''r-C° 6 r 3--1/2" CAP SCREW cow ro, - 5eeke: 5 2 2 EA FGRR9 10.040 20.08 `X 20" 1/8" RING GASKET RIND RUBBER, 150# -� are: � so �.od �. i" x Ar,6 VA. 00 o1?-1cA10NAt- _TNVo«0. Sub Total Freight Talc Grand Total FAY 3 �;(S r IS98 5,234.80 455.43 5,690.23 TOTAL P.001